Notice ID: 91294f864b1c48dba780d547f51e2ec7Award NoticeAwarded
C1DA--AE/NRM 663A4-23-201 Replace 40 Ton Condenser Tier4 FY24 Tier1
Awarded on September 29, 2024. Full description on SAM.gov.
Awarded tounder 36C26024C0062 (source: SAM.gov award notice)• $201.2K
Overview
- Posted
- September 30, 2024
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 541330: Engineering Services
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Department of Veterans Affairs American Lake VA Medical Center 9600 Veterans Drive Southwest Tacoma, WA 98493-0003
- Last updated
- Dec 4, 2025
- Award date
- Sep 29, 2024
- Award amount (SAM.gov award notice)
- $201.2K
Identifiers
- Solicitation number
- 36C26024R0063
- Notice ID
- 91294f864b1c48dba780d547f51e2ec7
- Award number (PIID)
- 36C26024C0062
Description
This is not a request for proposal. This is a request for Standard Form (SF) 330 Architect-Engineer Qualifications packages only. All information needed to submit SF 330 documents is contained herein. No solicitation package, technical information, or bidder/plan holder list will be issued. The Government will not pay, nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. GENERAL INFORMATION Veterans Health Administration (VHA) Regional Procurement Office West (RPOW) Network Contracting Office 20 (NCO20) is seeking sources and intends to award a firm fixed price design contract for Architect-Engineering (A-E) services for the development of complete construction documents, which include working drawings, specifications, and reports, and construction period services for Project No. 663A4-23-201, Replace 40 Ton Condenser at B200, at the Puget Sound VA Medical Center, American Lake campus, Tacoma, WA. The A-E Services contract that is anticipated to be awarded will be procured in accordance with the Selection of Architects and Engineers statute [formerly known as the Brooks Architect Engineer Act], Federal Acquisition Regulation (FAR) subpart 36.6 Architectural and Engineering Services, VA Acquisition Regulation (VAAR) 836.6, and VA Acquisition Manual (VAAM) M836.6 Architect-Engineer Services. In accordance with FAR 36.209, Construction Contracts with Architect-Engineer Firms, no contract for the construction of a project shall be awarded to the firm that designed the project or its subsidiaries or affiliates, except with the approval of the head of the agency or authorized representative. PROJECT INFORMATION This project is a 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns. The NAICS code for this procurement is 541330 Engineering Services and the annual small business size standard is $25.5M. A full design team is required to complete this project. The VA expects to award the anticipated A-E contract approximately early July, 2024. The anticipated period of performance for completion of design is 360 calendar days after notice of award (NOA). The VAAR magnitude of construction is between $2,000,000 and $5,000,000. Please note that the 360 calendar-day period of performance for the design completion begins with the issuance of the NOA and that a notice to proceed (NTP) will not be issued for the completion of a design project. SUBMISSION REQUIREMENTS: The below information contains the instructions and format that must be followed for the submission of the SF 330 Statement of Qualifications: Submit one (1) SF 330 Statement of Qualifications to Contract Specialist Dennis Einarson at NCO20AESF330@va.gov. This must include Parts I and II and any applicable attachments. The submission must include the SF 330, Architect-Engineer Qualifications form is available online at: http://www.cfm.va.gov/contract/ae.asp or https://www.gsa.gov/system/files/SF330-21.pdf . The SF 330 submission is due by May 6, 2024, 8:00am PST. The SF 330 must be submitted in one email and have a file size no larger than 5 MB. No hard copies will be accepted. The subject line of the email must read: SF 330 Submission 36C26024R0063, Project No. 663A4-23-201, Replace 40 Ton Condenser at B200 The SF 330 submission must not exceed a total of 50 pages. This includes title page, table of contents, and any other relevant information. Any pages submitted by an offeror that exceed the limit will not be considered during the evaluation. Each page must be in Arial size 12 font, single spaced. Part II of the SF 330 and any CPARs or PPQs will NOT count toward the page limitation. A PPQ obtained for another SF 330 submission may be submitted for this project. However, if significant portions of the project have been completed since the PPQ was filled out, a new PPQ should be submitted to accurately assess the project. Firms must include the following information in section B of the SF 330 submission: SAM Unique Entity Identifier Tax ID number Cage code Primary point of contact s email address and phone number All questions must be submitted to dennis.einarson@va.gov with the subject line SF 330 Questions - 36C26024R0063 Project No. 663A4-23-201, Replace 40 Ton Condenser at B200 The cutoff for question submission is April 22, 2024, 8:00am PST. Questions will be answered through amendment to the notice posted to Contract Opportunities at SAM.gov. This procurement is a 100% set-aside for SDVOSB concerns. Offers received from other than SDVOSBs will not be considered. Offerors must be certified as SDVOSBs by the U.S. Small Business Administration (SBA) and visible in the Veteran Small Business Certification (VetCert) database (https://veterans.certify.sba.gov/) at the time of SF 330 submission, written response submission, and award. Failure to be certified in the VetCert database at these times will result in the offeror being deemed ineligible for award. All joint ventures must be SBA certified at the time of SF 330 submission, written response submission, and award and must submit agreements that comply with 13 CFR 128.402 prior to contract award. All prime firms must meet the NAICS code requirement specified in this notice. The Contracting Officer will verify the NAICS code in VetCert. Failure to meet the NAICS code requirement may result in the rejection of the SF 330 submission. SF 330 submissions received after the date and time specified will not be considered. Late proposal rules per FAR 15.208 will be followed for late submittals. Firms not providing the required information may not be evaluated. All information must be included in the SF 330 submission package. It is the offeror s responsibility to check the Contract Opportunities website at SAM.gov for any revisions to this announcement prior to submitting their SF 330. A-E SELECTION PROCESS Firms who timely submit SF 330s in response to this announcement, and in accordance with submission requirements, will be considered for evaluation. The selection will be made as follows: SF 330s will be evaluated in accordance with the primary selection criteria as stated in this notice. These evaluations will determine the most highly qualified firms for this particular requirement. In accordance with FAR 36.602-3(c), at least three of the most highly qualified firms will then be notified of the Government s intent to hold discussions. Firms that were not selected for discussions will be notified at this time. In accordance with FAR 36.607(b), any requested debriefings of successful and unsuccessful firms will be held after final selection has taken place and will be conducted, to the extent practicable, in accordance with 15.503, 15.506(b) through (f), and 15.507(c). Note that 15.506(d)(2) through (d)(5) do not apply to architect-engineer contracts. Discussions will be held with top three firms in the form of written responses. The firms invited to participate in discussions will be notified by Contract Specialist or Contracting Officer by email with detailed instructions that will include questions or topics to address. Following the completion of discussions, the firms will be evaluated and ranked based on the primary and (if necessary) secondary selection criteria. The final evaluation and ranking will consider the SF 330 submission for each firm, as well as additional information obtained via discussions. The highest rated firm will be selected to receive the solicitation and engage in negotiations. The solicitation will be issued to the highest rated firm as a Request for Fee Proposal (RFP). All SOW attachments and site-specific documentation will be provided to the highest rated firm with the RFP. A site visit may be authorized during the negotiation process. An award will then be made as long as the negotiation of rates and hours leads to a fair, balanced, and reasonable determination of the final contract price. If negotiations with the highest rated firm are unsuccessful, the firm will be notified that negotiations have been terminated. Negotiations will then be initiated with the next highest rated firm, and so on until award can be made or this announcement is cancelled. PRIMARY SELECTION CRITERIA: Firms responding to this notice will be evaluated and ranked using the primary and secondary selection criteria listed below. The factors are listed in descending order of importance. The evaluation will consider how each factor is addressed and how it is formatted to coincide with the selection criteria. Selection Criteria 1, Professional Qualifications (Sections C through E): The evaluation will consider the professional qualification necessary for satisfactory performance of required service. The evaluation shall consider the specific experience (minimum of five years) and qualifications (i.e., education, training, registration, certifications, overall relevant experience, and longevity with the firm as full-time employees) of personnel proposed for assignment to the project, and their record of working together as a team when evaluating professional qualifications. The lead designer in each discipline must be registered but does not have to be registered in the particular state where the project is located. The A-E shall demonstrate they are able to sign and stamp each drawing by individuals licensed in any state in the United States for the key positions listed below. Provide Professional License numbers and/or proof of Licensure. A resume for each of these key positions must be provided via Section E of the SF330. Key positions and disciplines required for this project may include among others CADD Technician Civil Engineer Cost Estimator Electrical Engineer Environmental Engineer Fire Protection Engineer Geotechnical Engineer Industrial Hygienist Interior Designer LEED consultant Life Safety Engineer Mechanical Engineer Physical Security Specialists Plumbing Engineer Project Manager Quality Assurance Registered Communications Distribution Designer (RCDD) Security specialist Structural Engineer Architect (LEED certified) Offer must include the following statement of SDVOSB compliance on the cover page when submitting the personnel proposed to perform the work under this requirement: I [signatory authority] ___________________, [company or Joint Venture] __________________, certify that the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified SDVOSBs by the Small Business Association s Veteran Small Business Certification (VetCert) in compliance of VA Acquisition Regulation (VAAR) 852.219-75. The information provided in sections C through E of the SF 330 will be used to evaluate this evaluation factor. Do not include this information in section H, unless it is pertinent to support the information listed in the other sections. Selection Criteria 2, Specialized Experience and Technical Competence (sections F, G, and H): The evaluation will consider specialized experience and technical competence in design and construction period services for replacing a 40 ton condenser. Provide information for example projects which best illustrate the proposed team s experience and competencies for this contract. Submissions shall include information regarding experience and competence in replacing 40 ton compressors demonstrating knowledge of: New refrigerant systems to effectively service the existing eight walk-in refrigerators and freezers, at their perspective OEM recommended operating range, to preserve and retain food stores to be used in food preparation and meals format. Audio and visual emergency alarms to alert personnel of system shortfalls/maintenance issues. Very high seismic zones; American Lake is in a very high seismic zone and the design must analyze and address any seismic requirements for the mounting of mechanical equipment to housekeeping pads, rooftop mounting and overhead mounting in accordance with published criteria for a very high seismic zone. See Scope of Work for complete scope description Submissions shall include no more than five (5) and no less than three (3) recent and relevant, Government and private experience, example projects, similar in size, scope, construction features and complexity, which clearly illustrate experience and competencies listed above and in other portions of this solicitation. Recent is defined as services provided in the five (5) years prior to the closing date of this solicitation. Relevant is defined as projects, within the United States, its territories, or possessions, requiring tasks identified in this solicitation. Similar complexity is considered projects of an operational, construction, or design likeness to the work covered in this solicitation. Two (2) of the example projects must have construction completed or construction substantially (50%+) complete. Submit example project information in Section F of the SF 330. Section G of the SF 330 will be used to evaluate the prior experience of the prime firm and any key subcontractors working together on the provided example projects. The evaluation will also consider narratives addressing the following topics for the Offeror, and key consultants, in Section H of the SF 330: The management s approach The coordination of disciplines and subcontractors Quality control procedures, and Familiarity with VA Design Guides/Manuals, Master Specifications, and other applicable standards. The narratives should clearly illustrate how each of the topics were addressed. Re-stating or reiterating this list or the Scope of Work in Section H will not be sufficient. Narratives submitted in Section H of the 330, shall not exceed one (1) page in length for the Offeror and each key consultant. The narrative submissions shall not exceed ten (10) pages total for this criterion. Selection Criteria 3, Capacity (Section H) The evaluation will consider the team s plan and the evaluation will consider the firm s ability to meet the schedule of the overall project, as well as the available capacity of key disciplines to perform the work in the required time. Provide the available capacity of key disciplines by providing current project workload, inclusive of all projects awarded during the previous 12 months and the full potential value of any current indefinite delivery contracts. Offeror shall clearly state their available capacity presenting workload percentages for the key disciplines and/or team members. Also, the offeror must provide the completion percentages and expected completion date for projects awarded in the previous 12 months. The information for this factor shall be provided in Section H of the SF 330. Please ensure the capacity applies toward the team/personnel provided in the SF 330. Selection Criteria 4, Past performance (section H) The evaluation will consider the firm s past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules. Past performance will be evaluated for all projects provided in Section F. The Contractor Performance Assessment Rating System (CPARS) database will be reviewed to evaluate the projects that have a CPARS entry. CPARS are not required to be submitted with the SF330 submission. The contract number for the project must be submitted with each project in Section F so CPARS can be reviewed in the database. For any project that does NOT have CPARS data available, a Past Performance Questionnaire (PPQ) is required to be submitted with the SF330. The PPQ should be rated and signed by the evaluator. In the event that a firm does not receive a requested complete PPQ from an evaluator prior to the time for submission, the firm shall submit the partially completed PPQ with Section 1 and the Evaluator Information in Section 2 completed. Ensure a POC is listed with the project title/contract number. The VA will make reasonable attempts to contact the POC upon submission for PPQ completion. Evaluations may also include additional performance related from the firm, customer inquiries, Government databases, publicly available sources, and additional projects in CPARS. The Government reserves the right to contact any POC listed on a CPARS report or PPQ. Failure to provide requested data, accessible points of contact, or valid phone numbers may result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member performing the work under this contract. The information for this factor shall be provided in Section H of the SF 330. For PPQs, please utilize the attached PPQ document only. Completed PPQs should be incorporated into the SF 330 directly. PPQs should not be submitted separately to NCO20 directly. Any PPQs will not be counted towards the page limitations for this submission. However, any narratives provided for past performance in Section H shall not exceed two (2) pages in length and will be counted toward the total submission page limit. Selection Criteria 5, Knowledge of the locality (Section H), The evaluation will consider the knowledge of the locality, including specific knowledge of local conditions or project site features, such as geological features, climatic conditions, working with and local construction methods or local laws and regulations of the area of Walla Walla, WA. The information for this factor shall be provided in Section H of the SF 330. Note that the intent of this factor is to showcase a firm s understanding of the project site and locality, and NOT where the firm is located, how far away the firm/branch office is from the site, and how they would travel to the site. Information related to the firm s location shall be provided in Section H under Secondary Selection Criterion Factor 1, Geographic Location. See below. Selection Criteria 6, Experience in Construction Period Services, (Section H) The evaluation will consider experience in Construction Period Services (CPS) necessary for performance of this contract. Submissions shall provide information which clearly illustrates CPS experience in the following: Solicitation support services Professional field inspections during the construction period, both scheduled and emergent Coordination with commissioning requirements/commissioning services Review of construction submittals for design conformance, variance, and applicable code/standard compliance Support in answering requests for information (RFI) during the construction period Support of construction contract changes to include drafting statements of work and cost estimates Maintaining a comprehensive submittal log inclusive of material data, shop drawings, certifications, etc. Providing timely and complete responses to requests for information Providing supporting documentation (statements of work, cost estimates, technical reports, etc.) for construction modifications Providing record drawing documentation Process for correcting design errors/omissions identified during construction Attendance at pre-bid, post-award, and commissioning kick off construction project conferences Providing minutes of weekly construction meetings throughout the duration of construction Site visits during construction both scheduled and emergent Ensuring compliance with the design drawings and specifications Preparation of site visit reports Generation of punch-list reports Review of construction project modifications for cost and technical acceptability Attendance and participation during the final acceptance inspection Preparation of record drawings of the completed construction project based on the construction contactor s as-built drawings Maintenance of RFI logs Attendance at weekly conference calls Providing minutes of meetings between the AE, VA, and contractors Pre-final inspection site visits Production of as-built documentation The information for this factor shall be provided in Section H of the SF 330. Selection Criteria 7, Experience with Historic Buildings, (Section H) The evaluation will consider experience with working with historic sites. This facility has all or part of their facility registered with the State Historic Preservation Office (SHPO) or other similar entity and has a Memorandum of Understanding (MOU) that may apply to the scope of the project. Provide a narrative of no more than two (2) Pages, demonstrating experience with working with historic buildings and sites under SHPO MOUs or similar. The information for this factor shall be provided in Section H of the SF 330. SECONDARY SELECTION CRITERIA: Geographic location. Location of the firm, as measured by the driving distance (miles) between the Offeror s principal business location and the Puget Sound VA Medical Center, American Lake campus, Tacoma, WA. Determination of the mileage will be based on Google Maps. (https://www.google.com/maps/dir/). *The secondary selection criterion is used as a tiebreaker, if necessary, in ranking the most highly qualified firms following the completion of discussions. The secondary selection criterion will not be applied when determining a firm s SF 330 submission highly qualified or not highly qualified.
Award Overview
Award Number
36C26024C0062
Award Amount (SAM.gov award notice)
$201.2K
Award Date
Sep 29, 2024
Awardee
Awardee UEI
C2TLU3VGKPC6
Awardee CAGE Code
4CEE7
Original Solicitation
Notice ID: 91294f864b1c48dba780d547f51e2ec7
Posted Date: Sep 30, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $89.1KSigned Nov 13, 2026
- $471.1KSigned Nov 10, 2026
- $1.2MSigned Nov 10, 2026
- $299.4KSigned Nov 4, 2026
- $286.8KSigned Nov 2, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C26024R0063- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationApr 4, 2024
C1DA--AE-NRM-663A4-23-201 Replace 40 Ton Condenser
- AwardedCurrentSep 30, 2024
C1DA--AE/NRM 663A4-23-201 Replace 40 Ton Condenser Tier4 FY24 Tier1
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Description: The Department of Veterans Affairs (VA) seeks to retain an independent third-party Commissioning Agent to perform comprehensive commissioning services for the subject project. This project will replace and repair roofing and lighting protection at the Cincinnati VA Medical Center (Building Numbers: 1, 2, 3, 8, 13, 14, 15, 16 and trailers) including main and Fort Thomas Campuses (Building Numbers: 64, 117 and trailers), in accordance with the general items as written (231000 sq-ft). Selection Criteria: (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; (6) The extent to which potential contractors identify and commit to the use of service-disabled veteran owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors. SUBMITTAL INSTRUCTIONS All interested and capable contractors must submit an electronic copy of their SF 330s, via email, by the closing time/date of this announcement. Note the following: No hard/physical copies will be accepted. Limit SF 330 packages to 50 pages. Only the first 50 pages will be evaluated. Submit all documentation as one single file. The total size of the electronic submission (email and all attachments) must not exceed 15MB; larger emails may get rejected by the network server and will be considered non-responsive. Cited relevant projects must be within the last five (5) years. Submit packages via email to the contract specialist by the deadline:Â ronald.heidemann@va.gov Subject line must include the notice number: 36C25027R0011 Please include your firm s POC and UEI in the email body. ***End of Presolicitation Notice** | 85% | Pre-Solicitation | 11/05/2026 |
Provide complete design services, including all necessary schematics, design development, surveys, cost estimates, construction drawings and specifications, and construction period services (CPS) for solicitation to replace and repair roofing and lighting protection at the Cincinnati VA Medical Center, 3200 Vine Street, Cincinnati, OH 45220 (Building Numbers: 1, 2, 3, 8, 13, 14, 15, 16 and trailers) and the Fort Thomas Campus, 1000 S. Ft. Thomas Ave, Ft. Thomas, KY 41075 (Building Numbers: 64, 117 and trailers), in accordance with the general items as written (231000 sq-ft - estimated). This project will replace and repair the roofing and lightning protection. Replacement of outdated roofing and lighting protection will reduce overall emergency maintenance, increase facility operation, and provide proper protection. SELECTION CRITERIA The Government will evaluate each potential contractor under the terms of its: A. Professional qualifications necessary for satisfactory performance of required services; B. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; C. Capacity to accomplish the work in the required time; D. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; E. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; F. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services, and; G. The extent to which potential contractors identify and commit to the use of service-disabled veteran-owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors. SUBMITTAL INSTRUCTIONS All interested and capable contractors must submit an electronic copy of their SF 330s, via email, by the closing time/date of this announcement. Note the following: No hard/physical copies will be accepted. Limit SF 330 packages to 50 pages. Only the first 50 pages will be evaluated. Submit all documentation as one single file. The total size of the electronic submission (email and all attachments) must not exceed 15MB; larger emails may get rejected by the network server and will be considered non-responsive. Cited relevant projects must be within the last five (5) years. Submit packages via email to the contract specialist by the deadline:Â ronald.heidemann@va.gov Subject line must include the notice number: 36C25027R0009 Please include your firm s POC and UEI in the email body. ***End of Presolicitation Notice** | 85% | Pre-Solicitation | 11/04/2026 |
Description: The Department of Veterans Affairs (VA) seeks to retain an independent third-party Commissioning Agent to perform comprehensive commissioning services for the subject project. This project will upgrade and replace all 21 elevators and elevator components as necessary on the main Cincinnati campus as well as the Ft. Thomas campus. Asbestos and lead-based paint abatement is part of this project (if necessary). Selection Criteria: (1) Professional qualifications necessary for satisfactory performance of required services; (2) Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; (3) Capacity to accomplish the work in the required time; (4) Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; (5) Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; (6) The extent to which potential contractors identify and commit to the use of service-disabled veteran owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors; and Submission Info: Please submit your SF 330s to ronald.heidemann @va.gov by the closing date/time of this announcement. No physical copies will be accepted. Please include your firm s POC and UEI in the email body. ***End of Presolicitation Notice** | 85% | Pre-Solicitation | 11/03/2026 |
Provide complete design services, including all necessary schematics, design development, surveys, cost estimates, construction drawings and specifications, and construction period services (CPS) for solicitation to upgrade and replace all elevators and elevator components at the Cincinnati VA Medical Center, 3200 Vine Street, Cincinnati, OH 45220 and the Ft. Thoms Domiciliary, 1000 S. Ft. Thomas Ave, Ft. Thomas, KY 41075. This project will modernize, replace, and repair 21 elevators that are deteriorated, outdated, or frequently out of service. Several elevators contain obsolete components that are no longer available for purchase, requiring replacement to ensure continued reliability and maintainability. Other units require upgrades to doors, flooring, and ceiling finishes due to normal use and deterioration. SELECTION CRITERIA The Government will evaluate each potential contractor under the terms of its: A. Professional qualifications necessary for satisfactory performance of required services; B. Specialized experience and technical competence in the type of work required, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials; C. Capacity to accomplish the work in the required time; D. Past performance on contracts with Government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules; E. Location in the general geographical area of the project and knowledge of the locality of the project; provided, that application of this criterion leaves an appropriate number of qualified firms, given the nature and size of the project; F. Experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates shall be included as an evaluation criterion when construction period services is included in the statement of work for A-E services, and; G. The extent to which potential contractors identify and commit to the use of service-disabled veteran-owned small businesses, veteran-owned small businesses, and other types of small businesses as subcontractors. SUBMITTAL INSTRUCTIONS All interested and capable contractors must submit an electronic copy of their SF 330s, via email, by the closing time/date of this announcement. Note the following: No hard/physical copies will be accepted. Limit SF 330 packages to 50 pages. Only the first 50 pages will be evaluated. Submit all documentation as one single file. The total size of the electronic submission (email and all attachments) must not exceed 15MB; larger emails may get rejected by the network server and will be considered non-responsive. Cited relevant projects must be within the last five (5) years. Submit packages via email to the contract specialist by the deadline:Â ronald.heidemann@va.gov Subject line must include the notice number: 36C25027R0008 Please include your firm s POC and UEI in the email body. ***End of Presolicitation Notice** | 85% | Pre-Solicitation | 11/02/2026 |
ACQUISITION INFORMATION: The Wilmington Department of Veterans Affairs Medical Center, located at 1601 Kirkwood Highway, is seeking professional Architect and Engineering (A&E) services for Project No. 460-23-008 | Renovate 5 East This announcement is being issued in accordance with the Selection of Architects and Engineering firms (Public Law 92-582) and implemented in the Federal Acquisitions Regulations (FAR) Part 36. Architectural and Engineering (A&E) firms permitted by law to practice the professions of architecture or engineering are requested to send two copies of an SF 330 (8/2016 Edition) and CD from qualified and eligible firms classified as 100% SERVICE DISABLED VETERAN OWNED SMALL BUSINESS CONCERNS. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330s from qualified firms that meet the professional and set aside requirements listed in this announcement. The selected A/E firm shall adhere to the following guidelines: All designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at http://www.cfm.va.gov/til/. A/E shall pay particular attention to USAF, NFPA, BOCA, VA Handbook and VHA Directives. A/E is responsible for providing all services necessary for design of this project i.e. mechanical, electrical, sampling and monitoring, and control. Any major design deviations from these manuals should be discussed and approved by the Medical Center before the design is incorporated on the contract documents. Estimates should include an appropriate percentage for overhead and profit. Contract Award Procedure: Interested A&E firms shall e-mail a PDF SF330 document to Katelyn Fallon, Katelyn.Fallon@va.gov by 3:00 PM, EST, June 8, 2026. A&E firms shall be registered at www.sam.gov and https://veterans.certify.sba.gov/. If available, please include your firm's https://veterans.certify.sba.gov/ SDVOSB status verification. Failure of a proposed SDVOSB A&E firm to be certified by the CVE at the time of the SF330 is submitted shall result in elimination from further consideration for award. Following an evaluation of the qualifications and performance data submitted, three or more firms considered to be the most highly qualified firms to provide the type of services require may be chosen for interviews. After interviews, the most highly qualified firm will be issued the solicitation and requested to submit a proposal. The Government will not pay, nor reimburse, any costs associated with responding to this announcement. The Government is under no obligation to award a contract as a result of this announcement. A&E Firms will be selected based on demonstrated competence and qualifications for the required work. NAICS 541330 and size standard $25.5M apply. The award of a Firm Fixed-Price contract is contemplated and is subject to the availability of FY26 funding. The construction magnitude is between $2,000,000 and $5,000,000. Evaluation Factors 460-23-008 | Renovate 5 East Factor 1: PROFESSIONAL QUALIFICATIONS & EXPERIENCE OF KEY PERSONEL Offerors must provide background of firms (prime and sub-consultants) and list of key personnel with professional registrations, certifications, licenses and/or other relevant credentials (ex. Registered Architect-RA, Professional Engineer-PE, LEED Accredited Professional, Certified Planner. List all State registrations for individuals licensed in multiple jurisdictions. Offerors shall identify and provide resumes of all key personnel. Key personnel are those who will be directly involved in providing the contract services will be evaluated on education, project experience, technical ability and other relevant qualifications that will provide the best opportunity for the successful completion this contract. Indicate specific role of key personnel for this contract and their level of involvement in example projects under Section G in Part 1 of the SF330. Factor 2: FIRM CAPACITY & MANAGEMENT OVERSIGHT Offerors must provide an organizational chart identifying key personnel for this contract. Additionally, offerors must provide a management plan which describes the firm s ability to accomplish work with in-house personnel either onsite or at branch offices, and clearly delineate what work will be performed by subconsultants. Proposals will be evaluated on how teams are organized, effectiveness of the organization, how well the teams work together, how they will maintain good working relationships; that roles, responsibilities and authorities are clearly established; how the teams can be proactive or responsive to emerging situations, conducting situation evaluations and make midcourse corrections. Evaluation will be on communication, is there a plan and commitment to timely communications; are communications defined, clear, and efficient and demonstrate how stakeholders are included. The evaluation will also consider the firm s present workload and the availability of the project team for the specified contract performance period. Plan should state the offerors proposed response time to review shop drawings, RFIs, change order requests, submittals, etc. Offerors should note if selected response times proposed may be incorporated into the statement of work as the standard. Specify the percentage of work on each project performed by each partner, if the project is a joint venture. If supplemental resources are needed, identify how the resources will be obtained through partnering or teaming. Provide a listing of all active VA projects, dollar amount and estimated completion date. Factor 3: SPECIALIZED EXPERIENCE & PAST PERFORMANCE Offerors will be evaluated on the team's demonstrated experience, performance, technical abilities, and relevant project work of a similar scope, budget, and complexity as the Statement of Work for new construction, renovations, major modernizations, building additions, historic restorations, hospital design, VA projects, among other tasks listed in the SOW. Submissions will be evaluated on demonstrated ability to execute constructible, biddable, and well-coordinated construction documents, while meeting schedules and tracking/controlling costs to bring projects in on budget +/- 5%. Offerors shall provide estimates, bid price and final construction cost (to include change orders) of the 10 most recent projects completed. Contractors shall provide up to five projects demonstrating experience in construction period services to include professional field inspections during the construction period, review of construction submittals, support in answering requests for information during the construction period, and support of construction contract changes to include drafting statements of work, and cost estimates. These maybe the same projects identified above however contractor shall clearly delineate the construction period services performed and identify them for consideration. Past performance on contracts with government agencies and private industry in terms of cost control, quality of work, and compliance with performance schedules will be evaluated. Past performance and specialized experience will also be evaluated based on example projects with past client/customer reviews. Offerors are encouraged to list awards, letters of recommendation, outstanding merits, evaluations, or letters from past clients that demonstrate quality in design, superior project management, customer service, or professional performance. The Government may also use corporate knowledge when evaluating this factor. Factor 4: GEOGRAPHIC LOCATION & PLAN The plan will outline the team's knowledge of Wilmington VAMC and unique requirements, along with the team s ability to accomplish the required AE services. Offeror s must indicate firm s/team s location, including main offices, branch offices and any subconsultants offices and demonstrate how the team will service the geographic area. The plan shall demonstrate knowledge of local conditions within the geographical area including tactical, operational, strategic issues for all areas of design, as well as bidding and construction related to the key disciplines. This may include everything from supply, labor force, weather and seismic conditions, to the local construction climate's impact on cost estimating. There will also be consideration given to how key team members can conduct pre-design site review of the proposed work while minimizing extra cost to the government for travel. Factor 5: PROPOSED PROJECT DESIGN APPROACH Design approach statements will be evaluated based on demonstration of a clear understanding of the instant project. Statements should identify potential problems and proposed solutions. Statements shall also outline designers plans to execute project and plan subsequent construction while minimizing impact on VA hospital operations. Evaluation will also consider business philosophy, customer service philosophy and standard level of care. Factor 6: Use Service Disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses and other types of small business, Per VAAR M836.602-1, the contractor shall provide a summary identifying the extent to which it commits to the use of service-disabled Veteran-owned small businesses, Veteran-owned small businesses, and other types of small businesses as subcontractors. Proposed subcontractors shall be identified by business type, DUNS number and percentage of work to be performed. Wilmington, DE VA Medical Center Wilmington, DE 19805 SCOPE OF WORK For Renovate 5 East Bid Documents/Final Report Ready by: 231 Days after NTP -- Services -- Provide: Professional A/E design services to include but not limited to: Contract drawings and specifications for construction. Site investigation- mechanical, plumbing, electrical, demolition, and construction; architectural, structural, mechanical, plumbing, electrical, demolition, construction, and environmental services. 3rd Party Cost Estimates Infection Control Risk Assessment Meet all of the requirements as outlined in VA Program Guide PG-18-15 (Volume C), A/E Submission Instructions for Minor and NRM Construction Program. Reference at http://www.cfm.va.gov -- Documentation and Acronyms -- Applicable Documents: The following laws, regulations, policies, and procedures in effect on date of contract issuance and all subsequent changes or updates apply: Federal Acquisition Regulation Veterans Administration Acquisition Regulation Service Contract Act (SCA) Directory of Occupations (Fifth edition) http://www.dol.gov/whd/contracts/sca.htm ANSI: https://pdflakekxng.files.wordpress.com/2015/04/ansi-z133-safety-standard-pdf.pdf VA Directive 0058- VA Green Purchasing Program VA Directive 0057- VA Environmental Program Master Construction Specification: https://vatilms.va.gov/vatilms/catalog Acronyms: Glossary : Acronyms used in this SOW are listed below for easy reference: CO Contracting Officer COR Contracting Officer s Representative FAR Federal Acquisition Regulation CFM Construction & Facilities Management VA Veteran Affairs EPA Environmental Protection Agency SOW Statement of Work -- Project Scope -- GENERAL: A/E shall plan, design, and produce complete, coordinated, code-compliant Construction Documents for the renovation, including architectural, plumbing/medical gas, electrical, fire protection, low- voltage/nurse call, IT, structural (as needed), and interior design packages. Submittals shall follow PG-18-15 stage gates and content requirements. SPECIFICS: A/E to convert 2,900 into a flexible inpatient care area with rooms/bays that accommodate patient beds and support equipment. Apply VA Design Guide for med/surgical and ICU units. A/E to provide modular casework and finish selections suitable for infection prevention. A/E to work closely with the end user and VA facilities staff to develop an efficient and functional design within VA guidelines. A/E to design and show all infection control / dust prevention measures required. A/E to assess and design any asbestos abatement such as pipe lagging, floor tile, and mastic. A/E to provide necessary literature on new technology or installation methods when required. A/E will conduct investigations to ensure recommended methods are compatible within building. Identify and correct fire and life safety deficiencies by site inspections. The consultant shall address these items as required to correct deficient items. Identify and correct improperly filled firewall penetrations. All areas in this building are fully sprinkled. This note applies to areas considered under this specific project only, not the Medical Facility as a whole. Construction Waste Management, Specification 01 74 19 is to be included. Fire Safety Peer Review. VA shall contract an independent Fire and Life Safety Engineer to conduct a fire and life safety peer review of the project at the 75% design phase for compliance with code and VA Design Manuals. The contracted Fire and Safety Engineer will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting. A/E shall incorporate all required changes into the design at no additional fee to the VA. All designs shall be accomplished in accordance with VA guidelines and specifications, which are available on the Internet at http://www.cfm.va.gov and https://wbdg.org/ffc/federal-facility-criteria. The A/E will follow VA design guides and provide revised and improved specifications based on the VA standard specifications. Synopsys: Design shall accommodate: Architectural layout supporting inpatient care and clinical workflow Modular, reconfigurable casework Piped medical gases with outlets, alarm systems, and zone valves HVAC modifications meeting inpatient ventilation requirements Electrical power, lighting, and grounding Nurse call, code blue, telecommunications, and low voltage systems Fire protection, life safety, ICRA/PCRA requirements Other Specifics: AutoCAD files of existing design will be provided for use. Phase all work in coordination with Hospital staff to minimize down-time to areas affected by the project. Construction Waste Management, Specification 01 74 19 is to be included. Design to maintain all infection control/ dust prevention measures. List all Permits necessary to complete the project. Consolidate all necessary submittals by specification section on an excel spreadsheet. Checklist to be utilized to track/ monitor submittal process. -- Site Investigation -- EXPECTATION: A/E will make site visits as necessary to survey existing conditions. Make site visits as required to determine existing as-built conditions affecting this project. Provide any structural, architectural, electrical, and mechanical investigative work including exterior site work, of both existing and designed systems necessary to ensure the accuracy of the design. Prepare any measured drawings of existing systems of facility required to ensure the accuracy of the design. Provide a CIH to evaluate the impacted building areas for asbestos. Wilmington VA has an asbestos survey which will need to be verified. Provide a CIH to evaluate the impacted building areas for lead-based paint. Exterior window frames have not been tested for lead-based paint, but exterior doors have and several did test positive. NOTE: Information including drawings and other documentation provided to the A/E is used as reference only. All additional references and design specifications are available in VHA s Technical Information Library at address http://www.cfm.va.gov and https://wbdg.org/ffc/federal-facility-criteria. AutoCAD background drawings will be provided by the VA. The A/E shall field verify all dimensions. A/E shall field verify every aspect that relates to the project. Coordinate site visits with the COR. -- Sustainable Design and Energy Reduction -- EXPECTATION: All designs shall be in accordance sustainable design and energy reduction. Federal Mandates require all Federal government construction projects to comply with sustainability and energy reduction requirements. To this end, the VA is committed to the Guiding Principles for Federal Leadership in High Performance and Sustainable Buildings. Firms that are selected to design VA projects should already have demonstrated their sustainable design capabilities through the VA selection process. They will find the criteria and procedures in the VA s Sustainable Design and Energy Reduction Manual a baseline for developing the design according to the unique conditions that each project represents. -- Environmental/Occupational Safety and health (EOSH) -- Expectation: All projects and project designs shall contain language that addresses all applicable EOSH requirements. Regulatory Compliance- EOSH requirements for work performed at the above location can be found in: Volume 29 of the Code of Federal Regulations, Part 1910- Occupational Safety for General industry. Volume 29 of the Code of Federal Regulations, Part 1926- Occupational Safety for the Construction Industry. Volume 40 of Code of Federal Regulations, Protecting of the Environment. Volume 49 of the Code of Federal Regulations, Part 397- Transportation of Hazardous Materials. Title 7 of Delaware Code, Conservation Title 16 of Delaware Code, Health and Safety Regulations: All work shall comply with local, state, and federal rules and regulations, as well as VA technical standards. Compliance is to whichever rule or regulation is the most stringent. VA Master Specifications shall be used as default when no specifications are issued and when a referenced specification is not found in the project RFP package. The intent of the default specifications is to furnish concise industrial and/or commercial standards for design and construction of Government facilities. If the Statement of Work does not address a specification for an element of the work, the default specification shall apply for the element of work as approved by COR. The omittance of a VA specification, does not relieve the contractor to perform required work under the base contract and proposal. -- Design Review Schedule -- EXPECTATION: Submit review packages so they are received on the noted day. SUBMISSIONS: Submit review packages so they are received on the noted day (calendar days after NTP) or earlier: Notice to Proceed Site Analysis Day 0 (0 days) Initial Meeting with Stakeholders Day 7 (7 days) Site Analysis Day 28 (21 days) Site Analysis Review Day 35 (7 Days) NTP Schematic Design Day 42 (7 Days) Schematic Design Day 63 (21 Days) Review Meeting (Schematic) Day 70 (7 Days) NTP Design Development Day 77 (7 Days) Design Development Document Submission (25%) Day 98 (21 Days) PDT Review Meeting (25%) Day 112 (14 days) Design Development Document Submission (50%) Day 133 (21 Days) PDT Review Meeting (50%) Day 147 (14 days) Design Development Document Submission (75%) Day 168 (21 days) PDT Review Meeting (75%) Day 182 (14 days) Design Development Document Submission (100%) Day 203 (21 days) PDT Review Meeting (100%) Day 217 (14 days) Contract Documents Submission (Final) Day 231 (14 days) Note: The issue of the NTP will be the first PDT Meeting. A/E will be required to attend and take minutes of each Project Design Team (PDT) Meeting. Minutes will be submitted electronically to the Project Manager and Contracting Officer within three calendar days of each meeting. -- Design Requirements/Submissions -- EXPECTATION: Submit complete review package in accordance with the following requirements and guidelines outlined in http://www.cfm.va.gov. Please pay specific attention to the schematic, design and construction submission requirements. As appropriate depending upon the complexity of the design, the A/E may elect to delete individual submissions where they are not required (i.e. Do not address Site Development, Landscaping for interior renovation projects) DELIVER: All design packages directly to the COR on the established dates to allow the VA to review. A transmittal letter is required to go to the Contracting Officer on the same day as delivery. Include all information as follows and as outlined in the attachments for each submission. Information required for each submittal is outlined in Program Guide PG-18-15 Volume C May 2006. The manual is available at the following address: http://www.cfm.va.gov 25% Design Development Submission: Attachment A 25% Submission Requirements Checklist of Requirements for the 25% Design Development Submission. Define the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (25% Design Development) Identify Working Drawings scope within construction budget Develop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code. Identify all design calculations Identify all existing utilities and utility requirements Identify all potential bid deduct alternatives Identify all phasing requirements for construction to minimize impact on medical center operations Design all finishes, required submittals Develop 3D models and rendering 50% Submission Requirements: Attachment B 50% Submission Requirements Checklist of Requirements for the 50% Design Development Submission (Attachment B) Address all comments from the 25% review. Define the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (50% Design Development) Identify Working Drawings scope within construction budget Finalize impact of existing asbestos (Attachment B) Develop plans and marked up specifications to the 50% level, as determined by the COTR, to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code Identify all design calculations Identify all existing utilities and utility requirements Identify all potential bid deduct alternatives Identify all phasing requirements for construction to minimize impact on medical center operations Design all finishes, required submittals Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process. Present energy modeling and financial impacts using various types of windows for consideration. Develop Infection Control Risk Assessment (VA EC-43) Develop 3D models and rendering 75% Design Development Submission: Attachment C 75% Submission Requirements Checklist of Requirements for the 75% Design Development Submission. Address all comments from the 25% review. Define the design elements based on the selected option and submit all information required by VA Program Guide PG-18-15 (75% Design Development) Identify Working Drawings scope within construction budget. Develop plans and marked up specifications to meet all applicable federal and state codes/requirements, including but not limited to OSHA, DER, EPA, NEC, NFPA 101 Life Safety Code. Identify all design calculations Identify all existing utilities and utility requirements Identify all potential bid deduct alternatives Identify all phasing requirements for construction to minimize impact on medical center operations Design all finishes, required submittals Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process. A/E shall utilize the services of the Network 4 Fire and Safety Consulting firm to conduct a fire and life safety peer review of the project. The A/E shall provide the Project Engineer with a complete copy of the 75% documents for submission to the consulting firm. The designated firm will return comments to both the A/E and the VA Project Engineer prior to the corresponding review meeting. Develop 3D models and rendering 100% Design Development Submission: Attachment D 100% Submission Requirements Checklist of Requirements for the 100% Design Development Submission. Address all comments from the 75% review. Design all finishes, required submittals. Consolidate all necessary submittals by specification section on an Excel spreadsheet. Checklist to be utilized to track/monitor submittal process. Revise and update cost estimate Preparation of project scope for advertisement and account for any bid deduct alternatives developed in the 75% design submission Finalize all design calculations Finalize all potential bid deduct alternatives Finalize all phasing requirements for construction Finalize Infection Control Risk Assessment (VA EC-43) Address all comments from the VISN Safety and Fire Protection Review Develop 3D models and rendering Contract Documents (CD) Submission: Attachment E Submission Requirements Submit a complete document set of all contract requirements. The Cover Page shall be submitted for approval signatures. If necessary, update and submit until approved by the VA. -- Location & Hours -- Designed Location: Building 1, Primary Care at the VAMC Wilmington, Delaware located at 1601 Kirkwood HWY, Wilmington, DE 19805. Hours: Site visits will be performed only between the Monday to Friday, 7:00AM-3:30PM. Access will be provided during this time, except federal holidays. The contractor will not have any personnel on site any other day without the proper approval from the COR. -- Personnel and Management -- AE Personnel: The Contractor shall be responsible for employing qualified personnel to perform the work specified in this SOW. The Contractor shall make sure that subcontractor and employees have proper documentation to authorize personnel to work in the United States of America. The Contractor shall maintain the personnel, organization, and administrative control necessary to ensure that the work delivered meets the contract specifications and requirements. The Contractor is required that all subcontractor or employees have been screened by the VAMC Wilmington Healthcare System. All personnel are required to wear a VA government furnished badge. All contractor and subcontractor are required to wear a government and company furnish badge while performing services under this contract. The badge will contain a personal picture, name of employee, and Contractor's name. Badges shall be worn on the outer garment attached to the outer shirt or jacket pocket by a button or clip or worn around the neck secured by an appropriate identification card lanyard. Government issued identification badge remains the property of the Government and shall be returned to the issuing office or other designated Government personnel upon transfer of Contractor employees from the contract. The contractor shall insure that employee or subcontractor have valid driver license when driving a vehicle on property. Management: All information generated in performance of this contract becomes property of the Government and must be surrendered upon request and/or completion of the contract. The Contractor must protect against the destruction and/or misplacement of all information produced under this contract, unless directed under local policy to destroy. This includes both hard and soft copies of data. The Contractor shall not release any information (including photographs, files, public announcements, statements, denials, or confirmations) on any part of the subject matter of this contract or any phase of any program hereunder without the prior written approval of the COR. Contractor personnel or subcontractor shall conduct themselves in a professional manner (i.e. timeliness, communication; spoken and written etc.). The Contracting Officer may require the Contractor to remove from the job site any employee working under this contract for reasons of suspected misconduct, a suspected security breach, or suspected to be under the influence of alcohol, drugs, or any other incapacitating agent. Contractor employees shall be subject to dismissal from the premises upon determination by the Contracting Officer that such action is necessary in the interests of the Government. The hospital director or designated representative has the authority to bar individuals from the Government facility. The removal from the job site or dismissal from the premises shall not relieve the Contractor of the requirement to provide sufficient personnel to perform the services as required by this performance work statement. The Government shall not reimburse the Contractor for travel and other expenses associated with the removal of personnel. Contractor personnel are not authorized to carry or possess personal weapons to include, but not limited to, firearms and knives with a blade length in excess of three inches, while assigned under this contract. Employees will perform their duties independent of, and without the supervision of, any Government official. The tasks, duties, and responsibilities set forth in the contract may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility. Safety/Security Requirements: The Contractor shall comply with all applicable federal, state and local laws and ensure performance is secure while protecting material, equipment, and supplies from damage and loss. The Contractor shall ensure that employees or subcontractor have the proper PPE for the job. Government security personnel shall have the express right to inspect for security violations at any time during the term of the contract. Work Attire and Appearance: Contractor personnel shall present a professional appearance commensurate with standards delineated for Government civilian personnel acting in similar capacities. -- Damages/Insurance -- Damages: The Contractor is liable for all damages to Government equipment, property; utilities, etc., located at the site (e.g. sprinkler heads, ceiling tiles, manholes, fire hydrants, vehicles, windows, etc.) caused by the Contractor, its employees or it subcontractors. The Contractor shall immediately report all damages to the COR and shall provide the Contracting Officer (CO) and COR, a written report, within 24 hrs. The report shall include: What occurred, who was involved, when it occurred (Time/Date), where did it occurred, why it occurred, how it occurred, and the proposed means to repair or replace. Contractor is to maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241. ATTACHMENT A Deliver the following (labeled with 25% Design Development Document Submission) and include this attachment as a checklist with your submission: 25% Design Development Submission Requirements 2 copy of a narrative report forwarding the design development 25% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F and F1. 1 full set and 2 half sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software. 1 copy of updated itemized cost estimate by spec section and trade (labor, material and equipment) 1 copy of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review. 1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in Microsoft Word 360 and .pdf format on (CD) ATTACHMENT B Deliver the following (labeled with 50% Design Development Documents Submission) and include this attachment as a checklist with your submission: 50% Design Development Submission Requirements 2 copy of a narrative report forwarding the design development 50% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F. 1 full set and 2 half sets of all drawings updating all previous comments required by project produced on AutoCAD 2025. software. 1 copy of updated itemized cost estimate by spec section and trade (labor, material and equipment). 1 copy of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review. 1 copy of the Infection Control Risk Assessment. 1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in Microsoft Word 360 and .pdf format on (CD) ATTACHMENT C Deliver the following (labeled with 75% Design Development Document Submission) and include this attachment as a checklist with your submission: 75% Design Development Submission Requirements 2 copy of a narrative report forwarding the design development 75% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F. 1 full set and 2 half sets of all drawings updating all previous comments required by project produced on AutoCAD 2025 software. 1 copy of updated itemized cost estimate by spec section and trade (labor, material and equipment). 1 copy of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review. 1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in Microsoft Word 360 and .pdf format on (CD) ATTACHMENT D Deliver the following (labeled with 100% Design Development Documents Submission) and include this attachment as a checklist with your submission: 100% Design Development Submission Requirements 2 copy of a narrative report forwarding the design development 100% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager, and any design calculations or analysis, document the dates, times, places, names of surveyors, existing conditions of systems surveyed, all field observations, as well as A/E design recommendations. Report shall also contain sample catalog cut sheets of new equipment to be installed in the design. Shall include IH Report - Task 1 as per Attachment F. 1 full set and 2 half sets of all drawings updating all previous comments required by project produced on AutoCAD 2025. software. 1 copy of updated itemized cost estimate by spec section and trade (labor, material and equipment). 1 copy of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review. 1 copy of the Infection Control Risk Assessment. 1 copy of drawings in AutoCAD 2025 and .pdf format and specifications in Microsoft Word 360 and .pdf format on (CD) ATTACHMENT E EXPECTATION: Submit complete bid document for final review prior to solicitation. Continue to submit bid documents until all changes are incorporated by the A/E for final signature prior to solicitation. Upon approval duplicate copies as required. Deliver the following (labeled with Contract Documents Submission) and include this attachment as a checklist with your submission: Contract Document Submission Requirements 2 copy of the Cover Sheet (AutoCAD) for final VA signatures. 1 full set and 2 half sets of all drawings updating all previous comments required by project, produced on AutoCAD 2025 software for final VA review. If approved final sets to be submitted with signed off cover sheet. 1 copy of final project specification prepared in Microsoft Word 360 software. Include a master submittal list in the specifications. 2 CDs containing All drawings in AutoCAD 2025 and in .pdf format All specifications in both Microsoft Word 360 and .pdf format Submittal Spreadsheet identifying all the submittals required to be submitted by the contractor for review. The list shall be organized by division and specification. Upon signature approval, provide 2 sets of final Contract Documents (complete with VA signed Cover Sheet). Provide two ½ size sets of final drawings. ATTACHMENT F A/E SPECIFICATIONS VA MEDICAL CENTER WILMINGTON, DE DEPARTMENT OF VETERANS AFFAIRS A/E REGULATIONS ASBESTOS ABATEMENT I. The A/E shall hire a Certified Industrial Hygienist (CIH) Consultant to assist in the assessment, design and construction monitoring for asbestos abatement. II. The CIH shall meet the following minimum qualifications: A. Be certified by the American Board of Industrial Hygienists in Industrial Hygiene-Comprehensive. B. Have asbestos abatement experience in assessment, design, abatement construction monitoring and decontamination clearance. C. His office to be as close as possible to the project location, so that he will be available to the Resident Engineer during construction on an on-call basis with a response time of one day. D. Will have support staff and back-up capacity to provide adequate level of support to the Resident Engineer throughout construction. III. The scope of work for the A/E with his CIH consultant is as follows: A. Preliminary (25%) Design Task 1: Review building records and interview station personnel for detection of trade name material used for the construction of the buildings, which are known to contain asbestos. Perform a visual inspection of the areas impacted and develop a sampling strategy that will yield statistically viable conclusions on extent of asbestos present. Perform this task at the first preliminary submittal and notify VA on results at 100% submission. B. Final (50,75 and 100% Reviews) Design Task 2: Collect bulk suspected asbestos samples and utilize the services of a testing lab accredited by the American Industrial Hygienists Association. Upon receiving the results determine adequacy for an assessment report. Any samples requiring further clarification, utilizing scanning electron microscopy (SEM), need to be contracted to a qualified laboratory for sample analysis. If additional samples are required, take such samples at this stage so that the maximum detection of asbestos can be achieved. This service (bulk sampling) will be at no cost. Task 3: Prepare an exposure assessment report on only the impacted areas of the modification project. Include the following information: Describe the impacted areas by sketches, room names or other means. Show or describe the location of each sample taken, its composition and identification number. Classify each impacted space as Major Abatement Minor Abatement or No Abatement areas. A Major Abatement area requires full protective measures (sealing off, change room, shower room, etc.), and all asbestos must be removed within the limits of the area. A Minor Abatement area can be decontaminated with one or more applications of the glove and bag approach. A No Abatement area requires no abatement work. For each Major Abatement area, provide quantity and cost estimates of all asbestos within the limits of the area. Quantities to be in linear feet of pipe and square feet of ceilings and walls. The cost to be derived from the quantities multiplied by a unit price. For each Minor Abatement area, provide the description, size and location of each element to be decontaminated and a cost estimate. Provide summary of the square feet of floor space for all abatement areas, the total linear and square feet of asbestos to be abated, the total cost of abatement and a preliminary schedule of completion. Include in the cost estimate any cost for decontamination. Provide an assessment on the impact of abatement on building sub-systems such as ceilings, lights, walls, carpets, pipes and equipment. Provide room-by-room description and estimated quantities of impacted items to be placed (number of lighting fixtures, square feet of ceiling, etc.) and a summary of these quantities. Provide a cost estimate for all impacted items. Provide a cover statement signed by both the A/E and the CIH consultant. The statement shall be in accordance with the Sample Cover Statement provided by the VA, as part of the A/E package. Submit the report at the 75% Design Review Submission. Task 4: Prepare drawings and specifications for the asbestos abatement work reflecting the assessment report. The drawings shall be separately identified from the rest of the drawings, be 1/8 scale plans and shall provide as a minimum the following information: For each Major Abatement area show the limits of sealing off, the location and quantities of asbestos material, the arrangements for auxiliary rooms, such as change room, shower room, etc., transportation to the loading platform. For each Minor Abatement area show on plans the exact location type and length of pipe element to be abated by the glove and bag approach and any other abatement features. Provide details, sections, notes and any other information that are necessary for complete bid documents. Prepare project specifications by editing and modifying the VA master specifications on asbestos abatement. Provide the drawings and specifications for the restoration of the impacted building sub-systems as an integral part of the overall project design. Provide for replacing of removed asbestos insulation with acceptable non-asbestos insulation, replacing contaminated carpets, replacing old contaminated light fixtures and replacing partially torn down plaster ceilings. The submittals of the working drawings for abatement shall coincide with the submittals for the working drawings of the modification project. Provide an integrated phasing showing how the abatement and the general modification work will be executed. Provide some reasonable cushion between each abatement phase and the following general construction phase to allow for unforeseen delays in abatement completion. Task 5: Assist VA to determine whether the abatement sub-contractor meets qualification requirements. Provide onsite continuous monitoring during construction of the performance of the abatement sub-contractor. Check and approve the set-up for each Major Abatement area, check the standard operating procedure of the abatement contractor, continuously monitor air contamination inspections to ensure compliance with specifications and drawings, and monitor access/egress into containment areas. Determine abatement of asbestos discovered during construction and advise the Resident Engineer on time and cost for such abatement. Task 6: Perform the final inspection and testing at the end of the abatement work on the area and if the results are satisfactory, release the space to the general contractor for general work. Task 7: At the end of all abatement work, a compliance certificate signed by both the CIH and the A/E shall be issued. The compliance certificate shall be in accordance with the Sample Certificate provided by the VA in the A/E package. IV. The CIH consultant and his technician(s) shall be involved as lead trade in Tasks 1,2,3,5,6, and 7 and shall assist the A/E in the performance of Task 4. ATTACHMENT F-1 A/E SPECIFICATIONS VA MEDICAL CENTER WILMINGTON, DE 19805 COVER STATEMENT FOR ASBESTOS ASSESSMENT REPORT 1. The enclosed Asbestos Assessment Report for has been prepared, as part of Project # and covers the following buildings . I certify that I have surveyed each of the buildings or areas in my contract, have interviewed station personnel and have supervised technicians for the examination of available records related to the buildings. 2. Based on the information gathered through the above activities and on the expected extent of the renovation as explained to me by of the A/E firm on this project, I have devised a sampling plan and I have supervised the trained Industrial Hygiene Technicians during the collection of the samples. 3. I have selected a qualified analytical laboratory for the analysis of the samples and I have evaluated the sampling results to ensure that statistically viable results on asbestos hazards were available for all buildings involved. 4. Bases on the above information, I have prepared the attached Asbestos Hazard Assessment Report. This report reflects the best-known abatement technology, the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects and all applicable regulations. An abatement design, which will be prepared by a qualified abatement contractor, will achieve the desired decontamination of the impacted areas and minimize exposure of people and the environment. (C. I. H. NAME CERTIFICATION NO. & STATE CERTIFIED IN) ATTACHMENT F-2 A/E SPECIFICATIONS VA MEDICAL CENTER WILMINGTON, DE 19805 CERTIFICATION ON ASBESTOS ABATEMENT FOR DEPARTMENT OF VETERANS AFFAIRS CONSTRUCTION PROJECTS 1. I certify that the asbestos abatement of buildings , which are renovated under Project No. located at VAMC, has been successfully completed in accordance with the drawings and specifications. These documents were prepared under my supervision (which were reviewed and approved by me prior to construction). 2. I certify that all impacted spaces have achieved the decontamination levels required by the Asbestos Management Policy for the Department of Veterans Affairs Construction Projects . 3. I certify that during the entire abatement process and for all impacted areas, the maximum protection of people and the environment that known technology can provide has been achieved. 4. I further certify that during the abatement process all the applicable regulations and the provisions of the Department of Veterans Affairs Asbestos Policy have been observed. 5. The specific results of my final testing and inspection for each impacted area are attached. The final testing and inspection were performed under my supervision prior to turning each space over to the VAMC for further remodeling work. (C. I. H. NAME CERTIFICATION NO. & STATE CERTIFIED IN) End of Document | 81% | Pre-Solicitation | 06/08/2026 |
Additional Details
Solicitation Number
36C26024R0063
Archive Date
Nov 29, 2024
Office Address
VANCOUVER, WA, 98661