GovChime
Notice ID: 006fbb37d71e4ad8885e934abd8f9d28Award NoticeAwarded

Z2DA--EHRM Long Beach, 600-20-120, Construction

Awarded on June 10, 2021. Full description on SAM.gov.

Awarded tounder 36C26221C0122 (source: SAM.gov award notice)• $8.5M

Overview

Posted
June 11, 2021
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Place of performance
DEPARTMENT OF VETERANS AFFAIRS VA LONG BEACH HEALTHCARE SYSTEM 5901 E. 7TH STREET, Long Beach, 90822
Last updated
Dec 4, 2025
Award date
Jun 10, 2021
Award amount (SAM.gov award notice)
$8.5M

Identifiers

Solicitation number
36C26221B0004
Notice ID
006fbb37d71e4ad8885e934abd8f9d28
Award number (PIID)
36C26221C0122

Description

This document serves as a solicitation posting. The VA Long Beach Healthcare System located at 5901 E. 7th Street, Long Beach, CA 90822, has a requirement to perform construction services for Project 600-20-120, Electronic Health Record Modernization (EHRM) Infrastructure Upgrades. Work will be performed in a functioning hospital environment. Contractor shall furnish all supervision, tools, labor, training, materials, equipment, and transportation necessary to accomplish the work. The work includes, but is not limited to general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures and certain other items necessary for completion. All work shall be performed in strict accordance with the terms, conditions, specifications and drawings (when available) of the solicitation and all applicable local and VA building codes. This project will be procured as 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB) and must be listed as verified in the Vendor Information Pages (VIP) database at https://www.vip.vetbiz.va.gov/. The North American Industry Classification Code (NAICS) used for this requirement is 236220, Commercial and Institutional Building Construction with a Size Standard of $39.5M. The magnitude of this construction project is between $10,000,000 and $20,000,000. The VA will issue an Invitation for Bid (IFB) on or about 4/12/2021 via Contract Opportunities at https://beta.sam.gov/. A site visit will be scheduled, and the date/time/location will be provided with the solicitation.

Full description on SAM.gov

Award Overview

Award Number

36C26221C0122

Award Amount (SAM.gov award notice)

$8.5M

Award Date

Jun 10, 2021

Awardee

Awardee UEI

HHRZNKJMJYF7

Awardee CAGE Code

5SSQ9

Original Solicitation

Notice ID: 006fbb37d71e4ad8885e934abd8f9d28

Posted Date: Jun 11, 2021

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 36C26227C0033
    TALION CONSTRUCTION, LLC
    Department of Veterans AffairsNAICS 236220
    $41.6KSigned Nov 4, 2026
  • 36C77622C0063
    TALION CONSTRUCTION, LLC
    Department of Veterans AffairsNAICS 236220
    $9.5MSigned Sep 22, 2026
  • 36C25923C0061
    TALION CONSTRUCTION, LLC
    Department of Veterans AffairsNAICS 236220
    $10.4MSigned Aug 27, 2026
  • 36C77624C0088
    TALION CONSTRUCTION, LLC
    Department of Veterans AffairsNAICS 236220
    $18.5MSigned Jul 29, 2026
  • 36C77624C0088
    TALION CONSTRUCTION, LLC
    Department of Veterans AffairsNAICS 236220
    $17.8MSigned Jul 6, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C26221B0004
  1. Pre-Solicitation
  2. Awarded

This opportunity has been awarded.

  1. 5×
    Pre-SolicitationMar 29, 2021

    Z2DA--EHRM Long Beach, 600-20-120, Construction

    Notice d91acff2987f42848810e9f5094b52ac on SAM.gov

  2. AwardedCurrentJun 11, 2021

    Z2DA--EHRM Long Beach, 600-20-120, Construction

    Notice 006fbb37d71e4ad8885e934abd8f9d28 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product..
-AwardedOpen
Correct FCA Deficiencies Construction - Solicitation The contractor shall be responsible for all aspects of the project and each phase shall be subject to VA approval at designated project milestones. This project includes (but not limited to) all labor, materials, supplies, equipment, services, training, lighting, communications, security, operation and maintenance manuals, as built drawings, permits (if necessary), construction, installation, and commissioning.
-Solicitation09/03/2026
INTRODUCTION The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single firm-fixed-price contract for the design-bid-build EHRM Training and Administrative Space Construction project at the St. Louis VA Health Care System (VAHCS) John Cochran campus located at 915 North Grand BLVD, St. Louis, MO 63106. PROJECT DESCRIPTION The VA Saint Louis Health Care System John Cochran Division requires a construction contractor to perform upgrades in support of the Electronic Health Record Modernization (EHRM) program. The construction area is located on the first floor of Building 2 and includes both training and administrative spaces. This project includes the execution of Phases 2, 3, and 4 of the associated design plans. Phase 2 addresses the North Training Rooms (Rooms 139, 140, 141, 142), totaling approximately 2,000 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes. Phase 3 addresses the South Training Rooms (Rooms 126, 127, 128), totaling approximately 1,800 square feet. Work includes upgraded power and data infrastructure and new flooring and wall finishes. Additionally, Phase 3 includes the renovation of a 130-square-foot breakroom, with new floor and wall finishes, casework, a new sink, and a cold-water tie-in for an ice machine. Phase 4 addresses multiple areas: renovation of an approximately 1,400-square-foot corridor with new floor and wall finishes; upgrades to two offices (approximately 150 square feet each) with upgraded power and data infrastructure and new flooring and wall finishes; and upgrades to an existing data closet, including new floor and wall finishes, installation of an additional server rack with associated equipment, and replacement of the existing mini-split HVAC unit. Note: Phase 1 is excluded from this scope, as it was completed under a separate contract. Note: All power and data drops originally indicated as floor-mounted shall now be wall-mounted, as shown on revised drawings EP101 and TN101. Installation must match these updated sheet details; no floor-mounted outlets are permitted. ADMINISTRATIVE The solicitation will be issued as an Invitation for Bids (IFB) conducted in accordance with FAR part 14 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be issued as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45.0 million. The solicitation will be issued in early to mid-October 2026. The period of performance is approximately 150 calendar days from the issuance of the notice to proceed. In accordance with VAAR 836.204, the magnitude of construction is between $250,000 and $500,000. This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to Amanda.Webster@va.gov. Telephone calls will not be accepted.
-Solicitation12/02/2026
-AwardedOpen
The James H. Quillen VA Medical Center located in Mountain Home (Johnson City), Tennessee has a requirement for Renovate Building 204 Cath Lab II in accordance with (IAW) the provided specifications and drawings. This project consists of all supervision, labor, materials, equipment, and transportation. Amendment 0001 - provides revised drawings and specs Amendment 0002 - provides Site Visit sign-in sheet Amendment 0003 - provides RFIs and responses, revised specs and drawing, cath shielding, final coordination study for reference, and an addendum summary for the drawing and spec changes. This extends proposal responses to 8/10/2026 Amendment 0004 - provides follow up RFIs and responses, revised documents for these RFIs, only.
-Solicitation08/10/2026

Additional Details

Solicitation Number

36C26221B0004

Archive Date

Jul 10, 2021

Office Address

Gilbert, AZ, 85297