GovChime
Notice ID: 9ced8d7f7ac24d728fe9549c55b8a884Award NoticeAwarded

H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING

Awarded on June 4, 2024. Full description on SAM.gov.

Awarded tounder 36C25224P0733 (source: SAM.gov award notice)• $160.1K

Overview

Posted
June 5, 2024
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
541350: Building Inspection Services
Agency
Department of Veterans Affairs

Notice details

Place of performance
CLEMENT J. ZABLOCKI VA MEDICAL CENTER 5000 W. NATIONAL AVENUE, MILWAUKEE, 53295
Last updated
Sep 9, 2025
Award date
Jun 4, 2024
Award amount (SAM.gov award notice)
$160.1K

Identifiers

Solicitation number
36C25224Q0416
Notice ID
9ced8d7f7ac24d728fe9549c55b8a884
Award number (PIID)
36C25224P0733

Description

The Contractor shall provide all labor, supervision, materials, tools, and equipment necessary to provide maintenance, inspection, testing, and calibration of the Electrical Power Distribution System and all of its components located at the Clement J. Zablocki Medical Center, Milwaukee, WI 53295.

Full description on SAM.gov

Award Overview

Award Number

36C25224P0733

Award Amount (SAM.gov award notice)

$160.1K

Award Date

Jun 4, 2024

Awardee

Awardee UEI

QHUDB4KNZNX5

Original Solicitation

Notice ID: 9ced8d7f7ac24d728fe9549c55b8a884

Posted Date: Jun 5, 2024

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

3
  • 36C25222P0832
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 541350
    $383.4KSigned Jun 16, 2026
  • 36C25222P0832
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 541350
    $383.4KSigned Mar 26, 2026
  • 36C25222P0832
    SDV SERVICES, INC.
    Department of Veterans AffairsNAICS 541350
    $326.1KSigned Mar 25, 2025

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25224Q0416
  1. Market Research
  2. Pre-Solicitation
  3. Solicitation
  4. Awarded

This opportunity has been awarded.

  1. Market ResearchApr 8, 2024

    H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BASE + 2 OYS

    Notice 76330997c9ed4b75abfafe75e396c477 on SAM.gov

  2. Pre-SolicitationApr 30, 2024

    H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BASE + 2 OYS

    Notice 89e84230ea4d4355aab7c2ace9cf1c51 on SAM.gov

  3. 3×
    SolicitationApr 30, 2024

    H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING BASE + 2 OYS

    Notice de728de12f4140c390902ec49676bdf5 on SAM.gov

  4. AwardedCurrentJun 5, 2024

    H259--ELECTRICAL DISTRIBUTION SYSTEM TESTING

    Notice 9ced8d7f7ac24d728fe9549c55b8a884 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Arc Flash Hazard Analyses Scope of Work General Contractor shall conduct an Arc Flash Hazard Analyses in accordance with National Fire Protection Association (NFPA) 70E, Standard for Electrical Safety in the Workplace, NFPA 70, National Electric Code and Institute of Electrical and Electronics Engineers (IEEE) Guide for the Specification of Scope and Deliverable Requirements for an Arc-Flash Hazard Calculation Study in Accordance with IEEE Std 1584. The study will conform to the editions for the above-referenced standards in effect as of the date of the solicitation. The study shall include all significant locations in the electrical distribution system (switchboards, switchgear, motor control centers, panelboards, busways, etc.) from the incoming utility equipment or cabling down to 208V systems. Data collection and documentation shall include the 208V system. The study shall be performed using software programs specifically designed to standards governing short-circuit; protective coordination and arc flash hazard calculations. Final submittals shall include a formal reporting of findings, collect data and study calculations in a comprehensive report. Arc Flash Hazard Analyses Requirements The Arc Flash Hazard Analyses will consist of the following phases or requirements: Data Gathering and Field Verification Contractor shall: Field-verify and mark up existing single line drawings needed to perform an accurate study. In the event single-line drawings are not available, Contractor shall develop single-line drawings to reflect the as built configuration of the facility electrical system. Gather and document necessary system data required to complete the study. Data should include but is not limited to (as applicable): Location (building, room, etc.) Equipment Identification Equipment Information Manufacturer, Model, Catalog Number and Type Equipment Rating (Voltage, Ampacity, Interrupting Rating, etc.) Configuration (Main Lug, Main breaker, Number of breakers, etc.) Overcurrent Protection Relaying Type, Manufacturer, Function(s), CT and PT ratios, etc. Fuses Type, Manufacturer, Rating, etc. Existing Settings Cable Type, Size and Length (lengths are to be field confirmed) Cable Busway Type, Manufacturer, Rating and Length Motor Load and Contactor Data (record data and application for motors 25 HP and above) Contractor must coordinate with facility engineering staff to obtain necessary power company data such as minimum and maximum fault currents as well as X/R ratios. Correspondence documenting utility data shall be included in the final submittal. Data collection requires the removal and/or opening of equipment to field verify data. Data collection requires observing each piece of equipment covered by this study. Contractor shall record and report any deficiencies, such as missing identifying labels, warning labels, non-functioning latches or locks, missing hardware (covers, screws, breaker blank fillers, etc.), etc. Short Circuit Study Contractor shall use field-verified single line drawings and data to perform a three-phase bolted fault short-circuit momentary and interrupting duties system short circuit calculation for the facilities electrical system. The calculations shall be conducted in accordance with applicable ANSI C37.010, C37.5, C37.13, NFPA 70E, NEMA, and NEC standards and codes. At a minimum the following location shall be included: Electric utility supply termination point. Incoming switchgear. Unit substation primary and secondary terminals. Low voltage switchgear. Motor control center Standby generator and automatic transfer switch. Branch panelboard. The study shall identify and report data used in the calculations in both descriptive terms (cable wire size, motor hp, transformer kVA and impedance, etc.) and impedance values. Transformer nameplate impedance shall be used when available. A section of the study shall be devoted to verification of equipment duty ratings identifying whether equipment is within or operating outside it interrupting rating. Short circuit calculations must be tabulated and included with the project submittals. Protective Device Coordination Study Contractor shall provide a Protective Device Coordination Study to determine satisfactory setting and ratings for the facility s major protective devices in accordance with applicable industrial standards such as ANSI/IEEE 399 and ANSI/IEEE 242. Coordination Study results must include time-current curves (TCC) supporting findings and recommendation to be provided with project submittals. Deficiencies in device settings or-rated equipment are to be noted in the report. Protective device settings are to be tabulated separately and included within the report. Arc Flash Hazard Analyses Contractor shall perform an Arc Flash Hazard Analyses in compliance with IEEE 1584, NFPA 70 and NFPA 70E. Flash protection boundary and incident energy levels shall be calculated at all significant locations in the electrical distribution system. Incident energy calculations must consider multiple system scenarios (normal) to establish the worst-case incident energy level for each equipment studied under this study. Additionally, calculations should emphasize a conservative approach for the protection of personnel. Incident energy and flash protection boundary calculations results must be tabulated and included with project submittals. Protective Device Settings Contractor shall set adjustable protective devices to reflect proposed settings identified in the Protective Coordination Study. This must be coordinated with facility engineering staff as certain device settings can only be performed during a power outage. Equipment Labeling and Miscellaneous Work Contractor shall provide and install arc flash warning labels for designated electrical devices evaluated under this study. All arc flash labels shall comply with NFPA 70E and include: Equipment name or identifying designation Nominal voltage Flash hazard boundary Hazard risk category Incident energy Working distance Arc flash labels shall be machine printed with no field markings. Single labels shall be provided for designated equipment evaluated under this study. Contractor shall install applicable labels (customary warning labels high voltage, owner-provided equipment identification labels, etc.) found missing or deficient while collecting field data and as agreed with the facility engineering staff. Exit Briefing Upon completion of the study but prior to issuing study submittals, Contractor shall conduct an exit briefing for facility engineering staff and others designated representatives. The briefing shall include: Overview of each study phase and related issues. Notable arc flash hazard areas. Recommended solutions for mitigating dangerous arc flash hazard levels to include potential implementation of maintenance settings. National Electric Code (NEC) violations noted during the study. Other electrical safety related issues. Recommendations. Submittals Upon completion of the Arc Flash Hazard Analyses, Contactor shall submit four (4) bound copies including electronic version on CD or DVD of the final report containing the following: Power System Studies - The completed short-circuit, protective device coordination arc flash hazard analysis studies shall include the following sections: Executive Summary. Descriptions, purpose, basis, and scope of the studies. Tabulation of circuit breaker, fuse, and other protective device ratings versus calculated short-circuit duties. Protective device time versus current coordination curves, tabulations of relay and circuit breaker trip unit settings, and fuse selection Fault current calculations including a definition of terms and guide for interpretation of the computer printout. Details of the incident energy and flash protection boundary calculations. Recommendations for system improvements, where needed. Electrical system one-line diagram in printed and electronic version. The electronic version must be in AutoCad and PDF formats. SKM Compatible Data Import Files. Supplemental Report: Contractor shall prepare a report documenting findings and observation not addressed elsewhere in the submittals. This section shall include condition of found equipment and corrective actions taken to resolve or repair same. Qualifications All work shall be conducted under the supervision and approval of a Registered Professional Electrical Engineer (PE). The PE shall have a minimum of five (5) years experience in performing and interpreting power systems studies. Project Duration Contractor shall complete all work within 180 days of notice to proceed. Scheduling Contractor shall perform onsite work during normal operating hours (7:30 AM to 4:30 PM), Monday through Friday. Work to be performed outside of normal working hours must be coordinated with and approved by the COR. Work requiring a power outage must be submitted in writing (including date and duration of outage) to the COR not later than two weeks prior to the requested date.
-Special Notice11/02/2026
SOURCES SOUGHT SYNOPSIS The Department of Veterans Affairs is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support a requirement for Elevator Testing Services located at FHCC VAMC , North Chicago IL. o Captain James A. Lovell Federal Health Care Center, North Chicago, IL. The result of this market research will contribute to determining the method of procurement. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 341350. THERE IS NO SOLICITATION AT THIS TIME. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred. Background: The purpose of this Contract is to provide for the inspection/testing of the vertical transportation system located at the Captain James A. Lovell Federal Health Care Center ( FHCC ), 3001 Green Bay Road, North Chicago, IL 60064-3048, as set forth in this Performance Work Statement. A complete listing of all vertical transportation system components, including thirty-one (31) elevators, two (2) cart lifts, and two (2) dumbwaiters (collectively VTS components ), is set forth in the Vertical Transportation System Schedule at the end of this Performance Work Statement. Any additional vertical transportation system components put into service after award of this Contract shall be included in the Vertical Transportation System Schedule at price(s) consistent with the current Price Schedule. A complete listing of all VTS Components, including twenty-nine (31) elevators, two (2) cart lifts, and two (2) dumbwaiters, is set forth in the Vertical Transportation System Schedule at the end of this Statement of Work. Any additional vertical transportation system components put into service after award of this Contract shall be included in the Vertical Transportation System Inventory at price(s) consistent with the current Price Schedule. If your organization has the potential capacity to perform these contract services, please provide the following information: 1) Organization name, address, email address, website address, if applicable, telephone number, and size and type of ownership for the organization; and 2) Tailored capability statements addressing the particulars of this effort and documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements. The Government will evaluate market information to ascertain potential market capacity to provide services consistent in scope and scale with those described in this notice and otherwise anticipated. BASED ON THE RESPONSES TO THIS SOURCES SOUGHT NOTICE/MARKET RESEARCH, THIS REQUIREMENT MAY BE SET-ASIDE FOR SDVOSB. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions. Submission Instructions: Interested parties who consider themselves qualified to perform the above-listed services are invited to submit a response to this Sources Sought Notice by 10:00AM Local Time (Central) on November 11th, 2026. All responses under this Sources Sought Notice shall be emailed to Michelle.Klug2@va.gov. STATEMENT OF WORK Inspections Overview: The Contractor shall perform Annual Category 1, Semiannual, and Full-Load Category 5 VTS component inspection/testing as follows: a. Annual Category 1 inspection/testing is typically conducted in May of each year; a. Semiannual inspection/testing is typically conducted in November of each year; and b. Full-Load Category 5 testing will be performed in November 2027. c. Note: Typical inspection/testing dates are subject to change, in FHCC s sole discretion. Basic Contractor Responsibilities: The Contractor shall provide all personnel, equipment, material, parts, software, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for execution of the work to be performed under this Contract. Any work found to be non-conforming to the terms of this Contract shall be promptly corrected by the Contractor at no additional cost to the Government. All work shall be performed in a neat and professional manner, including the removal of all trash and debris at the completion of all work. Contractor Limitations: The Contractor performing inspection/testing under this Contract is prohibited from performing any repairs or other work on any of the VTS components covered by this Contract. Safety: All work performed under this Contract shall conform to such safety precautions as the FHCC Fire/Safety and Engineering Departments determine, in their sole discretion, to be necessary, in addition to all other requirements set forth elsewhere in the Contract. Inspection/Testing Standards. 1. All inspection/testing of FHCC s vertical transportation system components shall comply with the most current version of the following standards: a. American Society of Mechanical Engineers ( ASME ) 17.1: Handbook on Safety Code for Elevators and Escalators; b. ASME 17.2: Guide for Inspection of Elevators, Escalators, and Moving Walks; c. ASME 17.3: Safety Code for Existing Elevators and Escalators; d. National Fire Protection Association ( NFPA ) 70: National Electrical Code; and e. NFPA 70E: Standard for Electrical Safety in the Workplace. 2. During any inspection/testing, parts shall be removed and equipment cleaned, as necessary, to determine their exact condition. All parts shall be properly reinstalled after removal. 3. All inspections shall be performed in the presence of an elevator maintenance technician, currently under contract as the VA elevator maintenance contractor, and the COR or designated FHCC representative. 4. Immediately following the conclusion of each inspection/testing, the Contractor shall brief the COR or designated FHCC representative regarding the inspection/testing results, including without limitation: code violations, safety concerns, and immediate maintenance needs. 5. The COR, in the COR s sole discretion, may reject any work performed under this Contract that is noncompliant with any of the requirements set forth in this Contract. All rejected work shall be corrected as quickly as reasonably possible at no additional expense to the Government. Inspection Checklists: The Contractor shall provide a fully completed inspection checklist applicable to each VTS component using the Checklist for Inspection of Electric Elevators The comments section of each checklist shall include a. If the VTS component is safe operating condition; a. If the VTS component will perform in accordance with Original Equipment Manufacturer ( OEM ) standards; b. Whether the VTS component has been altered, except in conformity with all applicable standards set forth in this Contract; c. If the VTS component has any deficiencies, referencing the appropriate standard as applicable; and d. Whether there are any recommended VTS component repairs or upgrades. e. Documentation. Upon completion of the inspection/testing of all FHCC s VTS components, the Contractor shall provide a report within thirty (30) days to the COR and other FHCC personnel as directed. The report shall be electronically submitted in pdf format utilizing word processing to the maximum extent practicable; individual file size shall not exceed 7 MB. Each report should include: Certificates of Inspection: The Certificate of Inspection for each VTS component shall include the following information: a. Location (building and city/state); a. Identification number; b. Capacity; c. Speed; d. Date of inspection; e. Name of inspector and company; f. Inspector s signature; and g. Inspector s Qualified Elevator Inspector ( QEI ) number. Scheduling Inspection/Testing: The Contractor shall coordinate a mutually agreeable time with the COR at least thirty (30) days prior to the typical inspection months, as defined above. Hours for Inspection/Testing: All work performed under this Contract shall be performed during normal hours of facility operation, as defined below, except for inspection/testing that, in the COR s judgment, may severely impact elevator service. Inspection/testing that severely impacts elevator service shall be conducted after normal hours of facility operation at no additional cost to the Government. Reinspection: If any VTS component(s) require reinspection, the Contractor shall: a. Provide a quote to the COR for the reinspection(s) at a price consistent with the Price Schedule s Unit Price for the current contract period; and a. Coordinate reinspection(s) with the COR only after a Contract Modification has been awarded authorizing such reinspection. b. Inspector Qualifications. Inspectors performing VTS component inspection/testing under this Contract shall be a currently certified Qualified Elevator Inspector by an ASME-accredited organization, in accordance with ASME QEI-1: Standard for the Qualification of Elevator Inspectors. Inspectors performing work under this Contract shall be regularly employed by the Contractor. The Contractor shall provide a copy of each inspector s QEI-1 certification to the COR prior to any VTS component inspection/testing being performed. c. Scheduling. d. On-Site Work Requirements. In addition to any other requirements set forth in this Contract, the Contractor shall comply with the following on-site work requirements: Contractor Orientation/Training: The Contractor shall attend an orientation prior to beginning any work under this Contract, at the COR s discretion. This orientation may include the following topics: Contract terms and conditions; performance monitoring; badging procedures; safety; fire procedures; severe weather procedures; disease transmission; infection control; disaster procedures; and any other topic deemed necessary by the COR. At the COR s discretion, the Contractor may be responsible for providing some or all this information/training to its employees, as directed by the COR. Check-in/Check-out Requirements: The Contractor shall comply with all facility check-in and screening requirements. Upon successful completion of the facility s check-in and screening process, the Contractor shall check-in with the COR, or the COR s designee, advising them of the nature and location of the work to be accomplished. The Contractor shall check-out with the COR, or the COR s designee, at the conclusion of such work, prior to departing the VA facility, advising them of the work completed and any problems/issues identified. Hours of Operation: Normal hours of facility operation ( Business Hours ) are Monday through Friday, 7:00 a.m. 3:30 p.m. Local Time, except for the following Federal Holidays: a. New Year s Day; a. Birthday of Martin Luther King, Jr.; b. Washington s Birthday; c. Memorial Day; d. Juneteenth National Independence Day; e. Independence Day; f. Labor Day; g. Columbus Day; h. Veterans Day; i. Thanksgiving Day; j. Christmas Day; **** Any other day declared a Federal Holiday by Presidential Proclamation**** Noninterference with Facility Functions: The Contractor shall perform its services under this Contract in a manner that does not interfere with the facility s functions, including maintaining all tools and equipment in an orderly fashion and cleaning the work area at the conclusion of a service visit. The Contractor shall interrupt its work at any time to not interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment, and carts. In the event of an emergency, Contractor MANUFACTURER TYPE ELEVATOR # LOCATION Inspection Frequency 1 SMARTRISE/HW TRACTION P-1 BLDG. 133 CA Annual May/Semi-Annual November 2 SMARTRISE/HW TRACTION P-2 BLDG. 133 CA Annual May/Semi-Annual November 3 SMARTRISE/HW TRACTION P-3 BLDG. 133 CA Annual May/Semi-Annual November 4 MID-AMERICAN TRACTION P-4 BLDG. 131 Annual May/Semi-Annual November 5 MID-AMERICAN TRACTION P-5 BLDG. 131 Annual May/Semi-Annual November 6 SMARTRISE/HW TRACTION P-7 BLDG. 133 Annual May/Semi-Annual November 7 SMARTRISE/HW TRACTION P-8 BLDG. 133 Annual May/Semi-Annual November 8 SMARTRISE TRACTION P-10 BLDG. 134 Annual May/Semi-Annual November 9 SMARTRISE TRACTION P-11 BLDG. 134 Annual May/Semi-Annual November 10 SMARTRISE TRACTION P-13 BLDG. 135 Annual May/Semi-Annual November 11 SMARTRISE TRACTION P-18 BLDG. 1 Annual May/Semi-Annual November 12 MID-AMERICAN HYDRAULIC P-20 BLDG. 46 Annual May/Semi-Annual November 13 MID-AMERICAN TRACTION P-21 BLDG. 66 Annual May/Semi-Annual November 14 MID-AMERICAN TRACTION P-22 BLDG. 7 Annual May/Semi-Annual November 15 MID-AMERICAN HYDRAULIC P-23 BLDG. 4 Annual May/Semi-Annual November 16 MID-AMERICAN HYDRAULIC P-24 BLDG. 133 Annual May/Semi-Annual November 17 SCHUMACKER ELEVATOR HYDRAULIC P-25 PARKING GARAGE 195 Annual May/Semi-Annual November 18 SCHUMACKER ELEVATOR HYDRAULIC P-26 PARKING GARAGE Annual May/Semi-Annual November 19 SCHUMACKER ELEVATOR HYDRAULIC P-1 BLDG. 133EF Annual May/Semi-Annual November 20 SCHUMACKER ELEVATOR HYDRAULIC P-2 BLDG. 133EF Annual May/Semi-Annual November 21 SMARTRISE HYDRAULIC S-1 BLDG. 133CA Annual May/Semi-Annual November 22 SCHUMACKER ELEVATOR HYDRAULIC S-1 BLDG. 133EF Annual May/Semi-Annual November 23 SCHINDLER HYDRAULIC S-2 BLDG. 6 Annual May/Semi-Annual November 24 SCHINDLER HYDRAULIC S-3 BLDG. 6 Annual May/Semi-Annual November 25 MID-AMERICAN TRACTION S-6 BLDG. 131 Annual May/Semi-Annual November 26 SMARTRISE TRACTION S-9 BLDG. 133 Annual May/Semi-Annual November 27 SMARTRISE TRACTION S-12 BLDG. 134 Annual May/Semi-Annual November 28 SMARTRISE TRACTION SF-14 BLDG. 135 Annual May/Semi-Annual November 29 KONE TRACTION P-27 PARKING GARAGE 196 Annual May/Semi-Annual November 30 TAC32H HYDRAULIC 556FH-ELEV-001-CO100 CORRIDOR 100 Annual May/Semi-Annual November 31 SMARTRISE HYDRAULIC 5-ELEV-E1-CO101 CORRIDOR 101 Annual May/Semi-Annual November FHCC VERTICAL TRANSPORTATION SYSTEM SCHEDULE ELEVATORS CART LIFTS MANUFACTURER CART LIFT # LOCATION INSPECTION FREQUENCY 1 LIFT-O-MATIC CART LIFT 1 BLDG. 133CA Annual May/Semi-Annual November 2 LIFT-O-MATIC CART LIFT 2 BLDG. 133CA Annual May/Semi-Annual November DUMBWATIERS DUMBWAITER # LOCATION INSPECTION FREQUENCY 1 DUMBWAITER 1 BLDG. 133 Annual May/Semi-Annual November 2 DUMBWAITER 2 BLDG. 133CA Annual May/Semi-Annual November
-Market Research11/11/2026
Tri-Annual Electrical Inspection IAW the Performance Work Statement. Total Small Business Set-Aside, Quotes are due on 11/20/2026 at 16:00 (4pm) PST.
-Combined Synopsis11/20/2026
Tri-Annual Electrical Inspection IAW the Performance Work Statement. Total Small Business Set-Aside, Quotes are due on 11/20/2026 at 16:00 (4pm) PST.
-Combined Synopsis11/20/2026
Amendment 0004 (P04) to RFQ 36C25526Q0617, Fire Alarm, Smoke and Automatic Door Inspection and Testing Services (IDIQ). The purpose of this amendment is to extend the quote due date to November 20, 2026, 3:00 PM CST. The previous due date was 11/10/2026 1500 CST. All other terms and conditions remain unchanged. Offerors must acknowledge this amendment by signing and returning the SF30 with their quote, or as otherwise stated in the amendment. Offerors who already submitted a quote may submit a revised quote by the new due date. If no revised quote is received, the quote already on file will be considered. .
-Solicitation11/20/2026

Additional Details

Solicitation Number

36C25224Q0416

Archive Date

Jun 15, 2024

Office Address

MILWAUKEE, WI, 53214