Notice ID: f3fd3f2b752e47899eebe00222c7156fSolicitation
Z2DA--Upgrade Existing Fire Alarm System
Archived on January 18, 2023. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−07:00
- Posted
- December 13, 2022
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- NETWORK CONTRACT OFFICE 19 (36C259)
- Place of performance
- Department of Veterans Affairs Oklahoma City VA Medical Center 921 NE 13th St., Oklahoma City, 73104
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 36C25922R0091
- Notice ID
- f3fd3f2b752e47899eebe00222c7156f
Description
Statement of Work Upgrade Existing Fire Alarm System Project No. 635-20-101 Objective: The Government s objective is to meet the fire alarm and suppression system requirements set forth by the National Fire Protection Association (NFPA) for Fire Protection Alarm Systems and Fire Suppression Systems, to ensure the safety of personnel and preservation of unit assets. Specifically, the Oklahoma City Veterans Affairs Medical Center (VAMC) is seeking General Contractor firms to provide all construction services for the upgrade of existing fire alarm system. It is the intent of this solicitation to follow the design and specifications. Verification of all existing conditions shall be done, and anything overlooked or not included in the proposal required for code compliance should be verified and promptly reported to the COR. Scope of Work: The Oklahoma City Veterans Affairs Medical Center (OKCVAMC) will undergo a fire alarm system upgrade. This project includes construction items for addition, modification, and upgrade to bring the facility into compliance with NFPA 72. The Contractor shall furnish all labor, tools, materials, transportation, and equipment, disposal of waste, supervision and personnel to meet the requirements for the upgrade of the fire alarm system. No work outside the Statement of Work (SOW) is authorized, the contractor is responsible for contracting the Contracting Officer (CO) if they believe additional work outside the original scope is necessary. Architectural: This project provides a design to bring the current fire alarm system into compliance with NFPA 72. Performance Requirements: The contractor shall perform all requirements listed below. Refer to the Attachments sections below for a list of all the drawings and specifications. Basis of design for construction reference NFPA 72 version 2020. Building #20 fire alarm system is brought into the new fire alarm system with new devices, detectors, flow switch, tampers switches and audio visual. Sub-Basement upgrade of components of fire service and fire pump are being upgraded, with regard to tamper and flow switches. Building #1 select stairwells pull stations and strobes added. AHU duct detectors added at select locations. Carbon monoxide system is being added to Boiler Plant area to comply with VA standards and NFPA 72. Speakers have been added to increase audibility throughout the hospital, and existing speakers are being replaced on a one for one basis. Visual notification has been added in select portions of the facility to increase visibility. Server Room smoke detectors to be replaced to create a more accessible device for maintenance. Performance Standards: Proper adherence to all safety procedures is required prior to, during, and after work being performed. The contractor shall furnish all personal protective equipment (PPE) as required. The contractor shall safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to contractor operations and activities, and avoid interruptions of Government operations in the performance of services. The contractor shall be solely responsible for the management, including all associated labor, equipment, materials, mailing costs, and inspection, to meet the requirements of this project. Phasing Schedule & Continuity of Medical Center Operation: The contractor shall coordinate and communicate with the Contracting Officer Representative (COR) to develop an approved phasing schedule to minimize interference with medical center operations and ensure Veteran s healthcare is not impeded. Additionally, the contractor shall give a minimum of 24 hours notice to commencement of work by notifying the COR by both telephone and an email. Pre-Construction Conference: The contractor agrees to attend the pre-construction conference convened by the CO in accordance with FAR 42.5. The CO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor s performance. At these meetings, the CO will apprise the contractor of how the Government views the contractor s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government. Place of Performance: Veterans Affairs (VA) Medical Center, Oklahoma City 921 NE 13th Street Oklahoma City, Ok 73104 Period of Performance: The period of performance for this project shall be 300 days from the Notice to Proceed (NTP). Hours of Work: The hours of work shall take place during the normal business hours of 7:30 AM and 4:00 PM, Monday through Friday, Federal Holidays excluded. Request for weekend, after-hour, and Federal holiday work is permitted with a request in writing submitted beforehand. Off hours are not to billed as overtime. Federal Holidays and any other day declared a federal holiday by the President of the United States are defined below. New Year s DayMartin Luther King Jr s Day Presidents Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day Juneteenth Day If a holiday falls on Sunday, the following Monday will be observed as the National Holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National Holiday by the U.S. Government. All work is to have a limited impact on the facility, veterans, and employees. This may require evening or weekend hours and will be identified in the schedule. All after hours work should be scheduled in advance. Postponement/Delays: In the event climate or weather conditions become unsuitable for work or may induce an environmental hazard, then the entire work shall be rescheduled to a date and time satisfactory to the Contractor and the COR. Postponement due to inclement weather will not cause assessment of the penalty provision outlined above, nor should there be an additional cost to the Government. All work shall be scheduled and performed within the date and time approved by the COR, in conjunction with the department occupying the space served by this equipment. Roles and Responsibilities: The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, cost control and for resolving any differences between the observations documented by the COR and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor s performance, and must be identified and designated by the CO. The COR The COR is designated in writing by the KO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract. CODES, STANDARDS AND EXECUTIVE ORDERS The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) http://www.cfm.va.gov/til/ PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi- Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016. Quality Control: Quality Control (QC): The contractor shall develop and maintain an effective QC Plan (QCP) to ensure services are performed in accordance with this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor s QCP is the means by which it assures itself that its work complies with the requirements of the contract. Acceptance Standards: The VA reserves the right to dispute completion of contract scope if contract work is found not in accordance with manufacturer recommendations, is not satisfactorily executed, or if the system is not properly tested and inspected to achieve certification. All work completed by the Contractor must be reviewed and approved by the VA. Work must be approved for one location of each type of fixture prior to proceeding with all other locations specified. If conditions that exist that are not like the location previously approved the contractor shall get approval prior proceeding with work in locations with similar conditions. Contractor Employee Qualifications/Licenses: Contractor shall provide personnel who have the knowledge, qualifications, and working experience to perform the functions outlined in this SOW. Contractor must be licensed and certified to work on fire alarm panels, and systems per: Oklahoma Administrative Code: Title 380 Department of Labor, chapter 75 alarm and locksmith industry rules, subchapter 3 license requirements. Safety and Prevention: In the performance of this contract, the contractor shall take such safety precautions as necessary to protect the lives and health of occupants of the building. The Contractor shall immediately correct any fire and safety deficiencies caused by his/her personnel. If the Contractor fails or refused to correct deficiencies promptly, the Contracting Officer may issue an order stopping all or any part of the work and hold the contractor in default of the contract. The Contractor shall comply with applicable Federal, State and local safety and fire regulations and codes which are in effect at the beginning of the contract. The contractor shall keep abreast of and comply with changes in these requirements and codes applicable to the contract. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities, and shall ensure safe and healthful working conditions for its employees The Contractor s personnel shall follow applicable facility policies concerning fire/disaster programs. All materials and equipment will be removed from the facility or stored properly at the end of the workday and secured during the workday. Under no circumstances will the Contractor allow for any equipment to be left unattended for any length of time. The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially with regard to exits and exit way access. Utility shutdowns shall not compromise security, communication, or fire safety for occupants. No flammable liquids shall be stored or used in the medical center. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Agency (NFPA) 10 and NFPA 241. Contractor shall keep certification onsite at all times of extinguisher inspections. The Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction. All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads. The Contractor shall assume responsibility of environmental protection of all material storage. Accident Prevention: Precaution shall always be exercised for the protection of persons (including employees) and property. These shall include, but not be limited to, the installation of adequate safety guards and protective devices for all equipment and machinery, whether used in the performance of work or permanently installed as part of the work. Contractor shall comply with all applicable laws relating to safety precautions, including the safety regulations of the Division of Industrial Safety, Department of Industrial Regulations of the state. Environmental Protection: In order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents. The Contractor is responsible for daily cleanup of all areas affected by its work. Areas in use or affected shall be returned to condition in which they were turned over or initially found. VA Housekeeping shall not be dispatched for cleaning associated with contractor work. The Contractor shall take every precaution in preserving flooring, finishes, equipment, and furniture in areas of work. The Contractor shall repair or replace any damage incurred during its work at their expense. Contractor shall use freight elevators for transmission of materials and personnel. Contractor shall take every precaution in preserving the elevators, including the hoist way and lobby doors, interior finishes, and shall conduct all good practices in observing lifting and motor components tolerances. Any damage incurred to any elevator component due to negligence will be repaired at expense of the contractor, within the workday of incurred damage. Badges and Parking: All Contractor personnel are required comply with VAAR 852.273-74 (Available online at VA Technical Information Library) which covers the following requirements: background checks, and the wearing of identification (I. D.) badges issued by the VA Sheridan VAMC. Contractor must acquire badge, of appropriate level, for all staff onsite prior to work beginning. While on VA Facilities grounds, temporary or official I.D. badges shall be worn continuously. Failure of the background check may result in specific personnel being disallowed to work on VA premises and the Contractor will need to provide replacement personnel. It is the responsibility of the Contractor s personnel to park in the appropriate designated parking areas. The designated parking area will be specified by COR and VA Police upon award of contract. While performing under this contract, all vehicles used by the contractor shall be locked and the keys removed when not in use. This is intended to protect the contractor s property and the safety of the patients at the medical center. Due to parking constraints, the number of contractor vehicles on site might be limited per the COR or VA Police. Building Access: The COR shall issue the contractor one key. The COR shall provide the Contractor access to all buildings and rooms required in the provisions of this contract. The Contractor shall notify the COR when leaving these areas. The contractor shall ensure to return all keys that were issued issued back to the COR after work is completed, failure to return key(s) will result in a charge of $150 per key which the contractor will be responsible for paying. Clearances/Access Controls: Contractor and all personnel shall comply with the security clearances or access controls of areas within the Medical Center. In the event that the Contractor has to obtain access to areas that require special security precautions the COR will notify the contractor prior to access. Attachments: Stamped and Sealed Construction Drawings Construction Specifications Construction Design Narrative
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Contract end date
Sep 30, 2024
NAICS
236220
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C25922R0091- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationSep 14, 2022
Z2DA--Upgrade Existing Fire Alarm System
- 5×SolicitationCurrentNov 3, 2022
Z2DA--Upgrade Existing Fire Alarm System
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
GENERAL: Introduction: An inspection for current code compliance of the lightning Protection System on Building 71N has been conducted and found the system needs upgrades and repairs to meet current NFPA 780 and UL96A standards. The Sheridan VA Medical Center needs the services of a qualified contractor to perform the needed lightning protection upgrades to the main hospital building 71N. Located on the Sheridan Wyoming Veterans Affairs Medical Center (VAMC) campus, at 1898 Fort Road, Sheridan, Wyoming 82801. Statement of Work: Specifics a. Existing Conditions The existing lightning protection system (LPS) for Building 71N was installed in 1989 during the building s original construction. Overall, the system remains in fair condition, though it requires repair because several air terminals have become detached from their adhesive bonds to the roof surface. Air terminals are present at all high points of the structure, and all roof-mounted equipment and appurtenances are properly grounded. A main grounding bus connects the communication systems and possibly the electrical distribution system to the primary service ground. The specific location where the grounding system bonds together the structural steel, electrical system, lightning protection components, and plumbing to create an equipotential ground could not be identified during the assessment. A continuous grounding loop encircles Buildings 9, 71, and 71N, with all roof air terminals and down conductors tied into this loop. Down conductors descend to the loop at the corners of each of these buildings. Each air terminal has at least two separate grounding paths, satisfying current code requirements. No Transient Voltage Surge Suppression (TVSS) devices were observed in the system. The lower 8 feet of the ground down conductors are encased in PVC electrical conduit for protection. New Construction Recent construction has added large equipment and a screen wall to the roof, which now obstructs and interferes with the original positioning of the existing air terminals. This new equipment sits higher than the existing lightning protection system components, rendering the current air terminals ineffective at intercepting and safely directing lightning strikes to ground. Project Requirements To bring the existing lightning protection system (LPS) into compliance the following corrections are needed: Install Transient Voltage Surge Suppression (TVSS) devices at the building s main service panel. Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground. Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface. Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork. Install an air terminal at each corner of the new HVAC equipment. Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors. After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system. General: Construction project is to be completed within 120 calendar days from date of Notice to Proceed (NTP). Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans and this SOW per VA construction standards. Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection submittals shall be completed and approved prior to ordering of materials for the project. The building tenants not in the construction areas will remain at work in the buildings during this construction. Patients will remain on the floor in areas not under construction, so the contractor shall make patient safety, and infection control measures a priority. The contractor shall coordinate work locations and schedules with VA COR to minimize impact to building tenants. All electrical, carpentry, architectural, mechanical work, product design, project management, and other work needed on this project shall be provided by the Contractor. All required electrical work, low, medium, or high voltage, shall be installed and terminated by the Contractor. No wiring or cabling shall be abandoned in place. All piping, cabling, and wiring shall be labeled. All cabling and patch cabling shall match the VAMC s station-standard colors. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs Design Manuals and VA .PUBLICATIONS (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory (UL), International Building Code IBC 2003, and National Electric Code (NEC) building codes and standards and the VA Information Security Handbook 6500.6, 6550.0 etc.). The Contractor shall read and be familiar with the most current editions of the applicable codes, standards, guides, and manuals. Sources can be accessed at the Office of Construction and Facilities Management s Technical Information Library (TIL) (http://www.cfm.va.gov/TIL). Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise fire sealed, and shall be done in this contract to meet VA standards and NFPA standards. Contractor shall utilize the VAMC s station-standard fire stop products or approved equal product(s). The station-standard products are SpecSeal fire caulk product is SpecSeal SSS Intumescent Firestop Sealant; and, if needed, the SpecSeal Composite Sheet may be used in areas approved by the COR. The Contractor shall inquire of the COR if any existing equipment, fixtures, hardware, doors, frames, or any other property removed is desired to be retained by the VA for reuse elsewhere within the medical center, at the time of removal. If the VA desires to retain an item, the Contractor shall deliver it to a location designated by the COR. If the VA does not desire to retain an item, the Contractor shall dispose of it properly off-station. The new components installed shall be tested and commissioned, re-certified, and/or tested before VA acceptance. All testing parameters shall be provided by the Contractor with source references to the COR and 3rd-party reviewer before testing begins. Copies of all test reports must be provided to the COR. HVAC systems that have changes made to them as part of this project, beyond diffuser replacement, shall be tested and balanced by the Contractor. Any IT data cables installed or modified as part of this effort shall be tested after installation. Test methods and plans shall be coordinated with the COR. Any Med Gas systems modified as part of this effort shall be re-certified back to the closest shut-off in the system. The Contractor shall arrange for any required re-certification as part of this contract and shall provide plans and results to the COR for approval. Fire alarm devices that are tied into the building fire alarm system, that are replaced or relocated as a result of this work, shall be tested before that phase of the project is complete. The Contractor shall arrange for all required fire alarm testing. If a building s fire alarm system is under warranty, testing must be accomplished by the contractor who holds the warranty. Any fire sprinklers that are relocated as part of this project shall be reviewed and approved by VA Safety prior to installation. All fire sprinkler work shall be coordinated with VA Safety so as to avoid accidentally setting off the system. At the conclusion of the project, the Contractor shall provide the VA and AE with a red-lined set of construction drawings, showing any as-built variations from the plans, as called for in the specifications. The Contractor must repair any damage caused by the Contractor or their subcontractors during this project. Repairs shall be done timely and will be coordinated with the COR. Repairs shall be of equal or better quality and finish than the existing that was damaged. Contractor s work hours shall be between 7:30am-4:00pm Monday-Friday, unless otherwise coordinated with, and approved in advance by, the COR. Noisy work shall not begin prior to 7:30am. Contractors shall not work on weekends, or federal holidays as specified by U.S. Office of Personnel Management (OPM), unless approved in advance by the COR or CO. For approved weekend or holiday work, Contractor must adjust their workers pay accordingly at no additional cost to the VA. The Contractor shall repair any disturbed earth around and in the construction areas. This shall include: Removing any rocks or clumps that have been brought to the surface. Filling in any ruts or depressions with approved fill material, such that the areas are level or at the required slope. Returning the surface cover to what is was before the project, or as called out in the project drawings. In the case of grass, the contractor shall provide topsoil as necessary to provide a good medium for grass growth. If the area(s) cannot be covered by the VA sprinkler system, then the Contractor shall provide for the watering of the new grass until it is established. Any area that the grass does not take to shall be reseeded under the warranty period. The Contractor shall replace any trees, shrubs, or other plants damaged or destroyed during construction, per the project landscape drawings, at no additional cost to VA. Safety and Security: The Contractor shall follow all safety specifications and shall always have an OSHA-30 certified person on-site, at each work location, overseeing the construction. All other Contractors and subcontractors working on-site shall have at least OSHA-10 certifications. Some work will be in medical areas of the hospital, on floors with patients present, so the contractor shall plan for infection control measures to include dust containment, negative pressure, and cleanup to hospital standards. The Contractor will, with the participation of the COR, complete an Infection Control Risk Assessment (ICRA), using the VA forms and process, and Contractor shall implement all protection measures called for in the risk assessment. For work on an active mental health unit, the Contractor shall follow strict tool control and access control in construction areas. Any patients found in construction areas shall be immediately reported to ward staff and the COR. The Contractor shall read and follow the current version of the FMS Safety Plan, which outlines expectations for tool control and safety on-station, [as well as stricter requirements for work on the Acute Psychiatric Ward (APU) located on the 2nd floor of Building 8 (e.g., Rule of Two minimum with one person overseeing the work at all times). Work on APU is not in-scope for this project.] General Contractor shall distribute the FMS Safety plan to their workers and subcontractors. General Contractor shall note this training in their daily logs. General station safety requirements: It is vitally important to keep tools and other items that offer a patient the opportunity for self-harm under control at all times. Tools, extension cords, and similar items should not be left out unattended where patients can gain access to them. This includes in the open backs of contractor vehicles, trailers, laydown areas, tool carts, etc.. Tools should be locked in a job box, some other type of toolbox, or within a room that can be secured from unauthorized access as approved by the COR. This means no tools are left in halls, rooms, etc. in which contractors lose sight of the tools. Lock tools up in a locking cart as needed. Checking of area as the day s work progresses for tools left unattended- examples are, but not exclusively, screwdriver rolling under furniture, razor blade changes left in the grass outside, reels of cords that could hang someone, left unattended around the corner from current work. Large storage containers must be locked if not occupied by a staff member and overnight. Tools and supplies left out in laydown area must be monitored, as patients can walk the entire site. Also, site cleanliness is an OSHA requirement. Badging requirements: All Contractors and subcontractors must obtain a temporary contractor badge from the Engineering Office (Building 5, Room 208) when they first arrive on-site. A valid (i.e., not expired), Government-issued photo ID (such as a Driver s License) is required to be issued a badge. Contractors who have a valid PIV Badge or CAC Badge will not need to be issued a temporary badge. For Contractors on-site less than 179 calendar days per year, the above will suffice, and Contractor PIV badges are not needed. An exception to this: a contractor PIV badge is needed (regardless of work length) within IT closets and other designated secure areas. (For IT closets specifically, it is permissible for just one Contractor with a PIV badge to supervise the work of their contractors at all times within the IT closets.) For Contractors on-site 180 calendar days or more per year, they are required to obtain Contractor PIV badges, which requires fingerprints and a background check process. Contractor PIV badges are valid for 6 months maximum. It is the Contractors responsibility to ensure their badges stay valid and are renewed timely. Contractor shall check with COR at pre-construction meeting for the most-current badging requirements and for beginning the Contractor PIV badge process, as required. Contractor s work shall include all items listed herein this SOW and in the drawings, specifications, and details provided, unless items are specifically called out as VA-provided materials or labor. **Contractor shall field verify all quantities, sizes, and dimensions and receive approved submittals before ordering products and supplies for this project. END OF STATEMENT OF WORK | - | Solicitation | 11/27/2026 |
AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON OCTOBER 20, 2026. The purpose of this amendment is as follows: Post clarification of responses. Proposals due on Oct 22, 2026 @ 11:30 AM CT. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON OCTOBER 15, 2026. The purpose of this amendment is as follows: Post responses to questions and supporting documents. Post updated Statement of Work (changes in BLUE font). Extend proposal due date. Proposal is extended to Oct 22, 2026 @ 11:30 AM CT. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON OCTOBER 2, 2026. The purpose of this amendment is as follows: Extend proposal due date to accommodate needed time to respond to clarification questions. Proposal is extended to Oct 16, 2026 @ 11:30 AM CT. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON SEPTEMBER 23, 2026. The purpose of this amendment is as follows: A) Post responses to 2nd set of questions and supporting documentation. B) Post updated SOW (changes in Blue font). C) Extend proposal due date. Proposals due on October 5, 2026 @ 11:30 AM CST. D) All proposals will be emailed to Christina Beeler-Blackburn via Christina.beelerblackburn@ va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON SEPTEMBER 16, 2026. The purpose of this amendment is as follows: Extend proposal to have needed time to answer submitted questions. Proposals due on September 24, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON SEPTEMBER 1, 2026. The purpose of this amendment is as follows: Post second site visit documents. Extend proposal to have needed time to answer submitted questions. Proposals due on September 17, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other terms and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 20, 2026. The purpose of this amendment is as follows: Post site visit documents and responses to questions. Clarify statement of work with updated information. Add second site visit on 8/25/26 @ 9:00 AM CST. Meet in the CCR trailer F5. See site map for location. Questions are due no later than 8/26/26 at 2:30 PM CST. Extend proposal due date to September 4, 2026 @ 11:30 AM CST. All proposals will be emailed to Christina Beeler-Blackburn via Christina.beeler-blackburn@va.gov. All other items and conditions remain the same. AN AMENDMENT TO SOLICITATION 36C25926R0082 POSTED ON AUGUST 17, 2026. The solicitation has a technical issue with posting full amendments. Once the issue is resolved all responses to questions will be posted. Original: Project 635-21-139, Repair Parking Garage 1 Deficiencies OBJECTIVE: The purpose of the project is to address the defects and deficiencies of the existing Parking Garage 1. The contractor shall furnish all equipment, materials, labor, supervision, and quality control to perform work for VA Project 635-21-139 Repair Parking Garage 1 Deficiencies located East of the VA Medical Center main building at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. SCOPE OF WORK: This summary is not intended to be all inclusive and does not absolve the contractor of responsibility to address the defects and deficiencies of the Parking Garage 1 consistent with the contents of the specs and/or drawings. Bidders are responsible for the entirety of the project scope described in the contract documents (drawings and specifications) and shall submit RFI s on any conflicts between drawings and specifications immediately that may impact bids. Bidders are responsible for all work specified or shown in the bid documents including the Statement of Work, Drawings, and Specifications. Work includes but is not limited to the following: Parking striping and signage, fixing a sidewalk that is not ADA compliant, installing suicide prevention, providing a new stairwell on the south side of the parking garage. Civil, architectural, electrical, lighting, wayfinding, low voltage, and structural systems are included in this project. The contractor shall comply with all requirements listed in the project solicitation including the construction drawings, the project specifications, and all solicitation amendments as may be issued. These documents will be followed during construction and shall be considered project requirements. The areas adjacent to the proposed addition shall be continuously occupied by the OKC VAMC. The Contractor shall implement phasing to ensure that the construction will not impact or impede the VAMC s mission to care for the Veterans. The contractor shall provide quality control of all work conducted and the individual appointed shall be competent and educated/experienced in the field of work this scope encompasses. Codes and Standards: The Contractor shall follow all applicable codes and standards to this type of work including but not limited to Health Care System Memorandums (HCSM), OSHA Guidelines, NFPA 101, NFPA 70, Lock-out-Tag-out, and Rules of Station. Period of Performance: 270 calendar days after Notice to Proceed (NTP). Task Management: Engineering shall identify a Contracting Officer s Representative (COR). The COR will provide technical assistance and clarification required for the performance of this contract, participate in project meetings, review invoices, and receive deliverables. After contract award, the Contracting Officer will appoint a COR and issue a COR appointment letter stating the authority for the COR. The contractor will receive a copy of the written appointment. The Dept. of Veterans Affairs (VA) requires strict adherence to the Code of Federal Regulations 29, Part 1926. This includes the requirement that the prime contractor have a Competent Person known as site superintendent on the job at all times (must have a 30-hour OSHA card), and that all contractor and subcontractor employees have received a minimum of ten (10) hours of OSHA construction safety training. Documentation of these requirements shall be submitted and approved prior to performing the work. Storage and Security: Contractor shall be responsible for storage and security of the project site at East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104. Contractor shall request Contracting Officer approve use bonded and insured off-site storage locations and COR shall access to view off-site stored materials and equipment. Parking: Contractor s personnel can park within project site, park on the fourth floor of the Parking Garage or utilize street parking in the neighborhood. Contractor shall not utilize adjacent parking lot for The Cathedral of Our Lady of Perpetual Help. Oklahoma City VA Medical Center shall not waive or make reimbursement for parking violations of the Contractor s personnel under any circumstances. Work Hours: Construction shall be performed during normal working hours Monday Fridays from 7:30 am to 3:30 pm excluding federal holidays unless requested and approved by the COR and 14-day notice is required. Federal holidays include: New Year's Day January 1st Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11th Thanksgiving Day Fourth Thursday in November Christmas Day December 25th When a holiday falls on a Sunday, the following Monday shall be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also, included, would be any other day specifically declared by the President of the United States of America to be a National Holiday. Delivery Location: All work related to this contract shall be performed at the Parking Garage 1 located East of the VA Medical Center main building (921 NE 13th Street, Oklahoma City, Oklahoma 73104) at the corner of NE 13th street and N. Kelly Avenue, Oklahoma City, Oklahoma 73104 Payment Information: The contractor shall provide the following payment information for VA use. It must be an exact match with the information under the contract number in the Contract Registration (not the contractor s company or individual representative s registration) as well as with the information under the contractor s DUNS number in the System Award for Management http://www.SAM.gov. Mismatched information will result in rejected invoice. Company Name Legal Business Name and DBA (Doing Business As) Name Mailing Address Contact and Address Information Remittance Address Remit To Address Information Employer s Identification Number Federal Tax ID DUNS (Data Universal Numbering System) CODES, STANDARDS AND EXECUTIVE ORDERS: VA has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and Master Specifications specify other codes and standards that VA follows on its projects: VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) (http://www.cfm.va.gov/til/). PG-18-1 Master Construction Specifications PG-18-3 Design and Construction Procedures PG-18-4 Standard Details and CAD Standards VA BIM Manual V2.2 PG-18-5 Equipment Guide List H-18-8 VA Seismic Design Handbook PG-18-9 Space Planning Criteria PG-18-10 Design Manuals (by discipline) PG-18-12 Design Guides (graphical, by function) PG-18-13 Barrier Free Design Guides PG-18-14 Room Finishes, Door, and Hardware Schedules (consult COR for local standards) PG-18-15 Minimum Requirements for A/E Submissions PG-18-17 Environmental Compliance Manual H-7545 VA Cultural Resource Management VA Handbook 0056, Sustainable Building Program VA Directive 0056, Sustainable Building Program VA Directive 0055, VA Energy and Water Management Program NFPA 101 Life Safety Code NFPA National Fire Codes International Building Code (IBC) and all other International Code Series (IPC, IMC, IECC, IFGC, etc.) when applicable or referenced in VA Design documents/ guides. Occupational, Safety and Health Administration (OSHA) Standards. National Electrical Code (NEC) Safety Code for Elevators and Escalators, American Society of Mechanical Engineers (ASME) A 17.1. ASME Boiler and Pressure Vessel Code ASME Code for Pressure Piping Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13) Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318) Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC) Energy policy Act of 2007 (EPAct) DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management. The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification. Ventilation for Acceptable Indoor Air Quality ASHRAE Standard 62.1- 2013. Safety Standard for Refrigeration Systems ASHRAE Standard 15 2016. | - | Solicitation | 10/22/2026 |
THIS IS A PRESOLICIATION NOTICE A REQUEST FOR QUOTE POSTED ON OR ABOUT OCTOBER 23, 2026. Lightning Protection Update B71N 36C25926Q0880 The Contractor/Vendor will Update the Lightning Protection at Building 71 N at the Sheridan VAMC located at 1898 Fort Road, Sheridan WY 82801 . The NAICS code for this procurement is 236220 with a small business size standard of $19 M. The magnitude of this project is between $25,000 and $100,000. This project will be 100% set-aside for Service Disable Veteran-Owned Small Businesses, as stated below. The POC for this project will be Elia Ruiz Manzo. She can be contacted at 303-712-5727 or email at Elia-Laritza.Ruiz-Manzo@va.gov. Important Notice: Apparent successful offerors must apply for and receive verification from the Small Business Administration (SBA) through the SBA certification database via 13 CFR Part 128, VAAR 819.7011, and VAAR 819.7003 by submission of documentation of Veteran status, ownership and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the SBA certification database at the time of offer submission. Failure to be both VERIFIED by SBA and VISIBLE on the SBA certification database at the time of offer submission and contract award will result in the offeror s proposal being deemed non-compliant. All offerors are urged to contact the SBA and submit the required documents to obtain verification of their SDVOSB status if they have not already done so. 852.219-74 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside. As prescribed in 819.7011, insert the following clause: VA Notice of Total Set-Aside for Verified Veteran-Owned Small Businesses (NOV 2022) (a) Definition. For the Department of Veterans Affairs, Veteran-owned small business or VOSB : (1) Means a small business concern - (i) Not less than 51 percent of which is owned by one or more Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more Veteran(s); (ii) The management and daily business operations of which are controlled by one or more Veteran(s); (iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document; (iv) The business has been verified for ownership and control pursuant to 38 CFR part 74 and is listed in VA's Vendor Information Pages (VIP) database at: https://www.vetbiz.va.gov/vip/; and (v) The business will comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size and government contracting programs at 13 CFR parts 121 and 125, provided that any requirement therein that applies to a service-disabled veteran-owned small business concern or SDVO SBC, is to be construed to also apply to a VA verified and VIP-listed VOSB, unless otherwise stated in this clause. (vi) The term VOSB includes VIP-listed service-disabled veteran-owned small businesses (SDVOSB). (2) Veteran  is defined in 38 U.S.C. 101(2). (3) The term small business concern  has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632). (4) The term small business concern owned and controlled by Veterans  has the meaning given that term under section 3(q)(3) of the Small Business Act (15 U.S.C. 632(q)(3)), except that for a VA contract the firm must be listed in the VIP database (see paragraph (a)(1)(iv) of this clause). (b) General. (1) Offers are solicited only from VIP-listed VOSBs, including VIP-listed SDVOSBs. Offers received from entities that are not VIP-listed at the time of offer shall not be considered. (2) Any award resulting from this solicitation shall be made only to a VIP-listed VOSB who is eligible at the time of submission of offer(s) and at time of award. (3) The requirements in this clause apply to any contract, order or subcontract where the firm receives a benefit or preference from its designation as a VOSB, including set-asides, sole source awards, and evaluation preferences. (c) Representation. Pursuant to 38 U.S.C. 8127(e), only VIP-listed VOSBs are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible VOSB as defined in this clause, 38 CFR part 74, and VAAR subpart 819.70. (d) Agreement. When awarded a contract action, including orders under multiple-award contracts, a VOSB agrees that in the performance of the contract, the VOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size and government contracting programs at 13 CFR parts 121 and 125, including the non-manufacturer rule and limitations on-subcontracting requirements in 13 CFR 121.406(b) and 125.6. Unless otherwise stated in this clause, any requirement in 13 CFR parts 121 and 125 that applies to an SDVO SBC, is to be construed to also apply to a VIP-listed VOSB. For the purpose of the limitations on subcontracting, only VIP-listed VOSB, (including independent contractors) is considered eligible and/or similarly situated (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to comply with the required certification requirements in this solicitation (see 852.219-75 and/or 852.219-76 as applicable). These requirements are summarized as follows: (1) Services. In the case of a contract for services (except construction), the VOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not VIP-listed VOSBs (excluding direct costs to the extent they are not the principal purpose of the acquisition and the SDVOSB/VOSB does not provide the service, such as airline travel, cloud computing services, or mass media purchases). When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. (2) Supplies/products. (i) In the case of a contract for supplies or products (other than from a non-manufacturer of such supplies), the VOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not VIP-listed VOSBs. When a contract includes both supply and services, the 50 percent limitation shall apply only to the supply portion of the contract. (ii) In the case of a contract for supplies from a non-manufacturer, the VOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted. Refer to 13 CFR 125.6(a)(2)(ii) for guidance pertaining to multiple item procurements. (3) General construction. In the case of a contract for general construction, the VOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not VIP-listed VOSBs. (4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not VIP-listed VOSBs. (5) Subcontracting. A VOSB must meet the NAICS size standard assigned by the prime contractor and be listed in VIP to count as similarly situated. Any work that a first tier VIP-listed VOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For supply or construction contracts, the cost of materials is excluded and not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the portion of the contract with the preponderance of the expenditure upon which the assigned NAICS is based. For information and more specific requirements, refer to 13 CFR 125.6. (e) Required limitations on subcontracting compliance measurement period. A VOSB shall comply with the limitations on subcontracting as follows: [Contracting Officer check as appropriate.] __By the end of the base term of the contract or order, and then by the end of each subsequent option period; or __By the end of the performance period for each order issued under the contract. (f) Joint ventures. A joint venture may be considered eligible as a VOSB if the joint venture is listed in VIP and complies with the requirements in 13 CFR 125.18(b), provided that any requirement therein that applies to an SDVO SBC is to be construed to also apply to a VIP-listed VOSB. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants. (g) Precedence. The VA Veterans First Contracting Program, as defined in VAAR 802.101, subpart 819.70, and this clause, takes precedence over any inconsistencies between the requirements of the SBA Program for SDVO SBCs and the VA Veterans First Contracting Program. (h) Misrepresentation. Pursuant to 38 U.S.C. 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company's VOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406-2, Causes for Debarment). (End of clause) | - | Pre-Solicitation | 10/23/2026 |
THIS IS A PRESOLICIATION NOTICE A REQUEST FOR PROPOSAL POSTED ON OR ABOUT October 13, 2026 Construct PRRTP (Building Q) Completion items 36C25926R0103 This project addresses deficient items in Building Q that are necessary to ensure full functionality of the building and its surrounding areas and compliance with all VA codes and requirements. Building Q is located at the Rocky Mountain Regional Veterans Administration Medical Center (RMR VAMC) at 1700 N. Wheeling St., Aurora, CO 80045. The NAICS code for this procurement is 236220 with a small business size standard of $45 M. The magnitude of this project is between $2,000,000 and $5,000,000. This project will be 100% set-aside for Service-Disabled Veteran-Owned Small Businesses, as stated below. The POC for this project will be Josiah Benton. He can be contacted at 303-712-5770 or email at josiah.benton@va.gov Important Notice: Apparent successful offerors must apply for and receive verification from the Department of Veterans Affairs Center for Verification and Evaluation (CVE) in accordance with 38 CFR Part 74 and VAAR 819.7011 by submission of documentation of Veteran status, ownership, and control enough to establish appropriate status. Offerors must be both VISIBLE and VERIFIED by the Department of Veteran Affairs CVE at the time of offer submission. Failure to be both VERIFIED by CVE and VISIBLE on VetCert at the time of offer submission and contract award will result in the offeror s proposal being deemed non-compliant. All offerors are urged to contact the CVE and submit the required documents to obtain CVE verification of their SDVOSB status if they have not already done so. 852.219-73 VA Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside. As prescribed in 819.7011, insert the following clause: VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) (a) Definition. for the Department of Veterans Affairs, Service-disabled Veteran-owned small business concern or SDVOSB : (1) Means a small business concern - (i) Not less than 51 percent of which is owned by one or more service-disabled Veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled Veterans or eligible surviving spouses (see VAAR802.101, Surviving Spouse definition). (ii) The management and daily business operations of which are controlled by one or more service-disabled Veterans (or eligible surviving spouses) or, in the case of a service-disabled Veteran with permanent and severe disability, the spouse or permanent caregiver of such Veteran. (iii) The business meets Federal small business size standards for the applicable North American Industry Classification System (NAICS) code identified in the solicitation document. (iv) The business has been certified for ownership and control pursuant to 38 U.S.C. 8127, 13 CFR 128, and is listed as certified in the SBA certification database at https://veterans.certify.sba.gov/; and (v) The business agrees to comply with VAAR subpart 819.70 and Small Business Administration (SBA) regulations regarding small business size, government contracting, and the Veteran Small Business Certification Program at 13 CFR parts 121, 125, and 128. (2) The term Service-disabled Veteran means a Veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16). (3) The term small business concern has the meaning given that term under section 3 of the Small Business Act (15 U.S.C. 632). (4) The term small business concern owned and controlled by Veterans with service-connected disabilities has the meaning given the term small business concern owned and controlled by service-disabled veterans under section 3(q)(2) of the Small Business Act (15 U.S.C. 632(q)(2)). (5) The term SDVOSB participant or certified SDVOSB means a small business that has been certified in the SBA Veteran Small Business Certification Program and listed in the SBA certification database (see 13 CFR 128.102). (b) General. In order for a concern to submit an offer and be eligible for the award of an SDVOSB set-aside or sole source contract, the concern must qualify as a small business concern under the size standard corresponding to the NAICS code assigned to the contract and be listed as an SDVOSB participant in the SBA certification database as set forth in 13 CFR 128. (1) Offers received from entities that are not certified SDVOSBs and listed in the SBA certification database at the time of offer shall not be considered. (2) Any award resulting from this solicitation shall be made to a certified SDVOSB listed in the SBA certification database who is eligible at the time of submission of offer(s) and at the time of award. (3) The requirements in this clause apply to any contract, order, or subcontract where the firm receives a benefit or preference from its designation as an SDVOSB, including set-asides, sole source awards, and evaluation preferences. (c) Representation. Pursuant to 38 U.S.C. 8127(e), only certified SDVOSBs listed in the SBA certification database are considered eligible to receive award of a resulting contract. By submitting an offer, the prospective contractor represents that it is an eligible and certified SDVOSB as defined in this clause, 13 CFR 121, 125, and 128, and VAAR subpart 819.70. (d) Agreement/LOS certification. When awarded a contract action, including orders under multiple award contracts, an SDVOSB agrees that in the performance of the contract, the SDVOSB shall comply with requirements in VAAR subpart 819.70 and SBA regulations on small business size, and government contracting programs at 13 CFR part 121 and part 125, including the non-manufacturer rule and limitations on subcontracting (LOS) requirements in 13 CFR 121.406(b) and 13 CFR 125.6. For the purpose of limitations on subcontracting, only certified SDVOSBs listed in the SBA certification database (including independent contractors) shall be considered eligible and/or similarly situated (i.e., a firm that has the same small business program status as the prime contractor). An otherwise eligible firm further agrees to comply with the required LOS certification requirements in this solicitation (see 852.219 75 or 852.219 76 as applicable). These requirements are summarized as follows: (1) Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified SDVOSBs listed in the SBA certification database (excluding direct costs to the extent they are not the principal purpose of the acquisition and the SDVOSB/ VOSB does not provide the service, such as airline travel, cloud computing services, or mass media purchases). When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract. (2) Supplies/products. (i) In the case of a contract for supplies or products (other than from a non-manufacturer of such supplies), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database. When a contract includes both supply and services, the 50 percent limitation shall apply only to the supply portion of the contract. (ii) In the case of a contract for supplies from a non-manufacturer, the SDVOSB prime contractor will supply the product of a domestic small business manufacturer or processor, unless a waiver as described in 13 CFR 121.406(b)(5) has been granted. Refer to 13 CFR 125.6(a)(2)(ii) for guidance pertaining to multiple item procurements. (3) General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified SDVOSBs listed in the SBA certification database. (4) Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified SDVOSBs listed in the SBA certification database. (5) Subcontracting. An SDVOSB subcontractor must meet the NAICS size standard assigned by the prime contractor and be certified and listed in the SBA certification database to count as similarly situated. Any work that a first tier SDVOSB subcontractor further subcontracts will count towards the percent of subcontract amount that cannot be exceeded. For supply or construction contracts, the cost of materials is excluded and not considered to be subcontracted. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the portion of the contract with the preponderance of the expenditure upon which the assigned NAICS is based. For information and more specific requirements, refer to 13 CFR 125.6. (e) Required limitations on subcontracting compliance measurement period. An SDVOSB shall comply with the limitations on subcontracting as follows: __By the end of the base term of the contract or order, and then by the end of each subsequent option period; or X_By the end of the performance period for each order issued under the contract. (f) Joint ventures. A joint venture may be considered eligible as an SDVOSB if the joint venture complies with the requirements in 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the joint venture participants. (g) Precedence. The VA Veterans First Contracting Program, as defined in VAAR 802.101, subpart 819.70, and this clause, takes precedence over any inconsistencies between the requirements of the SBA Veteran Small Business Certification Program and the VA Veterans First Contracting Program. (h) Misrepresentation. Pursuant to 38 U.S.C. 8127(g), any business concern, including all its principals, that is determined by VA to have willfully and intentionally misrepresented a company s SDVOSB status is subject to debarment from contracting with the Department for a period of not less than five years (see VAAR 809.406 2 Causes for Debarment). (End of clause) | - | Pre-Solicitation | 10/20/2026 |
GENERAL: Introduction: An inspection for current code compliance of the lightning Protection System on Building 71N has been conducted and found the system needs upgrades and repairs to meet current NFPA 780 and UL96A standards. The Sheridan VA Medical Center needs the services of a qualified contractor to perform the needed lightning protection upgrades to the main hospital building 71N. Located on the Sheridan Wyoming Veterans Affairs Medical Center (VAMC) campus, at 1898 Fort Road, Sheridan, Wyoming 82801. Statement of Work: Specifics a. Existing Conditions The existing lightning protection system (LPS) for Building 71N was installed in 1989 during the building s original construction. Overall, the system remains in fair condition, though it requires repair because several air terminals have become detached from their adhesive bonds to the roof surface. Air terminals are present at all high points of the structure, and all roof-mounted equipment and appurtenances are properly grounded. A main grounding bus connects the communication systems and possibly the electrical distribution system to the primary service ground. The specific location where the grounding system bonds together the structural steel, electrical system, lightning protection components, and plumbing to create an equipotential ground could not be identified during the assessment. A continuous grounding loop encircles Buildings 9, 71, and 71N, with all roof air terminals and down conductors tied into this loop. Down conductors descend to the loop at the corners of each of these buildings. Each air terminal has at least two separate grounding paths, satisfying current code requirements. No Transient Voltage Surge Suppression (TVSS) devices were observed in the system. The lower 8 feet of the ground down conductors are encased in PVC electrical conduit for protection. New Construction Recent construction has added large equipment and a screen wall to the roof, which now obstructs and interferes with the original positioning of the existing air terminals. This new equipment sits higher than the existing lightning protection system components, rendering the current air terminals ineffective at intercepting and safely directing lightning strikes to ground. Project Requirements To bring the existing lightning protection system (LPS) into compliance the following corrections are needed: Install Transient Voltage Surge Suppression (TVSS) devices at the building s main service panel. Establish proper bonding by interconnecting all electrical systems, communication systems, piping, and structural steel at the service entrance to create an equipotential ground. Repair all roof air terminals that have detached or pulled away from their adhesive mounts on the roof surface. Install new air terminals at both ends of each screen wall, with additional terminals spaced at 20-foot intervals along the top of each wall, and at the highest point of the HVAC ductwork. Install an air terminal at each corner of the new HVAC equipment. Connect all newly installed air terminals to the existing LPS using #2 bare copper conductors. After these corrections have been completed, a qualified inspection is required to verify full compliance with NFPA 780 and UL 96A standards. Upon successful inspection, a Master Label Certificate should be issued for the lightning protection system. General: Construction project is to be completed within 120 calendar days from date of Notice to Proceed (NTP). Contractor shall provide all equipment, materials, supplies, tools, software, supervision, and labor required for this project, which may include, but is not limited to, demolition work, providing negative pressure environment for work, and providing all new equipment, utilities, and room finishes as indicated in the plans and this SOW per VA construction standards. Safety submittals shall be completed and approved prior to the commencement of on-site construction work. Material selection submittals shall be completed and approved prior to ordering of materials for the project. The building tenants not in the construction areas will remain at work in the buildings during this construction. Patients will remain on the floor in areas not under construction, so the contractor shall make patient safety, and infection control measures a priority. The contractor shall coordinate work locations and schedules with VA COR to minimize impact to building tenants. All electrical, carpentry, architectural, mechanical work, product design, project management, and other work needed on this project shall be provided by the Contractor. All required electrical work, low, medium, or high voltage, shall be installed and terminated by the Contractor. No wiring or cabling shall be abandoned in place. All piping, cabling, and wiring shall be labeled. All cabling and patch cabling shall match the VAMC s station-standard colors. The installation must, at a minimum, be in accordance with all applicable codes indicated in the Department of Veterans Affairs Design Manuals and VA .PUBLICATIONS (Master Construction Specifications, Construction Standards, National Fire Protection Association (NFPA), Underwriters Laboratory (UL), International Building Code IBC 2003, and National Electric Code (NEC) building codes and standards and the VA Information Security Handbook 6500.6, 6550.0 etc.). The Contractor shall read and be familiar with the most current editions of the applicable codes, standards, guides, and manuals. Sources can be accessed at the Office of Construction and Facilities Management s Technical Information Library (TIL) (http://www.cfm.va.gov/TIL). Any penetrations through any floors, ceilings, or walls shall be fire caulked, or otherwise fire sealed, and shall be done in this contract to meet VA standards and NFPA standards. Contractor shall utilize the VAMC s station-standard fire stop products or approved equal product(s). The station-standard products are SpecSeal fire caulk product is SpecSeal SSS Intumescent Firestop Sealant; and, if needed, the SpecSeal Composite Sheet may be used in areas approved by the COR. The Contractor shall inquire of the COR if any existing equipment, fixtures, hardware, doors, frames, or any other property removed is desired to be retained by the VA for reuse elsewhere within the medical center, at the time of removal. If the VA desires to retain an item, the Contractor shall deliver it to a location designated by the COR. If the VA does not desire to retain an item, the Contractor shall dispose of it properly off-station. The new components installed shall be tested and commissioned, re-certified, and/or tested before VA acceptance. All testing parameters shall be provided by the Contractor with source references to the COR and 3rd-party reviewer before testing begins. Copies of all test reports must be provided to the COR. HVAC systems that have changes made to them as part of this project, beyond diffuser replacement, shall be tested and balanced by the Contractor. Any IT data cables installed or modified as part of this effort shall be tested after installation. Test methods and plans shall be coordinated with the COR. Any Med Gas systems modified as part of this effort shall be re-certified back to the closest shut-off in the system. The Contractor shall arrange for any required re-certification as part of this contract and shall provide plans and results to the COR for approval. Fire alarm devices that are tied into the building fire alarm system, that are replaced or relocated as a result of this work, shall be tested before that phase of the project is complete. The Contractor shall arrange for all required fire alarm testing. If a building s fire alarm system is under warranty, testing must be accomplished by the contractor who holds the warranty. Any fire sprinklers that are relocated as part of this project shall be reviewed and approved by VA Safety prior to installation. All fire sprinkler work shall be coordinated with VA Safety so as to avoid accidentally setting off the system. At the conclusion of the project, the Contractor shall provide the VA and AE with a red-lined set of construction drawings, showing any as-built variations from the plans, as called for in the specifications. The Contractor must repair any damage caused by the Contractor or their subcontractors during this project. Repairs shall be done timely and will be coordinated with the COR. Repairs shall be of equal or better quality and finish than the existing that was damaged. Contractor s work hours shall be between 7:30am-4:00pm Monday-Friday, unless otherwise coordinated with, and approved in advance by, the COR. Noisy work shall not begin prior to 7:30am. Contractors shall not work on weekends, or federal holidays as specified by U.S. Office of Personnel Management (OPM), unless approved in advance by the COR or CO. For approved weekend or holiday work, Contractor must adjust their workers pay accordingly at no additional cost to the VA. The Contractor shall repair any disturbed earth around and in the construction areas. This shall include: Removing any rocks or clumps that have been brought to the surface. Filling in any ruts or depressions with approved fill material, such that the areas are level or at the required slope. Returning the surface cover to what is was before the project, or as called out in the project drawings. In the case of grass, the contractor shall provide topsoil as necessary to provide a good medium for grass growth. If the area(s) cannot be covered by the VA sprinkler system, then the Contractor shall provide for the watering of the new grass until it is established. Any area that the grass does not take to shall be reseeded under the warranty period. The Contractor shall replace any trees, shrubs, or other plants damaged or destroyed during construction, per the project landscape drawings, at no additional cost to VA. Safety and Security: The Contractor shall follow all safety specifications and shall always have an OSHA-30 certified person on-site, at each work location, overseeing the construction. All other Contractors and subcontractors working on-site shall have at least OSHA-10 certifications. Some work will be in medical areas of the hospital, on floors with patients present, so the contractor shall plan for infection control measures to include dust containment, negative pressure, and cleanup to hospital standards. The Contractor will, with the participation of the COR, complete an Infection Control Risk Assessment (ICRA), using the VA forms and process, and Contractor shall implement all protection measures called for in the risk assessment. For work on an active mental health unit, the Contractor shall follow strict tool control and access control in construction areas. Any patients found in construction areas shall be immediately reported to ward staff and the COR. The Contractor shall read and follow the current version of the FMS Safety Plan, which outlines expectations for tool control and safety on-station, [as well as stricter requirements for work on the Acute Psychiatric Ward (APU) located on the 2nd floor of Building 8 (e.g., Rule of Two minimum with one person overseeing the work at all times). Work on APU is not in-scope for this project.] General Contractor shall distribute the FMS Safety plan to their workers and subcontractors. General Contractor shall note this training in their daily logs. General station safety requirements: It is vitally important to keep tools and other items that offer a patient the opportunity for self-harm under control at all times. Tools, extension cords, and similar items should not be left out unattended where patients can gain access to them. This includes in the open backs of contractor vehicles, trailers, laydown areas, tool carts, etc.. Tools should be locked in a job box, some other type of toolbox, or within a room that can be secured from unauthorized access as approved by the COR. This means no tools are left in halls, rooms, etc. in which contractors lose sight of the tools. Lock tools up in a locking cart as needed. Checking of area as the day s work progresses for tools left unattended- examples are, but not exclusively, screwdriver rolling under furniture, razor blade changes left in the grass outside, reels of cords that could hang someone, left unattended around the corner from current work. Large storage containers must be locked if not occupied by a staff member and overnight. Tools and supplies left out in laydown area must be monitored, as patients can walk the entire site. Also, site cleanliness is an OSHA requirement. Badging requirements: All Contractors and subcontractors must obtain a temporary contractor badge from the Engineering Office (Building 5, Room 208) when they first arrive on-site. A valid (i.e., not expired), Government-issued photo ID (such as a Driver s License) is required to be issued a badge. Contractors who have a valid PIV Badge or CAC Badge will not need to be issued a temporary badge. For Contractors on-site less than 179 calendar days per year, the above will suffice, and Contractor PIV badges are not needed. An exception to this: a contractor PIV badge is needed (regardless of work length) within IT closets and other designated secure areas. (For IT closets specifically, it is permissible for just one Contractor with a PIV badge to supervise the work of their contractors at all times within the IT closets.) For Contractors on-site 180 calendar days or more per year, they are required to obtain Contractor PIV badges, which requires fingerprints and a background check process. Contractor PIV badges are valid for 6 months maximum. It is the Contractors responsibility to ensure their badges stay valid and are renewed timely. Contractor shall check with COR at pre-construction meeting for the most-current badging requirements and for beginning the Contractor PIV badge process, as required. Contractor s work shall include all items listed herein this SOW and in the drawings, specifications, and details provided, unless items are specifically called out as VA-provided materials or labor. **Contractor shall field verify all quantities, sizes, and dimensions and receive approved submittals before ordering products and supplies for this project. END OF STATEMENT OF WORK | - | Solicitation | 10/30/2026 |
Additional Details
Solicitation Number
36C25922R0091
Archive Date
Jan 18, 2023
Office Address
Greenwood Village, CO, 80111