GovChime
Notice ID: a30f47d484bd41529902b7157f82eb3fSolicitation

J061--AUTOMATICE TRANSFER SWITCHES AND PARALLELING SWITCHGEAR PREVENITIVE MAINTENANCE, TESTING, AND INSPECTION SERVICES

Archived on January 27, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−06:00
Posted
November 17, 2022
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total

Notice details

Office
256-NETWORK CONTRACT OFFICE 16 (36C256)
Place of performance
Veterans HealthAdministration Michael E. DeBakey VA Medical Center (MEDVAMC) 2002 Holcombe Blvd., Houston, 77030
Last updated
Sep 25, 2026

Identifiers

Solicitation number
36C25623Q0012
Notice ID
a30f47d484bd41529902b7157f82eb3f

Description

SOLICITATION AMENDMENT 0001 Solicitation 36C25623Q0012 for automatic transfer switches and paralleling switchgear preventive maintenance, testing, and inspection services at the Michael E. DeBakey VA Medical Center located in Houston, TX is amended to to answer questions submitted in response to the solicitation and provide additional information requested. This amendment includes a list of questions submitted, with answers, and additional exhibits to assist in answering those questions submitted. These exhibits will NOT become part of the resultant contract award. The closing date and time, as indicated in block 8 of the Standard Form 1449 will NOT be extended as a result of this amendment. SOLICITATION The Michael E. DeBakey VA Medical Center (MEDVAMC) located in Houston, TX, has a requirement for a contractor to provide all parts, labor, tools, materials, equipment, transportation, and supervision necessary to perform monthly, semi-annual, and annual maintenance, inspection, and testing of all GE-Zenith and Mustang CAT Automatic Transfer Switches (ATS) and Paralleling Switch Gear (PSG). This is a 100% Small Business set-aside under NAICS code 238210. All interested parties must be registered in the System for Award Management (SAM) at https://www.sam.gov, as of the date of quote submission and date of award. Award WILL NOT be delayed for registration. Interested parties must submit all questions concerning the solicitation, in writing, via email to james.hunt2@va.gov, to be received no later than 4:30pm CT, Friday, November 11, 2022. Questions submitted after this date/time may not be answered. As indicated on the cover page, all quotes must include the following to be considered for award: - Contractor’s business name (as registered in SAM) - Contractor’s address (as registered in SAM) - Contractor’s unique entity ID (as registered in SAM) - Contractor’s Point of Contact (POC) Name - POC phone number - POC email address - Completed Price Schedule (Solicitation Section B.1) - Completed Technical Capability Questionnaire (Attachment 3) - Completed Solicitation Provision 52.204-24 (Solicitation Section E.1) - Completed Solicitation Provision 52.209-7 (Solicitation Section E.2) - Completed Solicitation Provision 52.212-3 (Solicitation Section E.6). Complete and return only paragraph (b)(2) of this provision if your annual representations and certifications in SAM, have been entered or updated in the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard(s) applicable to the NAICS code(s) referenced for this solicitation), at the time this offer is submitted. SITE VISIT: Quoters are urged and expected to inspect the site(s) where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. Site visits must be scheduled for completion in time to allow for the submission of questions no later than 4:30pm CT, Friday, November 11, 2022. The following individual may be contacted for site visit schedule information: John Debibar Email: john.debibar2@va.gov Ph: 713-791-1414

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Jan 2, 2025

NAICS

238210

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

James Hunt
Contracting Officer

Documents

No documents available.

Lifecycle

Solicitation:36C25623Q0012
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    Pre-SolicitationOct 12, 2022

    J061--AUTOMATICE TRANSFER SWITCHES AND PARALLELING SWITCHGEAR PREVENITIVE MAINTENANCE, TESTING, AND INSPECTION SERVICES

    Notice 77c3420a50874a5080bc49e1fb2011df on SAM.gov

  2. 2×
    SolicitationCurrentOct 26, 2022

    J061--AUTOMATICE TRANSFER SWITCHES AND PARALLELING SWITCHGEAR PREVENITIVE MAINTENANCE, TESTING, AND INSPECTION SERVICES

    Notice a30f47d484bd41529902b7157f82eb3f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The purpose of this amendment is to provide answers to the questions received prior to the cutoff date. In addition to providing answer to the questions, a site visit is also set for 0900 on Tuesday 27 October 2026 at the Louis Stokes Cleveland VA Medical Center 10701 East Boulevard, Cleveland, Ohio 44106-1702. We will meet at the information desk, first floor of the Atrium. This is directly across from the parking garage. Is this a new requirement or a recompete? If a recompete, please identify the incumbent contractor, the previous contract number, and the prior contract value. The final option year of the previous contract 36C25022F0010 has expired. Can prior test reports (most recent tri-annual cycle, IR survey, oil analysis) be provided to help establish equipment condition and test history? Prior test reports will not be shared outside of authorized staff. What is the estimated contract value or funding range for this requirement? This is not a construction requirement and therefore we do not have a project magnitude. The circuit breaker testing schedules for Option Year 1 (November 1, 2027 October 31, 2028) and Option Year 4 (November 1, 2030 October 31, 2031) appear to omit the quantity column shown in the other annual schedules. Could the Government provide revised schedules identifying the quantities for each listed circuit breaker in these two option years? Edited spreadsheet for breaker listing provided below. The SOW identifies working hours of 7:00 a.m. 11:30 p.m. Monday through Friday and 6:00 a.m. 6:00 p.m. Saturday and Sunday when maintenance requires an electrical power interruption. However, we could not locate an equipment schedule distinguishing Normal (Monday Friday) equipment from Critical (Saturday Sunday) equipment. Could the Government provide this classification or confirm how contractors should determine which equipment requires weekend work for pricing purposes? Any work that requires power to be interrupted will be completed on Sunday s, during daylight hours. Work that does not require power interruption, i.e. IR scan or transformer oil samples can be completed M-F during normal working hours. The section requires electrical contracting to be the primary specialty of the contractor's business and references properly trained and licensed permanent staff. Would the VA consider a qualified small-business prime contractor that provides contract management, coordination, quality assurance, and oversight while utilizing an experienced electrical testing subcontractor with the required NETA certifications, licensed personnel, equipment, and relevant past performance? This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations. Technician certification equivalence: the statement of work requires technicians certified to NETA standards or an equivalent certifying organization. Would NICET-certified technicians performing testing to the latest NETA MTS standards be accepted as equivalent for this requirement? NICET-certified technicians may be accepted as meeting the "equivalent certifying organization" requirement, provided the certification is in a relevant electrical testing, maintenance, or power-distribution-related subfield and the individual possesses the knowledge, training, and experience necessary to perform the testing, inspection, maintenance, and troubleshooting activities required under this contract. Consistent with the SOW requirements, personnel performing the work shall have a minimum of five (5) years of relevant documented experience and shall perform all testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS). Additionally, NICET Level III or higher in an applicable electrical power testing or power distribution discipline will be considered equivalent to the NETA certification requirement. Additionally, would the VA consider the subcontractor's technical qualifications and past performance when evaluating the prime contractor's technical capability? This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While subcontractors may be utilized as permitted by the solicitation, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Evaluation of technical capability and past performance will be conducted in accordance with the evaluation criteria specified in the solicitation. Finally, please confirm which limitation on subcontracting applies to this procurement under NAICS 238210. The NAICS for this requirement is 238210 Offer due date: The SAM.gov notice header lists a response date of October 19, 2026, but the solicitation text says quotes are due October 23, 2026 at 3:00 PM ET. Please confirm which date and time govern. SAM was corrected within 4 hours of the posting to reflect 10/23/2026 at 15:00 which matches the solicitation that was posted. Period of performance: The SOW lists a base year of November 1, 2026 through October 31, 2027, plus four option years. Please confirm the anticipated award date that supports a November 1 start. The current need is to start 11/1/2026. The period of performance will start as soon as possible if not on 11/1/2026. The SOW requires NETA-certified technicians "or equivalent." Please confirm whether the certification may be held by the subcontractor's technicians doing the testing, and which other certifications are acceptable as equivalent. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary testing, inspection, maintenance, and troubleshooting activities required under this contract. The use of qualified subcontractors is permitted; however, the prime contractor shall maintain an active onsite role and directly perform a substantial portion of the work with its own qualified personnel. The prime contractor's role shall not be limited solely to contract administration, project management, quality assurance, or oversight functions. For personnel qualification purposes, NETA-certified technicians are acceptable. As an equivalent certification, the Government will accept NICET Level III or higher certification in an applicable electrical power testing or power distribution discipline, provided the technician has a minimum of five (5) years of documented relevant experience and performs testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS). Limitations on subcontracting: The solicitation includes FAR 52.219-14. Please confirm that the services limit applies (no more than 50% of the amount paid may go to subcontractors that are not similarly situated). Yes the clause applies to this requirement. Payment: The solicitation includes clause 52.232-90 Fast Payment Procedure, which covers supply deliveries. Please confirm how invoicing will work for this service: after each testing event is completed and accepted, or monthly in arrears. Invoice upon completion, not more than Monthly. The evaluation weighs technical capability and requires references. Is there a prescribed format or minimum number of references quoters should submit, and should the references be healthcare or VA facility electrical testing work? The relevance of references, due to the complexity of performing electrical testing, maintenance, and outage activities within an operating healthcare environment, the Government recommends that offerors provide references demonstrating experience performing work of similar scope, complexity, and operational criticality whenever available. References involving healthcare facilities, VA medical facilities, or other mission-critical facilities are preferred but are not required. Please clarify whether the equipment quantities listed on Page 20 of 65 under Infra-Red Line Items for Inspection are also included in the testing and maintenance scope, or whether the listed equipment requires infrared inspection only. If testing and maintenance are required, please provide the equipment type and voltage level for each item. The equipment listed under "Infra-Red Line Items for Inspection" is included for infrared inspection purposes only under Section 5.4 and is not included in the testing and maintenance scope unless specifically identified elsewhere in the SOW. Accordingly, no additional equipment type or voltage information is required for these line items. Please confirm whether protective relay testing is required under this solicitation. If so, please provide the quantity, manufacturer, model, and voltage level for the protective relays to be serviced. Yes. Protective relay testing is included under this Statement of Work. Specifically, Section 5.5, "Medium Voltage Relay Testing," requires the contractor to inspect, clean, test, calibrate, and maintain adjustable protective relays. The protective relays to be serviced are associated with the facility's 11 kV switchgear and consist of approximately 37 relays. The manufacturer is Schweitzer Engineering Laboratories (SEL). Known relay models include: SEL-351 SEL-587A SEL-551 Voltage Level: 11 kV. Offerors should base their proposals on the testing, calibration, inspection, and maintenance of these protective relays as required by the SOW. Please clarify whether the cost of replacing or refilling transformer cooling liquid is the responsibility of the contractor or the VA. If it is the contractor s responsibility, please provide a cost allowance for this work. Yes. Replacement or refilling of transformer cooling liquid shall be the contractor's responsibility when testing indicates the liquid no longer meets the manufacturer's specifications, as required by the SOW. No separate cost allowance will be provided by the Government, and offerors shall include all costs associated with this requirement in their proposal. The facility currently has four (4) oil-filled transformers with approximate oil capacities as follows: Energy Center Transformer: 704 gallons Research Transformer: 292 gallons Penthouse Transformer #1: 151 gallons Penthouse Transformer #2: 151 gallons The most recent transformer oil sample testing did not recommend oil replacement for any of these transformers. Copies of recent oil sample reports may be provided upon request. Please confirm if the permitted working hours, including shutdown hours, for this contract will be after business hours or from Monday through Friday, 7:00 a.m. to 11:30 p.m. or Saturday and Sunday, 6:00 a.m. to 6:00 p.m. Work requiring electrical power interruptions and planned shutdowns is anticipated to occur on assigned Sundays during daylight hours. Specific outage dates and work schedules will be coordinated by the Government based on facility operational requirements and the impact of the outage on medical center operations. Work activities that do not require interruption of electrical service may be performed during the normal operating hours identified in the SOW. Please provide the quantity of battery systems requiring inspection, testing, and maintenance under this solicitation. The solicitation includes one (1) medium-voltage switchgear battery backup system and charger requiring inspection, testing, and maintenance. Battery system details are as follows: Quantity: One (1) battery system Application: Medium-voltage switchgear control power system Manufacturer: ALCAD Configuration: 96-cell battery bank Nominal Voltage: 129 VDC Battery Model: XHP130 The contractor shall perform inspection, testing, and maintenance of this battery system in accordance with the requirements of the Statement of Work. Please confirm whether Automatic Transfer Switches (ATSs) are included in the required testing and maintenance scope. If so, please provide the quantity, their rated power, and clarify whether testing is required annually or once every three years. Automatic Transfer Switches (ATSs) are included in the infrared inspection requirements of this contract. Infrared inspections, including ATS infrared inspections, shall be performed annually in accordance with Section 5.4 of the SOW. ATS testing, maintenance, and repair are not included in the scope of this SOW and are covered under a separate maintenance agreement. Therefore, ATS quantities, ratings, and testing frequencies for maintenance and testing purposes are not applicable to this solicitation. Can you provide the one-line diagram of the facility and the previous electrical study report? Facility power diagrams will not be shared outside of authorized staff. Is there a required format, page limit, or volume structure for the technical and price quotes? The solicitation states that failure to follow the document format will render a quote non-responsive. Submission must be complete and contain an appropriate level of detail to allow the evaluator to determine technical acceptability and Compliance with the RFQ. Please confirm that "tri-annual" means once every three years (triennial), with the equipment rotating per the Section 5.10 lists (Base/OY3, OY1/OY4, OY2). Correct. For the purposes of this SOW, "tri-annual" means once every three (3) years. Equipment identified in Section 5.10 is tested and maintained on a three-year rotational schedule as outlined in the Base Year/Option Year 3, Option Year 1/Option Year 4, and Option Year 2 equipment lists. Several items lack kVA ratings (Surgery transformers, Parking Garage oil transformer). Please provide kVA and voltage ratings. Please also confirm the EC1 MV switch quantity shown as "6-Jun" in the Option Year 3 list. EC1 MV switch quantity = 1 Surgery Sub 1,000 kVA Parking Garage 300 kVA What is the medium-voltage service level (e.g., 5 kV, 15 kV), and how many MV switches, relays, and battery systems are in scope? The medium-voltage distribution system covered under this solicitation operates at 11 kV. The equipment currently in scope includes: Medium-Voltage (MV) Switches: 33 Protective Relays: 37 Schweitzer Engineering Laboratories (SEL) protective relays Battery Systems: One (1) medium-voltage switchgear battery backup system Offerors should base their proposals on the inspection, testing, maintenance, and related services associated with the above equipment. Section 5.2 covers breakers 400A and above, but the lists include breakers below 400A (e.g., 100A 300A MCCBs). Are breakers under 400A in scope for testing? Circuit breakers rated below 400 amps are not included in the testing requirements of Section 5.2. Breakers rated below 400 amps that are listed and located within distribution equipment containing breakers rated 400 amps and above shall be manually exercised during the maintenance activity but are not required to undergo testing. The IR line item list skips items 157 163. Are these intentionally excluded or missing? Appears to be a numbering error where equipment has been added or removed during unrelated construction projects. Section 5.4 states problem connections shall be replaced or tightened. Is connector replacement included in the firm-fixed price, or handled as an out-of-scope repair? Please define "basic repair." Connector replacement required under Section 5.4 is included in the firm-fixed-price scope. "Basic repair" refers to minor corrective actions that can be completed without additional material costs beyond incidental consumables and without extending the scheduled work effort. Any repair involving replacement of equipment other than connectors, significant additional labor, or material costs not contemplated by the SOW will be considered out-of-scope work. For liquid-filled transformers, is fluid replacement and refill (and disposal of used oil) included in the fixed price or treated as additional work? Fluid replacement, refill, and disposal of used oil, when required based on testing results, are included within the firm-fixed-price scope of this contract and are the contractor's responsibility. As specified in the SOW, liquid-filled transformers shall have the cooling liquid tested and replaced when testing indicates the liquid no longer meets the manufacturer's specifications, and the transformer shall be refilled to the manufacturer's specified levels. ** Section 5.9 notes that if breaker or ATS settings are not available, the contractor may conduct a study. Is a coordination study in scope for pricing? Are current coordination and arc flash studies available? The most recent coordination study and arc flash study will not be shared outside of authorized staff. Offerors shall base their pricing on the information provided by the VA. Any additional coordination or arc flash studies performed by the contractor shall be at the contractor's expense and at no additional cost to the Government. Section 5.8 (4-hour outage test, 2029): please identify the local utility provider and confirm the services the contractor is expected to pay for. The planned outage is expected to occur between 7:30 a.m. and 11:30 a.m. on the assigned Sunday. The contractor shall include in its firm-fixed-price proposal onsite support from 7:00 a.m. to 3:00 p.m. to provide emergency response, troubleshooting, and technical support for power-distribution equipment covered by this SOW. A NETA-certified technician, qualified to troubleshoot and support the equipment included in this SOW, shall be onsite for the duration of the scheduled outage and restoration period. Should the outage extend beyond the planned 4-hour duration due to a malfunction of power-distribution equipment, the contractor shall continue to provide troubleshooting and technical support necessary to assist the Government in restoring electrical service. The Government will coordinate the outage with Cleveland Public Power and will be responsible for all utility-provider fees and outage-related costs. The contractor shall not be responsible for the cost of replacement parts, materials, or repairs that require work outside the scope of this contract. Any such work shall be handled in accordance with the contract provisions for additional work and shall require Government approval prior to execution. The Inspection and Acceptance section references "monthly inspection" and "response to service call." Neither appears elsewhere in the SOW. Are monthly inspections or emergency service calls required? If so, what are the response times? This requirement is not applicable to this solicitation. The references to "monthly inspection" and "response to service call" in the Inspection and Acceptance section were included in error and will be removed from the SOW. No monthly inspections or emergency service-call response requirements are included under this contract. The deliverables table lists ">30 days" and "14 days," while Section 6 requires reports within 7 days. Please clarify the required report turnaround times. The report turnaround times identified in the Deliverables table shall govern. The requirement in Section 6 stating that reports must be submitted within seven (7) days was included in error and will be corrected in the SOW. Contractors shall adhere to the report submission timelines specified in the Deliverables table. How many planned outages/shutdowns will be allowed per year, and will work requiring de-energization be limited to weekends (6 AM 6 PM)? Will VA perform switching and lockout, or is the contractor responsible? Planned outages will be scheduled as required to support the testing and maintenance activities identified in Section 5.10. Multiple pieces of equipment may be combined and tested during a single outage or testing day when determined to be beneficial to the Government. The exact outage schedule for each contract year will be determined by facility operational requirements, equipment availability, and the impact of the outage on medical center operations. When de-energization is required, outages are anticipated to occur on assigned Sundays during daylight hours. Specific dates and outage durations will be coordinated by the Government. The VA will perform all switching operations and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements. Will VA staff be available to support switching and load transfers during testing? VA staff will perform all switching operations, load transfer, and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements. Are there any background investigation, PIV badge, or TB/vaccination requirements for contractor personnel? Contractor will need to complete background investigation and be issued a contractor badge. Please confirm the contract type is firm-fixed-price. Yes this will be awarded as a firm fixed-price contract. Please provide the applicable Service Contract Act wage determination for Cuyahoga County, OH. Service Contract Act WD #: 2015-4727 Please confirm whether 52.219-9 (Small Business Subcontracting Plan) applies, given the 100% small business set-aside. After further review 52.219-9 will not apply to this requirement. Section 52.212-2 references past performance, but the listed evaluation factors are Technical Capability and Price. Will past performance be evaluated as a separate factor? CPARS will be reviewed for negative past performance. Qualifications and experience: Under SOW Sections 7(C) (F) and 14(B) (C), may the electrical-contracting specialty, permanent licensed technical staff, technician certifications, and required experience and references be demonstrated through the proposed performing subcontractor? Or must the prime contractor independently satisfy those requirements? We understand that all applicable limitations on subcontracting would still need to be met. This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations. Evaluation of offeror qualifications and experience will be conducted in accordance with the solicitation requirements and evaluation criteria. Are you able to provide the equipment list for the hospital? The equipment included in the scope of this contract is identified in Section 5.10 and other applicable sections of the SOW. No separate equipment list will be provided. Offerors should use the information contained within the SOW for proposal preparation. Are you able to provide the most recent inspection and/or maintenance report? Prior test reports will not be shared outside of authorized staff. Can the Government clarify what constitutes minor repairs included in the fixed-price requirement versus repairs requiring a separate contract modification? Minor repairs are those corrective actions that are incidental to the testing, inspection, and preventive maintenance services specifically identified in the SOW and that can be completed as part of the scheduled maintenance effort without requiring replacement of major equipment or components. Examples include tightening electrical connections, torquing hardware, cleaning, lubrication, adjustment, calibration, minor housekeeping activities, and similar corrective actions identified during testing and inspection. The SOW expressly includes "onsite testing, inspection, minor repair, and housekeeping" as part of the required services. Repairs that exceed basic or minor repair, including major component replacement, equipment refurbishment, or other work outside the defined maintenance and testing scope, shall not be performed under the fixed-price requirement. The contractor shall submit a cost estimate and scope of work to the COR for review and routing to the Contracting Officer (CO). Such work requires CO approval and may require a separate order/contract or contract modification and funding authorization before performance. As stated in the SOW, "In the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation."
85%
Combined Synopsis10/30/2026
81%
Solicitation11/02/2026
SUMMARY The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Network Contracting Office (NCO) 5, is issuing this Sources Sought Notice to identify vendors that are interested in and capable of providing the required services. The Louis A. Johnson VA Medical Center, located in Clarksburg, WV, requires a contractor to provide Triennial Electrical System Inspection, Testing, and Maintenance for the facility. Interested vendors should review the Statement of Work (SOW) to determine the specific services required. NCO 5 is seeking responses from firms that are interested in this procurement and possess the resources, capabilities, and qualifications necessary to perform these services. Anticipated NAICS CODE 238210, PSC CODE J061 Please submit your capabilities statement and provide responses to all questions listed below. SOURCES SOUGHT NOTICE: 36C24527Q0039 1. Business name (including Unique Entity ID (SAM.gov) 2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and 3. Person of contact (including telephone number & email address). 4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities. 5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (including applicable NAICS) 6. Brief Summary of categories of services that your company can/cannot provide. 7. Certification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable) 8. Confirmation that your organization has the capability and expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response: a. Do you intend to self-perform this effort? b. If you are located outside the immediate area, how will you self-perform? c. Or do you intend to subcontract work under this contract? If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? Response Instructions: Respond to this Notice 36C24527Q0039 by 11-05-2026 @ 10 AM ET. Send all responses to Billie.Pratt@va.gov Subject line on email: 36C24527Q0039 Sources Sought Notice | Company Name STATEMENT OF WORK Triennial Electrical System Inspection, Testing, and Maintenance Louis A. Johnson VA Medical Center (688) 1 Medical Center Drive Clarksburg, WV 26301 Document Number ENG-SOW-2026-ELEC-TRI-001 Revision Rev 1 Generator load bank, arc flash, and power quality scope removed (separate contracts) Date Issued May 2026 Originating Activity Engineering Service (138), LAJ VAMC Cognizant Official Contracting Office VISN 5 Network Contracting Office Anticipated Vehicle Firm-Fixed-Price (FFP), Single-Award Set-Aside To be determined by Contracting Officer (SDVOSB priority per VAAR 819.7004) Period of Performance 180 calendar days from NTP, with mobilization NLT 30 days from award 1.0 GENERAL INFORMATION 1.1 Purpose The Department of Veterans Affairs (VA) requires a qualified electrical testing contractor to perform the triennial inspection, testing, and preventive maintenance of the normal and Essential Electrical System (EES) distribution and support equipment at the Louis A. Johnson VA Medical Center (LAJ VAMC), Clarksburg, West Virginia. The intent of this work is to verify the integrity, reliability, and code compliance of the in-scope electrical equipment, identify and correct deficiencies, and provide the documentation required to satisfy The Joint Commission (TJC), CMS Conditions of Participation, NFPA, and VA accreditation/inspection requirements for the elements within scope. 1.2 Background LAJ VAMC is a VHA Complexity Level 2 medical center within VISN 5. The campus electrical distribution serves Type 1 Essential Electrical Systems under NFPA 99 (Life Safety, Critical, and Equipment Branches). Buildings within scope include the main hospital, Boiler Plant, building 7, Building 20, the Clinical Addition, and supporting structures. The previous comprehensive triennial electrical inspection was performed in CY 2023; this procurement covers the CY 2026 cycle for the in-scope equipment. Generator triennial preventive maintenance and 3-year load bank testing (NFPA 110-2025 §8.4.2), the arc flash risk assessment / coordination study refresh, and any campus power quality / harmonics survey are being procured under separate contract vehicles and are NOT within the scope of this SOW. 1.3 Objective Achieve and document one hundred percent (100%) compliance with all applicable codes and standards listed in Section 3.0 for the equipment categories within scope, including but not limited to NFPA 70-2023 (NEC), NFPA 70B-2023, NFPA 70E-2024, NFPA 99-2024, NFPA 101-2024, NFPA 111-2022, ANSI/NETA MTS-2023, VHA Directive 1028, and VA PG-18-10. 1.4 Definitions and Acronyms Acronym Definition AHJ Authority Having Jurisdiction ATS Automatic Transfer Switch CHENG / DCE Chief Engineer / Deputy Chief Engineer COR Contracting Officer's Representative EES Essential Electrical System (NFPA 99 Type 1) GFCI Ground-Fault Circuit Interrupter IRT Infrared Thermography LAJ VAMC Louis A. Johnson VA Medical Center, Clarksburg, WV NETA InterNational Electrical Testing Association PM Preventive Maintenance SOW Statement of Work UAN / UAC Utility Advisory Notice / Utility Advisory Committee UPS Uninterruptible Power Supply VLF Very Low Frequency (cable test method) NF 2.0 SCOPE OF WORK The Contractor shall furnish all labor, supervision, NETA-certified personnel, licensed electricians, professional engineering oversight, test equipment, calibrated instrumentation, materials, transportation, lodging, per diem, and incidentals necessary to perform the triennial inspection, testing, cleaning, and minor corrective maintenance of the in-scope electrical distribution and support equipment at LAJ VAMC, in accordance with Sections 3.0 and 4.0 of this SOW. 2.1 General Scope Summary Work shall include, but is not limited to: Visual, mechanical, and electrical testing of medium-voltage (MV) and low-voltage (LV) switchgear, switchboards, panelboards, motor control centers (MCCs), distribution and unit substations, dry-type and liquid-filled transformers, busway, and feeder cables. Functional testing and exercising of all Automatic Transfer Switches (ATSs) on the Life Safety, Critical, and Equipment Branches. Protective relay testing, calibration, and trip-curve verification on all MV and selected LV electronic-trip breakers (settings verified against the existing Government-furnished coordination study; no study revision performed under this SOW). Insulation resistance, contact resistance, and primary injection testing of LV power circuit breakers; secondary injection where applicable. Ground electrode and grounding system resistance testing (3-point fall-of-potential). Energized infrared thermographic survey of all electrical equipment from service entrance through branch panelboards. Patient care space receptacle testing in accordance with NFPA 99-2024 §6.3.3.3 (line voltage, polarity, grounding integrity, retention force). UPS battery system inspection and testing in accordance with NFPA 111-2022 and IEEE 1188 (VRLA) / IEEE 450 (vented). Documentation reconciliation of in-scope equipment maintenance records, deficiency reporting, and final triennial test report package. 2.2 Out of Scope (Procured Under Separate Contracts) The following are EXCLUDED from this contract and are being procured under separate contract vehicles: Generator triennial preventive maintenance and the NFPA 110-2025 §8.4.2 three-year load bank testing of the four (4) facility emergency standby generators. Arc Flash Risk Assessment update and Short-Circuit / Time-Current Coordination Study refresh, including arc flash labeling. (The Contractor under this SOW shall use the Government-furnished current arc flash study and labels for PPE selection only.) Campus Power Quality / harmonics survey, including IEEE 519 evaluation, transient capture, voltage sag/swell logging, and any related instrumentation. Replacement of major equipment (e.g., generators, transformers, switchgear) beyond the minor consumables and corrective work allowed under CLIN 0013. New construction, renovation, or substantial design work. Medium-voltage cable replacement (testing only is in scope). Lightning protection system inspection (separate NFPA 780 contract). Fire alarm system testing (separate NFPA 72 contract). Repairs exceeding $2,500 per item without prior written authorization from the Contracting Officer. 3.0 APPLICABLE DOCUMENTS, CODES, AND STANDARDS All work shall conform to the latest edition adopted by the AHJ as of the date of award. Where standards conflict, the most stringent shall govern. Contractor shall verify edition currency with the COR prior to mobilization. NFPA 110 and NFPA 70E are listed for limited reference (documentation reconciliation, contractor electrical safety) only; no testing under those standards is performed under this SOW. 3.1 National Fire Protection Association (NFPA) Standard Title Edition NFPA 70 National Electrical Code (NEC) 2023 NFPA 70B Standard for Electrical Equipment Maintenance (mandatory) 2023 NFPA 70E Electrical Safety in the Workplace (contractor safety only) 2024 NFPA 99 Health Care Facilities Code 2024 NFPA 101 Life Safety Code 2024 NFPA 110 Emergency & Standby Power (ATS / documentation reference only) 2025 NFPA 111 Stored Electrical Energy Emergency and Standby Power Systems 2022 3.2 Department of Veterans Affairs (VA) VHA Directive 1028 (current) Electrical Power Distribution Systems VA Master Construction Specifications, Division 26 Electrical (current) VA PG-18-10 Electrical Design Manual for VA Hospital Facilities (current) VA PG-18-3 Topic 3, Design and Construction Procedures 3.3 Industry Standards ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems ANSI/NETA ETT-2022 Standard for Certification of Electrical Testing Technicians IEEE 43 Recommended Practice for Testing Insulation Resistance of Electric Machinery IEEE 80 / 81 Substation Grounding / Earth Resistance Measurement IEEE 400.2 Field Testing of Shielded Power Cable Systems Using VLF ( 0.1 Hz) IEEE 450 Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries IEEE 1188 Maintenance, Testing, and Replacement of VRLA Batteries IEEE C57.12.90 Test Code for Liquid-Immersed Distribution Transformers IEEE C57.106 Guide for Acceptance and Maintenance of Insulating Oil IEEE C2 (NESC) National Electrical Safety Code ASTM D877 / D1816 Dielectric Breakdown of Insulating Liquids 3.4 Regulatory and Accreditation The Joint Commission (TJC) Environment of Care: EC.02.05.03, EC.02.05.05, EC.02.05.07, EC.02.05.09 (in-scope elements only) CMS Conditions of Participation, 42 CFR §482.41 Physical Environment OSHA 29 CFR 1910.137 Electrical Protective Equipment OSHA 29 CFR 1910.269 Electric Power Generation, Transmission, and Distribution OSHA 29 CFR 1910 Subpart S Electrical OSHA 29 CFR 1926 Subpart K Electrical (Construction) 4.0 TECHNICAL REQUIREMENTS Each subsystem below corresponds to a Contract Line Item Number (CLIN) in Section 12.0. All testing shall conform to the visual, mechanical, and electrical test procedures and pass/fail acceptance criteria of ANSI/NETA MTS-2023 unless a more stringent VA or NFPA requirement applies. 4.1 Medium-Voltage (15 kV Class) Switchgear and Distribution Applies to the campus 15 kV-class metal-clad/metal-enclosed switchgear, primary disconnects, MV cable, and step-down transformers feeding the main hospital service. 4.1.1 Visual and Mechanical (NETA MTS §7.1) De-energize, lock-out / tag-out (LOTO), clean (vacuum and approved solvent) all compartments; inspect for arc tracking, contamination, corona, mechanical damage, hardware torque per manufacturer. Verify nameplate, mechanical interlocks, key interlock schemes, racking mechanisms, shutters, and viewing windows. Inspect grounding, bonding, and ground bus continuity. Lubricate per manufacturer; replace consumables (filters, desiccants, indicator lamps). 4.1.2 Electrical Tests (NETA MTS §7.1) Insulation resistance phase-to-phase and phase-to-ground, 1 minute (5,000 VDC for 15 kV class). AC overpotential / VLF withstand on MV cables per IEEE 400.2 (0.1 Hz, 22 kV peak for 15 kV class), if cable age exceeds 10 years. Contact resistance (ductor) on bus connections ( +50% of like-equipment baseline). Vacuum bottle integrity test (DC overpotential) on vacuum interrupters. Power factor / dissipation factor on MV bushings, CTs, and transformers (Doble M4000 or equivalent). 4.2 Low-Voltage Switchgear, Switchboards, and Panelboards 4.2.1 Visual and Mechanical (NETA MTS §7.1, §7.5, §7.6) Open and inspect every switchboard, distribution panel, and lighting panelboard not exceeding 24 months since last internal inspection (priority: service entrance, EES gear, ICU, OR, ED panels). Torque-check all bolted bus connections to manufacturer specification or NETA Table 100.12; document with calibrated torque wrench. Verify breaker-to-bus stab integrity, bracing, and bonding. 4.2.2 Electrical Tests Insulation resistance, phase-to-phase and phase-to-ground, 1,000 VDC minimum for 600 V class. Primary current injection on all main, tie, and feeder LV power circuit breakers 800 A frame; secondary injection on solid-state trip units. Settings shall be verified against Government-furnished current Coordination Study; deviations shall be reported as deficiencies. Contact / pole resistance on every LV power breaker; compare to baseline. GFCI testing on all required circuits (operability + 6 mA trip per UL 943). Verify and tighten neutral and ground bonding; verify single-point bonding at separately derived systems per NEC 250.30. 4.3 Distribution and Unit Substation Transformers Includes campus dry-type transformers and any liquid-filled units within scope. Visual inspection: enclosures, ventilation, bushings, indicators, sound level, infrared baseline. Insulation resistance (1 min / 10 min, polarization index) per IEEE 43. Turns-ratio test (TTR) all taps, all phases. Winding resistance (DC) per IEEE C57.12.90. For liquid-filled: dielectric breakdown (ASTM D877/D1816), Dissolved Gas Analysis (DGA) per IEEE C57.104, water content, acidity, IFT, and color. Verify and torque all bolted connections. 4.4 Automatic Transfer Switches (ATS) Life Safety, Critical, Equipment Branches Inspect contacts, mechanism, controllers, and wiring on every ATS. Verify timing settings: TDNE (time delay normal-to-emergency), TDEN, TDES, TDEC; document against NFPA 110 §6.2.6 and facility settings. Perform load-side and source-side voltage and phase rotation checks. Functional transfer test under no-load and (Government-coordinated) under-load; document transfer times. Bypass-isolation operation (where equipped) exercise both bypass and isolation positions. Replace consumable contacts where pitting > 25% per manufacturer. NOTE: Generator starting and the load-side EPSS performance test under NFPA 110-2025 §8.4.2 are excluded from this SOW (separate contract). ATS-side functional verification shall be coordinated with the generator contractor's testing window where practical. 4.5 Protective Relay Testing Test all MV protective relays (50/51, 50/51N, 87, 27/59, 81, etc.) per ANSI C37.90 and NETA MTS §7.9. Verify settings against the Government-furnished current Coordination Study any deviation reported as a deficiency. (Study revision and arc flash incident energy recalculation are out of scope; see §2.2.) Functional trip test through the breaker (system test) on at least one device per protection zone. Provide before-and-after settings record and certified test reports. 4.6 Grounding System Three-point fall-of-potential test on the main service ground per IEEE 81; target 5 ohms per VA PG-18-10. Two-point bond-resistance testing on equipment grounds and lightning ground ring tie-ins (visual only for LP system). Verify isolated ground (IG) integrity in patient care spaces and IT/data closets. 4.7 Infrared Thermographic Survey Energized scan with calibrated radiometric camera ( 0.05°C NETD, 50 V; permit must be approved by the DCE or CHENG. LOTO procedures shall conform to 29 CFR 1910.147 and the LAJ VAMC LOTO program; group lockout for multi-employer work. 9.2 PPE Arc-rated PPE selected from the Government-furnished current site-specific arc flash labels and study; if any in-scope equipment is missing a current label, work on that equipment shall STOP and the COR notified. Voltage-rated rubber gloves (Class 0/2/4 as appropriate), tested within last 6 months. Insulated tools rated for system voltage. 9.3 Test Equipment All instruments shall be calibrated within the last 12 months by a NIST-traceable lab; calibration stickers and certificates shall be available on request. Use only Cat III / Cat IV-rated meters appropriate to the system voltage. 9.4 Reporting Any near-miss, injury, or property damage shall be reported to the COR within 1 hour. Daily safety briefings (tailgates) documented and provided to the COR weekly. 10.0 ACCEPTANCE, WARRANTY, AND QUALITY ASSURANCE 10.1 Acceptance Criteria All test results meet the pass/fail thresholds of ANSI/NETA MTS-2023 and the manufacturer's published values. All deficiencies discovered are documented, classified (Priority 1 4), and either corrected within scope or reported with Class A engineering recommendations. All required documentation submitted, accepted, and incorporated into the LAJ VAMC Engineering record set and TJC EOC binder. Compliance crosswalk demonstrates 100% coverage of NFPA 70 / 70B / 99 / 111, TJC EC.02.05.x (in-scope elements), CMS §482.41, and VHA Directive 1028 line-items in scope. 10.2 Warranty Workmanship warranty: minimum twelve (12) months from date of Government acceptance of final report. Any retest required to validate corrected deficiencies during the warranty period shall be performed at no additional cost. 10.3 Quality Assurance Surveillance Plan (QASP) The Government will administer the QASP through the COR, with surveillance methods including: 100% inspection of submittals, random sampling of field test data sheets ( 10%), customer complaint resolution, and final acceptance review. Performance metrics: Schedule adherence: 95% of Level-2 schedule milestones met. Submittal quality: 5% return rate for revision. Safety: zero recordable incidents; zero electrical-contact events. Compliance: 100% of in-scope code requirements addressed and documented. 11.0 GOVERNMENT-FURNISHED PROPERTY AND INFORMATION The Government will provide: Existing single-line diagrams, prior triennial reports, current Arc Flash Study and labels, current Coordination Study, and EPSS records (electronic copies). Access to the facility, equipment rooms, and key control during the Period of Performance. Designated laydown / staging area outside the building footprint. Trash/recycling and standard sanitary facilities. PIV/contractor flash credentials following completion of background investigations. The Government will NOT provide: Tools, instruments, calibration services, consumables, PPE, or test equipment. Lodging, meals, transportation, or per diem. 12.0 CONTRACT LINE ITEM NUMBER (CLIN) STRUCTURE The IGCE issued under separate cover (ENG-IGCE-2026-ELEC-TRI-001 Rev 1) reflects the following 14-CLIN structure. Offerors shall price each CLIN as Firm-Fixed-Price (FFP) except where noted. CLIN Description Type / Unit 0001 Project Management, Submittals, and Mobilization FFP / Lot 0002 Medium-Voltage Switchgear & MV Cable Testing FFP / Lot 0003 Low-Voltage Switchgear, Switchboards, Panelboards FFP / Lot 0004 Distribution & Unit Substation Transformers FFP / Lot 0005 Automatic Transfer Switches (all branches) FFP / Lot 0006 Protective Relay Testing & Calibration FFP / Lot 0007 Grounding System Testing FFP / Lot 0008 Infrared Thermographic Survey FFP / Lot 0009 Patient Care Receptacle Testing (NFPA 99 §6.3.3.3) FFP / Lot 0010 UPS / Battery Systems (NFPA 111) FFP / Lot 0011 Documentation Reconciliation & Compliance Crosswalk FFP / Lot 0012 Final Reporting & Project Closeout FFP / Lot 0013 Contingency for Minor Corrective Maintenance (NTE) T&M / NTE 0014 Optional After-Hours / Weekend Premium Pool Option / NTE 13.0 COMPLIANCE CROSSWALK (100% MAP IN-SCOPE ELEMENTS) The following matrix maps each in-scope element to the governing standard. Generator/EPSS, arc flash, and power quality compliance are addressed by separate contracts. Scope Element / CLIN Primary Standard(s) Accreditation Tie-In MV Switchgear (CLIN 0002) NETA MTS §7.1; NFPA 70 Art. 110, 230, 240; NFPA 70B §11 TJC EC.02.05.05; VHA Dir 1028 LV Distribution (CLIN 0003) NETA MTS §7.5, §7.6; NFPA 70 Art. 408, 240; NFPA 70B §11 TJC EC.02.05.05; CMS §482.41 Transformers (CLIN 0004) NETA MTS §7.2; IEEE C57; NFPA 70B §13 TJC EC.02.05.05 ATS (CLIN 0005) NETA MTS §7.22; NFPA 110 §6.2; NFPA 99 §6.7 TJC EC.02.05.07; VHA Dir 1028 Relays (CLIN 0006) NETA MTS §7.9; ANSI C37.90; IEEE C37.2 TJC EC.02.05.05 Grounding (CLIN 0007) NETA MTS §7.13; IEEE 81; NEC Art. 250 VA PG-18-10 IRT (CLIN 0008) NFPA 70B Annex L; NETA MTS §9 TJC EC.02.05.05 Patient Receptacles (CLIN 0009) NFPA 99-2024 §6.3.3.3; NEMA WD-6 TJC EC.02.05.05; CMS §482.41 UPS / Batteries (CLIN 0010) NFPA 111-2022; IEEE 450 / 1188 TJC EC.02.05.07 Documentation (CLIN 0011, 0012) NFPA 70B §8 TJC EC.02.05.01 13.1 Compliance Coverage Boundary Statement This SOW achieves 100% compliance for all in-scope equipment listed above. The complete LAJ VAMC electrical compliance posture for the CY 2026 cycle is achieved through the combined deliverables of THIS contract plus the following separate contracts: (a) Generator triennial PM and 3-year load bank (NFPA 110-2025 §8.4.2) covering EPSS testing; (b) Arc flash risk assessment update and short-circuit/coordination study refresh (NFPA 70E §130.5; IEEE 1584); and (c) Campus power quality / harmonics survey (IEEE 519). The Engineering Service is responsible for the integrated compliance crosswalk across all three procurements.
80%
Market Research11/05/2026
3-Year Electrical Testing and Repair Contract Performance Work Statement (PWS) General Requirements: Contractor shall furnish all supplies, materials, equipment, personnel/labor and technical supervision required to perform inspections, repairs, testing, cleaning, calibrations and adjustments on the electrical power distribution system and associated equipment at the Hampton Veterans Affairs Medical Center within the allotted time frame of this contract. This is a 4160 volt primary system that includes various secondary voltages and both emergency and normal power sources. A comprehensive list of equipment is included in this contract as well as a dollar amount to be set aside for repairs. All inspections and testing procedures must meet the criteria of the original equipment manufacturer along with the latest editions of the following codes, standards and specifications listed: ANSI, IEEE, ICEA, NETA, NEMA, NFPA, JCAHO and VA regulations. The contractor shall be responsible for supplying all portable power required to power up any and all test equipment necessary throughout these tests. The use of normal or emergency building power will not be allowed. The contractor shall be responsible for securing all manufacturers information, curves, data, procedures and any other information necessary to conduct specific tests on equipment and systems. Prior to beginning field-testing, the testing organization shall submit test procedures and a detailed test schedule to the Electrical Supervisor for each item of equipment to be field-tested. No testing is to be performed until after the test procedures and schedules have been approved. The contractor shall be responsible for all coordination between Dominion Virginia Power (if applicable), station supervisory personnel and test personnel for scheduling shut-downs, system tests and tests on system components. The V.A Medical Center Electrical Staff will be responsible for conducting the actual scheduled outages and reenergizing of circuits and components on V.A. premises and V.A. owned equipment only. Lockout/Tagout of this equipment will be performed jointly between the V. A. Medical Center Electricians and the Contractor. The contractor will be responsible for removal and replacement of any and all breakers needing to be tested. All breakers being removed will be properly reinstalled. Any and all conductors removed from a breaker will be properly terminated back to that breaker and any and all lugs will be properly torqued to manufacturers specifications. Testing shall commence and be completed within nine (9) consecutive days, beginning on a Saturday and ending on the following Sunday. The specific dates shall be coordinated with the COTR. All outages shall be scheduled with the COTR two weeks in advance of testing start date. Testing dates may change due to inclement weather, however, the COTR shall first be notified and approve any changes necessary. Contractor shall anticipate all work to be done after normal working hours. Outages will be scheduled at night between the hours of 5:00 p.m. and midnight and between the hours of 7:00 am and 5:00 p.m. on weekends. However the Contractor should be prepared to work longer hours should problems develop to assure restoration of power. Daytime hours, during the week, may be approved under certain circumstances if there is no impact to building occupants. This would be a rare instance, thus Contractor should anticipate overtime hours for all contract requirements. Equipment Repairs: Minor repairs shall include but not be limited to such items as loose bolts, loose or broken lugs, wiring terminals, heaters, malfunctioning targets, dirty/high resistance connections, etc and shall be corrected on site during testing if possible. Repair or replacement of larger items such as breakers shall also be performed during this outage if possible. However if parts are not readily available, these items will be repaired or replaced under a separate smaller outage and will be scheduled after parts or components are available. Contractor shall set aside a line item not to exceed $50,000 for repair or replacement parts with this contract. All repairs shall be invoiced under this line item at the conclusion of the contract. This amount is to be used for bidding purposes. However a materials breakdown will be required with the final invoice and Contractor shall be paid actual costs with appropriate mark up s up to $50,000 for parts. Contractor is not to exceed this amount without prior written approval of the Contracting Officer. Minimum Equipment Test Requirements: 5 KV AIR CIRCUIT BREAKERS 1. The breakers will be removed from their compartments. The compartments shall be cleaned and inspected. Shutters shall be cleaned, inspected, and tested for proper operation. The racking mechanisms shall also be cleaned, lubricated and tested for proper operation. 2. All cable termination s, both primary and secondary, shall he checked for signs of overheating, proper tightness and support. 3. All exposed bus connections shall be checked for signs of overheating and for proper tightness. 4. The arc chutes will be removed, cleaned and inspected. 5. The entire breaker and the mechanism will be inspected. 6. The entire operating mechanism will be thoroughly cleaned, lubricated and exercised. 7. All of the interior components of the circuit breaker will be thoroughly cleaned. 8. The contacts and current carrying assemblies will be inspected for burning, pitting, arcing, worn fingers, garter springs etc. 9. The contacts will be cleaned and anti-oxidant grease will be applied to the breaker s main contacts. 10. The breaker contact resistance will be measured and recorded. 11. An insulation resistance test will be performed and results recorded. 12. The breaker will then be closed manually to ensure proper closing and trip operations. 13. Any and all interlocks will be checked and proper operation will be verified. 14. The breaker will be electrically operated when test stands are available, or the breaker will be operated from its cubicle, if the system allows. 15. All indicating devices such as lights, flags, switches etc. shall be tested for proper operation. Any that are not operating properly shall be repaired at that time if possible. 16. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. ENCLOSED AIR BREAK SWITCHES (MEDIUM VOLTAGE) 1. After shutdown, the entire switch mechanism will be cleaned and inspected. 2. The switch contacts will be checked for proper alignment. Anti-oxidant grease will be applied to the main contacts. 3. The switch s arcing contacts will be checked for the proper opening sequence relative to the main contacts. 4. The switch s operating mechanism will be inspected for wear and proper operation. The entire mechanism will be cleaned and lubricated. All interlocks will be tested and proper operation will be verified. 5. Fuses will be inspected; size and type will be recorded. 6. All phase isolation barriers will be cleaned, and the barriers will be checked for contamination and corona damage. 7. All insulators will be cleaned and visually inspected for cracks and chips. 8. All exposed bus and cable connections will be checked for proper tightness and for evidence of overheating, burning or tracking. 9. All lightning arrestors will be cleaned and inspected for broken or damaged porcelain and subjected to an insulation resistance test. Results shall be recorded. 10. All ground connections will be inspected and repaired if found to be inadequate. 11. Contact resistance and insulation resistance tests will be performed, where possible, and the results recorded. 12. All heat strips throughout the enclosure shall be made operational, by repair or replacement, prior to completion of inspection. OIL-FILLED TRANSFORMERS 1. The transformers will be inspected for leaks, poor seals and or gaskets, and for proper oil levels. 2. The transformer tank and its cooling fins will be inspected for rust, chipped paint, dents, and proper connection to ground. 3. All of the bushings will be cleaned, inspected for cracks and or chips. proper tightness. and evidence of overheating. 4. All gauges and alarm devices will he inspected, recorded and reset where applicable. 5. Insulation resistance tests of each transformer winding will he performed, where possible and the results recorded. 6. Turns ratio test shall be performed and recordings documented. 7. The oil will be sampled and tested in accordance with ASTM procedures. All sampling devices used will be new, clean and sealed with thread sealant. Drip pans shall be installed under all the valves prior to any oil removal. The contractor will clean up any and all oil lost during sampling. DRY-TYPE TRANSFORMERS 1. Check enclosure for dents, loose bolts, proper ventilation, anchoring and grounding. 2. The inside of the transformer shall be cleaned and all electrical terminations will be checked for signs of overheating and proper tightness. 3. Insulation resistance tests of each transformer winding will be performed, where possible and the results recorded. 4. Turns ratio test shall be performed and recordings documented. SWITCHGEAR AND STRUCTURE 1. After power shutdown, the entire switchgear interior will be thoroughly cleaned. 2. Exposed bus connections will be checked for proper tightness. 3. All of the bus insulators will be thoroughly cleaned and visually inspected for cracks and chips. 4. All control switches, auxiliary relays, and devices will be cleaned, lubricated (if applicable), and checked for proper operation. 5. All disconnect switches will be cleaned, lubricated, adjusted and an anti-oxidant grease applied to the contacts. 6. The lightning arrestors will be cleaned and subjected to an insulation resistance test. Results will be recorded. 7. An insulating resistance test of the bus will be performed. Results will be recorded. LOW VOLTAGE AIR CIRCUIT BREAKERS 1. Each breaker will have its inspection covers removed and the breaker will be thoroughly cleaned. 2. All contact surfaces will be cleaned to assure maximum conductance. 3. Anti-oxidant grease will be applied to the breaker s main contacts. 4. Mechanisms will be checked and lubricated. The mechanical operation will be verified. 5. A current equal to 90 and 110 percent of the breaker s trip coil setting will be applied to verify proper pick-up of the tripping mechanism. 6. Primary injection testing shall be performed in order to verify that all long-time, short time, instantaneous and ground fault set points are properly set. Those that are not shall be properly adjusted and retested. Units will be tested by passing multiples of their ratings through each phase of the breaker. The resultant trip-times will be recorded. 7. Contact resistance will be measured and contacts will be adjusted, where possible, for maximum surface contact and pressure. Value of contact resistance tests will be recorded. 8. An insulation resistance test will be performed from each pole to the other two poles and to ground, and the values recorded. 9. On draw out breakers, the breaker carriage and racking mechanism will be cleaned and lubricated. OIL DISCONNECT SWITCHES 1. The switch mechanism will be opened where applicable. 2. The switch contacts will he inspected and cleaned where applicable. 3. The switch s operating mechanism will he visually and manually inspected for wear, operation, binding and then cleaned and lubricated. 4. The switch s insulating fluid will be sampled. tested and fluid levels returned to normal. 5. The complete unit will then be reassembled and tested for proper operation. 6. The contractor will clean up any and all oil lost during sampling. 7. Insulation resistance tests will be performed where accessible and results recorded. MOLDED CASE CIRCUIT BREAKERS (ELECTRICAL TEST) 1. Each molded case circuit breaker will be inspected in its enclosure for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. 4. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 5. Primary injection testing shall be performed in order to verify that all of the manufacturers curve characteristics; such as long time pick-up and delay, short time pick-up and delay, ground fault pickup and delay and instantaneous pick-up points, are all properly set. Those that are not shall be properly adjusted and retested. 6. Contact resistance will be measured and the results recorded. 7. An insulation resistance test will be performed and the results recorded. 8. The breakers with instantaneous trip units, with a cable connection capability, will be tested. 9. The breaker s trip time will then be compared to the manufacturer s characteristic curve. MOLDED CASE CIRCUIT BREAKERS (MECHANICAL TESTS) 1. The molded case circuit breakers will be inspected in their enclosures for proper installation. 2. The covers of breakers, which are removable, will be removed. 3. The interior and exterior of the breaker will then be thoroughly cleaned. The breaker will be inspected for burning, overheating, wear, proper alignment and general condition. 4. The breaker will be mechanically exercised and lubricated. 5. Mechanically trip all circuit breakers equipped with push to test capabilities 6. Where possible, contact and insulation resistance will be measured. Results will be recorded. PROTECTIVE RELAYS 1. Relays in draw-out cases will be removed from the case and thoroughly inspected, cleaned and tested. 2. The disks, target rockers and similar moving parts will be inspected. 3. The interiors of draw-out cases will be cleaned, the covers cleaned and the gaskets inspected. 4. The relays will then be electrically tested with current or voltage as required in accordance with the manufacturer s procedures. Relays with characteristic curves will be tested at three tap or pick-up multiples (of found settings). 5. The targets and seal-in units of all relays will be tested to assure proper operation. 6. The relay circuit will be tested to assure that the relay will respond to primary voltages or currents as appropriate. 7. Test tripping of circuit breakers will be performed where an outage can be arranged. INSTRUMENTATION CALIBRATION 1. Examine all devices for damage and wire connection tightness. 2. Perform a calibration test on all meters using a standard and power supply to determine accuracy at each cardinal point. 3. On meters supplied with transducers, the calibration will be performed from the transducer. 4. All instrument multipliers will be verified. 5. Meter selector switches will be inspected for proper application and operation. WATT HOUR METER CALIBRATION 1. Visual and mechanical inspection: Examine all devices for mechanical or electrical damage and wire connection tightness. Check conditions of meter face and face gaskets. 2. Electrical tests: Check calibration of all meters at five points using full scale test instruments. Calibrate watt-hour meters to one-half percent (0.5%). Verify all instrument multipliers. Meter selector switches will be inspected for proper application and operation. TRANSFORMER & CIRCUIT BREAKER INSULATING OIL The insulating fluids will be sampled and tested from each oil-filled device. Sample containers will be new, sealed and opened only immediately prior to filling. Sampling of oils will be accomplished in accordance with ASTM D-923 and sampling of askarels will be done in accordance with D-1809. The oil samples will be returned to the laboratory and tested for the following: TEST DESIGNATION TEST METHOD 1. Color/Visual ASTM Dl 500-D2 1 29/D 1524 2. Dielectric Breakdown ASTM D877 3. Neutralization Number ASTM D974 4. Specific Gravity ASTM D1298 5. Moisture Content ASTM D1533 6. Dissolved Gas in Oil Analysis (500k VA and up) Required Qualifications of Testing Organization and Personnel: The testing firm shall be an independent testing organization, which can function as an unbiased testing authority, professionally independent of any manufacturer, or supplier of equipment or systems evaluated by the testing firm. The testing firm shall meet the criteria for full membership or be a full member company of the InterNational Electrical Testing Association. Proof of this membership is to be included with the proposal package. The testing organization that is employed under this contract shall have been regularly engaged in the testing of electrical materials, devices, installations and systems for a minimum of five years. Proof of this experience is to be included with the proposal package. All work under this contract shall be performed under the supervision of the testing organization s Professional Engineer who will be available to discuss any and all procedures used to test, survey, report and service the equipment required under this contract. Testing, inspection, calibration and adjustments shall be performed by Field Engineers/Technicians certified by the National Institue for Certification in Engineering Technologies (NICET) and/or the International Electrical Testing Association (NETA) and have a minimum of five years of experience inspecting, testing and calibrating electrical distribution equipment, systems and devices. Proof of experience is to be included with the proposal package. The testing organization shall only utilize field engineers and technicians who are regularly employed by the firm or testing service. The testing organization shall submit the names, certification numbers and resumes of the Registered Professional Engineer, the lead Field Engineer/Technician and all other Field Engineers/Technicians who will be performing tests and inspections under this contract. This information is to be included with the proposal package. Test assistants and apprentices may be assigned to the project as assistants to certified Engineers/Technicians at a ratio not to exceed one certified Engineer/Technician to one non-certified assistant or apprentice. The testing organization shall have a calibration program, which assures that all test instruments are calibrated in accordance with the International Electrical Testing Association (NETA). The accuracy shall be directly traceable to the National Institute of Standards and Technology (NIST). Up to date calibration labels shall be visible on all the test equipment or that equipment will not be allowed to be used under this contract. Equipment List: The following equipment needs to be added or removed for 2023: 148 HE panel (add) New MRI (add) OR HE Panel (add) Building 159 (remve breakers but keep transformer) Building 152 (remove) will need to add new gear associated with building 44 B1dg# Equipment Type Quantity Rating 11O/11OA Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels 2 Transformer 500 KVA (pad mount) Transformer 1000 KVA (pad mount) 1 Transformer 1500 KVA (pad mount) 1 11OA ED Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case w/ Micrologic (main) 1 1000 Amp Molded Case w/ Micrologic 1 450 Amp Molded Case 1 400 Amp Molded Case 3 225 Amp Molded Case 1 200 Amp Molded Case 1 175 Amp Molded Case 3 150 Amp Molded Case 3 110 Amp Molded Case 1 100 Amp Molded Case 1 70 Amp Transformer 300 KVA (dry type) 1 ER Switchboard Square D Molded Case w/ Micrologic 1 1000 Amp Molded Case 1 600 Amp Molded Case 2 400 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 200 Amp Molded Case 2 150 Amp Molded Case w/Micrologic 1 150 Amp Molded Case w/Micrologic 4 110 Amp Molded Cade w/Micrologic 1 600 Amp MPD1 (one) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 2000 Amp Molded Case w/Micrologic 1 1000 Amp Molded Case w/Micrologic 3 300 Amp Molded Case w/Micrologic 1 250 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 1 200 Amp Molded Case w/Micrologic 14 150 Amp Molded Case w/Micrologic 2 125 Amp Molded Case w/Micrologic 4 100 Amp MPD2 (two) Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Rack In Breaker (main) 1 4000 Amp Molded Case w/Micrologic 6 400 Amp Molded Case w/Micrologic 1 225 Amp Molded Case w/Micrologic 3 200 Amp Molded Case w/Micrologic 12 150 Amp Molded Case w/Micrologic 1 125 Amp Molded Case w/Micrologic 2 100 Amp 11OB Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Panels 3 Transformer 1000 KVA 3 Switchboard 1(one) G.E. Plug-ins Molded Case TQL 1 100 Amp Molded Case TQL 1 400 Amp Molded Case TQL 4 600 Amp Molded Case TQL 1 2000 Amp Molded Case TQL 1 1000 Amp Switchboard 2 (two) G.E. Plug-ins Molded Case TQL 4 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 2000 Amp Switchboard 3 (three) G.E. Plug-ins Molded Case TQL 2 225 Amp Molded Case TQL 2 300 Amp Molded Case TQL 4 400 Amp Molded Case TQL 1 600 Amp Molded Case TQL 1 2000 Amp Emergency Panel Board 1 (one) HE Molded Case TQL 2 250 Amp Molded Case TQL 3 600 Amp Molded Case TQL 2 800 Amp Molded Case TQL 1 1200 Amp 146 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1500 KVA 1 Switchboard G.E. AV-Line Volt Meter 1 Ammeter 1 Ground Break System 1 AKW Breaker (main) 1 2000 Amp Versatrip Breaker 1 600 Amp Versatrip Breaker 1 300 Amp Versatrip Breaker 1 150 Amp 116 Switchgear Structure Medium Voltage Switches 2 Medium Voltage Fuse Panels Transformer 500 KVA (pad mount) 1 Transformer 150 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 4 400 Amp Molded Case 2 225 Amp Molded Case 9 200 Amp Molded Case 3 150 Amp Molded Case 2 30 Amp 148 Switchgear Structure G.E. Load Interrupter Switch 1 Medium Voltage Fuse Panel 1 Transformer 1000 KVA (pad mount) 1 Switchboard G.E. AV-Line Voltmeter 1 KWH Meter 1 Ammeter 1 Power Break Breaker (main) 1 1200 Amp Power Break Breaker (auto transfer) 1 200 Amp Versatrip Breaker 3 600 Amp Versatrip Breaker 6 300 Amp Versatrip Breaker 1 400 Amp 129 Switchgear Structure Transformer 300KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 3 400 Amp Molded Case 1 600 Amp Molded Case 1 300 Amp Molded Case 2 225 Amp Molded Case 1 150 Amp Molded Case 1 100 Amp 15 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 300 KVA 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 600Amp Molded Case 1 300 Amp Molded Case 1 225 Amp Molded Case 1 150 Amp Molded Case 2 100 Amp Molded Case 4 50 Amp 159 Switchgear Structure Transformer 150 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1200 Amp Molded Case 2 800 Amp Molded Case 2 225 Amp Molded Case 2 150 Amp Molded Case 1 100 Amp 151 Switchgear Structure Transformer 300 KVA (pad mount) 1 Switchboard Square D Voltmeter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 1000 Amp Molded Case 2 600 Amp Molded Case 2 225 Amp 152 Switchgear Structure Medium Voltage Switches 3 Medium Voltage Fuse Pane1 1 Transformer O KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 2 800 Amp Molded Case 3 400 Amp Molded Case 1 225 Amp Molded Case 3 200 Amp Molded Case 1 30 Amp 154 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 1 800 Amp Molded Case 2 700 Amp Molded Case 1 600 Amp 155 Switchgear Structure Transformer 500 KVA (pad mount) 1 Switchboard Arrow Hart Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case 2 600 Amp 156 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard Square D Volt Meter 1 KWH Meter 1 Ammeter 1 Molded Case (main) 1 2000 Amp Molded Case 1 1000 Amp Molded Case 2 400 Amp Molded Case 1 350 Amp Molded Case 3 200 Amp Molded Case 2 60 Amp Molded Case 1 40 Amp Molded Case 1 30 Amp 158 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 135 Switchgear Structure Medium Voltage Switches 1 Medium Voltage Fuse Panels 1 Transformer 500 KVA (pad mount) 1 Switchboard Square D Molded Case (main) 1 800 Amp Molded Case 1 400 Amp Molded Case 1 300 Amp Molded Case 2 200 Amp Molded Case 1 100 Amp Molded Case 1 90 Amp Molded Case 2 40 Amp Molded Case 1 30 Amp Molded Case 1 15 Amp 137 Switchgear Structure Transformer 750 KVA (pad mount) 1 Switchboard ITE Voltmeter 2 KWH Meter 2 Ammeter 2 Rack In Breaker (main) 1 2500 Amp Rack In Breaker 3 800 Amp Rack In Breaker 4 400 Amp Rack In Breaker 10 225 Amp Rack In Breaker 1 200 Amp Rack In Breaker 1 40 Amp 139 Switchgear Structure Medium Voltage Vault 1 Rack In Breaker (ITE 5kV) 10 Time Overcurrent Relays 32 Voltmeter 10 Ammeter 10 Control and Instrument Switches 9 144 Switchgear Structure Molded Case 1 800 Amp Molded Case 1 400 Amp 113 Switchgear Structure (Eaton) Molded Case Breaker 7 225 Amp Molded Case Breaker 1 600 Amp Molded Case Breaker 2 400 Amp Molded Case Breaker 3 200 Amp Transformer 112.5KVA (pad mounted) 1 Transformer 30KVA (suspended) 2 Transformer 75KVA (suspended) 1 Transformer 15KVA (suspended) 1 Formal Reports: The testing organization shall submit three copies of the Comprehensive Inspection and Testing report (through the Prime Contractor if applicable) to the COTR within 30 calendar days following the conclusion of testing. The report shall be itemized by building and shall include, at a minimum, complete nameplate data, age, maximum loading in amperes (where applicable), and the condition as found and as modified for each piece of equipment and device tested. Notification in writing shall be submitted immediately to the COTR upon completion of testing for any equipment or component deemed to be in a critical state including recommendations for corrective action. A Registered Professional Engineer shall make certification.
80%
Solicitation11/10/2026
This Presolicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. The Presolicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2024-02 published in the Federal register December 22, 2023. This solicitation is for a Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this procurement is 238210 (Electrical Contractors and Other Wiring Installation Contractors) with a small business size standard of $19 Million Dollars. The FSC/PSC is J061 (Maintenance, Repair, and Rebuilding of Equipment-Electric Wire and Power Distribution Equipment).
80%
Pre-Solicitation11/10/2026

Additional Details

Solicitation Number

36C25623Q0012

Archive Date

Jan 27, 2023

Office Address

RIDGELAND, MS, 39157