GovChime
Archived

6350--36C25925Q0275 Bollard Replacement/Repair for RMR VAMC

Overview

Response deadline
4:00 PM MDT
Posted
April 2, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
811210: Electronic and Precision Equipment Repair and Maintenance
Agency
Department of Veterans Affairs

Notice details

Office
NETWORK CONTRACT OFFICE 19 (36C259)
Place of performance
Department of Veteran Affairs Eastern Colorado Healthcare System Rocky Mountain Regional VA Medical Center 1700 N. Wheeling Street, Aurora, 80045
Last updated
Nov 15, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C25925Q0275
Notice ID
4de9a7d866774ae485200dd291f729e7

Description

The purpose of this amendment 0001 is to post the contractor questions and answers. Q1. Does as-built documentation for the bollards, electrical power unit (EPU), and control panels exist? If so, please provide. A1. The government is not aware of any as built drawings in our possession. Q2. Is there an existing Access Control System integration with the bollards? If so, please describe. (Example: Secure limit input, electronic frequency operation (EFO) status input, raise command output, etc.) Please provide any documentation relating to the integration if it exists. A2. There is the guard shack control and the Security Command Center (SCC) controls. For the EFO the VA does not believe this is currently part of the system Q3. On the site walk the bollards, the guard shack control panel, and the EPU in the basement were viewed. Are there any other control panels or barrier control interfaces in the bollard system (perhaps in the SCC)? If so, please describe their location, function, and provide a photo. A3. There is no additional specific control panel other than what was seen during site visit. Q4. Are any of the bolt holes in the bollard casing (the threaded portion of which retains the top cover plate with bolts) stripped? A4. The government have not seen any problems with the threaded portions stripped on the covers. The government is planning on replacing these bolts. Q5. Are the conduit pathways that connect from the EPU to the bollards and the controls clear and unobstructed such that they are serviceable to re-pull cables as needed? A5. The government does not know of any obstruction in the conduit to prevent anyone from pulling more wires through. Q6. Is the site aware of drainage issues with this array of bollards? If so, is the reason known? A6. The drainage system is not working. The north set of bollards has water that collects on the last two (2) bollards to the north of the system flooding the bollard holes. This is the reason proper drainage is requested in the statement of work (SOW). Q7. What type of drainage system is utilized for these bollards? A7. There is rock at the bottom of the bollards. As far as a French drainage the government does not know for certain if that this in place. Q8. For the desired slot cut drainage system, where is the closest sewer/storm drain tie-in? A8. The closet storm drain is located under the bollard system north of the EPU where the drainpipe can be connected. Q9. Is the site aware of any issues with the EPU in the basement? If so, please describe A9. The government is not aware of any issues with the EPU in the basement.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Files (5)

  • 36C25925Q0275 0001.docx

    17 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Wage determination.pdf

    75 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • FAR 52.225-2 Buy American Certificate.docx

    14 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • P09 Final RMR SOW Bollard Repair 3.4.docx

    22 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 36C25925Q0275.docx

    30 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    6350--36C25925Q0275 Bollard Replacement/Repair for RMR VAMC

    Notice aec65af3cfe84fcc9bc7506935d99b8c on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    6350--36C25925Q0275 Bollard Replacement/Repair for RMR VAMC

    Notice 4de9a7d866774ae485200dd291f729e7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C25925Q0275

Archive Date

Apr 14, 2025

Office Address

Greenwood Village, CO, 80111