GovChime
Notice ID: 049fe1dc833344f78e857cc1e8ea7df4Combined Synopsis/Solicitation

J035--629-21-3-690-0005, Elevator Testing and inspection Base Year April 1,2021-March 31,2022

Archived on January 13, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
December 8, 2020
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
541350: Building Inspection Services
Agency
Department of Veterans Affairs

Notice details

Office
256-NETWORK CONTRACT OFFICE 16 (36C256)
Place of performance
Southeast Louisiana Veterans Healthcare System 2400 Canal St., New Orleans, 70119
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C25621Q0152
Notice ID
049fe1dc833344f78e857cc1e8ea7df4

Description

5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 1 4 0002 12-08-2020 629-21-3-690-0005 NCO 16 Department of Veterans Affairs Overton Brooks VA Medical Center (90C) 510 East Stoner Avenue Shreveport LA 71101 NCO 16 Department of Veterans Affairs Overton Brooks VA Medical Center (90C) 510 East Stoner Avenue Shreveport LA 71101 To all Offerors/Bidders 36C25621Q0152 11-12-2020 X x x 1 The purpose of this modification is to post questions and answers asked during RFQ. 1. See attached questions and answers below. RFQ closes December 14, 2020 @ 2:00 PM CST. Questions and Answers Verifying that contract awardee shall be a true elevator inspection firm that self performs all inspections pertaining to facility. Yes Are you requesting an hourly rate for Reinspection Clins or a total fixed accumulated cost? Total cost for the reinspection The 12.26.2.20 Emergency power operations part of the inspection. This is normally scheduled at a different time. How do we interpret this? We have a separate contract for elevator maintenance and that vendor documents the emergency elevator operations when we run generator tests. During the testing and inspection for this contract, 12.26.2.20 will just be document review. Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate? Yes, Once the award is issued vendor will receive the tax-exempt form if required. (Upon request) Will the Government provide comprehensive written badging requirements for the project if badging is required? Yes, we will. The contractor shall check in upon site arrival and sign in with Police Services. A temporary badge will be given; however, the contractor will not be permitted to have escorting privileges over the course of this contract. Contractor staff shall be escorted by the VA Elevator Maintenance contractor or VA staff. Describe all tasks that may be required for this project as it relates to infectious control? There are no infectious control requirements. Please note, this is a service request, not a project. What is the level of infectious disease control rating for this site? See question 3 Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA s networks and is currently in use at many VA locations. Only if the vendor will provide the government a username and password to access. We currently are not set up with ProCore. Does the Government have a contractor currently or previously providing elevator testing & inspection services? If so, please provide the point of contact for this service provider. Contract VA256-16-A-0065 RD3, Inc. Office: 720-457-3311 andrew.n@rd3inc.com Scope Questions: 7. 1.2 Maximum Individual task order amount is $36,000. Can the VA please clarify this statement? Is this the maximum annual cost of the project, or the maximum cost per CLIN item? This is the maximum potential annual cost and should only happen once, during quintennial testing, since those tests are twice the price of a normal test. 8. 12.26.2.20 Emergency power operations This is traditionally not part of an inspection & testing contract. This is normally completed during emergency power testing procedures that are conducted by the facility. This is normally billed as an off-hours hourly cost because there is significant requirement for coordination with the facility. Should this work be included in the contractor s scope? The VA documents Emergency Power Operation during monthly generator tests. The vendor will not need to do this. The vendor will only need to look over the VA s documentation for compliance.

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Apr 1, 2022

NAICS

541350

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C25621Q0152
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentNov 16, 2020

    J035--629-21-3-690-0005, Elevator Testing and inspection Base Year April 1,2021-March 31,2022

    Notice 049fe1dc833344f78e857cc1e8ea7df4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Conduct a comprehensive, phased environmental assessment of the St. John CBOC facility with destructive verification (core drilling, strategic panel/wall‑cover removal). Destructive test methods utilized must be approved by the Contracting Officer (CO). Conduct a comprehensive, phased environmental assessment of the St. John CBOC facility to identify, characterize, and document moisture intrusion, mold, and other biological growths across the building envelope and interior areas, including above-ceiling spaces and wall cavities, with destructive verification (core drilling, strategic panel/wall-cover removal). A Destructive Testing Plan (locations/methods) shall be submitted and preapproved by the Contracting Officer (CO) prior to execution; individual openings may proceed under the approved pla
-AwardedOpen
STATEMENT OF WORK FIRE DAMPER INSPECTION AND TESTING 1. Scope. The intent of this one-time service is to inspect and test multiple building s Fire Dampers (247 dampers) for regulatory compliance on the Biloxi VA Campus as described below within the 90 days following the Notice to Proceed. 2. Specifications/Characteristics: Minimum technical specs must be provided to meet the requirements of the GCVHCS. Campus Overview - The 247 Fire Dampers for inspection and testing are in the Patient Buildings of 3, 30, 14, 15, and 25 and the Non-Patient Buildings of 1, 2, 5, 19, and 28 on the Biloxi VAMC Campus. See Chart 1. These Fire Dampers assist fire prevention from the buildings and communicates with the current installed Fire Alarm System. See Table 1. All painted or damaged fusible links must be replaced with a link of same size, temperature, and load rating. The location of each fire damper and access panel to be verified on each drawing and then updated on each drawing in accordance with NFPA guidelines. All inspected fire dampers must have a visible label that corresponds to an Item number on the list, inspection date, condition, and inspector. Each building inspected will have its own inspection documentation with 2 pictures minimum per damper showing damper itself and general comments affecting damper operation. Each damper on the final report at a minimum shall state Pass / Fail. Contractor shall furnish within the 90 days, the red-lined AutoCAD 2000 / Adobe PDF drawing for each building on a CD and on 11 x 17 sheet. All pictures taken are to be labeled, organized by building and floor, and provided on a CD. Contractor shall furnish a formal Fire Damper Report on CD by building of all dampers inspected with inspectors signature. 3.0 Applicable Codes, Standards and Regulations 3.1. All work shall be done in accordance with the current National Fire Protection Agency (NFPA) Code requirements. 3.2. The Joint Commission, the latest applicable National Fire Protection Association (NFPA) standards, and Occupational Safety and Health Administration (OSHA) regulatory requirements. Testing is specific to 4 year frequency test for fire pump/smoke pump in facility. 3.2.1. NFPA 80 Standard for Fire Doors and Other Opening Protectives 3.2.2. NFPA 90A Standard for the Installation of Air Conditioning and Ventilating Systems 3.2.3. NFPA 101 Life Safety Code 3.2.4. NFPA 105 Standard for Smoke Door Assemblies and Other Opening Protectives 3.2.5. NFPA 5000 Building Construction & Safety Code 4. Comprehensive Fire/Smoke Damper Inspection Tasks Contractor shall: 4.1. Furnish all labor, tools, and equipment to inspect fire and smoke dampers at Biloxi VAMC Campus. 4.2. Use commercially reasonable efforts to locate and, once located, operate all dampers provided in list by Contracting Officer s Representative (COR) upon commencement of inspection. 4.3. Include documentation of all tested devices and must identify as a minimum which includes date inspected, unique device identification, device location, status (Pass or Fail), the type and quantity of devices tested in each building, and a consolidated deficiency finding list per building. 4.4. Coordinate with the COR, Air Conditioning Equipment Mechanic, Electronics Mechanic and notify local fire department that the fire alarm system is in test mode due to the inspection of the smoke and/or combination dampers. 4.5. Locate, access and survey area of dampers. 4.6. Clear each damper of any debris that would impede such dampers normal operation. 4.7. Check for penetrations. 4.8. Ensure no interference to operation due to: (rusted, bent, misaligned, or damaged frame or blades, or defective hinges or other moving parts). 4.9. Inspect all linkage and pivot points for freedom of movement and condition. 4.10. Manually activate actuators on electric smoke and/or combination dampers to verify proper operation. 4.11. Lubricate all moving parts on each damper. 4.12. Check operation of the latch if damper is provided with a latch. 4.13. Reset fusible links on fire dampers, to verify such fire damper fully closes and if necessary, replace any fusible link that is compromised (per NFPA code requirements). 4.14. Replace springs and/or access handles for the fire/smoke dampers as necessary. 4.15. Identify each unidentified unit location with a ceiling grid damper label. 4.16. Identify on drawings the location of each damper, along with placement of identification stickers on ceilings or other location to assist in future location of such dampers; 4.17. Authenticate compliance utilizing a customized Universal Product Code (UPC) label applied directly to all damper units, specifying reference number and inspection date. 4.18. Create a comprehensive inventory and repair list for all inspected damper locations. 4.19 Thoroughly clean all areas with a high-density high efficiency particulate air (HEPA) filtration system. 4.20. Complete all pertinent damper unit repairs as deemed necessary (linkage adjustments, damper unit mounts, flex installations). 4.21. Contractor shall be able to perform such repair or replacement if dampers are in need of either replacement or repair, the scope of repair or replacement shall be determined by the project manager and/or contractor technician. A list of defective dampers shall be generated by the contractor and provided to the COR and Contracting Officer for approval. 4.22. Provide a report on conclusion of performance of evidence of inspection, repair, or replacement to include a listing of the location of each damper, damper s VA established ID number, and whether such damper passed or failed; if a damper failed, a detailed explanation of such failure.   4.23. Repair exceptions pertain to access door installations and new damper unit installations as determined by Fire and Smoke Damper Inspection. 4.24. Summary of 4 year fire/smoke damper testing: a) Physically access each damper b) Remove fusible link in damper c) Cycle the damper to verify full closure d) Test smoke damper actuators e) Replace fusible link with new one f) Document pass/fail results 4.25. Purpose of testing ensures that each damper will close to stop fire/smoke from traveling through ducts or walls. 5. Repair Work 5.1. The contractor shall inspect and provide documentation of fire damper functionality. The contractor shall make any adjustments necessary to the fire damper linkages and brackets to correct operation of the damper. Replace any links found to be damaged, painted or otherwise compromised or unacceptable with a link of the same size, load and temperature rating. 5.2. Repairs beyond the scope of fusible links: If additional repairs are required to make a damper operational, provide the nature of the repair and a cost estimate in the inspection summary report. 5.3. Any work that will result in additional charges MUST be approved by the Contracting Officer, in writing, BEFORE such work begins. Any additional work performed by the Contractor without the prior, written approval of the Contracting Officer shall be at no additional 6. Delivery Gulf Coast Veterans Health Care System Warehouse Bldg 26 400 Veterans Ave Biloxi MS 39531 Mon-Fri 7:00am- 3:30pm 7. Period of Performance is 12/31/2026 12/30/2027. Table 1: Fire Dampers to be Inspected and Tested Building 1 Damper Number Department or Area Damper Location  1 BSMT Ex Duct by AHU 9 RM BAC 9 2 BSMT Outside of RM BC 101 1 1 1A135 3 1 1C114 11 1 1C114 12 1 1C114 4 2 Mech RM across from 2C115 22 2 2B104 23 2 2A108 24 2 2C109 25 2 2C109 26 2 2C109 27 2 2C109 28 2 2C113B 29 2 2C113B 1 Attic 2 AHU 3 Supply 2 Attic 2 AHU 3 4 Attic 2 AHU 4 5 Attic 2 AHU 4 6 Attic 2 AHU 4 7 Attic 2 AHU 4 Supply 8 Attic 2 AHU 4 9 Attic 2 AHU 4 10 Attic 2 AHU 4 11 Attic 2 AHU 4 12 Attic 2 AHU 4 13 Attic 2 AHU 4 14 Attic 2 AHU 2 Supply 15 Attic 2 AHU 2 16 Attic 2 AHU 2 17 Attic 2 AHU 1 Return 18 Attic 2 AHU 1 Return 19 Attic 2 AHU 1 20 Attic 2 AHU 1 Supply 22 Attic 2 Exhaust 13 23 Attic 2 AHU 11 24 Attic 2 AHU 11 25 Attic 2 AHU 11 26 Attic 2 AHU 11 27 Attic 2 EF-9 Building 2 Damper Number Floor Damper Location  FD-1 1E 1B119 FD-2 1E 1B119 FD-3 1E 1B119 FD-4 1W 1A112 FD-5 1W 1A112 FD-6 1W 1A112 FD-7 2E 2B111 FD-8 2E 2B111 FD-9 2E 2B111 FD-10 2W 2A106 FD-11 2W 2A106 FD-12 2W 2A106 FD-13 3E 3B116 FD-14 3E 3B116 FD-15 3E 3B116 FD-16 3W 3A105 FD-17 3W 3A105 FD-18 3W 3A105 Building 3 / 30 Damper Number Floor Damper Location  12 2 AHU 2 Supply RM 2D140 1 1A 1H100 2 1A 1H100 3 1A 1H100 10 1G 1G116 11 1G 1G119 12 1G 1G121 13 1G 1G121 14 1G 1G128 15 1G 1G125 16 1G 1G125 17 1G 1G125 18 1G 1G125 19 1G 1G128 Hallway 20 1G 1G129 21 1G 1G132 22 1G 1G132 23 1G 1G132 24 1G 1G134 in chase 25 1G 1G134 in chase 26 1G 1G134 in chase 27 1G 1G140 28 1G 1G148 Double Doors 29 1G 1G143 30 1G 1G143 31 1G 1G143 32 1G 1G143 33 1G 1G135 in chase 1 1H 1H103 Main Corridor 2 1H 1H102 3 1H 1H102 4 1H 1H100 Hallway 6 1H 1H100 7 1H 1H100 1 1J C1-44 2 1J C1-44 3 1J C1-44 4 1J C1-44 5 1J C1-44 6 1J 1J141 7 1J 1J142 8 1J 1J143 9 1J C1-47 Above Door 10 1J C1-38 11 1J 1J127 12 1J 1J127 13 1J 1J145 14 1J 1J145 15 1J C1-51 1 2H 2H106 Hallway 2 2H 2H106 Hallway 3 2H 2H104 4 2F 2F112 Above Door 5 2F 2F112 6 2G 2G100 7 2G 2G100 Above Door 16 1J Above ceiling of 1st floor RM 1J102 9 2F 2C-23 Above Door 1 3F C2-19 Between 3F128 & 3F126A 2 3F Above Door Bldg 3 meets Bldg 30 3 3G 3G105C 4 3G 3G135 1 4F 4F115 2 4F 4F127 3 4F C4-115 Above Door 4 4G C4-22 in front of 4G110 5 4G C4-22 in front of 4G110 1 Attic 5G103 2 Attic 5G103 3 Attic 5G104 4 Attic 5G104 5 Attic 5G104 6 Attic AHU 6 7 Attic AHU 6 8 Attic AHU 1 10 Attic AHU 5 11 Attic AHU 5 Supply 13 Attic AHU 3 14 Attic AHU 4 Supply 15 Attic AHU 4 18 Attic 5F101 Building 5 Damper Number Floor Damper Location  1 1 Rm 1A-106 2 1 Rm 1A-107 3 1 Rm 1A-107 4 1 Rm 1A-108 5 1 Rm 1A-112 6 1 Rm 1A-112 7 1 Rm 1A-113 8 2 Rm 2A-10 9 2 Rm 2A-107 10 2 Rm 2A-108 11 2 Rm 2A-108 Building 14 Damper Number Floor Damper Location  1 1 C1-15 Above Double Doors 2 1 C1-15 Above Double Doors 12 1 C1-9 13 1 C1-9 14 1 C1-9 1 Attic AHU 2 2 Attic AHU 2 3 Attic AHU 1 4 Attic AHU 1 5 Attic AHU 3 6 Attic AHU 3 Building 15 Damper Number Floor Damper Location  10 1B 1B106 1 1D 1D100 9 2B 2B108 1 2G 2G102 15 2 Supply Air up/down near 2G100 16 2 Exhaust Air down to 1st Fl up to EF-5 on roof 17 2 Return Air duct down 18 2 Exhaust Air down to 1st Fl up to roof 19 2 Exhaust Air down to 1st Fl up to EF-5 on roof 1 Attic AHU 2 Supply 2 Attic Ahu 2 Return 3 Attic AHU 2 Exhaust 5 Attic AHU 3 Supply 6 Attic AHU 3 Return 7 Attic AHU 3 Exhaust 8 Attic AHU 3 Supply 9 Attic AHU 3 Return 11 Attic AHU 1 Exhaust 12 Attic AHU 1 Supply 13 Attic AHU 1 Supply 14 Attic AHU 1 Return Building 19 Damper Number Floor Damper Location  1 1A 1A117 2 1A C1-5/1A117 5 1A 1A117 6 1A 1A117 1 1B 1B127 2 1B 1B127 3 1B Corridor next to 1B127 7 2A 2A104 in floor 8 2A 2A104 in floor 1 2B 2B126 in floor 4 2B 2B126 1 3A 3A105 in floor 4 3A 3A105 in floor 15 3B 3B123 in floor 16 3B 3B123 in floor 1 Attic AHU 2 (A area) 2 Attic AHU 2 (A area) 3 Attic AHU 1 (B area) 4 Attic AHU 1 (B area) Building 25 Damper Number Floor Damper Location  8 1B 1B156 9 1B 1B156 42 1B 1B153 43 1B 1B153 15 1C 1C122 16 1C 1C122 17 1C 1C123 18 1C 1C122 21 1C 1C125 22 1C 1C125 47 2A C2-11 48 2A 2A122 49 2A C2-11 50 2A 2A122 51 2A C2-11 55 MEZZ AHU 1 56A MEZZ AHU 1 56B MEZZ AHU 1 57 MEZZ AHU 1 35 MEZZ AHU 2 36 2B C2-20 By 2B133 37A MEZZ AHU 2 Return 37B MEZZ AHU 2 Return 38 MEZZ 2B134 39 MEZZ 2B134 40C MEZZ AHU 2 Supply 41 2B 2B133 53 2B 2B134 12 2C 2C138 13 2C 2C121 (Hall) 14 2C 2C145 (Hall) 27 2C 2C132 30 MEZZ AHU 3 Exhaust 31 MEZZ AHU 3 Supply 32A MEZZ AHU 3 Return 32B MEZZ AHU 3 Return Building 28 Damper Number Floor Damper Location  1 NW 1A100 - Lobby Elevator P1 Side 2 NW 1A100 - Lobby Elevator P2 Side 3 SW 1A103 - Lobby Elevator P3 Side 4 SW 1A103 - Lobby East Side 5 SW 2A102 - Lobby Elevator P3 Side 6 SW 2A102 - Lobby East Side 7 NW 5A100 - Lobby Elevator P1 Side 8 NW 5A100 - Lobby Elevator P2 Side 9 SW 5A102 - Lobby Elevator P3 Side 10 SW 5A102 - Lobby East Side -End of Scope of Work-
-Market Research10/06/2026
-AwardedOpen
-AwardedOpen
Fire Alarm, Suppression Systems, and Hood Testing, Inspection, and Certification Services - SAVAHCS
-Combined Synopsis11/12/2026

Additional Details

Solicitation Number

36C25621Q0152

Archive Date

Jan 13, 2021

Office Address

RIDGELAND, MS, 39157