Notice ID: 5972e08511854dc5aa9c71861f985f70Combined Synopsis/Solicitation
J041--RFQ Amendment (Questions) 13 MAR 26 Repair Services - Chiller Plant Skid 1 & 2 Pump
Archived on May 12, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM UTC+00:00
- Posted
- March 10, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business Set Aside
- NAICS
- 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 256-NETWORK CONTRACT OFFICE 16 (36C256)
- Place of performance
- Alexandria, VA Medical Center 2495 Shreveport Hwy, Pineville,, LA, 71360
- PSC
- J041: MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT
- Last updated
- Aug 21, 2026
Identifiers
- Solicitation number
- 36C25626Q0449
- Notice ID
- 5972e08511854dc5aa9c71861f985f70
Description
Amendment 00001 provides responses to questions for Solicitation Number 36C25626Q0449 and extends the due date of this solicitation. 1. Photos of the pumps/motors showing piping arrangement, electrical connection, and nameplate data. Are VFDs required? Is there any BAS connections or interlocks for the pumping system? ANS: The pics are attached to the email for this project. VFD's are required but not being replaced. No BAS connections needed. 2. Electrical for the Motors: HP, Voltage, Amperage and disconnecting means and locations. ANS: The information are located in the pics attached to the email. Electrical is all on name plate of pumps in pics 3. Pump capacity information: Flow Rate in GPM, & Pumping Head. ANS: The information are located in the pics attached to the email. Flow rate and GPM are on name plates in pics 4. What type of insulation is installed and thickness? ANS: The insulation is wrapped fiberglass insulation 2" thick 5. Is pump an End Suction, Double Suction, or In Line type Pump. ANS: See pics of pumps for the alignment for inlet and outlet 6. What is the pipe size for the Taco Triple Duty Valves to be installed. ANS: The piping is 12" for chiller 1 and 10" for chiller 2 Clarify the questions come from the scope: "The Contractor shall provide all tools, shipping, delivery, personnel, transportation, demolition, removal of old equipment, installation of new equipment, modifications to existing piping, to deliver and install the necessary equipment for repairing Chillers 1, and 2 ANS: The contractor must install both pump/motor for each chiller 1&2 and triple duty valve for both chillers. 2. The scope is to provide regular system health checks, preventative/routine maintenance, repairs, onsite training, and access to a technical support team in support of two industrial chillers and their subcomponents which consist of, but not limited to: magnetic drive pumps, piping, electrical connections, regulator valves, pneumatic actuators, gauges and indicators, heat exchangers, AC drives, and input modules. " ANS: The contractor after installation must verify the installation correct with functional for the 2 chillers pump/motors and triple duty valve.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Select documents to download
Showing 2 of 2 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Mar 10, 2026 | 122.26 KB | |||
| Combined Synopsis/Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | Mar 10, 2026 | 5.69 MB |
Lifecycle
Solicitation:
36C25626Q0449- Combined Synopsis
- 2×Combined SynopsisCurrentMar 4, 2026
J041--RFQ Amendment (Questions) 13 MAR 26 Repair Services - Chiller Plant Skid 1 & 2 Pump
Similar Opportunities
Additional Details
Solicitation Number
36C25626Q0449
Archive Date
May 12, 2026
Office Address
RIDGELAND, MS, 39157