Notice ID: e724a081e6074e0cb3e8f61804e2e2ffAward NoticeAwarded
J041-- 667-23-1-502-0001 - Chiller maintenance and associated equipment contract
Awarded on October 1, 2022. Full description on SAM.gov.
Awarded tounder 36C25623P0008 (source: SAM.gov award notice)• $196.2K
Overview
- Posted
- October 4, 2022
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
Notice details
- Place of performance
- Dept VA Overton Brooks VA Medical Center (90C) 510 E. stoner Ave., Shreveport, 71101
- Last updated
- Sep 9, 2025
- Award date
- Oct 1, 2022
- Award amount (SAM.gov award notice)
- $196.2K
Identifiers
- Solicitation number
- 36C25622Q0789
- Notice ID
- e724a081e6074e0cb3e8f61804e2e2ff
- Award number (PIID)
- 36C25623P0008
Description
5. PROJECT NUMBER (if applicable) CODE 7. ADMINISTERED BY 2. AMENDMENT/MODIFICATION NUMBER CODE 6. ISSUED BY 8. NAME AND ADDRESS OF CONTRACTOR 4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE 9A. AMENDMENT OF SOLICITATION NUMBER 9B. DATED PAGE OF PAGES 10A. MODIFICATION OF CONTRACT/ORDER NUMBER 10B. DATED BPA NO. 1. CONTRACT ID CODE FACILITY CODE CODE Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers E. IMPORTANT: is extended, (a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended. 12. ACCOUNTING AND APPROPRIATION DATA (REV. 11/2016) is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. 15C. DATE SIGNED B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: D. OTHER Contractor 16C. DATE SIGNED 14. DESCRIPTION OF AMENDMENT/MODIFICATION 16B. UNITED STATES OF AMERICA Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect. 15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER 15B. CONTRACTOR/OFFEROR STANDARD FORM 30 PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) (Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.) (If required) (SEE ITEM 11) (SEE ITEM 13) (X) CHECK ONE 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT (Signature of person authorized to sign) (Signature of Contracting Officer) 0001 Department of Veterans Affairs Overton Brooks VA Medical Center (90C) 510 East Stoner Avenue Shreveport LA 71101 Department of Veterans Affairs Overton Brooks VA Medical Center (90C) 510 East Stoner Avenue Shreveport LA 71101 To all Offerors/Bidders 36C25622Q0789 X X X 1 RFQ CLOSE JUNE 23, 2022 @ 13:00 CST See CONTINUATION Page 1 1 The purpose of this amendment is to extend RFQ solicitation closing date and to post question and answers from site visit. This solicitation 36C25622Q0789 is hereby extended from June 13, 2022 @ 13:00 CST to June 23, 2022 @ 13:00 CST. Please see continuation page for Q&A from site visit. CONTINUATION PAGE Question and Answers from site visit Please find our questions below for the subject solicitation: All scheduling will be done through either (1) the Operations Supervisor, (2) the AC Shop Supervisor, (3) the AC Shop Leader, or (4) the M&O Supervisor Chiller located on 3rd/4th floor we believe they said serves the Surgery Suite: What scheduling requirements are needed to take off-line for servicing? Chiller Annuals are performed during winter months when chiller load is low, generally December thru February. Chiller Plant: What are scheduling requirements for performing Annuals on Chillers? Same as Question 1. Concrete Cooling Tower with 3 Fans: What are scheduling requirements for inspection on CT? Same as Question 1. Should all pumps (approx. 12 total pumps) be included on the scheduled inspections? This was not clear in the scope of work described or mentioned specifically with other equipment that was clearly listed. Yes. Actual number is 13 pumps. If awarded as service contractor, will we also be called upon for unscheduled service calls? That depends on the task(s) to be performed. Can the cells of the concrete cooling tower be isolated allowing one cell to be cleaned at a time? Yes. The bottom of page 9 reads 3. The Contractor shall make thorough inspection of the equipment at six-month intervals during the months of January and July. Can the government please provide the scope of work associated with this task? Should this be considered a misprint? Remove the July requirement. This appears to call for 2 Annual Inspections. We don t, and actually can t (due to heavy chiller load during the summer), perform this task in July. Can all tasks associated with this RFQ be completed during normal business hours? If not, please advise What tasks for what pieces of equipment will need to be performed after hours. Yes, all tasks WILL be performed during normal business hours.
Award Overview
Award Number
36C25623P0008
Award Amount (SAM.gov award notice)
$196.2K
Award Date
Oct 1, 2022
Awardee
Awardee UEI
DBSMJLNJKBD7
Original Solicitation
Notice ID: e724a081e6074e0cb3e8f61804e2e2ff
Posted Date: Oct 4, 2022
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $1.6MSigned Sep 1, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C25622Q0789- Combined Synopsis
- Awarded
This opportunity has been awarded.
- 3×Combined SynopsisMay 3, 2022
J041--667-23-1-502-0001 - Chiller maintenance and associated equipment
- AwardedCurrentOct 4, 2022
J041-- 667-23-1-502-0001 - Chiller maintenance and associated equipment contract
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Replace Chillers in AHUs 1 & 2 558-22-172 | 95% | Awarded | Open |
STATEMENT OF WORK Project Number: 558-22-172 Replace Chillers for AHU 1 and 2 Scope: The scope of work shall generally consist of but not limited to the following: providing all labor, materials, tools, equipment, permits, testing, and reports required to complete the replacement of chillers that serves AHU 1 and 2 and associated equipment and structural upgrades as shown in the drawings and specifications. Construction Period - Pre-Construction Meeting: Contractor shall participate in and facilitate a Pre-Con in conjunction with the Contracting Officer, COR, A&E, and building stakeholders as needed. Contractor to hold weekly Construction Progress Meetings via Microsoft Teams or in-person and include the COR and CO as principal participants. Contractor provides Meeting Minutes within no less than 7 days following each Construction Progress Meeting. As-Built Drawing Submission: Provide Red-line drawings to A/E that include the contractor’s mark-ups in PDF formats. Hours of Operation and Phasing: Construction should be phased and timed such that: General Operation of the affected areas is not interrupted The facility operates on a 24-hour, 7 day per week schedule Contractor will conduct operations during 1st, 2nd and 3rd shifts such that minimal interruption of function occurs. 1st shift construction activities will be allowed with approval of the COR. Contractor to develop and coordinate phasing plan with input from staff and final approval of COR. Any construction work that necessitates a utility outage must be scheduled for the second shift or during the weekend. Please coordinate all shutdowns with the VA COR and submit a written shutdown request at least 20 days in advance of the proposed shutdown date. Storage: No storage of any material will be allowed on VA property unless approved by the COR. Period of Performance: Contractor shall complete this project no later than 270 days after issue of notice to proceed (NTP). Utility and System or Service Outages: No utility services such as water, gas, steam sewers or electricity, parking, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized in accordance with VA Lock-out Tag-out requirements. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the Medical Center Director’s prior knowledge and written approval. The contractor shall submit a request to interrupt any such services to COR, in writing, 20 days in advance of proposed interruption. General Requirements The contractor’s employees shall not enter the work site without appropriate badges and identification. They may also be subject to inspection of their personal effects when entering or leaving the project site. Execute work to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied jointly by patients or medical personnel, and Contractor’s personnel, except as permitted by COR where required by limited working space. Means of Egress: Do not block existing egress for occupied buildings, including paths from exits to roads per NFPA 101 and VA requirements. Minimize disruptions and coordinate with COR. All buildings will be occupied during performance of work. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the installation period. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Coordinate with COR. Obtain permits from facility Safety Manager at least 48 hours in advance. New work shall be installed and connected to existing work neatly, safely and professionally. Contractor to coordinate periodic VA inspection to ensure satisfactory workmanship of GC and Subcontractors. Any portion of the VAMC that is disturbed or damaged shall be replaced or repaired to its prior condition. The contractor is required to notify the COR upon arrival and departure of personnel at the work site every day work is performed during the execution of this project. END OF SCOPE OF WORK | 95% | Solicitation | 08/27/2026 |
Amendment 0004 issued to extend the response due date to 8 Oct 2026, 1300 hours. | 65% | Solicitation | 10/08/2026 |
SOLICITATION AMENDMENT 0004: SEE AMENDMENT 0004 | 57% | Combined Synopsis | 07/20/2026 |
Clean Heat Pump Indoor Units of Buildings 6500, 6120 and 6950 at Camp Humphreys | 57% | Combined Synopsis | 06/17/2026 |
Additional Details
Solicitation Number
36C25622Q0789
Archive Date
Oct 19, 2022
Office Address
RIDGELAND, MS, 39157