GovChime
Notice ID: fb6c877778344ef394e845abe34ad7bfAward NoticeAwardedArchived

H146--Critical SPS Water Testing Milwaukee VAMC and Green Bay CBOC 695C60326

Awarded on April 1, 2026. Full description on SAM.gov.

Awarded tounder 36C25226P0231 (source: SAM.gov award notice)• $474.2K

Overview

Posted
April 2, 2026
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
NAICS
541380: Testing Laboratories and Services
Agency
Department of Veterans Affairs

Notice details

Office
252-NETWORK CONTRACT OFFICE 12 (36C252)
Place of performance
Clement J Zablocki VA Medical Center 5000 W. National Ave, Milw, WI
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov
Award date
Apr 1, 2026
Award amount (SAM.gov award notice)
$474.2K

Identifiers

Solicitation number
36C25226Q0092
Notice ID
fb6c877778344ef394e845abe34ad7bf
Award number (PIID)
36C25226P0231

Description

Who will provide the bottles for specimen testing? The vendor will supply all bottles, tubes, cold packs, packaging and any other material supplies needed to perform and ship the specimens to maintain sample viability. Regarding the Perry Johnson Laboratory Accreditation (PJLA)Testing Accreditation and International Organization for Standardization (ISO) and International Electrotechnical Commission (IEC) 17025:2017 certifications, We have the A2LA Laboratory Certification, Elite Laboratory and the ASSE International Certification. Our questions is: Do we have to have the PJLA or is the Certifications that we have for testing sufficient? We will let the verbiage in the original documents stand. PJLA certification is required. Would the VA like us to incorporate an SOP for the SPS?. This would not be a need as part of the contract. 4. To make sure hold times are not exceeded in the event of shipping samples, will sampling in the afternoon be acceptable? Sampling in the afternoon is acceptable provided it does not delay delivery to the lab or interfere with maintaining appropriate chain of custody. 5. Can you please confirm the parameters needed to be tested monthly for the first point of generation critical water chemistry panel with micro. ST108 outlines all of the testing parameters. If the vendor is not aware of these testing parameters, the vendor likely lacks the knowledge or experience to adequately perform critical water testing. Please see attached document for the ST108 standard. 6. are field tests acceptable for pH, Alkalinity, conductivity, and hardness or will these need to be done by a Lab? Final results need to be conducted through lab analysis. 7. Does the Lab have to have PJLA certification or is another ANSI recognized auditing body such as ANAB acceptable for ISO certification? PJLA certification is required. 8. The solicitation states results must be password protected, does this apply only to the database where results are stored, or do emails need to be encrypted? Emails do not need to be encrypted. The web-based reporting structure should be password protected. 9. Clarification on how many of the tests are being run prior to the UV?  UV treatment is continual in our critical water loops, with the exception of the cart washer loop at the Green Bay facility, where there is no UV treatment.

Full description on SAM.gov

Award Overview

Award Number

36C25226P0231

Award Amount (SAM.gov award notice)

$474.2K

Award Date

Apr 1, 2026

Awardee

Awardee UEI

KBLVEEKP3DN5

Awardee CAGE Code

9MBK2

Awardee Address

RICHMOND, VA 23230-1655, VA

Original Solicitation

Notice ID: fb6c877778344ef394e845abe34ad7bf

Posted Date: Apr 2, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 36C25725P0722
    I-2-I SOLUTIONS, INC.
    Department of Veterans AffairsNAICS 541380
    $81.1KSigned Nov 5, 2026
  • 36C25627P0057
    I-2-I SOLUTIONS, INC.
    Department of Veterans AffairsNAICS 541380
    $10.9KSigned Nov 4, 2026
  • 36C24825P0724
    I-2-I SOLUTIONS, INC.
    Department of Veterans AffairsNAICS 541380
    $87.5KSigned Nov 3, 2026
  • 36C25725P0233
    I-2-I SOLUTIONS, INC.
    Department of Veterans AffairsNAICS 541380
    $942.4KSigned Oct 29, 2026
  • 36C24627P0027
    I-2-I SOLUTIONS, INC.
    Department of Veterans AffairsNAICS 541380
    —Signed Oct 27, 2026

Contacts

Contracting Officer

Primary Contact

Debbie Bruening
Contract Specialist

Documents

Files (1)

  • 36C25226P0231_1.docx

    13 KBAdded in Award Notice version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    H146--Critical SPS Water Testing Milwaukee VAMC and Green Bay CBOC 695C60326

    Notice fb6c877778344ef394e845abe34ad7bf on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeJan 20, 2026

    H146-- NEW Critical SPS Water Testing Milwaukee VAMC and Green Bay CBOC

    Notice 8831a9ae7ea947a98f95f58d3db82c8a on SAM.gov

  2. SolicitationRelated noticeJan 20, 2026

    H146-- NEW Critical SPS Water Testing Milwaukee VAMC and Green Bay CBOC

    Notice 6df16eeb62ab4e0d9519c047485c6057 on SAM.gov

  3. SolicitationRelated noticeJan 29, 2026

    H146-- NEW Critical SPS Water Testing Milwaukee VAMC and Green Bay CBOC

    Notice 8b4dded44ec042aba657eee0aa7645df on SAM.gov

  4. SolicitationRelated noticeFeb 4, 2026

    H146-- NEW Critical SPS Water Testing Milwaukee VAMC and Green Bay CBOC

    Notice 7864aad5da0c476fa7fdc68129e62be3 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The purpose of this amendment is to upload the Limitations on Subcontracting form that must be completed and submitted with all quotes.
-Combined Synopsis09/18/2026
AMENDMENT A0001 Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1
-Combined Synopsis11/16/2026
Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice Combined Synopsis/Solicitation Notice REQUEST FOR SF 330 36C25227Q0013 Project 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) Design/Engineering Services SF-330 Package Due: October 30, 2026, at 1:00 p.m. CST (see details below) Points of Contact: Donita.Grace@va.gov INTRODUCTION: THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE in accordance with Public Law 109-461. This is a Request for SF330s for Architect/Engineer (A/E) Design Services for Project Number 578-27-003: Renovate A Section 1st Floor Bldg. 1 (AE) at the Edward J. Hines VA Hospital in Hines, IL. THIS ANNOUNCEMENT IS NOT A REQUEST FOR PROPOSAL. NO SOLICITATION PACKAGE WILL BE ISSUED via SAM.gov. A request for proposal will be issued directly to the top-rated firm for which negotiations will commence in accordance with FAR part 36. The anticipated A/E design services, to be awarded, will be procured in accordance with the Selection of Architects and Engineers Act (Public Law 92- 582), FAR Part 36.6 and VA Acquisition Regulation 836.6. Period of Performance: 449 Calendar Days Contract Type: Firm-Fixed-Price Estimated Magnitude of Construction: Between $10,000,000 and $20,000,000 NAICS Code: 541310 Size Standard: $12.5 Million SBA & SAM : in accordance with VAAR 819.7003, at the time of SF330 submission and prior to award of any contract, the offeror must represent to the contracting officer that it is a (1) SDVOSB eligible firm; (2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and (3) SDVOSB listed as verified in SBA at: https://veterans.certify.sba.gov/ Additionally, all eligible firms must be registered and current in the System for Award Management (SAM) database to be evaluated and eligible for contract award. If the firm is not registered in SAM, you may register online at https://www.sam.gov. 1. PURPOSE: This Source Selection Plan (SSP) outlines the procedures that will be used to solicit architectural and engineering (AE) design services for Project 578-27-003 Renovate A Section on First Floor of Building 1. The goal of this project is to provide complete AE design services to renovate section A of the 1st floor of building 1. 2. ACQUISISTION DESCRIPTION: 2.1: RFI: A Request for Information shall be published to https://sam.gov whereby interested architect-engineering companies shall submit an SF330 package. This competitive procurement shall utilize a best value trade-off source selection process identified in FAR 15. 2.1.a: Source Selection Evaluation Board (SSEB): For the purpose of this acquisition, the SSEB will be same as the Technical Evaluation Board (TEB). 2.1.b: Below are the individual (TEB) evaluation criteria and ratings for the SF330s, listed in descending order of importance. FACTOR 1: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (30 Maximum Points) Subfactor 1A: Specialized Experience (15 Points). Subfactor 1B: Additional Experience (10 points). Subfactor 1C: Technical Competence (5 points). The A/E Firm shall demonstrate its specialized experience and technical competence in the design and construction period services for projects of similar size and complexity. Specialized project experience should include design of renovations to existing hospitals, renovations to buildings constructed prior to 1970 w/space constraints, design of Pathology Suites, and HVAC upgrades to existing hospitals. Additional experience includes mechanical, electrical, and structural engineering, architecture, interior design and finishes, physical security upgrades, building management systems/building automation systems (BMS/BAS), Computer-Aided Design and Drafting (CADD), critical path scheduling, fire protection, construction infection control protocols, design and installation of biological refrigeration and preservation systems, design and installation of vacuum tube transport systems, and project phasing and coordination in an active hospital setting. Offeror shall provide a minimum of three (3), and no more than five (5) recent and relevant Government and private experience projects similar in size, scope, and complexity, and experience with the type of projects/competence above. Relevant is defined as those task requirements identified in the Statement of Work. Recent is defined as services provided within the past seven (7) years with at least 50% of the Construction completed. At a minimum, include the following for each submitted project (if applicable): Project title, location, contract number, and detailed narrative describing the scope of services provided including the type of work performed by the offeror and its role in the project i.e., prime contract, Teaming Partner, or subcontractor. Project Owner, owner s point of contact including telephone number and email address. Services & Deliverables provided under the contract/task order Period of Performance, including start and completion dates for design and construction if applicable. Estimated cost of construction based on AE s design Final construction cost (or projected final construction cost if still underway) The percentage of total cost resulting from changes due to AE omissions. To demonstrate technical competence, the offeror shall include narratives of how the firm addresses each of the following topics. Simply restating this list will not be sufficient. The management approach The coordination of disciplines and subcontractors Quality control procedures Familiarity with VA Design Guides/Manuals, Master Specifications and other applicable standards. FACTOR 2: PROFESSIONAL QUALIFICATIONS (20 Maximum Points) Subfactor 2A: Key Positions (15 Points). Subfactor 2B: SDVOSB Compliance (5 Points). The architects and engineers on the firm s staff representing the project or signing/stamping drawings in each discipline must possess a minimum of five (5) years of experience and are required to be licensed, registered, or certified by a U.S. state, the District of Columbia, or a U.S. territory. Provide professional license jurisdiction of issue and license numbers and/or proof of licensure. A resume for each of these key positions must be provided, corresponding with the title matching the disciplines listed for the project. At a minimum, the offeror must describe the professional qualifications and specific experience in the required disciplines within the past five (5) years. Key positions and disciplines required for this project include, but are not limited to: Project Manager Architect Mechanical Engineer Electrical Engineer Plumbing Engineer Structural Engineer Interior Designer The evaluation will consider education, certifications, training, registration, overall and relevant experience and longevity with the firm. Offer must include the following statement of SDVOSB compliance when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ______________________, [company] _____________________; certify that the team proposed to perform under this requirement demonstrates the capability of 50% SDVOSB performance in compliance of 48 CFR 852.219-10. FACTOR 3: PAST PERFORMANCE (20 Maximum Points) Subfactor 3A: Past Performance of projects identified in FACTOR 1. (15 Points). Subfactor 3B: Average Past Performance of all projects (5 Points). Provide CPARS data for all projects identified in FACTOR 1. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. Please utilize the attached PPQ document. CPARS data and PPQs will not be included in the page count. All projects provided in the SF330 must be completed by the office/ branch/ individual team member performing the work under this contract. The following information must be clearly specified on each performance report: Contract/task order number Project title Prime firm Start date Completion date Offers shall only include CPARS data for the projects listed in FACTOR 1. The contracting officer shall directly retrieve CPARS reviews from www.CPARS.gov to determine average past performance of previous projects. Government Past Performance Information Systems may be accessed. Evaluating past performance and experience may include information provided by the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. Failure to provide requested data, accessible points of contact or valid phone numbers could result in a firm being considered less qualified. FACTOR 4: QUALITY CONTROL (10 Maximum Points) Subfactor 4A: Management approach (5 Points). Subfactor 4B: Quality methodology (5 Points). The A/E Firm shall describe its management approach, regarding coordination of disciplines and subcontractors, familiarity of the prime firm and any key subcontractors with VA Design Guides/Manuals, Master Specifications, ASHRAE standards, NEC, and other applicable standards. A/E Firm shall also provide the following: Quality Control organization, and management structure. Methods and procedures for control and prevention of nonconformances during design, preconstruction, and construction. Methods and procedures for nonconformance remediation at all stages of project. Methods and procedures for control and prevention of cost, and schedule overruns. Summarized schedules for selected three previous design projects that show initial approved project schedule, and any updates to schedule with time extensions. Provide a narrative to describe reasons and justifications for any deviations from initial schedule. Summarized cost estimates for selected three previous design projects that show initial approved total project cost estimate, and any increases to initial cost estimates. Provide a narrative to describe reasons and justifications for any deviations from initial estimates. Describe any unforeseen conditions that arose during construction for your last three projects. Provide a narrative to describe how your firm assisted the project management team to correct those deficiencies, and any methods used to mitigate extra costs and increases in project schedule. FACTOR 5: CAPACITY (10 Maximum Points) Subfactor 5A: Capacity to complete work within required timeline (5 Points). Subfactor 5B: Resource management and project management (5 Points). The A/E Firm shall attest to its capacity to accomplish the work in the required time. The evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of personnel in key disciplines. The A/E Firm shall also provide the following: A list that shows the total number of design and project professionals who are currently employed at the firm with professional titles for each. Total number of projects in study or planning stages Total number of active design projects Total number of active construction phase services A list of personnel assigned to each of the above projects An analysis and report of available capacity of key personnel for immediate new work The respondent shall: Summarize its approach to staffing and company resource management For the key personnel on the proposed project team, tabulate their current and projected workload as percentages of their available individual capacity. List all work awarded to the A/E Firm by the VA during the previous 12 months, as well as any current indefinite delivery, indefinite quantity (IDIQ) contracts that it has. List the current stage and percentage of completion for non-IDIQ projects. A signed statement shall be provided stating that the firm acknowledges that prior to award of the contract, it is required to notify the Government of any changes in its capacity that could limit its ability to perform the work within the required time. FACTOR 6: GEOGRAPHIC LOCATION (5 Maximum Points) Location of the firm, as measured by the travel time (hours) between the Offeror s principal business location and Edward Hines, Jr. VAMC, Hines, IL. Architect must provide details of travel between their main office and Edward Hines Jr, VAMC Hines, IL. This includes but not limited to airport travel time, driving distance, etc. If the architect has a satellite location, the architect must provide details of a fully staffed and well-established satellite office. Leasing documentation may be requested. FACTOR 7: EXPERIENCE IN CONSTRUCTION PERIOD SERVICES (5 Maximum Points) The A/E Firm shall demonstrate its experience in providing Construction Period Services for hospital facilities, particularly in HVAC renovation projects. The respondent shall provide a narrative that describes the methods and procedures used to implement each of the following Construction Period Services tasks: Professional field inspections during the construction period, with descriptions of types of inspections provided, and methods used for inspections and reporting during each phase of construction Review of construction submittals Support in answering requests for information during the construction period Support of construction contract changes to include updated drawings, drafting statements of work, and cost estimates. Weekly construction meeting participation Closeout documents to include final inspections and as-recorded drawings. SECONDARY SELECTION CRITERION*: FACTOR 8: CLAIMS (-5 to 0 Maximum Points) Subfactor 8: Record of significant claims against the firm because of improper or incomplete architectural and engineering services. (-5 to 0 Points). * The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF330 submission. 2.1.c: After TEB Individual Ratings of the SF330s are completed, the TEB shall convene and develop consensus ratings for the seven evaluation factors of the SF330s as defined above. COMMENT DESCRIPTION DEFINITIONS Strong point: Provides Merit/advantages to VA that increase the likelihood of successful contract performance. Weak point: Flaws/disadvantages that increase the likelihood of unsuccessful contract performance. 2.2.c: The eighth factor (Secondary Selection Criterion) will only be used if needed. The TEB shall provide a listing, in order of preference, of the firms considered most highly qualified to perform the work. The contracting officer shall issue a Request for Proposal (RFP) to the architect-engineer the TEB recommends for negotiations. 3. SOURCE SELECTION PROCESS: 3.1 SF330 Reviews: The board will review and evaluate the submitted SF330 s in accordance with the stated evaluation criteria to determine each individual offeror s ability and capability to perform the work required and confirmation of determination of responsibility per FAR 9.1. a) TECHNICAL EVALUATION BOARD SF330 INDIVIDUAL EVALUATIONS (1) Each board member will conduct an independent review and evaluation and complete an evaluation rating sheet for EACH SF330. Each category will be addressed with strengths or weaknesses noted. (2) The evaluation will be in accordance with the Evaluation Factors which are listed in the solicitation. b) TECHNICAL EVALUATION BOARD SF330 CONSENSUS (1) After each member has completed their independent evaluation, the Chairperson will discuss the evaluations with the entire team and assure each evaluation is complete. (2) During these discussions, the board will reach a consensus rating for each SF330 and document ratings using the consensus evaluation worksheets. The SF330 can be downloaded through the GSA Forms Library at: https://www.gsa.gov/forms-library/architect-engineer-qualifications. No Fax Responses will be accepted: personal visits for discussing this announcement will not be entertained or scheduled. Questions may be directed only by e-mail to Donita.Grace@va.gov. VA Primary Point of Contact: Donita Grace, NCO 12 Contract Specialist, Donita.Grace@va.gov. The page limit for SF330 s will be 30 pages max., any pages after 30 will not be considered. See attached document: P01 - SOW 578-27-003 Renovate A Section 1st Floor Bldg. 1
-Combined Synopsis10/30/2026
-AwardedOpen
36C26227Q0022 ******* The purpose of this amendment is to: 1. Respond to questions asked regarding this solicitation. 2. Change the Period of Performance (POP) start date from 11/20/2026 to 12/01/2026. Base: 12/01/2026 09/30/2027 OY 1: 10/01/2027 09/30/2028 OY 2: 10/01/2028 09/30/2029 OY 3: 10/01/2029 09/30/2030 OY 4: 10/01/2030 09/30/2031 3. Change the response due date from 11/09/2026 to 11/12/2026. Questions and Answers: Q. Can you please let me know the total number of outlets to be tested. A. 3,000 Total. Q. # vacuum inlets A. 3,000 Q. # of medical gas system source equipment & location Bulk Oxygen, Med air, Vacuum, Nitrogen, WAGD, Dental Air, Dental Vacuum, Carbon Dioxide. Locations Main Hospital and Building 32 (cancer center) Q. # of medical gas booms/columns A. 38, Please see attachment named BOOM INVENTORY . Q. Could you please clarify whether the prime contractor must independently hold the ASSE 6020 Medical Gas Inspector and ASSE 6030 Medical Gas Verifier certifications, or whether these requirements can be satisfied through a qualified subcontractor whose personnel possess the required certifications? A. ASSE 6020 and ASSE 6030 certifications are required. Q. What are the manufacturer, model, and serial number of the boom equipment, source equipment, vacuum and air system? At a minimum, we need a manufacturer, model #, serial number for each system and each motor/compressor. Would providing photos of the source equipment be possible? A. We do not have the serial numbers or photos of the boom equipment but please see Exell spreadsheet attached Boom Inventory which has the Make, Model and location. Q. The Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No, we cannot provide the inspection report but we are providing the boom inventory. Please see Exell spreadsheet attached Boom Inventory . Q. Can the Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No Q. If this is a follow-on requirement, what is the prior contract number? A. Prior Contract No. : 36C26222C0020 Q. Which gases and systems are in scope (oxygen, medical air, vacuum, nitrous oxide, nitrogen, carbon dioxide, WAGD, instrument air)? A. Please refer to statement of work section V. Scope Q. Is the bulk oxygen tank owned and maintained by the gas supplier, with the contractor s scope limited to the pipeline side? A. The bulk oxygen is owned and maintained by the supplier. Q. Are Category 3 systems, such as dental air and vacuum, in scope? A. Yes Q. Does the Government expect only annual periodic inspection and testing, or a full NFPA 99 system verification each year? A. Only Annual. Q. Does each annual CLIN cover a single inspection event per year? A. Yes Q. May the ASSE 6020 and 6030 credentials be held by subcontractor personnel instead of the prime s employees? A. Certs. Must be held by the prime and subcontractor. Q. Must the field team include both a 6020 inspector and a 6030 verifier, or is credential acceptable for annual testing? A. Yes Q. Should pricing assume evening or weekend work for the ICU, OR, SICU and ED zones? A. Yes. Q. If a master alarm sensor is not on a demand check fitting, will the VA allow a brief isolation to test it, or is that test excluded? A. Yes, a brief moment. Q. Are photos required for every outlet/inlet, or only for sources, alarm panels, zone valves and deficiencies? A. Only deficiencies. Q. How many particulate and dewpoint sample points are expected, based on the number of floors in the Main Hospital and Buildings 30, 31 and 32? A. No. This test will only to be performed for installation, repair, or modification of any medical gas piping systems, Building 29, 30 has no medical gas. Q. When was the last annual inspection done, and when was the first inspection due under this contract? A. The last inspection was completed on 11/24/25 - 2026 inspection needs to be completed before 12/21/26. Q. Oxygen particulate analysis: This filter test is typically performed as a pre-test during construction projects under NFPA 99. The results would generally be expected to remain unchanged unless the pipeline is breached during construction. Please confirm whether this test is required as part of the annual inspection. A. No particulate test performed during verification of newly installed or modified medical gas piping systems only. Q. ASSE 6010 certification: Please confirm whether ASSE 6010 certification is required. Our understanding is that this is a medical gas installer certification, rather than an annual inspection requirement under NFPA 99. A. No, only if repairs need to be performed, contractor shall be 6010 certified to make repairs. Q. Boom testing frequency: Please confirm whether boom testing is required annually. Our understanding is that NFPA 99 recommends testing every 18 months. A. VA requires this test to be performed annually. Q. Boom testing scope: Please confirm whether the testing includes disassembly of the booms to inspect for leaks and dry rot. A. Yes Q. Boom testing report: Please confirm whether the detailed report should include photographs of disassembled booms and a comprehensive list of recommended repairs. A. Yes, if any deficiencies are found. Q. Building confirmation: Mr. Stockman indicated that Eye Clinic Building 32 and Audiology Building 30 should be excluded from the proposal. Please confirm. A. Only main Hospital and building 31 (cancer center) will be tested annually. Q. Could you please clarify what repair work, if any, must be included in the annual fixed price? Specifically, should the contractor include any routine repairs or corrective maintenance, or will all repairs, replacement parts, and installation services be treated as separately authorized work under Section VI? A. This solicitation is only for Inspection, not for repairs. In the Statement of Work (Section VII) we have to include "Over and Above Repair" to clarify that the contractor must notify the POC immediately if any repairs needs to be made.
-Combined Synopsis11/12/2026

Additional Details

Solicitation Number

36C25226Q0092

Archive Date

May 2, 2026

Office Address