Notice ID: 14e7a0a5e1cd4bf2811ff8471c913811Sources SoughtArchived
F115--Sources Sought Notice Spill Prevention Control and Countermeasures Plan (SPCCP) 5-year review Marion, IL VA Medical Center
Archived on December 7, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 11:00 AM CST
- Posted
- November 3, 2025
- Notice type
- Sources Sought
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 541330: Engineering Services
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 255-NETWORK CONTRACT OFFICE 15 (36C255)
- Place of performance
- Department of Veterans Affairs Marion VA Medical Center 2401 West Main St., Marion, 62959
- Last updated
- Nov 6, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C25526Q0066
- Notice ID
- 14e7a0a5e1cd4bf2811ff8471c913811
Description
Revise Spill Prevention, Control, and Countermeasures Plan (SPCCP) For Marion, IL VA Medical Center (MRN) INTRODUCTION MRN VAMC is seeking a 5-year review and amendment of the current plan to verify compliance with current and any new requirements listed in (a-d) below and to update since the approval of the current SPCCP dated/signed March 30, 2021. The revised document shall be electronic and user-friendly. The contractor shall perform a 5-year review according to 40 CFR 112, to include any revisions, updates, or technical changes for amendment. The contractor will make necessary changes including plan content, maps, worksheets, charts, cross references, etc. The contractor may use current plans as references for technical information. SPECIFIC PROJECT REQUIREMENTS The contractor shall: amend, update, and prepare the existing SPCCP, which must be fully compliant with the latest requirements of 40 CFR 112 as well as applicable State and Local regulations. An update of the emergency response plan should be included for accidental releases of vehicular and equipment petroleum products, coolants, and lubricants within the SPCCP. This will include coordination with and cross-referencing the medical center s current Emergency Operations Plan and Integrated Contingency Plan. The plan shall be certified by an Illinois registered Professional Engineer (P.E.) experienced in SPCCP preparation and current industry standards for oil storage and spill prevention. 40CFR 112.7, Oil Pollution Prevention. Amend technical changes from design, construction, operation, and/or maintenance. National Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code. All applicable federal, state and local regulations. Provide updates for any new Reporting and Training requirements
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Documents
Files (3)
Links (1)
- Websitewww.va.govPosted
Lifecycle
- 3Version 3Sources SoughtArchivedCurrent
F115--Sources Sought Notice Spill Prevention Control and Countermeasures Plan (SPCCP) 5-year review Marion, IL VA Medical Center
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Presolicitation Notice Presolicitation Notice Page 3 of 14 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 14 Synopsis: The purpose of this amendment to the request for 330 s is: Extend the due date to 10/16/26 at 2:00pm CST Update page limitation from 50 to 65 total pages Revised factors 3, 4 and 5 PROJECT TITLE: Pre-Solicitation Notice for 657-27-101, FCA-Conduct Hazardous Material Abatement, 2027, AE Design. STL-JB&JC Saint Louis VA Medical Center John Cochran Division and Jefferson Barracks Division, Saint Louis, MO. CONTRACT INFORMATION a. This A/E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected based on demonstrated competence and qualifications for the required work. b. This procurement is restricted to Service-Disabled Veteran Owned Small Business (SDVOSB) firms. This requirement is being procured in accordance with the VAAR 836.606-73 as implemented in FAR Subpart 36.6. c. This is not a Request for Proposal, and an award will not be made with this announcement. This announcement is a request for SF 330 s from qualified contractors that meet the professional requirements. d. The selection criteria for this acquisition will be in accordance with FAR 36.602-1 and VAAR 836.602-1 and are listed below in descending order of importance. The completed SF 330 will be evaluated by the St. Louis VA Medical Center Evaluation Board in accordance with FAR 36.602-5(a) and the selection report shall serve as the final selection list, which will be provided directly to the Contracting Officer. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. e. Award of any resultant contract is contingent upon the availability of funds. f. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only to Abby.Monroe2@va.gov and Matthew.Finley@va.gov. Personal visits to discuss this announcement will not be allowed. g. The NAICS Codes for this procurement is 541330 Engineering Services and small business size standard of $25.5M. Award of a Firm Fixed Price contract is anticipated. The anticipated time for completion of design is approximately 96 Days (including an estimated 12 VPIH oversight days during construction period services.) calendar days including time for VA reviews. The estimated magnitude of the resulting construction price range is estimated to be between $250,000 and $500,000. h. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS INCOMPLIANCE WITH VAAR 852.219-10. ONLY BUSINESSES VERIFIED AND LISTED IN THE SMALL BUSINESS ADMINISTRATION (SBA) REGISTRY https://veterans.certify.sba.gov, SHALL BE CONSIDERED. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. j. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. k. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) l. A/E firms are required to respond if interested by submitting one (1) completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: https://www.gsa.gov/system/files/SF330-21.pdf). Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions shall be made electronically. m. Completed package shall be delivered electronically on or before 10/16/2026 at 2:00PM Central Standard Time to the NCO 15 Contracting Office, Attn: Matthew Finley, Contracting Officer @ matthew.finley@va.gov and Abby Monroe, Contract Specialist @ abby.monroe2@va.gov. PROJECT INFORMATION The mission of the Veterans Affairs Saint Louis Health Care System (VASTLHCS) is to provide the highest quality health care to our nation s veterans. In order to accomplish this mission, VASTLHCS Facility Engineering Service (FES) intends to partner with an AE/Industrial Hygiene Firm on a project that will produce a finished design package for a Hazardous Material Abatement Project. This package will be used to procure a separate construction contract to perform the actual abatement at John Cochran (JC) and Jefferson Barracks Divisions, St. Louis, MO. For this Project, VPIH Firm will provide Basic Professional Services as delineated in the Scope of Work for VPIH. Final abatement design documents are required No Later Than (NLT) 96 Calendar Days after the Award/Notice to Proceed Letter. Supplement B SCOPE OF WORK: A/E services are required for Schematics, Design Development, Construction Documents, Construction Cost Estimate and Construction Period Services for project number 657-27-101 FCA-Conduct Hazardous Material Abatement, 2027, AE Design. This project will conduct hazardous materials abatement across various buildings at the John Cochran (JC) and Jefferson Barracks (JB) Divisions of the VA St. Louis Health Care System (VASTLHCS) during FY27. The scope includes VPIH (Verification of Prior Investigation of Hazardous materials) for additional sampling, abatement design, and oversight. The abatement is limited and guided by the results of the most recent hazardous materials survey and areas prioritized for Infrastructure and Historic Construction Contract (IHCC) work or identified by Maintenance & Operations (M&O) for needed repairs. Locations and extent of abatement will be determined based on upcoming IHCC and M&O project priorities. This delivery order shall cover the following tasks. A/E Part Two Services of this design project (also known as Construction Period Services) includes responding to construction contractor Requests For Information (RFIs) during the solicitation and construction phases of the construction project, attendance at pre-bid, post-award and commissioning kick off construction project conferences, review of construction material submittals and shop drawings, approximately 5 site visits during construction to ensure compliance with the design drawings and specifications, preparation of site visit reports, coordination with project commissioning requirements, review of any construction project modifications for cost and technical acceptability, attendance in the final acceptance inspection, preparation of the punch list and preparation of record drawings of the completed construction project based on the construction contractor s as-built drawings. The A/E shall prepare a submittal log to be utilized by the VA during construction period services, maintain RFI log and provide meeting minutes for weekly construction meetings throughout the duration of construction. The A/E shall hire a third-party commissioning agent to commission all installed equipment. The above paragraphs constitute a basic outline of the work to be accomplished and in no way comprises all the details for design of this project. The A/E shall initiate detailed inspection of the project site to determine the needs and conditions for the design of this project. The A/E shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of the design project. The A/E shall further provide meeting minutes for all meetings held under this design project. General Statement A/E Part One Services (also known as Design Phase) for this design project includes site visit, field investigation, conduct of studies and user interviews to update drawings, specifications and cost estimates for all facets of work and disciplines/trades to facilitate a construction project. This project will Conduct Hazardous Material Abatement, STL-JB&JC 2. DESIGN DEVELOPMENT: a. The VPIH shall make investigations necessary to thoroughly evaluate the area. This may include, but not limited to, hazardous materials testing, identifying any and all asbestos and lead containing materials within the project area. b. Upon completion of initial field survey and assessment, provide a comprehensive report of existing conditions and findings to VASTLHCS Facility Engineering Service. Hazardous material surveys and design shall be in compliance with National Emissions Standard for Hazardous Air Pollutants (NESHAP) requirements for renovation and demolition projects. c. The VA team will evaluate and identify any additional project scope based on the survey findings. d. This project will be phased such that it impacts hospital function as little as possible. 3. Abatement Document: a. After the VA approves the VPIH proposed scope of work, the VPIH shall prepare abatement documents necessary to accomplish the approved design development including drawings and specifications. 4. Review of Abatement Work Plan: a. The VPIH shall review the contractor s proposed Abatement Work Plan and provide approval before proceeding to construction. 5. Abatement Oversight Service: a. The VPIH shall perform oversight services as detailed later in this scope of work. 6. Functional Product: a. It is important to emphasize that the VPIH shall perform design development and detailed design work and prepare detailed abatement documents. b. VPIH Survey: The VPIH Firm will complete a survey, to include testing, identifying any and all asbestos and lead containing materials within the project area. This project will remove all lead and asbestos in areas being renovated. c. Reference VA Asbestos Abatement Design Manual (PG 18-10) July 2011: i. 1.8 DESIGN REQUIREMENTS: The following elements are required for all asbestos abatement project designs for VA facilities: i. All project designs must be developed and/or reviewed and approved by an EPA Model Curriculum trained and applicable state accredited Asbestos Project Designer. This is to ensure that all applicable federal, state, and local regulations are followed regarding the design of asbestos abatement projects. These regulations include, but are not limited to, EPA NESHAP requirements, City of St. Louis Air Pollution division requirements St. Louis County Air Pollution division requirements, and Missouri Department of Natural Resources (MDNR) requirements. VA representatives conducting peer review of asbestos designs need not be accredited Asbestos Project Designers. ii. All asbestos inspections performed in VA facilities for the purposes of gathering information for the development of the asbestos abatement project design must be performed by EPA Model Curriculum trained and applicable state-accredited Asbestos Building Inspector. iii. VA Master Specifications have been developed for typical asbestos abatement work. The appropriate sections shall be edited to meet the project scope of work and specific project requirements. iv. The VPIH shall carefully coordinate specifications with the drawings so that all work required by the drawings is included in the specifications. Specification content that does not apply to the project shall be deleted. v. The VPIH shall modify the existing Master Specifications, when feasible, to address any abatement that is not specifically identified by the VA Master Specifications. ii. 1.9.2 DRAWINGS The following criteria must be used when creating drawings to be used in support of the asbestos abatement project. i. Refer to VA Design and Construction Procedures for general drawing requirements. ii. Consolidate notes and place them on the right-hand side of the sheet. iii. Show scale, compass point, orientation, key plan, title, column grids and numbers, match-lines, room numbers and titles corresponding to the Architectural drawings. iv. Clearly identify all locations of materials to be removed during the asbestos abatement project. v. Clearly identify any life-critical systems that exist in abatement areas to ensure that these systems are isolated and not disturbed during the project. iv. 2.3.1 ABATEMENT WORK TASKS: The specific ACM to be abated during the asbestos abatement project must be identified on the detailed plan and project drawings. A summary for each work task to be performed during the abatement project, as well as a summary of the techniques to be used, in addition to safety precautions and methods must be included in the design. v. 2.3.2 UNEXPECTED DISCOVERY OF ASBESTOS: For any previously untested building components suspected to contain asbestos and located in areas to be impacted by the work, additional samples will need to be collected of any materials found to determine the presence or absence of asbestos. The sampling must be performed by an AHERA accredited Asbestos Building Inspector. d. All spaces within the scope of work must be designed according to applicable codes and standards. e. The VPIH shall submit a design narrative (15%) and design plans (100% Contract Docs for VA Review, and Release for Construction Set) specifications, submittals schedule, and other documentation in accordance with the B4 DESIGN DELIVERABLES section of this Supplement B. The construction/abatement work will be performed under a separate construction/abatement contract awarded by the VA. As a result, the Construction Documents must conform to the estimated Total Construction Cost Price, not including any contingencies, and convey the entire construction work completely and clearly, such that any bidder can produce an accurate bid without surveying the work site. f. The VPIH will also participate in the VASTLHCS Pre-Construction Risk Assessment to determine the requirements hazardous material abatement and limitations on vibrations, noise, and disruptions to operations and utilities. The results of these assessments will be included in documentation submitted by the VPIH pursuant to, and inclusive of, the Construction Documents. g. Prior to submittal of a response to this proposal the VPIH shall meet with the Contracting Officer s Representative (COR) at the proposed project site to review the scope of services and the project goals. The COR will provide VPIH with a copy of the portions of the latest Facilities Condition Assessment (FCA) applicable to this project. h. Overall site plans will be provided as a Reference Drawing with Room Numbers showing the areas within the project boundary. i. The C&A requirements do not apply, and that a Security Accreditation Package is not required. 1. VPIH Responsibilities: a. Determine if asbestos, lead or mold is present. If found, design a method for abating/remediating all asbestos containing materials, lead containing materials and mold contaminated items impacting this project. b. Determine location of asbestos, lead and/or mold contamination, and any water and moisture damage. Work with the I.H. to uncover and assess hidden areas. To the extent possible, all materials known or suspected to be disturbed or otherwise impacted during this project must be sampled prior to demolition and included in the abatement design. If materials are unable to be sampled during the design phase of the project, they must be sampled during selective demolition processes during the construction phase or otherwise treated as ACM. c. For mold contamination, determine the contributing factors to the mold development. d. For asbestos and lead contamination, determine the extent of abatement required to eliminate all impacts to this project. e. Develop the Abatement Design for areas & materials covered under the project in accordance with EPA and VHA guidelines. f. Review the I.H. Report. g. Produce a written report and drawings compiling all necessary information. II. VA PROFESSIONAL INDUSTRIAL HYGIENIST (VPIH): The VPIH will retain a specialist in VPIH services to provide sufficient oversight of the abatement process. The following VPIH services will comply with federal, state and local laws and regulations: 1. Review of Contractor Provided Asbestos Abatement Plan: The VPIH is responsible for reviewing and approving the Contractor's Professional Industrial Hygienist (CPIH) work plans. Provide comments and recommendations to ensure VA personnel and/or patients are not exposed to asbestos fibers. 2. Provide Air and Materials Sampling: Provide air and materials sampling of the construction site to verify that no asbestos fibers were released during the asbestos abatement activities. Provide materials sampling within the construction site when suspect materials are uncovered and it is unconfirmed if the material contains asbestos or lead. Field work and sampling activities shall be performed by trained personnel under the direction of a licensed Industrial Hygienist or Board Certified Microbial Consultant. 3. Provide Abatement Oversight: Provide oversight of the abatement contractor to ensure compliance with abatement laws and regulations. 4. Provide Final Clearance: Ensure the contractor has completed the abatement work required and provide final clearance that the abatement work is complete and there are no impacts to the Medical Center. 5. Provide Final Report: Provide a final report showing daily logs, sampling results and collected documents. All work shall be in compliance with applicable laws, regulations and procedures published or issued by federal, state and local regulatory agencies for the abatement and control of hazardous materials. DESIGN TIMEFRAME: VPIH shall deliver final abatement design documents No Later Than (NLT) 96 Calendar Days after the Award/Notice to Proceed Letter. The follow on separate construction project will conduct abatement of Hazardous Material (Asbestos, Lead) at VASTLHCS John Cochran Division and Jefferson Barracks Division. Limited abatement will occur based on findings of the most recent survey (friable materials found, flaking lead-based paint, etc.) and investigations of the VPIH. Areas to be abated are identified and coordinated with In-House Construction Crew work or Maintenance & Operations needed repairs. Abatement could occur at any of the John Cochran or Jefferson Barracks Divisions Buildings depending on priority of upcoming IHCC & M&O work. Provide a proposal to include all labor, materials, equipment and CPIH services to perform the following work items. The estimate of construction cost is Between $250,000 and $500,000 (FAR 36.204). 3. EVALUATION FACTORS: Selection Criteria are in accordance with Federal Acquisition Regulation (FAR) 36.602-1 and FAR 36-602-5. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as necessary. SF 330 submissions including any additional pages are not to exceed sixty five (65) pages. Each page cannot exceed 81/2 x 11 in size. Qualifications (SF330) submitted by each firm for PROJECT NUMBER: 657-27-101, FCA-Conduct Hazardous Material Abatement, 2027, Jefferson Barracks & John Cochran Division, Saint Louis, Missouri 63106, will be reviewed and evaluated based on the following evaluation criteria listed below in descending order of importance: PROFESSIONAL QUALIFICATIONS: The qualifications of the individuals which will be used for these services will be examined for experience and education and their record of working together as a team. A/E firms shall have licensed professional architects and engineers currently registered in the state of Missouri or in a state of which Missouri has recognized the engineering license. The specific disciplines which will be evaluated are Architects, Civil Engineer, Mechanical Engineers, Electrical Engineers, Structural Engineers, Industrial Hygienists, Estimators, CAD operators, Project Managers, LEED Consultant, Fire Protection Engineer, and Interior Designer. 2. SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE: Provide detailed project information on any projects (that are complete - design and construction) the proposed team has worked together on in the last five (5) years. Special emphasis will be given to any medical facility related projects that are similar in scope. If the entire team has not worked together previously, provide detailed project information that each of the team members have worked on in the last three (3) years with special emphasis on medical facility projects. The project information should include project titles, a short scope of work, date of design completion, date of construction completion, firms involved, etc. Provide the project title, scope of work, date of design start for this team, percentage of design when accepted by team and completion of design. 3. CAPACITY TO ACCOMPLISH THE WORK: The general workload and staffing capacity of the design office that will be responsible for the majority of the design and the ability to accomplish the work in the required time. This factor evaluates ability of the AE firm, given their current projected workload and the availability of their key personnel, to accomplish the design project in the required time. It also requires that all firms submitting an SF 330 must certify that they can and will comply with VAAR 852.219-75 VA Notice of Limitations on Subcontracting. (See Attachment 1- VAAR 852.219-75 VA Notice of Limitations on Subcontracting ) The general workload and staffing capacity of the design office will be evaluated as follows: i.           Indicate the firms' present workload and the availability of the project team (including sub-consultants) for the specified contract performance period. ii.          What are your current staff levels, including consultants, available to accommodate this project while still maintaining ongoing projects/ workload iii.         In accordance with VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, you must certify that if awarded the contract your firm will comply with the limitations on subcontracting specified in this clause and in the resultant contract. You must complete, sign and submit Attachment 1- VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction document as part of your SF330 package which states the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in VAAR 852.219-73. If this certification is not completed and submitted with the SF 330, your package will not be evaluated, will be eliminated from the selection process, and cannot be awarded a contract. PAST PERFORMANCE: NCO 15 will evaluate past performance on recent and relevant contracts with Government agencies (emphasis on VA work) and private industry in terms of construction cost estimating, cost control, quality of work, compliance with performance schedules and a record of significant claims against the firm due to improper or incomplete engineering services (references required). Project past performances that are older than 10 years will receive a lesser rating than those references for projects accomplished within the past 10 years. Past performance evaluations may also be conducted using information obtained from CPARS or PPIRS and any other sources deemed appropriate by the Contracting Officer. Other sources may include, but are not limited to, inquiries of owner representative(s), Federal Awardee Performance, and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), past performance questioners, and any other known sources not provided by the Offeror. i.           Provide five (5) completed relevant project Final CPARS, past performance questionnaires, or similar documents as past performance documentation, or provide an explanation for not including five (5) relevant Final CPARS or other equivalent documentation 5. ESTIMATING EFFECTIVENESS. i.           Provide information on the five (5) most recently completed construction projects that were designed by this A/E team. Provide the project title, brief scope of work, A/E team s construction estimate total and actual construction award price. ii.          If the difference is greater than 10% explain why the A/E believes the difference was greater than 10%. If the team does not have any recent projects, provide the same information on projects that the prime A/E for this team was the prime A/E for the past projects. Provide the names, titles and experience of the persons that will perform the design for each discipline; and then have oversight of the entire estimate. 6. CLAIMS AND TERMINATIONS: Provide documentation of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services. Provide a detailed narrative of relevant projects within the last 5 years that have claims against the organization or have been terminated by the owner. Include the circumstances, cost, and schedule impacts to involved parties, and outcomes of the claims and/or terminations, these will be reviewed. | 56% | Pre-Solicitation | 10/16/2026 |
Solicitation 36C24426R0153 | 54% | Special Notice | 09/18/2026 |
Description This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2026-01. This solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The associated North American Industrial Classification System (NAICS) code for this procurement is 541330, with a small business size standard of $25.5 million. The FSC/PSC is R425. The New York Harbor VA Healthcare System (3 facilities) is seeking to purchase Lockout Tagout (LOTO)/Energy Control Procedures (ECP) implementation and software/maintenance services for one (1) base year plus the provision of four (4) option years. All interested companies shall provide quotations for the following: See attached Statement of Work (SOW) and pricing worksheet. Place of Performance Address: Manhattan VA Medical Center 423 East 23rd Street New York, NY 10010 Country: USA Address: Brooklyn VA Medical Center Country: 800 Poly Place Brooklyn, NY 11209 USA Address: St. Albans VA Medical Center 179-00 Linden Boulevard Queens, NY 11424 Country: USA The full text of FAR provisions or clauses may be accessed electronically at https://www.acquisition.gov/browse/index/far. The following solicitation provisions apply to this acquisition: FAR 52.212-1, Instructions to Offerors Commercial Products and Commercial Services Site Visit: Contractors have opportunity to attend a site visit on Monday, November 23rd, 2026, to view the requirements at the facility. Contractors shall email the CO (Nathan.Northrup@va.gov) no later than Friday, November 20th, 2026, Close of Business (COB), with their intention to attend and specifics will be provided in return. No other site visits will be provided. Contractors that do not attend the site-visit will not be excluded from competition; however, Contractors are encouraged to visit the site to gauge the complexity of this requirement. Questions/Requests for Information: Shall be sent to the Contract Officer via email at Nathan.Northrup@va.gov no later than November 24th, 2026, COB. All quoters shall submit the following at minimum: Capability statement demonstrating technical capability and approach to meet all the requirements of the SOW and all evaluation factors listed in section 2 below, Signed Limitations on Subcontracting Certification (attached), and a completed 36C24227Q0091 Pricing Worksheet (attached). All quotes shall be sent to the Contract Officer via email at Nathan.northrup@va.gov no later than November 27th, 2026, COB. Award will be based upon a comparative evaluation of quotes in accordance with the Simplified Acquisition Procedures of RFO FAR 12. [CO will include basis of evaluation in the quote/offer, e.g., Comparative evaluation is the side by side pairwise comparison of quotes based on factors resulting in a Contracting Officer decision for the quote most favorable to the Government.] Offerors must complete annual representations and certifications electronically via the System for Award Management (SAM) website located at https://sam.gov/. FAR 52.212-2 Evaluation-Commercial Products and Commercial Services: In accordance with RFO FAR 12.201-1 and FAR 12.201-2 when appropriate, the contracting officer may insert the provision at 52.212-2, Evaluation-Commercial Products and Commercial Services, in solicitations for commercial products or commercial services. The following are the decision factors: Technical: The quotation will be evaluated to the extent in which it can meet or exceed the Government s requirements outlined in the Statement of Work (SOW). Compliance with standards Experience and Expertise Training and certification Proposed schedule/timeline Quality assurance Past Performance: The past performance evaluation will assess the relative risks associated with a quoter s likelihood of success in fulfilling the solicitation s requirements as indicated by the quoter s record of past performance. The past performance evaluation may be based on the contracting officer s knowledge of and previous experience with the supply or service being acquired; Customer surveys, and past performance questionnaire replies; Contractor Performance Assessment Reporting System (CPARS) at http://www.cpars.gov/; or any other reasonable basis. No relevant past performance shall be rated as neutral past performance. Price: The Government will evaluate the price by adding the total of all line-item pricing (see attached pricing worksheet). The total evaluated price will be that sum. Options: The Government will evaluate quotations for award purposes by adding the total price for all options to the total price for the basic requirement. Subcontracting Plan/Certification: Outline of detailed subcontracting plans, what subcontractors will be responsible for, value of their efforts, etc., and a signed Limitations on Subcontracting Certification in accordance with VAAR 852.219-75. FAR 52.209-7 Information Regarding Responsibility Matters FAR 52.233-2 Service of Protest Fill in: Nathan.Northrup@va.gov, Contract Officer FAR 52.240-90 Security Prohibitions and Exclusions Representations and Certifications FAR 52.252-1 Solicitation Provisions Incorporated by Reference 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements Representation 52.204-7 System for Award Management Registration FAR 52.252-5 Authorized Deviations in Provisions VAAR 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference 852.233-70 Protest Content/Alternative Dispute Resolution 852.239-75 Information and Communication Technology Accessibility Notice The following solicitation clauses apply to this acquisition: FAR 52.217-9, Option to Extend Term of the Contract Fill in: 30 days, 60 days, 5 years FAR 52.222-90 Addressing DEI Discrimination by Federal Contractors FAR 52.240-91, Security Prohibitions and Exclusions CL 120 Supplemental Insurance Requirements FAR 52.252-2 Clauses Incorporated by Reference 52.203-6, Restrictions on Subcontractor Sales to the Government 52.203-17, Contractor Employee Whistleblower Rights 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements 52.204-13, System for Award Management Maintenance 52.209-6, Protecting the Government s Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded 52.209-10, Prohibition on Contracting With Inverted Domestic Corporations 52.212-4, Contract Terms and Conditions Commercial Products and Commercial Services 52.217-8, Option to Extend Services 52.219-6, Notice of Total Small Business Set-Aside 52.219-8, Utilization of Small Business Concerns 52.219-14, Limitations on Subcontracting 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran-Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program 52.222-35, Equal Opportunity for Veterans 52.222-36, Equal Opportunity for Workers with Disabilities 52.222-37, Employment Reports on Veterans 52.222-40, Notification of Employee Rights Under the National Labor Relations Act 52.222-41, Service Contract Labor Standards 52.222-42, Statement of Equivalent Rates for Federal Hires 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards Price Adjustment 52.222-50, Combating Trafficking in Persons 52.222-54, Employment Eligibility Verification 52.222-55, Minimum Wages for Contract Workers Under Executive Order 14026 52.222-62, Paid Sick Leave Under Executive Order 13706 52.223-5, Pollution Prevention and Right-to-Know Information 52.223-23, Sustainable Products 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving 52.228-5, Insurance Work on a Government Installation CL-120, Supplemental Insurance Requirements 52.229-3, Federal, State, and Local Taxes 52.232-33, Payment by Electronic Funds Transfer System for Award Management 52.232-40, Providing Accelerated Payments to Small Business Subcontractors 52.233-3, Protest After Award 52.233-4, Applicable Law for Breach of Contract Claim 52.236-2, Differing Site Conditions 52.236-3, Site Investigation and Conditions Affecting the Work 52.236-5, Material and Workmanship 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements 52.236-10, Operation and Storage Areas 52.236-11, Use and Possession Prior to Completion 52.236-12, Cleaning Up 52.236-13, Accident Prevention 52.236-21, Specifications and Drawings for Construction 52.237-2, Protection of Government Buildings, Equipment, and Vegetation 52.244-6, Subcontracts for Commercial Products and Commercial Services VAAR 852.204-72, Personnel Vetting and Credentialing VAAR 852.219-75, VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction See attached LOS Certification. VAAR 852.252-70 Solicitation Provisions or Clauses Incorporated by Reference 852.201-70, Contracting Officer s Representative 852.203-70, Commercial Advertising 852.219-74, VA Notice of Total Set-Aside for Certified Veteran-Owned Small Businesses 852.222-71, Combating Anti-Semitism 852.232-72, Electronic Submission of Payment Requests 852.239-76, Information and Communication Technology Accessibility To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows: "The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition." OR "The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:" Quoters shall list exception(s) and rationale for the exception(s), if any. Late submissions shall be treated in accordance with the solicitation provision at RFO 52.212-1(c). Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to the Point of Contact listed below. Point of Contact Nathan Northrup, Contract Officer RPO East, NCO 2 Contracting Office Nathan.Northrup@va.gov | 47% | Combined Synopsis | 11/27/2026 |
*= Required Field Combined Synopsis/Solicitation Notice Remediate Reserve Center UST Project UPDATED SUBMISSION REQUIREMENTS: SF 330 submittals shall be sent electronically via email to the attention of Kristopher Tolar and Christopher McDevitt. Standard Forms 330 s must be received no later than 4:00 PM on September 21, 2026. The submittal packages are to be sent via email to the following: Attention: Kristopher Tolar Email: Kristopher.tolar@va.gov Attention: Christopher McDevitt Email: Christopher.McDevitt@va.gov Subject Line: Solicitation 36C24426R0124 SF 330 Submittal | 47% | Combined Synopsis | 09/21/2026 |
44% | Awarded | Open |
Additional Details
Solicitation Number
36C25526Q0066
Archive Date
Dec 7, 2025
Office Address
LEAVENWORTH, KS, 66048