GovChime
Notice ID: 734f83501da1400ba468d620448281a6Presolicitation

C211--Correct Reusable Medical Equipment Storage / 589A4-24-101

Archived on April 23, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
January 29, 2024
Notice type
Presolicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
541310: Architectural Services
Agency
Department of Veterans Affairs

Notice details

Office
255-NETWORK CONTRACT OFFICE 15 (36C255)
Place of performance
Harry S Truman VAMC 800 Hospital Drive, Columbia, MO, 65201
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C25524R0049
Notice ID
734f83501da1400ba468d620448281a6

Description

PRESOLICITATION NOTICE Request for Architect Services (A/E) 330 submission Solicitation: 36C25524R0049 Correct Reusable Medical Equipment Storage Project No. 589A4-24-101 CONTRACT INFORMATION This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This procurement is restricted to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with the VAAR 836.606-71 as implemented in FAR Subpart 36.6. This is not a Request for Proposal, and an award will not be made with this announcement. This announcement is a request for SF 330 s from qualified Architectural and Engineer (A&E) contractors that meet the professional requirements. The selection criteria for this acquisition will be in accordance with FAR 36.602-1, evaluation factors are listed below. The completed SF 330 will be evaluated by the Columbia VAMC Evaluation Board in accordance with FAR 36.602-5(a) and the selection report shall serve as the final selection list, which will be provided directly to the Contracting Officer. Negotiations will be conducted beginning with the most highly qualified firm. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. The contract is anticipated to be awarded no later than March. Award of any resultant contract is contingent upon the availability of funds. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted to Jeanette Mathena and James Petrik via e-mail to: jeanette.mathena@va.gov and james.petrik@va.gov. Personal visits to discuss this announcement will not be allowed. The NAICS Code for this procurement is 541310 A/E Services and the small business size standard of $12.5 Million. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is estimated at 179 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction services if award of a construction project contract is made. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASID FOR QUALIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS INCOMPLIANCE WITH FAR 52.219-14 and VAAR 852.219-73. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFORMATION PAGES DATABASE, https://sam.gov/content/home SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/ and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at https://sam.gov/ for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: : http://www.gsa.gov/portal/forms/download/116486). Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be in pdf and emailed. Completed package shall be delivered on or before February 23,2024 by 2:00PM CT to the following email address: jeanette.mathena@va.gov and james.petrik@va.gov. Email subject line shall clearly identify Solicitation number:36C25524R0049 and project name, Correct Reusable Medical Equip Storage, Project No. 589A4-24-101. The 330 submission must be a pdf document and must be below 10 MG and not to exceed (50) pages. PROJECT INFORMATION This project has two major components: Evaluate the hospital s current Reusable Medical Equipment (RME) Storage rooms HVAC capability and make upgrades to the HVAC system to ensure it has adequate capacity to comply with the RME storage requirements in ASHRE Standard 170-2008. There are 33 RME storage rooms throughout entire hospital. Replace the four existing Ambulatory Care Addition (ACA) air handling units and upgrade the ACA building HVAC system. This will include installing clean steam generators, humidifiers, hot water heat exchangers, expanding the ACA reheat system to provide full coverage (not just perimeter) and installing dehumidifiers. The ACA current reheat system serves the perimeter of the building and lacks the ability to provide temperature control in all interior rooms. Reheat system expansion will include installing new VAVs. The Architect or architect/engineer firm capable of preparing all design and construction documentation including, but not limited to advance planning, design, and construction oversite (including final as-built drawings) at the Harry S Truman Veterans' Memorial Hospital (HSTVMH) in Columbia MO. Prime contractor shall have, at least, the following licensed/registered specialty disciplines be members of the firm, or team, with demonstrable expertise in their respective fields: Architect; Structural Engineer, Mechanical Engineer, Fire Protection Engineer, Life Safety Engineer, Plumbing Engineer; Communication (Building Automation Networking), Electrical Engineer, and Cost Estimator with experience on projects of similar size and complexity. It is important to emphasize that the A/E shall perform site investigation, design development, detailed design work, prepare detailed construction documents, keeping in mind that the end result is a completely functional and fully operational product. The A/E must consider constructability and maintaining hospital operations while designing the project. This will include phasing of construction and utility impacts. EVALUATION FACTORS: Selection criteria are in accordance with Federal Acquisition Regulation (FAR) Part 36.602-5. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as necessary. SF 330 submissions including any additional pages are not to exceed Fifty (50) pages. Each page cannot exceed 81/2 x 11 in size. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. SF 330 must be submitted as a PDF and cannot exceed 10MB. Qualifications (SF330) submitted by each firm for Project Correct Reusable Medical Equipment Storage, Project No. 589A4-24-101 will be reviewed and evaluated based on the following evaluation criteria listed below all factors are equally important: Professional Qualifications: the qualifications of the individuals which will be used for these services will be examined for experience and education and their record of working together as a team. The Architectural firm capable of preparing all design and construction documentation including, but not limited to advance planning, design, and construction oversite (including final as-built drawings) at the Harry S Truman Veterans' Memorial Hospital (HSTVMH) in Columbia MO. Prime contractor shall have, at least, the following licensed/registered specialty disciplines are mandatory for this project to be members of the firm, or team, with demonstrable expertise in their respective fields: Architect; Structural Engineer, Mechanical Engineer, Fire Protection Engineer, Life Safety Engineer, Plumbing Engineer; Communication (Building Automation Networking), Electrical Engineer, and Cost Estimator. The team shall have demonstrable experience in programing, planning and design of complex healthcare projects of a similar nature with experience on projects of similar size and complexity. Specialized Experience and Technical Competence: Specific experience and technical skill in the type and scope of work for medical renovations to existing medical facilities, including, where applicable, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Experience and qualification of personnel proposed for assignment and their record of working together as a team. The effectiveness of proposed project team (including management structure, coordination of disciplines, subcontractors, and prior working relationships) will be examined. The qualifications for Architect; Structural Engineer, Mechanical Engineer, Fire Protection Engineer, Life Safety Engineer, Plumbing Engineer; Communication (Building Automation Networking), Electrical Engineer, and Cost Estimator shall include a summary of at least five similar projects that demonstrate technical capabilities. Capacity to Accomplish the Work: The prime contractor will be evaluated to determine if it has the general workload and staffing capacity within its design office which will be responsible for the design to accomplish the work in the required time. In accordance with VAAR 852.219-75: In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Prime contractor must include its certification of compliance with the limitations on subcontracting specified in 852.219-75 with its 330 submissions. Past Performance: The past performance of projects that are complete (design and construction) that the firm has designed relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performances that are older than 5 years will receive a lesser rating than those references for projects accomplished within the past 5 years. Design Projects that are submitted and not constructed will not be considered. Location of Design Firm: the geographic proximity of each firm to the location of the VA Medical Center will be evaluated. The mileage restriction is in compliance with FAR 36.602-1. This factor will apply to the office from which the prime contractor s business office is established. Firms within 450 miles of the medical center will receive a maximum rating. Firms more distant than 450 miles will receive a lower rating for this factor. Firms may use Google Maps, MapQuest, Yahoo Maps, or Rand McNally to determine and report the distance of the office where the Prime Contractor is established. Prime contractor shall not use a subcontractor office, consultant office, or any office other than Prime Contractor s physical location established prior to publication of this notice to determine distance to the Columbia, VA. Claims and Terminations: record of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services will be examined. Reputation in A-E Community: reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services. Knowledge of locality: include knowledge of geological features, climatic conditions, or local construction methods that are unusual or unique to Harry S Truman VAMC, Columbia, Missouri. 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction. As prescribed in 819.7011(b), insert the following clause: VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction (NOV 2022) (a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that - (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.] (i) X Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73 or VOSBs as set forth in 852.219-74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. (ii) General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73or VOSBs as set forth in 852.219-74. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (iii) Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-73 or VOSBs as set forth in 852.219-74. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee; (ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating section 1001 of title 18. (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed. (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate. (d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror's bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. Certification I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror]. Printed Name of Signee: Printed Title of Signee: Signature: Date: Company Name and Address: (End of clause) Harry S Truman Veterans' Memorial Hospital (HSTVMH) Columbia, MO Supplement B - A/E DESIGN SERVICES for Correct Reusable Medical Equipment Storage Project No. 589A4-24-101 PROJECT NUMBER: 589A4-24-101 PROJECT TITLE: Correct Reusable Medical Equipment Storage DESIGN TIMEFRAME: A/E shall deliver final construction documents NLT 179 calendar days after the Award/Notice to Proceed Letter CONSTRUCTION BUDGET/DESIGN LIMITATION: Magnitude of construction project range: Between $1,000,000 to $5,000,000 The A/E will be required to design within this budget. The A/E will also be required to incorporate bid items into the bid documents that will allow for a 10% budget reduction. In accordance with FAR 52.236-22, Design within Funding Limitation (APR 1984), the estimated Total Construction Contract Price for this project proceeding into construction documents is not to exceed the Construction budget listed above, VA Furnished/Installed Medical Equipment, VA Furnished/Installed FFE or Professional Service Fees. The A/E is responsible for designing the project within the estimated total Construction Contract Price for the Design Development and Construction Document phases of this project. If, at any time, the A/E determines that the design s construction cost will exceed the Total Construction Contract Price (TCCP) the A/E shall immediately inform the Contracting Officer in writing. Such written notification shall include the reasons why the A/E believes the TCCP will probably be exceeded and shall offer proposed solutions to reduce the project cost to be within the TCCP. The A/E fee proposal shall be based on the design scope of work as defined below. If the contracting officer determines the TCCP can be increased the design fee will not be increased unless additional scope was requested and added through the modification process. CRITERIA FOR DESIGN AND PROJECT DEVELOPMENT (as applicable to project) - Barrier Free Design Standard - Design and Construction Procedures, PG-18-3 - Design Manuals, PG-18-10 - Design Submission Instructions, Minor and NRM Projects, PG-18-15, Vol C - Standard Details. Program Guide, PG-18-4 - Equipment Reference Manual, PG-18-6 - Equipment Guide List, Program Guide PG-18-5 - Space Planning Criteria PG-18-9 - Space Planning Criteria for Medical Facilities Handbook, 7610 - Uniform Federal Accessibility Standards - Signage Design Guide - Master Construction Specifications, Program Guide, PG-18-1 - VA Design Alerts - VHA National CAD Standards - National Codes and Standards (NFPA, NEC, Natl. Plumbing Code, EPA, OSHA, etc.) - Physical Security Design Manual for VA Facilities Note: The above documents can be found at the following website: http://www.cfm.va.gov/TIL/ SCOPE OF CONSTRUCTION PROJECT Description: The Architect or architect/engineer firm capable of preparing all design and construction documentation including, but not limited to advance planning, design, and construction oversite (including final as-built drawings) at the Harry S Truman Veterans' Memorial Hospital (HSTVMH) in Columbia MO. This project has two major components: Evaluate the hospital s current Reusable Medical Equipment (RME) Storage rooms HVAC capability and make upgrades to the HVAC system to ensure it has adequate capacity to comply with the RME storage requirements in ASHRE Standard 170-2008. There are 33 RME storage rooms throughout entire hospital. Replace the four existing Ambulatory Care Addition (ACA) air handling units and upgrade the ACA building HVAC system. This will include installing clean steam generators, humidifiers, hot water heat exchangers, expanding the ACA reheat system to provide full coverage (not just perimeter) and installing dehumidifiers. The ACA current reheat system serves the perimeter of the building and lacks the ability to provide temperature control in all interior rooms. Reheat system expansion will include installing new VAVs. Prime contractor shall have, at least, the following licensed/registered specialty disciplines be members of the firm, or team, with demonstrable expertise in their respective fields: Architect; Structural Engineer, Mechanical Engineer, Fire Protection Engineer, Life Safety Engineer, Plumbing Engineer; Communication (Building Automation Networking), Electrical Engineer, and Cost Estimator with experience on projects of similar size and complexity. It is important to emphasize that the A/E shall perform site investigation, design development, detailed design work, prepare detailed construction documents, keeping in mind that the end result is a completely functional and fully operational product. The A/E must consider constructability and maintaining hospital operations while designing the project. This will include phasing of construction and utility impacts. The A/E must be able to respond to issues in a timely manner, to include being on-site within 24 hours. This is due to the need to keep this project progressing and on time, avoiding any delay claims. As construction is heavy in the area, contractors are on tight schedules to schedule trades and equipment. Having an A/E that can be onsite within 24 hours allows emerging issues to quickly and efficiently be solved. The final design documents from a resultant task order will be subject to review and approval (by signature) of all members of an Integrated Project Team (IPT) consisting of medical center personnel. These individuals will be identified by the COR at the first design review meeting. Additionally, the design will be reviewed by a 3rd party for compliance with all life safety codes. It will be the A/E s responsibility to address and track responses to all issues arising from these reviews. As part of the 100% submission the A/E shall provide a written synopsis describing the overall scope of the construction project as well as any pertinent information about the project that would assist potential bidders in preparing a comprehensive bid package. This synopsis is intended to be a general description of the project not to exceed two written pages in length. The A/E design firm shall furnish all necessary architectural and engineering resources to provide a complete construction design package and construction period services. Architect / Engineer shall provide professional design services for Correct Reusable Medical Equipment Storage. The project shall include the following, along with all other design facets deemed necessary by the VA and Architect/Engineering firm for the completion of this project: Design shall meet all applicable/current codes for mechanical, plumbing, electrical, fire protection, and life safety, VA standards, VA Design Manuals, and VA Design Guides; All spaces will be designed to meet the Interagency Security Committee and other relevant physical security guidelines; The completed project shall be capable of achieving LEED Silver certification; All lighting shall be LED and dimmable; Security, access control, and surveillance to be tied into the existing security system; Building Management System to be tied into the existing Building Management System; All plumbing shall comply with VHA Directive 1061; HVAC system to be variable air volume type. Items b, c, d, e, and f apply to spaces being altered to support utility routing. No remodel work is intended in any area. All design should account for constructability and ensuring the construction is capable of being completed safely with minimal impact to the medical center operations. Project should be designed with bid deducts should bids come in above the estimate. This project is not expected to include more than 2 bid deducts. Anticipated time for completion of design is 179_calendar days including time for VA reviews. SITE INVESTIGATION A/E shall be responsible for conducting site visits for the purpose of data gathering, investigation and documentation of all existing conditions. Perform such investigations as required to accurately verify all existing conditions. Do not rely solely upon "as built" drawings. VA personnel will provide assistance with investigating the project site where prior experience with equipment and utilities will produce an appreciable advantage. The A/E firm shall be responsible for site review of the existing facility in order to field verify the owner's existing documents and as-built drawings. Any modifications that are required to be made as a result of the site review shall be communicated to the VA and corrected by the A/E firm. All site investigation shall be completed during the site investigation phase. Schematic The A/E shall do one onsite visit to the facility to meet and discuss with the Integrated Project Team. An agreed to and solid schematic design is the foundation for a successful design. The first meeting will be to do an initial site visit and hear the needs, wants and desires of the users for this space. The second meeting will be to present schematics for the project with A/E providing their pros/cons to each. This meeting can be site visit or TEAMs meeting. During this meeting the final schematic will be approved if justified. Project Phasing will be determined during this meeting. AE shall plan for design and design review meetings as part of the Scope of Work. Design Development Design Development: The A/E shall make investigations necessary to thoroughly evaluate the conditions of the existing space. The VA shall allow for five days of site investigation. Any investigation beyond that shall be at the A/E s expenses. The designer shall make recommendations that comply with the VA HVAC Design Manual and have been reviewed and approved by the medical center design team (this team will be identified in the future). The design shall include any energy efficiency improvements available for the application. The DD phase defines the space, a too scale depiction of spatial relationships, wall locations, restrooms, etc. All designs shall be in accordance with A/E Submission Instructions for Minor and NRM Construction Program, Program Guide PG-18-15, Volume C. Mechanical, plumbing, electrical, and fire and safety systems must meet current codes and standards, including VA Standards. All new space and utilities will be designed to meet the Interagency Security Committee s and other relevant physical security guidelines. The completed project shall can achieve LEEDS certification (actual certification will NOT occur). A/E shall provide a life safety code analysis of the proposed design in coordination with the existing adjacent functions to verify the proposed design does not generate any compliance issues. This is to include during the various phases. The A/E shall provide a certification that the Correct Reusable Medical Equipment Storage Project is a stand-alone project and does not require any follow-on project to make the space suitable for its intended occupancy. The A/E shall match existing finishes in hospital areas being modified to complete project work. Construction Documents A/E firm shall complete such further investigations to develop the accepted design development documents into working drawings and specifications for issuance through the competitive bid process. A/E firm shall provide a complete construction plan detailing all phases and sequencing of construction to minimize the impact on the facility. In most instances, copies of the VA Master Construction Specifications will be available off the Office of Construction & Facilities Management TIL website, which will be edited and incorporated in the project specifications. In those instances, where copies of the VA Master Construction Specifications are not available, the A/E shall develop the specification for incorporation into the project specifications. Copies of design guides, space criteria, room finishes, and other VA guidelines are also available off the Internet. It is required that the A/E design in accordance to VA guidelines as these guidelines supersede any other industry guidelines. It is important to note that all specification sections be thoroughly edited to maintain uniformity of formatting and structure. All spec writer notes must be removed. Working drawings and specifications shall provide for construction within the National Fire Protection Association Code, VA Standards, and other applicable national codes. the A/E shall package bid documents necessary to solicit, bid and award the construction of this project. A/E will provide a 1 to 2-page scope of work summary of the project to the contracting officer when 100% design documents are complete. The A/E shall provide a signed memorandum stating that this project has been designed as a standalone project. The VA shall provide this memorandum for signature. A/E firm shall provide two (2) copies of such drawings, copies of construction cost estimates, and specifications developed. Drawings shall be one (1) full size (36 x48 ) copy and one (1) half size (18 x24 ) copy and a set of specifications to the VA, and one (1) half size (18 x24 ) copy and a set of specifications to the contracting officer. Specifications should be hard copy and pdf format. Deliverables shall include (for ALL ELECTRONIC SUBMISSIONS, FILES MUST BE LESS THAN 10MB in size) Site Investigation 1El...

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Jul 29, 2024

NAICS

541310

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25524R0049
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. Pre-SolicitationCurrentJan 29, 2024

    C211--Correct Reusable Medical Equipment Storage / 589A4-24-101

    Notice 734f83501da1400ba468d620448281a6 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbestos Project Designer? If these must be separate individuals, should both be identified in the SF330? A CIH satisfies the requirement for the VPIH and the state-accredited Asbestos Project Designer. They can be the same individual. Site Visit: Supplement B, page 6, Section III.6.g: the A/E "shall meet with the COR at the proposed project site" prior to submitting a response Presolicitation Notice, page 4: "Personal visits to discuss this announcement will not be allowed" and only "the most highly rated firm must physically come to the site" before pricing Question: Please confirm that no site visit is required before the SF330 submission. No site visit is required prior to SF330 submission. Laboratory and Special Room Rquirements: Presolicitation Notice, page 7, Evaluation Criteria 2, Specialized Experience and Technical Competence: "laboratory requirements for the firm" Supplement B, page 18, Section B6.II.1: "floor plans of special rooms such as the endoscopy suite, recovery room, etc." Questions: Neither a laboratory nor an endoscopy suite or recovery room appears in the project scope. Do any of these requirements apply to this project? These requirements do not apply to this project. Can the VA please release updated and corrected documents? The evaluation criteria 2 will be changed to remove laboratory requirements for the firm and the COR will revise Supplement B to remove the endoscopy suite and recovery room from the Supplement B.
-Pre-Solicitation11/16/2026
Pre-solicitation Notice #36C25526R0182 for project 657-27-210JB, A/E-Repair RRTP for Restrooms in Building 3 and 51.
-Pre-Solicitation10/05/2026
PRESOLICITATION NOTICE Request for Architectural and Engineer (A/E) 330 submission Solicitation: 36C25526R0020 Upgrade Pharmacy & Pharmacy Compounding Suite HVAC MC, Project No. 589-26-472 CONTRACT INFORMATION Project 589-26-472, Upgrade Pharmacy & Pharmacy Compounding Suite HVAC This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected based on demonstrated competence and qualifications for the required work. This procurement is restricted to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with FAR Subpart 36.6. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330 s from qualified Architectural and Engineer (A&E) contractors that meet the professional requirements. The selection criteria for this acquisition will be in accordance with FAR 36.602-1 and are listed below. All factors are listed in descending order of importance. The completed SF 330 will be evaluated by the Kansas City VA Medical Center Evaluation Board in accordance with FAR 36.602-3 and the selection report shall serve as the final selection list, which will be provided directly to the Contracting Officer. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. The contract is anticipated to be awarded no later than April 30, 2026. Award of any resultant contract is contingent upon the availability of funds. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted to David Sterrett via e-mail to: david.sterrett@va.gov. Personal visits to discuss this announcement will not be allowed. The NAICS Code for this procurement is 541330 Engineering Services and small business size standard of $25.5 M. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 345 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction services if award of a construction project contract is made. In accordance with FAR 36.204 and VAAR 836.204, the estimated magnitude of the construction project being designed is anticipated to be between $2,000,000.00, and $5,0000,000.00. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR. THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS IN COMPLIANCE WITH VAAR 852.219-73 ONLY BUSINESSES VERIFIED AND LISTED AS CERTIFIED IN THE SBA CERTIFICATION DATABASE AT https://veterans.certify.sba.gov, SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) A-E firms are required to respond if interested by submitting one (1) completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be in pdf, no larger than 20 Megabytes(MG), and emailed. Completed package shall be delivered electronically on or before Friday, December 5, 2025 at 2:00 pm Central Standard Time (CST) to the NCO 15 Contracting Office, Attn: David Sterrett, Contracting Officer, to the following email address: david.sterrett@va.gov Email subject line shall clearly identify Solicitation number: 36C25526R0020 and project name, Upgrade Pharmacy and Pharmacy Compounding Suite HVAC, Kansas City, Project No. 589-26-472 The SF330 submission must be a pdf document, must be below 20 megabytes (MG), and is not to exceed sixty (60) pages. Photographs or other graphics will be included in the 60-page count. Title pages and tables of contents, if applicable, are excluded from the page count limitation. Pages submitted in excess of the limitations specified in this notice will not be evaluated. The following is an example of how this standard will be enforced- if Company A submits their SF330 that is 100 pages, and the limit is 60 pages, only pages 1-60 will be submitted to the selection team for evaluation and pages 61-100 will be removed from Company A s SF330 document prior to being submitted for evaluation. Note: Signed Attachment 1, VAAR 852.219-75 VA Notice of Limitations on Subcontracting, must be included with your SF330 package or the SF330 will not be evaluated. PROJECT INFORMATION The mission of the Veterans Affairs Kansas City VA Medical Center is to provide the highest quality health care to our nation s veterans. In order to accomplish this mission Kansas City Facility Engineering Service (FES) intends to partner with an Architect/Engineer (A/E) or Engineer Firm for a design completion for Project 589-26-472, Upgrade Pharmacy and Pharmacy Compounding Suite HVAC. General Statement: The U.S. Department of Veterans Affairs (VA) requires Architectural and Engineering (A/E) services to produce stand-alone Construction Documents, Reports, and Specifications for Project: 589-26-472 Upgrade Pharmacy and Pharmacy Compounding located at the Kansas City VA Medical Center. This project will provide a dedicated AHU for the inpatient & outpatient pharmacy suite, repair floors ceiling grid, provide a dedicated AHU and exhaust for the Pharmacy compounding suite, and provide a temporary AHU during construction for continued pharmacy operations. Pharmacy and Pharmacy Compounding Suite are in Valor Building (Bldg. 26) on the second floor. It is approximately 5,500 SF. Drawings showing the primary area of work on the 2nd floor(HVAC and Pharmacy), first floor and in the basement (HVAC) are included. The design team is expected to be knowledgeable about current Pharmacy regulations that the VA is required to follow and the current officially approved USP797/USP800. In addition, VA current requirements from the Technical Information Library related to Pharmacy and HVAC design must be followed. The construction magnitude of this project is estimated to be between $2,000,000 and $5,000,000. EVALUATION FACTORS: Selection Criteria are in accordance with Federal Acquisition Regulation (FAR) Part 36.602-1. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as necessary. SF 330 submissions including any additional pages are not to exceed sixty (60) pages. Each page cannot exceed 8-1/2 x 11 in size. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed sixty (60) pages. All pages above 60 pages will not be included in the evaluation. SF 330 must be submitted as a PDF to david.sterrett@va.gov and cannot exceed 20 MB in size. Refer to CONTRACT INFORMATION section points o. r. for additional submittal requirements and instructions. Qualifications (SF330) submitted by each firm for Upgrade Pharmacy & Pharmacy Compounding Suite HVAC, Project Number 589-26-472, will be reviewed and evaluated based on the following six (6) evaluation criteria listed below. The evaluation factors are listed in descending order of importance. The SF 330 selection criteria descriptions (1 through 6) are provided below: SF 330 Evaluation Factors (1 through 6) PROFESSIONAL QUALIFICATIONS Provide brief resumes of proposed team members who will specifically serve as the Project Manager(s), Designers of Record, and Quality Control Manager(s). In addition, provide resumes of other relevant team members or frequent subcontractors who will perform technical tasks under this contract including their record of working together. Designers and other team members include, but are not limited to: Architects, Engineers (Civil, Structural, Mechanical, Electrical, Plumbing, Fire Protection/Life Safety, Commissioning), Cost Estimators, Environmental Safety & Health, Industrial Hygiene, BIM/CAD Tech, and Third Party Fire Protection/Life Safety Design Review. The Designers of Record shall perform and direct the design within their respective discipline and shall sign and seal the drawings. All Designers of Record must be professionally registered in their discipline in the state of Missouri or in a state which Missouri has recognized their license. Provide all required professional credentials for each Designer of Record that allows them to sign and seal drawings in the state of Missouri or in a state which Missouri has recognized their license. Each resume shall include a minimum of three (3) and a maximum of five (5) specific completed projects in the past five (5) years that best illustrate the individual team members experience relevant to this contract scope. Resume shall state the role the specific individual played in the project. SPECIALIZED EXPERIENCE & TECHNICAL COMPETENCE Specialized experience and technical competence in health care facilities (to include joint ventures), including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. This factor evaluates the amount of experience the AE firm has in designing similar types of work/facilities and evaluating their technical competence. The factor includes an emphasis, where appropriate, on the firm's experience in energy conservation, pollution prevention, waste reduction and the use of recovered materials. Provide a detailed narrative of a minimum of three (3) and up to five (5) maximum relevant projects that have completed design within the last 10 years AND completed construction within the last 5 years which best illustrate overall team experience relevant to this contract scope. List projects that demonstrate the teams experience with projects of similar size and scope to those to be performed under this contract; Specific design areas to be evaluated within this factor are: VA Hospital or Pharmacy experience incorporating relevant codes. Experience with designing to VA HVAC Design Manual standards and requirements for critical use areas or similar commercial standards. Familiarity with U.S. Pharmacopeia (USP) and its regulations for Pharmacy including but not limited to USP-797, USP-795 and USP-800 as individuals and also as a team working together. Firms that demonstrate this type of relevant past experience will be given a higher rating. Familiarity with and experience incorporating the requirements of current or recent VA guidance documents related to Sustainable Buildings including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. CAPACITY TO ACCOMPLISH WORK The general workload and staffing capacity of the design office that will be responsible for the majority of the design and the ability to accomplish the work in the required time. This factor evaluates ability of the AE firm, given their current projected workload and the availability of their key personnel, to accomplish the design project in the required time. It also requires that all firms submitting a 330 must certify that they can and will comply with VAAR 852.219-75 VA Notice of Limitations on Subcontracting. (See Attachment 1) The general workload and staffing capacity of the design office will be evaluated as follows: Indicate the firms' present workload and future availability of the project team (including sub-consultants) shown by month through, at a minimum, the next 18 months for the specified contract performance period. Describe experience in successfully delivering project submittals per performance schedule, maintaining the same key personnel from design NTP through final construction punch lists, providing timely construction period of services support, and successfully completing multiple projects with similar delivery dates. Describe how the team is going to meet the strict design deadlines for the proposed project of 345 days. In accordance with VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, you must certify that if awarded the contract your firm will comply with the limitations on subcontracting specified in this clause and in the resultant contract. You must complete, sign and submit Attachment 1- VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction document as part of your SF330 package which states the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73. If this certification is not completed and submitted with the SF 330, your package will not be evaluated, will be eliminated from the selection process, and cannot be awarded a contract. PAST PERFORMANCE NCO 15 will evaluate past performance on recent and relevant contracts with Government agencies (emphasis on VA work) and private industry in terms of construction cost estimating, cost control, quality of work, compliance with performance schedules and a record of significant claims against the firm due to improper or incomplete engineering services (references required). Project past performances that are older than 10 years will receive a lesser rating than those references for projects accomplished within the past 10 years. Past performance evaluations may also be conducted using information obtained from CPARS or PPIRS and any other sources deemed appropriate by the Contraction Officer. Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance, and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. Provide five (5) completed relevant project Final CPARS, past performance questionnaires, or similar documents as past performance documentation, or provide an explanation for not including 5 relevant Final CPARS or other equivalent documentation. List all projects with a design fee of greater than $400,000.00 designed in the firm s office in the past five (5) years. Include a brief summary of the scope, completion date, contract number, design award amount, construction cost estimate, construction completion date (if completed), customer name, point of contact, and location of work. ESTIMATING EFFECTIVENESS Provide information on the five (5) most recently awarded construction projects that were designed by this A/E team. Provide the project title, brief scope of work, A/E team s construction estimate total and actual construction award price. Provide projects performed in the Kansas City area that have provided your team with knowledge of the local area. Include brief project summary, design to limitation or construction value, and completion date for each project. If the difference is greater than 10% explain why the A/E believes the difference was greater than 10%. If the team does not have any recent projects, provide the same information on projects that the prime A/E for this team was the prime A/E for the past projects. Provide the names, titles and experience of the persons that will perform the design for each discipline; and then has oversight of the entire estimate. CLAIMS, TERMINATIONS, AND LITIGATION Claims and Terminations: record of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services will be examined. Provide information on any litigation involvement of the past five (5) years and the outcome. Attachment 1 Request for Architectural and Engineer (A/E) 330 submission Solicitation: 36C25526R0020 Upgrade Pharmacy & Pharmacy Compounding Suite HVAC Project No. 589-26-472 FAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction As prescribed in 819.6011(b), insert the following clause: VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) (a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: [Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.] (i) [X] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219-73 or certified VOSBs listed in the SBA certification database as set forth in 852.219-74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee; (ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating 18 U.S.C. 1001. Attachment 1 (Continued) Request for Architectural and Engineer (A/E) 330 submission Solicitation: 36C25526R0020 Upgrade Pharmacy & Pharmacy Compounding Suite HVAC Project No. 589-26-472 (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed. (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate. (d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. Certification: I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror]. Printed Name of Signee: ________________________________________ Printed Title of Signee: _________________________________________ Signature: ___________________________________________________ Date: _____________________ Company Name and Address: ______________________________________ ________________________________________________________________ (End of clause)
-Pre-Solicitation12/05/2025
-AwardedOpen
-AwardedOpen

Additional Details

Solicitation Number

36C25524R0049

Archive Date

Apr 23, 2024

Office Address

LEAVENWORTH, KS, 66048