J045--Repair Boilers #2 and #3 White City SORCC
Archived on November 12, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 12:00 PM PDT
- Posted
- October 24, 2025
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- No Set aside used
- NAICS
- 238220: Plumbing, Heating, and Air-Conditioning Contractors
- Agency
- Department of Veterans Affairs
Notice details
- Office
- 260-NETWORK CONTRACT OFFICE 20 (36C260)
- Place of performance
- White City SORCC 8495 Crater Lake Hwy
- PSC
- J045: MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT
- Last updated
- Nov 6, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C26025Q0851
- Notice ID
- 57f269dae5d04b9d9c48f073a8f5d976
Description
SITE VISIT: 10/24/2025 @ 10AM Pacific, White City SORCC Bldg. 229 - ask for Trevor or Stephen
Project Summary: The consultant shall supply all labor, material and equipment to: Remove Burner from Burner Mounting Ring, Remove Burner Blast Tube from Burner, Remove Windbox Cover from right hand side of Blast Tube, Replace any Broken Stripped or damaged studs, Replace Windbox cover with new Fender and Lock Washers and install Brass Nuts, Remove Burner Mounting Ring from Boiler, Replace broken and stripped studs on the mounting ring of the Morrison Tube for #2 Boiler. Re-install Burner Mounting Ring with new finder washers and lock washers and install new brass nuts. Repair refractory damaged in Burner Mounting ring removal. Re-install Burner Mounting Ring with new Gaskets, replace Refractory seal for Burner Mounting ring. Re-install Burner Blast Tube with new gaskets, reattach burner and re-install all piping and electrical connections removed during disassembly. Ensure Burner fires on both Natural Gas and #2 Fuel Oil. Provide any refractory curing requirements. Additional Studs to be Replaced on #3 Boiler windbox access cover while onsite. Work to be performed at the Southern Oregon Rehabilitation Center and Clinics White City Oregon VAMC Boiler Plant. The work shall be documented in a full report of findings and recommendations. All Welding must be performed by or Supervised by a Licensed Boiler Maker. All Electrical work to be performed by a Licensed Electrician. Copies of licensing and factory training will be required prior to starting work. Work will be done on the Equipment listed below. #2 Boiler Superior Model 7-X-1250 National Board # 19030 Year Built 2019 #2 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-01 #3 Burner Webster Cyclonetic Model # JBEX5C-75-K-(****).M.(**)-MA-NFPS-85 Serial # 130478A-02 The period of performance is estimated at 30-45 days, but a final period of performance will be provided in a solicitation if one is issued.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (5)
- Download
Attachment 1 - Boiler Site Walk sign in 10.24.25.pdf
52 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
36C26025Q0851 0002.docx
26 KBAdded in Combined Synopsis/Solicitation version 5Posted - Download
36C26025Q0851 0001.docx
120 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
WD 2015-5571 7.8.25.pdf
48 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
36C26025Q0851_3.docx
114 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
J045--Repair Boilers #2 and #3 White City SORCC
- 2Version 2Combined Synopsis/SolicitationArchived
J045--Repair Boilers #2 and #3 White City SORCC
- 3Version 3Combined Synopsis/SolicitationArchived
J045--Repair Boilers #2 and #3 White City SORCC
- 5Version 5Combined Synopsis/SolicitationArchivedCurrent
J045--Repair Boilers #2 and #3 White City SORCC
Other notices for this solicitation
- Market ResearchAug 15, 2025
J045--Repair Boilers #2 and #3
Similar Opportunities
Additional Details
Solicitation Number
36C26025Q0851
Archive Date
Nov 12, 2025
Office Address
VANCOUVER, WA, 98661