Notice ID: 8235a9168a7945c185d2644cc0580e9dSources Sought
2320--WLR SPS truck lease (VA-23-00037283) 36C25219C0163 Renewal
Archived on May 20, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM UTC−05:00
- Posted
- May 3, 2023
- Notice type
- Sources Sought
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 532120: Truck, Utility Trailer, and RV (Recreational Vehicle) Rental and Leasing
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 252-NETWORK CONTRACT OFFICE 12 (36C252)
- Place of performance
- Clement J. Zablocki VAMC 5000 West National Ave., Milwaukee, 53295
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 36C25223Q0574
- Notice ID
- 8235a9168a7945c185d2644cc0580e9d
Description
STATEMENT OF WORK FOR Leasing/Maintenance of Sterile Processing Transport Trucks DESCRIPTION OF SERVICES. The contractor shall provide vehicle leasing services for 2 sterile processing vehicles plus backup vehicles needed for the Milwaukee VA Medical center. The contractor is responsible for providing all vehicles, equipment, labor, parts, tools, maintenance and repair of all contractor furnished equipment for the lease of two special purpose vehicles (plus backup vehicle(s) as necessary) to be operated by government employees at the Milwaukee VAMC. The contractor is also responsible to ensure that the backup vehicle(s), if needed, are fully equipped, serviceable, and have the same capabilities and features as the 2 primary vehicles. The contractor is responsible for performing to the standards in the contract as well as all local, state, and federal regulations. GENERAL PROCEDURES. The contractor shall provide all vehicles, equipment, labor, parts, tools, maintenance, repair and other related services necessary to provide two sterile processing transport trucks plus backup vehicle(s) if needed for the VA Medical Center in Milwaukee. The vehicles will be used to transport sterile instruments and instruments to be sterilized between buildings located on the Milwaukee VAMC campus. On an infrequent basis, the vehicles may be used to deliver sterile supplies to other VA locations within daily driving distance of the Milwaukee VAMC. The location of service for the vehicles will be: Clement J Zablocki VA Medical Center 5000 W National Avenue Milwaukee, WI 53295 The contractor shall provide the COR at the VA Medical center with a 24/7/365 single point of contact phone number in the event of vehicle breakdown or maintenance needs for unscheduled maintenance. This single point of contact phone number is required to ensure that the medical center has two fully functional vehicles at all times. This single point of contact shall take calls from VA personnel and provide all necessary communication, coordination and scheduling within their company to coordinate unscheduled maintenance and/or replacement vehicles needed for the Milwaukee VAMC. The contractor shall provide a replacement or backup vehicle within 2 hours of notification of primary vehicle breakdown. At no point will VA personnel be making phone calls to other vendors, other repair facilities or other internal contractor entities. Single point of contact must be available to take calls regarding vehicle breakdowns 24/7/365. The COR and Alternate COR at the Milwaukee VAMC shall be notified via email not less than 24 hours in advance of scheduled maintenance needs for the two leased vehicles. If scheduled maintenance will likely result in the VAMC being without a vehicle for more than two hours, the contractor shall provide the backup vehicle when picking up the vehicle needing scheduled maintenance. VEHICLES The requirements for (2) Primary trucks as well as any backup trucks provided are: 18 22-foot diesel engine box trucks (cargo trucks) Temperature control. Working digital readout, in-cab temperature controls to keep the freight compartment between 65 and 72 degrees In cab humidity monitor installed. The monitor shall provide readout of the humidity level inside the cargo compartment of the truck Ratcheting E track Equipment- The trucks shall have 3 rows of e tracks installed on each side of the cargo box, from front to back at 24, 40 and 56 inches from the floor. The e track equipment is used to secure the sterile cargo to the cargo compartment. Truck exterior with no logos or designs Truck shall be white in color Cargo Box interior must be made of nonporous cleanable and wipeable material Cargo box floor shall be metal, and shall be cleanable and wipeable Ability to transport a minimum of 7000 pounds at one time Automatic transmission Cargo box must be lighted Cargo box shall be 8 feet wide (96 ) Trucks load height shall be 48 inches from ground to floor of truck bed. Trucks cargo box shall be a minimum of 96 inches and a maximum of 102 inches (from floor of truck bed to top of the cargo box Both the interior and exterior of all trucks used under this contract must be clean and free of rust and damage QUALITY ASSURANCE. The Government will periodically evaluate the Contractor s performance to ensure services are received through intermittent on-site inspections and receipt of complaints from facility personnel HOURS OF OPERATION. The normal hours of operation for scheduled maintenance services provided under this contract are Monday - Friday from 8:30AM to 3:00PM, excluding holidays. In the event of unscheduled maintenance or vehicle breakdowns services to provide maintenance, repairs and backup vehicles shall be available 24/7/365. The Federal Holidays Observed by the VA are as follows: New Year s Day January 1st Martin Luther King s Birthday Third Monday in January President s Day Third Monday in February Memorial Day Last Monday in May Juneteenth Day June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday by U.S. Government agencies. When a holiday falls on a Saturday, the preceding Friday shall be observed as a legal holiday. CONTRACTOR PERSONNEL. The Contractor shall provide qualified employees. The Contractor shall be required to comply with all security requirements of the VA. The Contractor is responsible for ensuring all employees possess all required licenses for operating all vehicles and equipment used in the execution of this contract. The Contractor shall be responsible to ensure Contractor employees providing work under this contract are fully trained and completely competent to perform the required work. Contractor personnel shall wear a uniform with the Contractor's name printed in a neat and professional manner, to be easily visible and recognizable.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C25223Q0574- Market Research
Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)
- Market ResearchCurrentMay 3, 2023
2320--WLR SPS truck lease (VA-23-00037283) 36C25219C0163 Renewal
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
NORTHWOODS NATIONAL CEMETERY Office Trailer Lease Performance of Work Statement General Scope Northwoods National Cemetery has a requirement for a temporary office trailer for a period of twelve months to be provided in accordance with the terms and conditions outlined in this Performance Work Statement (PWS). Goal The primary objective of this contract is to provide temporary office space for one employee at Northwoods National Cemetery, located at 4520 Lakewood Rd, Harshaw, WI 54529. The contractor will be responsible for providing all required aspects of a 12 month trailer lease, including delivery, setup, and removal. General Requirements The Contractor shall provide a temporary office trailer for a period of 12 months as well as all transportation, labor, parts, and materials to deliver, setup, secure, dismantle and remove at the end of the lease. SPECIFICATIONS The following list, with subsequent corresponding descriptions of services, covers the types and delivery frequencies of services that will be required for fulfillment of this contract. The Contractor shall coordinate with the CO or COR as appropriate to determine delivery schedules, and the trailer placement location. Line-Item Number Section Description 0001 A.1.1 Delivery and setup of office trailer, skirting and steps 0002 A.1.2 Monthly fee for lease 0003 A.1.3 Dismantling, removal and return A.1.1 Delivery and setup of office trailer, skirting and steps: Prior to shipping, the contractor will notify the COR/CO and provide the government with the opportunity to verify the trailer meets the requirements. This inspection can take place either remotely or in-person. The trailer must not be shipped prior to this verification by the government. If the government finds the trailer does not meet the requirements the contractor shall provide an alternative trailer for inspection within 2 weeks (10 business days). The contractor shall provide all resources required to deliver, set up, and properly secure the trailer, skirting and steps. Final inspection and acceptance by the COR/CO will take place when the trailer is ready for occupancy. A.1.2 Monthly fee for lease: The monthly lease fee must include all reoccurring charges associated with the lease of the trailer including stairs, skirting, and all materials or equipment provided. A.1.3 Dismantling, removal and return: The contractor shall provide all resources required to dismantle and remove the trailer and all associated materials and equipment provided by the contractor. Office Trailer requirements: The contractor shall provide an office trailer of not less than 160 gross square feet that is designed and built for. The trailer must be in new or in as new condition but in no cases more than 3 years old. Trailers that are dirty, stained, discolored, have visible prior damage, or in disrepair will not be accepted. Installation of the office must meet all local and state codes for the town of Harshaw, Oneida County, Wisconsin. The minimum requirements are: 160 gross square feet Three-foot wide exterior door, including hardware. ADA ramp meeting all local, state and Federal ADA regulations for the town of Harshaw, Oneida County, Wisconsin. 2 operable windows that can be opened for ventilation. OSHA approved platform and stairs leading to grade. Skirting the entire perimeter of the office from the floor to the ground that matches the color and material of the exterior of the trailer Exterior finishes shall be visually pleasing to the eye and not detract from the solemnity and decorum of a national cemetery (i.e. Bright colors and large or attention-grabbing designs should be avoided) Provide floor, wall, and roof with insulation as follows: R-19 within the floor, R-13 within exterior walls, R-38 within the roof Interior finishes shall consist of resilient flooring, plywood paneling or painted wallboard on walls, and acoustical tile ceilings. Provide sufficient fluorescent lighting to deliver 70 foot-candles of light at desktop height without the aid of daylight. Provide one light switch Provide one duplex receptacle on each wall. If a wall is 10 feet long or more, provide two receptacles for each 10 feet, or portion thereof, of wall Thermostatically controlled, centralized heating and air conditioning system designed to maintain the temperature between 70- and 80-degrees F with 50 percent relative humidity maintained during the air conditioning season. Provide maintenance or repair services within 72 hours of notification. Contractor s Representative: Upon contract award, the Contractor shall promptly provide the Contracting Officer (CO) with the name and contact information of the individual designated as the Contractor s Representative for this contract. The Contractor s Representative shall have overall management responsibility for the execution of all contract requirements and shall serve as the primary point of contact for day-to-day operations, receiving technical direction, and addressing issues that arise under the contract. This individual shall also be responsible for coordinating and communicating matters of mutual concern with Government representatives. The Contractor s Representative may appoint a designated inspector or liaison to work directly with the Government on operational matters subject to the approval of the CO. Regulatory Compliance, Permits, Licenses: The Contractor shall obtain and maintain all applicable licenses, permits, and certifications necessary to perform the work required under this contract prior to the commencement of performance. All such licenses and permits shall be current and valid throughout the contract term. Upon request, the Contractor shall provide the Contracting Officer with copies of all licenses and permits. The Contractor shall, at no expense to the Government, be responsible for obtaining and maintaining all necessary licenses and permits and for complying with all applicable Federal, State, and municipal laws, codes, and regulations governing the performance of the contract. Verification of Service: The Contractor shall submit all monthly invoices via the Tungsten e-Invoice Network. Copies of each invoice shall be forwarded to the Contracting Officer s Representative (COR) for verification. The COR shall review each invoice to verify that services invoiced conform to contract requirements. In the event services were not delivered or invoiced incorrectly, the COR will document the discrepancies in writing and forward such documentation to the Contracting Officer (CO). The Cemetery certifying official will then contact the Contractor to resolve the issue and/or return the invoice for correction. If the COR does not contact the Contractor regarding any discrepancies within a reasonable timeframe, it shall be assumed the invoice is accurate and approved for payment. The Cemetery will retain copies of all approved invoices for their records and for future reference. Payments shall be made via electronic funds transfer (EFT) through the Tungsten e-Invoice Network following invoice approval. Inspection of Services: Definitions: For purposes of this clause, Services includes all services performed, workmanship, and materials furnished or utilized in the performance of the contract. The Contractor shall establish and maintain an inspection system acceptable to the Government covering all services performed under this contract. The Contractor shall maintain complete records of all inspection activities and shall make these records available to the Government during contract performance and for such period thereafter as may be required. The Government reserves the right to inspect and test all services called for by the contract at all reasonable times and locations during the contract term. Such inspections and tests shall be conducted in a manner that does not unreasonably delay the Contractor s performance. End of Scope | - | Market Research | 09/11/2026 |
Refrigerated Container and Refrigerated Trucks | - | Awarded | Open |
Refrigerated Container and Refrigerated Trucks | - | Combined Synopsis | 03/25/2026 |
| - | Awarded | Open | |
Solicitation for 8 vehicle leases. Please read combo and SoN in its entirety. Extended to 05 NOV 2026 to allow time for customer to answer questions. | - | Combined Synopsis | 11/05/2026 |
Additional Details
Solicitation Number
36C25223Q0574
Archive Date
May 20, 2023
Office Address
MILWAUKEE, WI, 53214