Notice ID: 08df2ab5dc624733bd185b401825335aAward NoticeAwarded
N059--Uninterrupted Battery Power Supply Replacement Service
Awarded on September 16, 2020. Full description on SAM.gov.
Awarded tounder 36C25620C0175 (source: SAM.gov award notice)• $135.5K
Overview
- Posted
- September 16, 2020
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 561210: Facilities Support Services
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Veterans Healthcare System (CAVHS) 4300 West 7th Street, Little Rock, 72205
- Last updated
- Apr 29, 2026
- Award date
- Sep 16, 2020
- Award amount (SAM.gov award notice)
- $135.5K
Identifiers
- Solicitation number
- 36C25620Q1223
- Notice ID
- 08df2ab5dc624733bd185b401825335a
- Award number (PIID)
- 36C25620C0175
Description
Page 2 of 2 The Veterans health Care System CAVHS, 4300 West 7th Street, Little Rock, Arkansas has a requirement for Uninterrupted Power Supply Battery Replacement Services. The contractor shall furnish all qualified/certified personnel, tools, materials, rigging, necessary equipment and services to include lodging, travel and meals necessary to perform the following scope of work. The scope of work for this contract will be to remove 320 old batteries and replace with 320 new batteries in three (3) separate UPS s. The contractor shall adhere to the requirements in accordance with (IAW) all terms, conditions, provisions, schedules, and specifications of this SOW, local, state, federal and VHA regulations. This is a pre-solicitation notice only. Interested parties should watch for the issuance of the solicitation and associated documents on or about Friday August 28, 2020 which will contain the specific instructions and requirements. The solicitation will be issued as Service-Disabled Veteran Owned Small Business under NAICS code 561210, with a size standard of $41.5M. The response due date of this solicitation and the date of contract award, as well as being registered in the System for Award Management (SAM) at www.sam.gov on the date of contract award. This is a Pre-Solicitation Notice only. This is not a request for pricing at this time. Please monitor this website for issuance of the actual solicitation, to download the associated solicitation documents.
Award Overview
Award Number
36C25620C0175
Award Amount (SAM.gov award notice)
$135.5K
Award Date
Sep 16, 2020
Awardee
Awardee UEI
XAZPFFCJF5A1
Original Solicitation
Notice ID: 08df2ab5dc624733bd185b401825335a
Posted Date: Sep 16, 2020
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C25620Q1223- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- SolicitationAug 28, 2020
6140--Request for Quotes for Uninterrupted Power Supply Battery Replacement Services
- Pre-SolicitationAug 28, 2020
6140--Request for Quotes for Uninterrupted Power Supply Battery Replacement Services
- SolicitationSep 1, 2020
6140--Request for Quotes for Uninterrupted Power Supply Battery Replacement Services
- AwardedCurrentSep 16, 2020
N059--Uninterrupted Battery Power Supply Replacement Service
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
48% | Awarded | Open | |
SYNOPSIS: INTRODUCTION: This Sources Sought Notice is for market research and information purposes only at this time and shall not be construed as a solicitation or as an obligation on the part of the Department of Veterans Affairs (VA). The Department of Veterans Affairs, Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) is conducting a market survey and is seeking potential sources for the EHRM Installation of DDPO at the Tibor Rubin VA Medical Center located in Long Beach, CA. PROJECT DESCRIPTION: This project is a construction project that addresses infrastructure gaps identified by the EHRM IO (Electronic Health Record Modernization Integration Office) team. The Contractor shall furnish all labor, materials and equipment to prepare the Tibor Rubin VA Medical Center in Long Beach, CA for the installation of additional data drops, power outlets and equipment bracing for equipment deployment of the Electronic Health Record (EHR). The contractor shall provide and install normal and emergency power outlets, data drops, and required equipment bracing to support this deployment. PROCUREMENT INFORMATION: The proposed project will be a competitive, firm-fixed-price contract utilizing the design-bid-build approach (Final Specifications and Drawings will be provided). The anticipated solicitation will be issued either as a Request For Proposal (RFP) in accordance with FAR Part 15, considering Technical and Price Factors or as an Invitation for Bid (IFB) in accordance with FAR Part 14, considering Price only. The results and analysis of the market research will finalize the determination of the procurement method. The type of socio-economic set-aside, if any, will depend upon the responses to this notice and any other information gathered during the market research process. This project is planned for advertising in mid to late-November 2026. In accordance with VAAR 836.204, the magnitude of construction is between $250,000.00 and $500,000.00. The North American Industry Classification System (NAICS) code 238210 (size standard $19.0 million) applies to this procurement. The duration of the project is currently estimated at 270 calendar days from the issuance of a Notice to Proceed. The services for this project will include providing all construction related services such as: providing labor, materials and equipment required to complete the project as per contract documents prepared by an independent Architect-Engineer firm. CAPABILITY STATEMENT: Respondents shall provide a general capabilities statement to include the following information: Section 1: Provide company name, Unique Entity Identifier (UEI), company address, Point-of-Contact name, phone number and email. Section 2: Provide company business size based on NAICS code 238210. Also, provide business type (i.e., Large Business, Small Business, Service-Disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-Owned Small Business, Hub Zone Small Business, etc.). Section 3: Provide a Statement of Interest in the project. Section 4: Provide the prime contractor s available bonding capacity in the form of a letter of intent from your bonding company with this submission. *Please ensure that the individual bonding capacity is in line with the VAAR Magnitude of Construction listed above. Section 5: Provide the type of work your company has performed in the past in support of the same or similar requirement. This section is IMPORTANT as it will help to determine the type of socio-economic set-aside, if any. Please provide the following in your response: No more than three (3) contracts that your company has performed within the last seven (7) years that are of comparable size, complexity, and scope to this requirement. Include the project name, project owner and contact information as this person may be contacted for further information, project scope, project size (Example: square footage), building use (Example: Medical Facility, Office Building, etc.), project dollar value, start and completion dates. Provide specific examples that relate aspects of previous projects to the proposed project. Describe specific technical skills and key personnel your company possess to perform the requirements described under description of work. Describe performance of the requirements while providing uninterrupted service to active hospital settings. Describe your Self-Performed** effort (as either a Prime or Subcontractor). Describe Self-Performed work in terms of dollar value and description. **Self-Performed means work performed by the offeror themselves, NOT work performed by another company for them for any of the project examples provided. It is requested that interested contractors submit a response (electronic submission) of no more than eight (8) single sided pages, single-spaced, 12-point font minimum that addresses the above information. This response must be submitted as a single application-generated (not scanned) PDF document that is less than or equal to 4MB in size. Please note that hard copies will not be accepted. Please also include a cover page, which includes, at a minimum: the company s name, address, Unique Entity Identifier (if available), socio-economic status, point-of-contact name, phone number, and e-mail address. Responses must include the Sources Sought number and project title in the subject line of their e-mail response. Submissions (responses) shall be submitted via email to the primary and secondary points of contact listed below by October 29, 2026 at 4:00 PM ET. No phone calls will be accepted. The Capabilities Statement submitted in response to this Sources Sought shall not be considered to be a bid or proposal. This notice is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. No evaluation letters and/or results will be issued to the respondents. After completing its analyses, the Government will determine whether to limit competition among the small business categories listed above or proceed with full and open competition as other than small business. At this time no solicitation exists; therefore, please do not request a copy of the solicitation. If a solicitation is released it will be synopsized in Contract Opportunities at https://sam.gov/. It is the potential offeror's responsibility to monitor this site for the release of any solicitation or synopsis. Contracting Office Address: VHA Program Contracting Activity Central (VHA-PCAC) 6100 Oak Tree Blvd. Suite 490 Independence, OH 44131 Primary Point of Contact: Mica Tacderan Contract Specialist mica.tacderan@va.gov Secondary Point of Contact: Jessica Hicks Contracting Officer Jessica.Hicks1@va.gov DISCLAIMER This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI. End of Document | 46% | Pre-Solicitation | 10/29/2026 |
The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in West Roxbury, MA intends to enter a sole source procurement, pursuant to the authority of FAR 6.302-1, with Encore Holdings LLC, for the following requirement: STATEMENT OF WORK (SOW) Background The VAMC West Roxbury campus operates an Edwards EST-3 fire alarm network that supports life safety monitoring, campus fire alarm annunciation, and associated interfaces. The existing EST-3 platform is aged and obsolete. The Government requires an in-kind/successor-platform migration from Edwards EST-3 to Edwards EST-4 to improve system reliability, maintainability, cybersecurity posture, and code compliance while preserving operational continuity and minimizing disruption to an occupied healthcare campus. The existing SIGA series field devices are expected to remain in place and are understood to be compatible with the EST-4 platform. Objective The objective of this requirement is to furnish all labor, supervision, programming, materials, tools, equipment, project management, testing, documentation, and training required to transition the VAMC West Roxbury campus fire alarm network from the existing Edwards EST-3 platform to an Edwards EST-4 networked platform while maintaining required fire alarm coverage and minimizing impairment duration. Applicable Standards and Requirements Work shall comply with applicable federal, state, local, VA, VHA, Joint Commission, OSHA, and Authority Having Jurisdiction requirements, including the latest adopted editions applicable to this facility. At a minimum, work shall be performed in accordance with the following, as applicable: NFPA 70, National Electrical Code. NFPA 72, National Fire Alarm and Signaling Code. NFPA 101, Life Safety Code. NFPA 25, where sprinkler supervisory and waterflow interfaces are affected. VA/VHA life safety, interim life safety measures, cybersecurity, and facility access requirements. Manufacturer requirements for Edwards EST-4 hardware, programming, FireWorks integration, and compatible SIGA field devices. Scope of Work The Contractor shall provide a complete, operational, tested, documented, and accepted Edwards EST-4 upgrade of the existing West Roxbury campus fire alarm network. The scope includes, but is not limited to, the following work elements. Project Management and Coordination Conduct a kickoff meeting with VA Engineering, Safety, IT, Police/Dispatch, clinical stakeholders as needed, and the Contracting Officer Representative (COR). Develop and maintain a project schedule identifying submittal dates, material procurement, programming milestones, outage/cutover windows, testing, training, and closeout. Coordinate all work affecting fire alarm service, system monitoring, FireWorks, master box/monitoring paths, network drops, building access, and any life safety impairment with the VA before work begins. Submit a written cutover plan before any node, panel, annunciator, or network segment is taken offline. The plan shall identify expected downtime, temporary monitoring method, notifications, responsible parties, rollback steps, and acceptance testing sequence. Coordinate with VA IT staff for FireWorks integration, IP/network drops, cybersecurity review, firewall modules, and any network-connected components required for the EST-4 platform. Provide manufacturer-certified project supervision and programming support throughout the project. EST-3 to EST-4 Programming Migration Pre-program and transition the existing Edwards EST-3 fire alarm program/database into an Edwards EST-4 architecture for the existing campus fire alarm network. Use qualified Edwards/EST-4 factory-trained programming personnel. Complete pre-programming off-site to the maximum practical extent and have the EST-4 program ready for integration after hardware upgrades are completed. Replicate any approved changes made to the EST-3 program before implementation into the EST-4 program before cutover. Perform program verification, input/output mapping, matrix verification, cause-and-effect review, FireWorks point mapping, and device/zone/nodal naming verification before final acceptance testing. Hardware Replacement and Installation Decommission and replace existing EST-3 internal fire alarm panel components that must be replaced as part of the EST-4 upgrade. Furnish and install Edwards EST-4 networked platform components, panel hardware, power supplies, network cards, modules, enclosures, batteries, and accessories required for a complete operational system. Replace all existing remote annunciators and backboxes in their existing locations with compatible EST-4 units. New units may differ in size from existing units; contractor shall identify any surrounding finish impacts before installation. Reuse existing field wiring, fiber, initiating devices, notification appliances, sprinkler/suppression interface points, and SIGA addressable devices where compatible and functional. Label new and replaced components, update panel directories, and provide device/node identifiers consistent with the accepted program and testing documents. Protect existing finishes, equipment, patient care areas, and building systems. Cutting, patching, and painting are excluded unless separately authorized in the final contract. Field Device and System Integration Integrate all existing addressable initiating devices, notification devices, sprinkler points, control points, and field wiring into the EST-4 platform to the extent they are compatible and functional. Maintain existing fire alarm sequence of operations unless changes are approved in writing by the VA. Integrate the upgraded system with the existing FireWorks system and campus monitoring architecture. Advanced scheduling with VA staff and IT staff is required. Verify interfaces to supervisory circuits, waterflow/tamper devices, elevator recall/shunt trip interfaces, HVAC shutdown, door release, smoke control or other building systems where such interfaces are part of the existing fire alarm sequence. Replacement of field devices, node-to-node rewiring, correction of existing wiring defects, and correction of pre-existing system troubles are excluded unless separately authorized by the Contracting Officer. Continuity of Monitoring and System Impairment Control No fire alarm panel, node, annunciator, or monitoring path shall be removed from service until the VA approves a written impairment/cutover plan. The Contractor shall support the VA in identifying temporary measures required to maintain monitoring coverage during each cutover window. Temporary cellular dialer or similar temporary monitoring measures shall be used if included in the final award or otherwise authorized by the Contracting Officer. The Contractor shall provide advance notice for all impairments and shall not leave a system impaired without VA approval. If fire watch is required by VA or the AHJ, the VA will establish the fire watch approach or add it by contract action. Testing, Inspection, and Acceptance After hardware installation and programming are complete, perform 100 percent testing of the upgraded fire alarm system. Testing shall include, at a minimum, all addressable initiating points, control points, sprinkler points, supervisory points, notification appliances, audio/visual devices, remote annunciators, power supplies, batteries, FireWorks graphics/point reporting, monitoring outputs, and required interfaces. Provide sufficient technicians to complete acceptance testing efficiently while minimizing disruption to the occupied medical campus. Notify the VA Safety Office, Engineering, IT, affected building occupants, monitoring personnel, and other stakeholders before testing. Testing shall be coordinated in advance with the COR. Document all passed/failed tests, deficiencies, corrective actions, retests, and final acceptance results. Deficiencies caused by existing field devices, field wiring, fiber, or pre-existing troubles shall be identified separately from contractor installation deficiencies. Final acceptance requires successful completion of 100 percent functional testing, receipt of required documentation, VA/COR acceptance, and AHJ acceptance when applicable. Training and Closeout Provide training to VA Engineering, Safety, and other designated personnel on the EST-4 system, panel operation, FireWorks functionality, alarm/supervisory/trouble response, disabling/enabling devices, global disconnects, and routine operator functions. Provide closeout documentation, final programming files/backups, record drawings, point lists, test reports, as-built sequence of operations, manufacturer literature, warranty information, and contact information for service support. Provide documentation sufficient for future maintenance, troubleshooting, and competitive support by qualified authorized providers where manufacturer restrictions allow. Work Hours and Scheduling Routine work is anticipated Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding federal holidays, unless otherwise approved by the VA. Outages, cutovers, testing, and work in sensitive clinical or operational areas may require after-hours scheduling at the direction of the VA. The Contractor shall coordinate all work with the COR and shall provide advance scheduling for testing and cutover activities. The NAICS code for this requirement is 238210. The VAMC West Roxbury campus fire alarm network is an existing Edwards EST-3 network integrated with campus life safety operations, FireWorks monitoring, remote annunciators, sprinkler points, control points, notification appliances, and existing addressable SIGA field devices. The Government need is not simply to purchase fire alarm equipment; it is to safely migrate an occupied healthcare campus from an obsolete Edwards EST-3 network to the manufacturer successor Edwards EST-4 network while maintaining life safety coverage, preserving existing field device compatibility, and reducing the risk of outages or incompatible programming. The existing EST-3 system is aged and obsolete. The EST-3 platform has been discontinued and that obsolete parts are difficult to source, with some critical components unavailable entirely. The production of the EST-3 platform concluded on December 31, 2023, that no new orders were accepted after that date, and that replacement parts are being phased out in waves. Continuing to rely on EST-3 exposes the VA to increasing risk that a failed panel component, power supply, annunciator, or other critical component cannot be promptly replaced, potentially impairing fire alarm functionality in an occupied medical campus. An Edwards EST-4 platform is required because it is the successor platform for the existing Edwards EST-3 network and allows the VA to reuse compatible existing SIGA field devices and field wiring. The SIGA series field devices are backward- and forward-compatible, allowing reuse of existing field devices. Use of a non-Edwards platform would require redesign and replacement of major portions of the fire alarm infrastructure, new field devices and/or modules, extensive rewiring, revised FireWorks integration, new sequence of operations, re-commissioning, and additional outages. That approach would substantially increase cost, schedule, risk, and disruption compared with the EST-4 in-kind/successor platform conversion. Encore has existing familiarity with the VA Boston Edwards fire alarm systems, campus FireWorks configuration, panel histories, deficiencies, VA safety/engineering coordination procedures, and the active service/programming environment. This work requires pre-programming and transition of the existing EST-3 fire alarm program to EST-4 by Encore lead programming personnel, with any changes to the EST-3 program before implementation replicated in the EST-4 program. That requirement makes continuity of programming knowledge and current system control critical. A site-specific fiber issue that must be coordinated during the upgrade: existing fiber terminations at each FACP node are problematic and may contribute to network instability on the EST-4 network. The contractor performing the EST-4 upgrade must understand and sequence this fiber-demarcation work with panel/node cutover, FireWorks integration, and acceptance testing. Encore has direct knowledge of the current fire alarm service environment and can coordinate the cutover without introducing avoidable responsibility gaps between the incumbent fire alarm service provider and a separate upgrade contractor. Award to a different contractor would require the new contractor to obtain or recreate the existing EST-3 database, verify every device and interface, learn the VA campus FireWorks and monitoring architecture, develop a cutover strategy without the incumbent service history, coordinate the West Roxbury fiber-demarcation issue, and coordinate responsibility boundaries with the service contractor during a life safety system transition. The use of a separate vendor would increase operational risk during cutover because the service contractor would remain responsible for fire alarm service continuity while another contractor altered the system baseline. This requirement is not based on lack of advance planning or the availability of funds. It is driven by technical lifecycle risk, discontinued/obsolete EST-3 components, compatibility with the existing Edwards/SIGA/FireWorks infrastructure, the West Roxbury FACP fiber-demarcation issue, and the need to safely transition the campus fire alarm network while maintaining fire alarm coverage in a healthcare environment. Encore Holdings LLC is the only firm capable of providing the supplies and services described above without the Veterans Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition and unacceptable delays in fulfilling its requirements. This notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by October 16, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government. | 44% | Special Notice | 10/16/2026 |
The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter a sole source procurement, pursuant to the authority of FAR 6.302-1, with Encore Holdings LLC, for the following requirement: STATEMENT OF WORK (SOW) Background The VAMC Brockton campus operates an Edwards EST-3 fire alarm network that supports life safety monitoring, campus fire alarm annunciation, remote annunciation, sprinkler and control point reporting, notification appliances, and associated interfaces. The existing EST-3 platform is aged and obsolete. Place of Performance: 940 Belmont Street, Brockton, MA Objective The objective of this requirement is to furnish all labor, supervision, programming, materials, tools, equipment, project management, testing, documentation, and training required to transition the VAMC Brockton campus fire alarm network from the existing Edwards EST-3 platform to an Edwards EST-4 networked platform while maintaining required fire alarm coverage and minimizing impairment duration. Applicable Standards and Requirements Work shall comply with applicable federal, state, local, VA, VHA, Joint Commission, OSHA, and Authority Having Jurisdiction requirements, including the latest adopted editions applicable to this facility. At a minimum, work shall be performed in accordance with the following, as applicable: NFPA 70, National Electrical Code. NFPA 72, National Fire Alarm and Signaling Code. NFPA 101, Life Safety Code. NFPA 25, where sprinkler supervisory and waterflow interfaces are affected. VA/VHA life safety, interim life safety measures, cybersecurity, infection-control, and facility access requirements. Manufacturer requirements for Edwards EST-4 hardware, programming, FireWorks integration, and compatible SIGA field devices. Scope of Work The Contractor shall provide a complete, operational, tested, documented, and accepted Edwards EST-4 upgrade of the existing Brockton campus fire alarm network. The scope includes, but is not limited to, the following work elements. Project Management and Coordination Conduct a kickoff meeting with VA Engineering, Safety, IT, Police/Dispatch, clinical stakeholders as needed, the VA fiber contractor if applicable, and the Contracting Officer Representative (COR). Develop and maintain a project schedule identifying submittal dates, material procurement, programming milestones, outage/cutover windows, fiber-demarcation coordination, testing, training, and closeout. Coordinate all work affecting fire alarm service, system monitoring, FireWorks, master box/monitoring paths, network drops, building access, and any life safety impairment with the VA before work begins. Submit a written cutover plan before any node, panel, annunciator, or network segment is taken offline. The plan shall identify expected downtime, temporary monitoring method, notifications, responsible parties, rollback steps, and acceptance testing sequence. Coordinate with VA IT staff for FireWorks integration, IP/network drops, cybersecurity review, firewall modules, and any network-connected components required for the EST-4 platform. Provide manufacturer-certified project supervision and programming support throughout the project. EST-3 to EST-4 Programming Migration Pre-program and transition the existing Edwards EST-3 fire alarm program/database into an Edwards EST-4 architecture for the existing campus fire alarm network. Use qualified Edwards/EST-4 factory-trained programming personnel. Complete pre-programming off-site to the maximum practical extent and have the EST-4 program ready for integration after hardware upgrades are completed. Replicate any approved changes made to the EST-3 program before implementation into the EST-4 program before cutover. Perform program verification, input/output mapping, matrix verification, cause-and-effect review, FireWorks point mapping, and device/zone/nodal naming verification before final acceptance testing. Hardware Replacement and Installation Decommission and replace existing EST-3 internal fire alarm panel components that must be replaced as part of the EST-4 upgrade. Furnish and install Edwards EST-4 networked platform components, panel hardware, power supplies, network cards, modules, enclosures, batteries, and accessories required for a complete operational system. Replace all existing remote annunciators and backboxes in their existing locations with compatible EST-4 units. New units may differ in size from existing units; contractor shall identify any surrounding finish impacts before installation. Reuse existing field wiring, initiating devices, notification appliances, sprinkler/suppression interface points, and SIGA addressable devices where compatible and functional. Label new and replaced components, update panel directories, and provide device/node identifiers consistent with the accepted program and testing documents. Protect existing finishes, equipment, patient care areas, and building systems. Cutting, patching, and painting are excluded unless separately authorized in the final contract. Field Device and System Integration Integrate all existing addressable initiating devices, notification devices, sprinkler points, control points, audio/visual devices, and field wiring into the EST-4 platform to the extent they are compatible and functional. Maintain existing fire alarm sequence of operations unless changes are approved in writing by the VA. Integrate the upgraded system with the existing FireWorks system and campus monitoring architecture. Advanced scheduling with VA staff and IT staff is required. Verify interfaces to supervisory circuits, waterflow/tamper devices, elevator recall/shunt trip interfaces, HVAC shutdown, door release, smoke control, or other building systems where such interfaces are part of the existing fire alarm sequence. Replacement of field devices, node-to-node rewiring, correction of existing wiring defects, and correction of pre-existing system troubles are excluded unless separately authorized by the Contracting Officer. Brockton Fiber Coordination and Network Stability Review the existing FACP node fiber terminations and identify any fiber-demarcation conditions that could affect EST-4 network stability. Coordinate with the VA and VA fiber contractor regarding local demarcation panels adjacent to each FACP, fiber patch cords within each panel enclosure to each FACP, and any other fiber remediation recommended before or during EST-4 cutover. Document any fiber-related deficiencies, risks, or recommended actions discovered during planning or cutover. Fiber-related costs, fiber installation, fiber remediation, and third-party fiber contractor work are excluded unless separately authorized. Do not proceed with final cutover of affected FACP nodes where identified fiber conditions create an unacceptable risk of network instability unless the VA approves the risk mitigation or sequencing plan. Continuity of Monitoring and System Impairment Control No fire alarm panel, node, annunciator, or monitoring path shall be removed from service until the VA approves a written impairment/cutover plan. The Contractor shall support the VA in identifying temporary measures required to maintain monitoring coverage during each cutover window. Temporary cellular dialer or similar temporary monitoring measures shall be used if included in the final award or otherwise authorized by the Contracting Officer. The Contractor shall provide advance notice for all impairments and shall not leave a system impaired without VA approval. Fire watch is excluded from the base proposal unless separately authorized. If fire watch is required by VA or the AHJ, the VA will establish the fire watch approach or add it by contract action. Testing, Inspection, and Acceptance After hardware installation and programming are complete, perform 100 percent testing of the upgraded fire alarm system. Testing shall include, at a minimum, all addressable initiating points, control points, sprinkler points, supervisory points, notification appliances, audio/visual devices, remote annunciators, power supplies, batteries, FireWorks graphics/point reporting, monitoring outputs, and required interfaces. Provide sufficient technicians to complete acceptance testing efficiently while minimizing disruption to the occupied medical campus. Notify the VA Safety Office, Engineering, IT, affected building occupants, monitoring personnel, and other stakeholders before testing. Testing shall be coordinated in advance with the COR. Document all passed/failed tests, deficiencies, corrective actions, retests, and final acceptance results. Deficiencies caused by existing field devices, field wiring, fiber, or pre-existing troubles shall be identified separately from contractor installation deficiencies. Final acceptance requires successful completion of 100 percent functional testing, receipt of required documentation, VA/COR acceptance, and AHJ acceptance when applicable. Training and Closeout Provide training to VA Engineering, Safety, and other designated personnel on the EST-4 system, panel operation, FireWorks functionality, alarm/supervisory/trouble response, disabling/enabling devices, global disconnects, and routine operator functions. Provide closeout documentation, final programming files/backups, record drawings, point lists, test reports, as-built sequence of operations, manufacturer literature, warranty information, and contact information for service support. Provide documentation sufficient for future maintenance, troubleshooting, and competitive support by qualified authorized providers where manufacturer restrictions allow. Contractor Qualifications Contractor personnel performing programming, installation, testing, and troubleshooting shall be factory trained and qualified for Edwards EST-3/EST-4 fire alarm systems and FireWorks integration, as applicable. Contractor shall provide proof of certifications and qualifications for personnel performing system programming and acceptance testing upon request. Contractor shall comply with VA access, identification, background, safety, infection control, and work notification requirements. Contractor shall provide personnel, tools, test equipment, ladders/lifts, programming equipment, and manufacturer software/hardware required for the work. Work Hours and Scheduling Routine work is anticipated Monday through Friday, 8:00 a.m. to 5:00 p.m., excluding federal holidays, unless otherwise approved by the VA. Outages, cutovers, testing, and work in sensitive clinical or operational areas may require after-hours scheduling at the direction of the VA. Overtime is excluded from the proposal unless included in the final award or separately authorized. The Contractor shall coordinate all work with the COR and shall provide advance scheduling for testing, fiber-demarcation coordination, and cutover activities. The NAICS code for this requirement is 238210. The VAMC Brockton campus fire alarm network is an existing Edwards EST-3 network integrated with campus life safety operations, FireWorks monitoring, remote annunciators, sprinkler points, control points, notification appliances, and existing addressable SIGA field devices. The Government need is not simply to purchase fire alarm equipment; it is to safely migrate an occupied healthcare campus from an obsolete Edwards EST-3 network to the manufacturer successor Edwards EST-4 network while maintaining life safety coverage, preserving existing field device compatibility, and reducing the risk of outages or incompatible programming. The existing EST-3 system is aged and obsolete. The EST-3 platform has been discontinued and that obsolete parts are difficult to source, with some critical components unavailable entirely. The production of the EST-3 platform concluded on December 31, 2023, that no new orders were accepted after that date, and that replacement parts are being phased out in waves. Continuing to rely on EST-3 exposes the VA to increasing risk that a failed panel component, power supply, annunciator, or other critical component cannot be promptly replaced, potentially impairing fire alarm functionality in an occupied medical campus. An Edwards EST-4 platform is required because it is the successor platform for the existing Edwards EST-3 network and allows the VA to reuse compatible existing SIGA field devices and field wiring. The SIGA series field devices are backward- and forward-compatible, allowing reuse of existing field devices. Use of a non-Edwards platform would require redesign and replacement of major portions of the fire alarm infrastructure, new field devices and/or modules, extensive rewiring, revised FireWorks integration, new sequence of operations, re-commissioning, and additional outages. That approach would substantially increase cost, schedule, risk, and disruption compared with the EST-4 in-kind/successor platform conversion. Encore has existing familiarity with the VA Boston Edwards fire alarm systems, campus FireWorks configuration, panel histories, deficiencies, VA safety/engineering coordination procedures, and the active service/programming environment. This work requires pre-programming and transition of the existing EST-3 fire alarm program to EST-4 by Encore lead programming personnel, with any changes to the EST-3 program before implementation replicated in the EST-4 program. That requirement makes continuity of programming knowledge and current system control critical. A site-specific fiber issue that must be coordinated during the upgrade: existing fiber terminations at each FACP node are problematic and may contribute to network instability on the EST-4 network. The proposal recommends that the VA fiber contractor provide local demarcation panels adjacent to each FACP with patch cords into each FACP enclosure. The contractor performing the EST-4 upgrade must understand and sequence this fiber-demarcation work with panel/node cutover, FireWorks integration, and acceptance testing. Encore has direct knowledge of the current fire alarm service environment and can coordinate the cutover without introducing avoidable responsibility gaps between the incumbent fire alarm service provider and a separate upgrade contractor. Award to a different contractor would require the new contractor to obtain or recreate the existing EST-3 database, verify every device and interface, learn the VA campus FireWorks and monitoring architecture, develop a cutover strategy without the incumbent service history, coordinate the Brockton fiber-demarcation issue, and coordinate responsibility boundaries with the service contractor during a life safety system transition. The use of a separate vendor would increase operational risk during cutover because the service contractor would remain responsible for fire alarm service continuity while another contractor altered the system baseline. This requirement is not based on lack of advance planning or the availability of funds. It is driven by technical lifecycle risk, discontinued/obsolete EST-3 components, compatibility with the existing Edwards/SIGA/FireWorks infrastructure, the Brockton FACP fiber-demarcation issue, and the need to safely transition the campus fire alarm network while maintaining fire alarm coverage in a healthcare environment. Encore Holdings LLC dba Encore Fire Protection / Encore Fire Protection is the only firm capable of providing the supplies and services described above without the Veterans Health Administration experiencing substantial duplication of cost that could not be expected to be recovered through competition and unacceptable delays in fulfilling its requirements. This notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by October 16, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government. | 44% | Special Notice | 10/16/2026 |
SF 30 CONTINUATION SHEET AMENDMENT 0002 Solicitation No.: 36C25627Q0022 Project: B170 Courtyard Window Re Caulk CAVHS Purpose of Amendment The purpose of this amendment is to provide the Government s responses to vendor questions submitted prior to the deadline. The following Questions & Answers are hereby incorporated into the solicitation. These clarifications do not change the scope of work unless explicitly stated. Only the Contracting Officer may authorize changes per FAR 52.212 4(c). SECTION: QUESTIONS & ANSWERS General Administrative Items Q1. Will the Government confirm that offers should be submitted via email to andrew.misfeldt@va.gov? A1. Yes. Submit one consolidated PDF ( 10MB), font Arial 11, in accordance with the solicitation instructions. Q2. Are there page limitations? A2. No page limits apply. The file-size limit of 10MB governs. Q3. Which form must be submitted SF 1449 or SF 1442? A3. Offerors shall submit a signed SF 1449. SF 1442 is not required. Evaluation Factors Q4. Please confirm the evaluation factors. A4. Evaluation consists of: Factor I Approach & Quality Management Factor II Professional Qualifications & Specialized Experience Factor III Past Performance Factor IV Price Factors I III are equal in importance and collectively approximately equal to Price. Q5. Does managing one subcontractor satisfy Past Performance requirements? A5. Yes, provided the offeror served as the prime contractor. Site Visit, Access, & Logistics Q6. Will there be a site visit? A6. A site visit was held on October 14, 2026. No additional site visits will be conducted. Q7. Please confirm logistical restrictions. A7. Approximate curtainwall height is 50 ft (verify independently). Elevator weight limit is 4,000 lbs. Courtyard door widths are 36 58 . Quiet hours are 2 3 PM and 10 PM 5 AM. Coordinate courtyard occupation with nursing staff. Q8. Are badges required? A8. Not for courtyard work during business hours. Badges are required for roof access. Delays caused by incomplete contractor submissions are not excusable delays. Scope Clarifications Q9. Does work occur along the entire curtainwall or only at leak locations? A9. Work shall occur along the entire curtainwall interface within Courtyards 1B and 1C to provide a continuous and complete seal. Q10. Should the entire length be repaired for a uniform seal? A10. Yes. Q11. Are cover caps replaced everywhere? A11. No. Replace only caps that are missing or cannot be reattached. Q12. Are other courtyard walls included? A12. No. Only the curtainwall/TPO/wall interface is included unless otherwise directed by the CO. Q13. Will the Government provide as builts or record drawings? A13. No. They are not available. Q14. Will the Government provide quantities? A14. No. Offerors must determine all quantities during the site visit. These measurements are binding for proposal purposes. Q15. Is full perimeter window caulking included? A15. No. Only the interfaces described in the SOW apply. Q16. Clarify termination bar installation. A16. Install the bar above the cant strip to secure the existing TPO using fasteners compatible with the substrate. Q17. Clarify face cap/flashing quantities. A17. Approximately 14 vertical caps have slid; one horizontal cap is missing; two require replacement. Remove flashing attached to the ground level base face cap. Offerors must verify all quantities. Q18. Will the awning require removal? A18. Not anticipated. Do not include awning removal unless CO directed. Q19. How many pavers must be moved and how should they be stored? A19. Approximately 70 pavers must be moved. Store in the courtyard, stacking no more than six high. Specifications, Submittals, & Warranty Q20. Which parts of VA 07 54 23 apply? A20. Membrane accessory materials and compatibility requirements apply. VA 07 92 00 applies to sealant products. Where requirements conflict, the more stringent governs. Q21. Confirm applicability of installer approvals, warranty, submittals, and pre installation meeting. A21. Manufacturer-approved roofing installer: Not required. Sealant warranty: 10-year manufacturer warranty required. Submittals: Required for sealants and termination materials showing compatibility. Pre installation meeting: Required prior to NTP; the 30 day PoP begins after NTP issuance. Q22. Provide TPO manufacturer or warranty info. A22. Unknown. Contractor is not responsible for maintaining prior warranties and shall ensure compatibility of materials. Schedule & Period of Performance Q23. Will NTP be flexible due to temperature/weather? A23. Yes. NTP may be adjusted as appropriate. Excusable delays are handled per FAR 52.212 4(f). Q24. Are background checks/PIV issuance included in the PoP? A24. Yes. Badges only required for roof access. Delays arising from incomplete contractor submissions are not excusable. Q25. Will water spray or infiltration testing be required? A25. No. Optional testing may be performed at the contractor s cost unless CO directed. Q26. Anticipated award/NTP date? A26. Award is anticipated on or around November 1, 2026 (subject to change). Schedule adjustments for weather may be considered if CO approved. Labor Standards, Set Aside, Subcontracting, & Bonds Q27. Which wage determination applies? A27. Davis Bacon Wage Determination AR20260032 applies. Q28. Will the contract be issued under DBRA only? A28. Yes. Any SCLS references are not applicable and will be conformed administratively. Q29. Which limitations on subcontracting apply? A29. Construction limitations apply. For special trade construction, no more than 75% (excluding materials) may be subcontracted to non similarly situated entities. LOS certification must be submitted. Q30. Are performance and payment bonds required? A30. No. Bonds are not required under this solicitation unless added by future amendment. Q31. Confirm SDVOSB status requirements. A31. This is a total SDVOSB set aside. Offerors must be certified in the SBA database at time of offer and award. Materials & Trades Q32. Will brake metal caps be accepted if originals are unavailable? A32. Yes, if they closely match existing caps and are approved before installation. Q33. Is a glazing contractor required? A33. No. Quantities & Pricing Basis Q34. Can VA provide LF quantities of termination bar or number of caps? A34. No. Offerors must determine quantities during the site visit. Q35. Should offerors price awning removal? A35. No. Do not include awning removal unless CO directed. Unforeseen/Differing Site Conditions Q36. How will additional TPO damage discovered during work be handled? A36. Repairs beyond the defined scope may only be performed if directed in writing by the Contracting Officer. Entitlement will be determined at that time. Q37. Are leaks associated with recent renovations? A37. No. Leaks have been occurring since the membrane was installed. Attachments Q38. Are photos/figures available? A38. Yes. Figures 1 6 included for reference only. Offerors must verify all conditions independently. Figure 1. Curtainwall Above GE101A and GE10B Figure 2. Curtainwall Above GF100 Figure 3. Missing Horizontal window base cap Figure 4. Flashing attached to horizontal window face cap Figure 5. TPO membrane beneath windows Figure 6. Metal Awning | 44% | Solicitation | 10/29/2026 |
Additional Details
Solicitation Number
36C25620Q1223
Archive Date
Nov 15, 2020
Office Address
RIDGELAND, MS, 39157