4120--36C26125Q0299 PAD Cooling Tower Repair

Overview

Response deadline
10:00 AM PDT
Posted
March 5, 2025
Notice type
Solicitation
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Office
261-NETWORK CONTRACT OFFICE 21 (36C261)
Place of performance
VA Palo Alto Healthcare System 3801 Miranda Ave Palo Alto, Palo Alto, 94304
Last updated
Nov 16, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C26125Q0299
Notice ID
659b06e058f64fd2a4d5d4d3c7c2bca7

Description

RFI RESPONSE The RFP submission due date is Feb 27th, this is the same deadline of submission of RFI's. Please advise and confirm in an amendment that the bid's due date will be after responses to all RFI's are received by bidding contractors. RFP submission is due March 10. New amendment will confirm RFI submission date to be March 7. The RFP requires 15 days period of performance. Please advise if an administrative NTP can be issued after award to cover for submittals, long lead procurement, shutdown requests and further field inspections. Or will the VA increase the period of performance to say another 2 months. The SOW states that the contractor must perform to the standards in this contract. This project shall take no longer than 15 calendar days from the notice to proceed to complete. Therefore, the contractor shall abide by the projected time of 15 days, if the project overlaps the 15-day mark a modification to extend POP will be issued. In reference to the RFP requirement 'Specific Tasks' under item 3.2.2 it is not clear on what to do with the 40HP motor, is contractor to 'REBUILD' or REPLACE' the 40 HP motor?- please clarify as this will be crucial to pricing the bid if the motor need to be completely replaced. Replace During the site visit, our associates inquired about the magnitude or price range for this solicitation. We were informed that bidders will have to provide that information to the VA. Please include this instruction in an amendment for everyone's information. The magnitude of the project is between $100,000 and $250,000. Our subcontractors who specialize in cooling tower works present during the site walk recommend replacement of the 40HP motor, coupling assembly, main tower support frame, fan housing and fan blades.- please confirm this is the VA intent as well to equalize the playing field for bidders. VA s intent is to have covered what is in the SOW. The product and model number for the motors and cooling tower are from 2012 and there is a possibility of these products to be no longer in production. Please advise if these components can be replaced with another product or an approved equal. Yes The RFP did not require any design submittal review for this project. Please advise if submittals will need to be prepared for VA review and approval prior to contractor procurement and installation. Yes, if not replace like for like.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Files (10)

  • S02-36C26125Q0299 0003.pdf

    225 KBAdded in Solicitation version 8Posted
    Download
  • Site Visit 03.03.2025.pdf

    59 KBAdded in Solicitation version 8Posted
    Download
  • S02-36C26125Q0299 0002.pdf

    297 KBAdded in Solicitation version 5Posted
    Download
  • Site Visit 02.19.2025.pdf

    44 KBAdded in Solicitation version 3Posted
    Download
  • 36C26125Q0299 0001.docx

    114 KBAdded in Solicitation version 3Posted
    Download
  • Attachment Safety Requirements.docx

    39 KBAdded in Solicitation version 2Posted
    Download
  • WAGE DETERMINATION Service Contract Act WD 2015-5641.pdf

    4.9 MBAdded in Solicitation version 2Posted
    Download
  • PAD-Site Plan- Cooling tower location.pdf

    930 KBAdded in Solicitation version 2Posted
    Download
  • 36C26125Q0299.docx

    127 KBAdded in Solicitation version 2Posted
    Download
  • 36C26125Q0299_1.docx

    14 KBAdded in Presolicitation version 4Posted
    Download

Lifecycle

  1. 9
    Version 9PresolicitationArchived

    4120--36C26125Q0299 PAD Cooling Tower Repair

    Notice df4499012d1c46e3a17413fd8ec89948 on SAM.gov

  2. 2
    Version 2SolicitationArchived

    Type changed from Presolicitation to Solicitation

    4120--36C26125Q0299 PAD Cooling Tower Repair

    Notice 8a5d7f19654644efa16ad7fc46740519 on SAM.gov

  3. 3
    Version 3SolicitationArchived

    4120--36C26125Q0299 PAD Cooling Tower Repair

    Notice 0cc58be3d28c4c51a55ae5583af55c89 on SAM.gov

  4. 4
    Version 4SolicitationArchived

    4120--36C26125Q0299 PAD Cooling Tower Repair

    Notice 4f1356ac0ec249af99786982dc5b5b02 on SAM.gov

  5. 5
    Version 5SolicitationArchived

    4120--36C26125Q0299 PAD Cooling Tower Repair

    Notice 7ecb882ab5de448090ee00120eaf6e48 on SAM.gov

  6. 6
    Version 6SolicitationArchived

    4120--36C26125Q0299 PAD Cooling Tower Repair

    Notice 9a6935fd127d45eb8243ef3ae8f146ad on SAM.gov

  7. 8
    Version 8SolicitationArchivedCurrent

    4120--36C26125Q0299 PAD Cooling Tower Repair

    Notice 659b06e058f64fd2a4d5d4d3c7c2bca7 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C26125Q0299

Archive Date

Apr 9, 2025

Office Address

MATHER, CA, 95655