GovChime
Notice ID: 68af97e2284f457bab40129f2f09ba64Award NoticeAwarded

Z1DA--537-19-124 Upgrade Nurse Call Construction

Awarded on July 6, 2023. Full description on SAM.gov.

Awarded tounder 36C25223C0064 (source: SAM.gov award notice)• $6.5M

Overview

Posted
July 6, 2023
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Notice details

Place of performance
Department of Veterans Affairs Jesse Brown VA Medical Center 820 South Damen Avenue, Chicago, IL, 60612
Last updated
Sep 9, 2025
Award date
Jul 6, 2023
Award amount (SAM.gov award notice)
$6.5M

Identifiers

Solicitation number
36C25223B0014
Notice ID
68af97e2284f457bab40129f2f09ba64
Award number (PIID)
36C25223C0064

Description

ACCOMPANYING 36C25223B0014 0005 Amendment of Solicitation Amendment 0005 Solicitation 36C25223B0014 Upgrade Nurse Call Project# 537-19-124 Jesse Brown VA Medical Center, Chicago, IL. This amendment consists of: Amendment provides replacement Bid Schedule page for three bid alternates. All bids shall consist of the following. Base Bid for entire SOW. Deduct Alternate No 1: Remove buildings 11 and 32 from the scope of work. Deduct Alternate No 2: Remove buildings 1, 11, 30, and 32 from the scope of work. Deduct Alternate No 3: Remove annunciator panels from the Police Operation Room 1555. Project Bid Opening remains 5/17/2023 at 11:00 am Local Time. The following changes are made on project specifications: None The following changes are made on project drawings: None GENERAL INFORMATION: REMINDER: Project Bid Opening remains 5/17/2023 at 11:00 am local time. Location: 115 South 84th Street, Suite 101 Milwaukee, WI 53214 (ground floor-signs will be posted) There are no further changes.

Full description on SAM.gov

Award Overview

Award Number

36C25223C0064

Award Amount (SAM.gov award notice)

$6.5M

Award Date

Jul 6, 2023

Awardee

Awardee UEI

PTSCYLWKCFK3

Original Solicitation

Notice ID: 68af97e2284f457bab40129f2f09ba64

Posted Date: Jul 6, 2023

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25223B0014
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 2×
    Pre-SolicitationFeb 15, 2023

    Z1DA--537-19-124 Upgrade Nurse Call Construction Jesse Brown VA Medical Center Chicago, IL.

    Notice c165b1f81e0744f6a361ac15eceaa233 on SAM.gov

  2. 6×
    SolicitationMar 30, 2023

    Z1DA--537-19-124 Upgrade Nurse Call Construction Jesse Brown VA Medical Center Chicago, IL.

    Notice 8f6d1898ab0646b59522705e53a76fca on SAM.gov

  3. AwardedCurrentJul 6, 2023

    Z1DA--537-19-124 Upgrade Nurse Call Construction

    Notice 68af97e2284f457bab40129f2f09ba64 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Amendment A0004 This Amendment 0004 extends out due date. We are working on responses to a few additional RFIs and will publish the responses in Amendment A0005. VIRTUAL BID OPENING INFORMATION: 1) There will be no in-person public bid opening process. This will be conducted as a public virtual activity. 2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join: https://teams.microsoft.com/meet/2473414420095?p=HOJS7WNgrbgMwvO73f (Meeting will be available to be accessed 10 min prior to bid opening) Meeting ID: 247 341 442 009 5 Passcode: ks79ub9w Dial-in by phone: 1-872-701-0185; Phone conference ID: 947 858 19# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Lynn.VanderVelde@va.gov AND Ryan.McMillin@va.gov as follows: with Subject: 36C25226B0014 BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on December 1st. The virtual public bid opening will be held at 11:30 AM local time on December 1st at the link and/or the phone # provided above. ……..End of Amendment A0004……..
100%
Solicitation12/01/2026
Amendment to a Previous Combined Solicitation Page 1 of Amendment to a Previous Combined Solicitation Page 3 of 3 Amendment to a Previous Combined Solicitation *= Required Field Amendment to a Previous Combined Solicitation Page 1 of 3 Modification to correct the construction cost magnitude to between $1,000,000.00 and $2,000,000.00. The Department of Veterans Affairs (VA), Jesse Brown VA Medical Center, Chicago, IL 60612 has a need for construction services for Security Upgrades. Contractor shall provide all design plans, tools, materials, components, labor, quality assurance, and supervision in accordance with construction documents, drawings and specifications to complete the required construction services. The principal components of work include: Installation and integration of security cameras; and Providing access control/physical security renovations. Period of Performance is 335 calendar days from issuance of notice to proceed. The construction cost magnitude range is between $1,000,000.00 and $2,000,000.00. Pursuant to Public Law 109-461, this solicitation is set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms. In accordance with VAAR 819.7003(b), at the time of submission of bids, and prior to award of any contracts, the offeror must represent to the contracting officer that it is: SDVOSB eligible vendor IAW VAAR Subpart 819.70; Small business concern under the NAICS code assigned to this acquisition; and Certified SDVOSB/VOSB listed in the SBA certification database at https://search.certifications.sba.gov/(see 13 CFR 128). The North American Industry Classification Code (NAICS) for this procurement is 238210; size standard $19.0 Million applies. The solicitation will be issued on or about 8/1/2026 with the bid opening date and time will be communicated in the solicitation. The bidder is responsible to monitor and download any amendments from Contact Opportunities at https://sam.gov/contracting which may be issued to this solicitation. The primary Point of Contact for this requirement is Misty L. Gates, Contract Specialist. Ms. Gates may be reached by email at Misty.Gates1@va.gov
85%
Pre-Solicitation09/03/2026
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
81%
Solicitation09/09/2026
CONSTRUCTION STATEMENT OF WORK Date: September 13, 2025 Project Number: 556-24-113 Project Name: Oil Transformer and Switch Enclosure Upgrade (GC) Location: Captain James A. Lovell FHCC 3001 Green Bay Rd, North Chicago, IL 60064 Part 1: Project Scope of Work Overview: Contractor shall provide all tools, materials, labor, quality assurance, and supervision for renovations resulting in a complete, compliant, and fully-functional project. Replace medium voltage oil-filled transformers that serve the following buildings on the James A. Lovell FHCC campus: 1, 3, 9, 11, 66, 137 and 187. Transformers have 4160 volt primary and 208/120 volt secondary. There are (4) transformers rated for 150 KVA, (2) transformers rated for 300 KVA and (1) transformer rated for 750 KVA. The 150 KVA transformer at building 3 will need to be relocated as well. Replace the electrical distribution switchboard at building 137. Replace the electrical distribution switchboard at building 3. Replace concrete pads for medium voltage oil filled transformers at buildings 9, 66, and 187. New transformer location at building 3 requires a new concrete pad as well. Install anti-ram rated bollards at all transformers. Part 2: Period of Performance: The following model presents the summary logic of the milestone sequence working backward from the delivery date of the longest lead time in the critical path to determine a mobilization date, and then forward from the delivery date of the longest lead time to completion of all work. Listed milestones and phases (calendar days): Notice To Proceed Day 0 Division 01 Submissions Completed Day 14 Division 01 VA Reviews Day 35 Division 02+ Submissions Day 50 Division 02+ VA Reviews Day 71 Longest Lead Item Procurement Day 72 (GC to determine and submit) VA review and GC revise schedule Day 93 Mobilize and Demo Day 94 (If all pre-construction submittals were approved) Pre-Longest Lead Item Construction Day 214 (GC to determine) Longest Lead Item Delivery Date Day 215 (GC to determine) Post Long-Lead Item Construction Day 335 (GC to determine) Construction Complete and Closeouts approved Day 356 Closeout (Contract end date) Day 357 Total: 357 days reflects an example workup of the plan. GC must submit the factory ship date commitment to VA and revise the Baseline Schedule to work forward and backward from that date to optimize the time in field (disruption of customer and reduction of GC costs). Part 3: Detailed Project Requirements: Project Objectives: Contractor is required to expedite planning and execution of this work, enabling the work to start and continue without interruptions caused by failure to procure long lead equipment and plan around the delivery dates This project is required to enable compliant and safe conditions for maintenance of electrical systems. GC and their consulting engineer to plan and execute a robust quality assurance plan and safety plan to prevent time and rework losses. List of AE Documents to be included in this Contract: See: 00 01 10 Table of Contents and the entire Project Manual See: 00 01 15 List of Drawing Sheets and the entire volume of drawings Pre-Bid Conference: VA shall schedule one pre-bid conference to be attended by prospective bidders to observe current conditions within the work area(s). Do not expect additional events to occur. The AE shall not attend the pre-bid event. No questions will be allowed during the event. All questions by all prospective contractors shall follow the RFI process described in the Solicitation. Prospective bidders shall not attempt to contact the AE or VA facilities engineering staff during the solicitation and bidding period. The AE and VA facilities engineering staff are instructed to ignore all such inquiries and report them to the VA Contracting Officer. All inquiries regarding this project shall be presented as complete and coherent Requests for Information (RFI) specifically citing design or specification sections, pages, paragraphs, notes, details, etc. to enable responses to RFI s. Follow the instructions provided by the Contracting Officer within the Solicitation regarding submission of RFI s. VA will post responses developed to enable all prospective bidders to receive the same information at the same time.
81%
Solicitation09/01/2026
80%
AwardedOpen

Additional Details

Solicitation Number

36C25223B0014

Archive Date

Sep 4, 2023

Office Address

MILWAUKEE, WI, 53214