GovChime
Notice ID: 720dac1fb5ee4a129bfb3461eec747abCombined Synopsis/SolicitationArchived

DG11--DirecTV Programming Service

Archived on September 27, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM MDT
Posted
September 8, 2025
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
516210: Media Streaming Distribution Services, Social Networks, and Other Media Networks and Content Providers
Agency
Department of Veterans Affairs

Notice details

Office
NETWORK CONTRACT OFFICE 19 (36C259)
Place of performance
Department of Veterans Affairs George E. Wahlen VA Medical Center 500 Foothill Blvd, Salt Lake City, 84148
Last updated
Nov 8, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C25925Q0778
Notice ID
720dac1fb5ee4a129bfb3461eec747ab

Description

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Heather Chase
Contracting Officer

Documents

Files (5)

  • 36C25925Q0778 0001_1.docx

    122 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • 36C25925Q0778 0001.docx

    15 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Picture of Encoders.1.jpg

    3.8 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 36C25925Q0778_1.docx

    530 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • 36C25925Q0778.docx

    14 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    DG11--DirecTV Programming Service

    Notice ebea354e37254b5195ac4703a00e3c51 on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    DG11--DirecTV Programming Service

    Notice 720dac1fb5ee4a129bfb3461eec747ab on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This Amendment to the Combined Synopsis/Solicitation Notice is as follows: VA Information Technology will purchase, install, and connect to the VA Network the following two CISCO systems. One unit will be dedicated to the Large LRC, and a 2nd unit will be dedicated to the Small LRC. Bids should include collaboration on integration of the VA purchased equipment into the audio-visual monitors, speakers, microphones, and control systems in both rooms to meet the requirements of the updated Salient Characteristics. Units provided by VA For the project will be equivalent to Two Cisco Webex Room Kit Pro PTZ 4K systems with an audience-facing camera and a presenter facing PTZ camera for each room. In addition, these are respones to the following questions: Will the Government determine, before quote submission or after award, which existing components, such as speakers and wiring, will be reused versus replaced? If this determination occurs after award, how will any resulting change in scope be handled for pricing purposes? Answer: The contractor can bid assuming re-use of existing speakers and wiring. If during install, if wiring or speakers are found to be broken, then replacement by additional purchases outside of this contract can be completed. 2. CLIN 0005 references an “OFE Equipment Rack.” Please confirm what “OFE” designates and whether the equipment rack is contractor-furnished or Government-furnished. Answer: Sorry for the confusion on this point. Please include a new Lectern within the bid. The existing “Open Frame Equipment Rack” located in the storage room to the front right of the large LRC can be re-used (Government-furnished) or replaced, whichever is more economically feasible during Vendor tear down the current system while managing existing wiring during that teardown. 3. CLIN 0004 includes “communication devices” without further specification. Please identify the type and quantity of communication devices required. Answer: 0004 is referring to the control boxes that would be required to incorporate the 4 LRC monitors, 1 Small LRC room monitor, Speakers in both rooms, and multiple microphones in both rooms. Deferring to the vendor on what kind, how many, and where these control boxes need to be located. Microphones requested: 1 wired mic in the large LRC, 2 wireless lavalier, overhead audience, and 2 handheld mics in the large LRC small LRC: 2 handheld mics, 2 wireless lavaliers, overhead included as well. 4. CLIN 0002 references conference-system touch panels, while CLIN 0004 identifies separate 10-inch and 7-inch control interfaces. Please confirm the total quantity and required room placement of all touch/control interfaces for the Large and Small LRC. Answer:1 touch panel near the front of the Large LRC 1 touch panel in the back elevated technology deck area at the back of the Large LRC (mirroring the functions of the front panel) 1 touch panel near the computer at the side of the room in the Small LRC 5. The Delivery Schedule lists the Training deliverable at 1,290 calendar days after contract start, which appears inconsistent with the stated period of performance ending December 31, 2026. Please confirm the correct training milestone. Answer: Between equipment purchases, setup off-site, tear down, install, setup, programming, and training. I am guessing completion in late spring 2027 realistically. 6. Please clarify the anticipated coordination process and lead time for VA IT to connect the Cisco control system to the VA network, including the appropriate point of contact or scheduling process after award. Answer: Estimated within 60 days that the CISCO equipment will be on site (please see the amendment at the end of this email for clarity of this statement). 7. Please confirm the invoicing platform that will apply to the resulting purchase order and the applicable payment terms. Answer: Financial Services Center Tungsten e-Invoice Setup: 1-877-489-6135 www.tungsten-network.com/login FSC e-Invoice Contact: 1-877-353-9791 FSC e-invoice email: vafsccshd@va.gov 8. Will the Government provide a formal inspection/acceptance procedure or checklist for project handoff, or will acceptance be based on COR and Education staff review and sign-off? COR sign off following completion of Education Staff training and initial use during that training would be appropriate. 9. Please confirm any facility-access requirements applicable to contractor personnel during installation, including badging, escorts, background screening, or similar requirements, along with the anticipated processing time. Answer:All the particulars will be included in the award package. 10. The solicitation identifies NAICS 516210. Please confirm that this is the intended NAICS code for this audio-visual system design and installation requirement. Answer:Yes 11. Are floor plans, room layouts, reflected ceiling plans, existing AV drawings, equipment layouts, photographs, cable-pathway information, or other drawings available for the Large and Small LRC? If available, we respectfully request that these documents be provided to assist offerors in developing accurate equipment, cabling, installation, and labor pricing. Answer: Not sure, please stand by. 12. Additionally, considering the technical clarifications above and the limited time between the Government’s anticipated responses and the current quote deadline, Communication Logic respectfully requests an extension of the proposal due date to September 30, 2026. This additional time would allow us and our integration partners to properly incorporate the Government’s responses and provide a complete and accurately priced proposal. Answer: The Offer due date remains unchanged. 13. Is it acceptable to replace the "Cisco" equipment with the Crestron Collaboration/Flex? Products are identical. The Cisco equipment is significantly more expensive. Answer: VA CANNOT use that Creston system.
-Combined Synopsis09/22/2026
The National Oceanic and Atmospheric Administration (NOAA) Office of Marine and Aviation Operations (OMAO) Portfolio Acquisition Executive (PAE) Platforms, using the procedures set forth in RFO Part 12, intends to negotiate on a sole source basis with gCaptain, LLC. located at 630 Quintana Road, Suite 192, Morrow Bay, CA for a firm-fixed price purchase order for job advertising services on gCaptain’s website to support outreach. Award is anticipated to occur by December 11, 2026. OMAO conducts outreach events targeting maritime experience eligible applicants/employees in order to maintain a strong workforce in a maritime community in which hiring is competitive. OMAO advertises in magazines and websites throughout the year in order to recruit for difficult to fill positions such as mariners licensed and unlicensed in deck, engine and stewards departments. The gCaptain website is the only known professional mariner site in regards to readership and site visits of over 1,200,000 per month. This company targets professional mariners, licensed and unlicensed in deck, engine and steward departments.gCaptain is the sole source for job advertising on their professional mariner website The North American Industry Classification System Code (NAICS) is 516210, Media Streaming Distribution Services, Social Networks, and Other Media Networks and Content Providers which has a size standard of $41.5M. This requirement will be issued as a small business set-aside. This presolicitation notice does not constitute a solicitation - a Request for Proposal (RFP), Request for Quotation (RFQ), or an Invitation for Bid (IFB) - and it does not restrict the Government in any way regarding its ultimate acquisition approach. However, if any other interested party believes that it can meet the requirements, it may submit a statement of capabilities, which if timely received, will be considered by NOAA. A determination by the Government not to compete this proposed requirement based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement in the future. Evidence must be provided of ability to provide the required services. The capability statement and any other information furnished must be in writing and must contain material in sufficient detail to allow NOAA to determine if the party can meet all of the requirements. Capability statements and related materials must be e-mailed to Contract Specialist Elizabeth Eichelberger at Elizabeth.Eichelberger@noaa.gov within 15 days of the posting of this notice.
-Pre-Solicitation11/27/2026
Request for Quote (RFQ) #: 36C25927Q0009 Bayesian-Guided Dosing Software (PrecisePK® or equivalent) (i) This is a combined synopsis/solicitation for commercial services prepared in accordance with Revolutionary FAR Overhaul (RFO) Part 12. This announcement constitutes the only solicitation. Offers are being requested and a separate written solicitation will not be issued. The Government reserves the right to make no award from this solicitation. * The deadline for all questions is 12:00pm MST, November 4, 2026. All questions must be submitted in writing no later than the question cut-off date marked above. All questions will be answered officially through an amendment to the solicitation. ** Quotes are to be provided to eric.ayers@va.gov no later than 12:00pm MST, November 9, 2026. Quotes shall not be hand carried. Faxed quotes shall not be accepted. Emailed quotes are the only method of submitted quotes (4MB email limit). The Government reserves the right to make the award solely on initial Quotes received. Offerors bear the burden of ensuring that all portions of the offer (and any authorized amendments) reach the designated office before the deadline specified in the solicitation. This RFQ shall be completed in its entirety, and signed and dated, failure shall not be considered for award. This is a Request for Quote (RFQ), and the solicitation number is 36C25927Q0009. The government anticipates awarding a firm-fixed price contract resulting from this solicitation. SEE ATTACHMENT 36C25927Q0009 RFQ.DOC FOR COMPLETE INFORMATION.
-Combined Synopsis11/09/2026
Contract FA452827P0006 for Cable TV Services has been awarded to Midcontinent Communications. The period of performance is for one 12-month base year and four 12-month option years. The total contract value inclusive of all options is $157,490.40. Cable TV Services are provided pursuant to the Cable Communications Policy Act of 1984. Midcontinent Communications is the sole provider of CATV services in the Minot AFB area.
-Sole Source / J&AOpen
THE PURPOSE OF THIS AMENDMENT 0001 TO RFQ 36C25927Q0036 IS TO ANSWER VENDOR QUESTIONS AND UPDATE THE RESPONSE DATE/TIME FOR QUOTES. Quotes are to be provided to eric.adusei@va.gov no later than 14:00pm MT, NOVEMBER 13th, 2026. VENDOR QUESTIONS AND ANSWERS PROVIDED BELOW: The following questions were submitted and answered in response to the subject solicitation. 1. SAM.gov identifies this opportunity as SDVOSB sole source, while the RFQ describes a 100% SDVOSB set-aside with comparative evaluation. Is this a competitive procurement open to quotations from all eligible SDVOSBs? Ans: Yes. This solicitation is being conducted as a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside using a comparative evaluation process. It is a competitive procurement open to quotations from all eligible SDVOSBs. The SAM.gov posting currently contains an error identifying the requirement as a sole-source acquisition. 2. CLIN 0002 lists 38 queen beds, while the furniture specifications list 2. Please confirm the correct quantity. Ans: The correct quantities are thirty-eight (38) twin mattresses and two (2) queen-size beds. Quotations should be submitted based on these quantities. Please reference the attached quantities requested document for needed numbers. PLEASE REFERENCE THE ATTACHED EXCEL SHEET FOR REQUIRED QUANTITIES. 3. The price schedule permits or equal products, while the SOW specifies Kwalu furniture and finishes. Please confirm that equivalent products from other manufacturers meeting all salient characteristics are acceptable. Ans: Yes. Offerors may propose "or equal" products from other manufacturers, provided the products meet all required salient characteristics and specifications identified in the solicitation. Furniture offered as an equal product shall have a finish equivalent to Kwalu Protea Natural Oak and otherwise satisfy the Government's stated requirements. 4. The price schedule specifies Medium Oak, while the furniture specifications identify an equivalent to Kwalu Protea Natural Oak. Which finish should vendors use for their quotations? Ans: Offerors shall base their quotations on a finish equivalent to Kwalu Protea Natural Oak. In the event of a discrepancy between the Price Schedule and the furniture specifications, the required finish shall be Kwalu Protea Natural Oak for all applicable furniture items. 5. Does an SBA nonmanufacturer rule waiver apply to this procurement? If so, please identify the applicable waiver and the items it covers. Ans: No. The SBA nonmanufacturer rule does not apply to this solicitation. Therefore, there is no applicable nonmanufacturer rule waiver associated with this procurement, and no items are covered by such a waiver. 6. CLIN 0002 (Queen Bed) lists a quantity of 38, while the SOW and Specifications list a quantity of 2. Please confirm the required quantity of queen beds. Ans: The required quantity for CLIN 0002 (Queen Beds) is two (2). The quantity of thirty-eight (38) applies to the Twin Mattresses, not the Queen Beds. Offerors should refer to the Bedroom Furniture Specifications document attached to the solicitation for the correct quantities of all items. PLEASE REFERENCE THE ATTACHED EXCEL SHEET FOR REQUIRED QUANTITIES. 7. The Price Schedule lists "Natural Oak" for CLIN 0001 and "Medium Oak" for CLINs 0002 and 0004 0009, while the Specifications list "Natural Oak" for all items. Please confirm the required finish for each CLIN. Ans: The required finish for all applicable CLINs shall be equivalent to Kwalu Protea Natural Oak. Any discrepancies between the Price Schedule and Specifications regarding finish color should be disregarded. Offerors shall base their quotations on a finish equivalent to Kwalu Protea Natural Oak for the furniture items included in this solicitation. 8. The SOW requests separate pricing for installation labor; however, the Price Schedule does not include a line item for installation. Should installation be included in each CLIN's unit price, or should it be priced as a separate line item? Ans: The Government will accept either approach for this solicitation. Offerors may include installation costs within each CLIN's unit price or price installation as a separate line item. In either case, the quote should clearly identify all costs associated with furnishing and installing the required items to ensure accurate evaluation and award. 9. CLIN 0001 includes both the XL Twin bed and the mattress, while the Specifications list the mattress separately. Please confirm whether the CLIN 0001 price should include both the bed and the mattress. Ans: Offerors may either list the bed and mattress as separate line items or combine them into a single line item. Both approaches are acceptable, provided the quote clearly identifies the products being offered and meets all solicitation requirements. 10. The SOW requires physical samples; however, the solicitation states that quotes must be submitted by email only. Are physical samples required with the quote? If so, please provide the shipping address and submission instructions. Ans: Yes. Offerors may submit physical finish samples as part of their quotation package in accordance with the solicitation requirements if they wish to do so. Electronic quotation documents shall be submitted via email. Physical finish samples may be delivered or mailed to: Department of Veterans Affairs Network Contracting Office 19 6162 South Willow Drive, Suite 300 Greenwood Village, CO 80111 Offerors should clearly identify the solicitation number and company name with any submitted samples. 11. The solicitation does not specify a delivery or installation timeline. Please provide the anticipated start date, the required completion date (or number of days after award), and the permitted daily work hours for installation. Ans: Delivery timelines will be addressed after contract award. At this time, please note that delivery and installation will be coordinated by the VA Interior Designer, Kate Rader. Installation is currently planned for three (3) rooms per day. The rooms scheduled for installation on the following business day will be coordinated and confirmed daily. If additional rooms become available, the contractor may install furniture in more than three rooms per day, as coordinated by the POC. Please provide an estimated performance period date on your quotes. 12. Please clarify the requirements for removal of existing furniture and mattresses. Is there a designated disposal location, will the VA provide an on-site dumpster, and is donation or standard disposal acceptable? Do any VA property turn-in procedures apply? Ans: The contractor shall remove and dispose of the existing furniture and mattresses identified in the solicitation as part of the required deinstallation services. At this time, the Government has not identified a designated disposal location or provided for an on-site dumpster. Offerors should include all costs associated with removal, transportation, and disposal in their quotations. The Government is currently coordinating with the appropriate facility personnel regarding any applicable VA property disposition requirements and will provide additional information, if necessary, through a solicitation amendment. 13. Will the VA provide an on-site storage area for new items that cannot be installed on the same day they are delivered? Ans: The Contractor shall provide thirty (30) days of free storage once the complete bill of materials has been received at a conditioned storage facility that meets all applicable building requirements, including, but not limited to, sprinkler systems, security measures, safety requirements, temperature controls, and environmental controls. Storage conditions should be maintained in a manner that preserves the furniture and does not void any manufacturer warranties. 14. Please describe the wall construction behind the drywall (e.g., wood or metal studs, blocking) where the wardrobes, weighing approximately 325 lbs., will be anchored. Ans: The Government does not currently have wall construction details available for release and is coordinating with the Facilities Department to obtain additional information. Offerors should base their quotations on the information provided in the solicitation documents. The awarded contractor shall coordinate field verification prior to installation to determine the appropriate mounting hardware and installation method required to safely anchor the wardrobes in accordance with the manufacturer's requirements. 15. Can the VA provide photos of the existing rooms where the furniture will be installed? Room layouts and furniture placement information are provided in the attached Bedroom Furniture Floor Plan pdf. Any additional pictures provided will be added to the RFQ via an amendment. 16. Is the contractor responsible for patching and repairing wall anchor holes left by the removal of existing wardrobes? Answer: Yes, the contractor will be responsible for patching and repairing all anchor holes resulting from the removal of existing equipment and the installation of new equipment. All repairs shall be completed in a professional manner and restore the affected surfaces to a condition comparable to their original appearance. 17. Will rooms be released in groups, and will they be vacated and cleared of personal items before the installation crew arrives? Ans: Yes, rooms will be released in phases. Installation is currently planned for three (3) rooms per day, with the rooms to be installed identified and coordinated daily through the VA Interior Designer. The Government will coordinate room availability with the contractor prior to installation. The Government will ensure rooms scheduled for installation are available for contractor access; however, room turnover and occupant coordination will be managed by the facility on a case-by-case basis. 18. What documentation is required to demonstrate the contractor's prior healthcare facility experience? Ans: Vendors may submit a manufacturer training certificate, letters of experience or reference letters, project lists identifying installations the proposed Project Manager/Lead Installer has worked on, or other documentation demonstrating how long the individual has been performing similar work. Documentation should clearly support the fact that the proposed Project Manager/Lead Installer possesses at least two (2) years of relevant experience performing installations of similar scope and complexity.
-Combined Synopsis11/13/2026

Additional Details

Solicitation Number

36C25925Q0778

Archive Date

Sep 27, 2025