Notice ID: b0935520d9c745eeb81d9c5a0f3b32e0Sources Sought

J045--Steam Trap Testing, Maintenance, and Repair Services

Archived on July 2, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−07:00
Posted
April 19, 2023
Notice type
Sources Sought
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Veterans Affairs

Notice details

Office
262-NETWORK CONTRACT OFFICE 22 (36C262)
Place of performance
VHA- Southern Arizona Veterans Healthcare System 3601 South Sixth Ave., Tucson, 85723
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C26223Q0900
Notice ID
b0935520d9c745eeb81d9c5a0f3b32e0

Description

This is a SOURCES SOUGHT ANNOUNCEMENT ONLY. It is neither a solicitation announcement nor a request for proposals or quotes and does not obligate the Government to award a contract. Requests for a solicitation will not receive a response. Responses to this-- sources sought announcement must be in writing. The purpose of this sources sought announcement is for market research to make appropriate acquisition decisions and to gain knowledge of potential qualified Service-Disabled Veteran Owned Small Businesses, Veteran Owned Small Businesses, 8(a), HubZone and other Small Businesses interested and capable of providing the services described below. Documentation of technical expertise must be presented in sufficient detail for the Government to determine that your company possesses the necessary functional area expertise and experience to compete for this acquisition. Responses to this notice shall include the following: (a) company name (b) address (c) point of contact (d) phone, fax, and email (e) Unique Entity ID (f) Cage Code (g) Tax ID Number (h) Type of small business, e.g. Services Disabled Veteran Owned small Business, Veteran-owned small business, 8(a), HUBZone, Women Owned Small Business, Small disadvantaged business, or Small Business HUBZone business and (i) must provide a capability statement that addresses the organizations qualifications and ability to perform as a contractor for the work described below. The Southern Arizona VA Health Care System (SAVAHCS) located at 3601 S. 6th Ave, Tucson, AZ 85723 is seeking a potential qualified contractor that can provide STEAM TRAP SURVEY MAINTENANCE AND REPAIR SERVICES. Important information: The Government is not obligated to/nor will it pay for or reimburse any costs associated with responding to this sources sought synopsis request. This notice shall not be construed as a commitment by the Government to issue a solicitation or ultimately award a contract, nor does it restrict the Government to a particular acquisition approach. The Government will in no way be bound to this information if any solicitation is issued. The VA is mandated by Public Law 109-461 to consider a total set-aside for Service-Disabled Veteran Owned Small Business set aside. However, if response by Service-Disabled Veteran Owned Small Business firms proves inadequate, an alternate set-aside or full and open competition may be determined. No sub-contracting opportunity is anticipated. The North American Classification System (NAICS) code for this acquisition is 238220. Notice to potential offerors: All offerors who provide goods or services to the United States Federal Government must be registered in the System for Award Management (SAM) at www.sam.gov. Additionally, all Service-Disabled Veteran Owned Businesses or Veteran Owned Businesses who respond to a solicitation on this project must be registered with the Department of Veterans Affairs Center for Veterans Enterprise VetBiz Registry located at http://vip.vetbiz.gov. All interested Offerors should submit information by e-mail to: cristine.carmody@va.gov . All information submissions to be marked Attn: Cristine Carmody, Contract Specialist and should be received no later than 4:00 pm PST on May 3, 2023. DRAFT DRAFT SOUTHERN ARIZONA VA HEALTH CARE SYSTEM Perform Steam Trap Survey, Testing, Maintenance, and Replacement Service (FY24) STATEMENT OF WORK BACKGROUND: Southern Arizona VA Health Care System (SAVAHCS) requires a qualified contractor to perform Steam Trap survey, maintenance & services located at the Tucson campus. The SAVAHCS campus is located at 3601 South 6th Avenue Tucson, Arizona 85723. This contract will be for a Base Year and Four (4) Option Years. The Southern Arizona VA Health Care System (SAVAHCS) has approximately 329 steam traps spread across multiple buildings. SAVAHCS buildings are located on a 105-acre campus with over 1 million square feet of conditioned space. Steam traps are mainly located in mechanical rooms although some steam traps are in underground chases or steam pits. The last steam trap survey was conducted in March 2022. The purpose of this contract is to secure materials and the qualified technical labor that is required to conduct survey and provide ongoing service and maintenance of existing steam traps at the SAVAHCS campus. SCOPE: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, replacement parts/equipment, supervision, and other items necessary to perform an annual steam trap survey and provide maintenance on approximately 329 steam traps and to submit required data and reports. The SAVAHCS has at least one sparge tank with multiple connected steam traps. Additionally, for the base year of the contract, it is estimated that approximately 12 steam traps will require repair or replacement. The estimate for repair or replacement during additional option years will be 10 steam traps. The replacement of these traps will be provided by the contractor at no additional cost to the government. The Contractor should anticipate work in a few steam pits (i.e., hot, enclosed space work). The Contractor should also anticipate the need to use asbestos-fiber filtering respirators for the survey work in a few areas. 2. DESCRIPTION OF SERVICES: Contractor shall conduct survey and maintain equipment in good operating condition the listed in the contract. The steam equipment is located at the Southern Arizona VA Health Care System (SAVAHCS) 3601 S. 6th Ave Tucson, AZ 85723. Provide all labor and equipment to provide a survey annually and maintain and repair steam traps for all facilities throughout the SAVAHCS campus including providing and replacement traps, parts, and components per this contract. The objective of this contract is to survey, catalogue, and tag the existing steam traps and to make the steam distribution system more energy efficient, safer, and easier to maintain. The Contractor shall not interfere with existing, on-going functions, or normal activity of the hospital. The contractor shall maintain a clean work area, and as appropriate, provide walk-off mats for dust control and appropriate construction barriers. Noise shall be kept to a minimum at all times. Work in patient-care areas may need to be accomplished during evening hours or weekends. Work that involves the need for steam shutdowns shall be scheduled through the Contracting Officer s Representative (COR) at least two weeks before the work activity. Furthermore, work in the Pharmacy area shall be scheduled through the COR at least two weeks and approve by pharmacy service chief or representative before the work activity can begin. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. 2.1. COMPLIANCE. The Contractor shall be fully responsible for the compliance with all VA, Joint Commission, local, state, and Federal environmental/occupational safety laws, rules, and regulations. The Contractor shall follow life and safety codes (The Joint Commission and NFPA 99 current edition) and take necessary actions to avoid conditions that may be hazardous to the health and safety of the hospital personnel and patients. The Contractor is responsible for meeting all applicable American Society of Mechanical Engineers (ASME), OSHA, NFPA, and VA guidelines standards and safe working processes; Lockout/Tagout. All work for the duration of the contract shall be performed by certified or trained technicians. 2.2. WORKING HOURS. Preventive maintenance work shall be performed on weekdays excluding Federal holidays, during the hospitals regular weekday working hours 7:00am 4:00pm. Federal holidays observed may be exchanged for Contractor observed day, only on a one-for-one basis, requested by the Contractor and subject to approval by the Contracting Officer Recognized Holidays: The Contractor is not required to perform service on the following federal holidays. New Year s Day Labor Day Martin Luther King Jr. s Birthday Columbus Day President s Day Veteran s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day 2.3. CONTRACTING OFFICER S REPRESENTATIVE (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. The COR is not authorized to change any of the terms and conditions of the contract; this may only be done by a written modification to the contract and signed by the Contracting Officer. 2.4 KEY PERSONNEL: The follow personnel are considered key personnel by the government: Contract Manager, Project Manager/Field Supervisor. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:00 p.m., Monday thru Friday except Federal holidays or when the government facility is closed for administrative reason. 2.5. CONFIRMATION OF REPAIR WORK: All completed repairs must be confirmed and approved by Maintenance & Operations, Utilities staff /Pipe Shop during regular hospital working hours, 7:00am 4:00pm, Monday through Friday excluding Federal holidays. After regular hours, weekends, and holidays, Maintenance & Operations Utility System Repair Operators may approve equipment available for use after repairs have been made. The COR will be notified of all after-hour or emergency repairs during the next normal working day. 2.6. MAINTENANCE, INSPECTIONS, AND TESTING: Inspections will be scheduled during the timeframe of the Contract year. Prior to scheduled month of service, the Contractor will provide Maintenance & Operations a schedule of the weekdays this service is to be performed, for their approval. Maintenance & Operations shall have the authority to reschedule this service within twenty-four (24) hours of scheduled time due to emergency event and/or scheduling conflict. Contractor shall inspect, adjust, lubricate, clean, repair, replace desiccants and test to ensure safe reliable service within all tolerances as required by the manufacturer s specifications. All parts used shall be of the original manufacturers design and specifications. All malfunctioning parts shall be replaced immediately to prevent undue down time and to ensure safe operation. NOTE: Upon discovery of malfunctioning parts, Maintenance & Operations COR shall be notified immediately for approval of repairs. 2.7. PREVENTIVE MAINTENANCE SERVICE: Preventive maintenance inspection shall be performed as necessary to meet manufacturer/factory specifications, recommendations, or VA requirements. A list of equipment and minimum service intervals expected are listed in Section 6 of this contract. 2.8. PERFORMANCE AND TESTING: After completion of maintenance, the system shall be operated by the Contractor in the presence of Maintenance & Operations staff to ensure all steam trap components perform to standards as outlined in the manufactures specifications. All components shall be checked and adjusted if necessary or applicable. 2.9. DOCUMENTATION OF SERVICES PERFORMED: Contractor must supply maintenance check list to COR for each item according to manufactures recommendations and specifications to be maintained. At the conclusion of all inspections the Contractor shall submit a report to the COR and Maintenance & Operations staff, indicating the elements of the inspection performed, findings, and recommendations if applicable. This report shall be submitted in the form of a checklist or manufacturer performance service ticket, provided all requested all information is supplied. All repair work shall be documented when service is completed. The repairman must indicate on his repair ticket the specific action taken, date and time repaired performed, all parts replaced, hours of labor required and travel time. The equipment serviced must be identified clearly by name and location. Upon completion of service, Maintenance & Operations must sign service ticket. 2.10. CLEANUP: The contractor shall be responsible for cleaning the work area and equipment upon completion of work. All accumulated rubbish or debris shall be removed. 2.11. SPECIAL TOOLS: The Contractor shall provide all tools, testing equipment for disassembly, assembly, adjustments, calibrating and other work as required for the performance of this Contract. 2.12. OVER AND ABOVE REPAIR: Upon discovery of a malfunctioning part the Contractor shall immediately notify Maintenance & Operations staff and COR. The repair job shall not be initiated until approval is obtained from contract COR. Charges for repair, labor and parts shall originate only when required and upon prior approval being granted by the COR. At the VA s option the Contractor may be requested to provide a price quotation for the repair job. The VA has sole discretion to select the Contractor who will provide these repair services and they will be ordered as a separate action (not as part of this contract). 2.13. CONTRACTOR EMPLOYEES: Contractor personnel performing work under this contract must have a general employment background check at the time of the proposed submission and must maintain the level of security required for the life of the contract. Contractor personnel shall present a neat appearance and be easily recognized as a Contractor employee. Example: wearing distinctive clothing such as uniforms, badges, patches, etc. 2.14. ESCORT AND SAVAHCS CHECK IN: Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves such as to avoid creating an impression in the minds of members of the public that they are Government officials. All Contractor personnel working on-site at the SAVAHCS facility shall check in and out with the Maintenance & Operations/ Utilities located in the basement of Building 2, Room B21C. Check-in procedures require receiving a temporary badge and completing the necessary information on the vendors sign-in sheet. Access to the work areas and performance monitoring will be provided by VA Maintenance & Operations Staff. After hours response will be monitored by VA Utilities Systems Repair Operators (USRO) ext. 6684 or the VA police at ext. 6514 2.15 POST AWARD CONFERENCE: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. 2.16 DATA RIGHTS: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights. 3. INFORMATION TECHNOLOGY: The C&A requirements do not apply. A Security Accreditation Package is not required. 4. GOVERNMENT FURNISHED ITEMS AND SERVICES: 4.1 Services: To expedite the survey process, SAVAHCS will provide a site representative (pipe fitter, plumber, or other maintenance staff member) to escort Contractor technicians through the facility. Although SAVAHCS will strive to ensure that steam traps are put in service and are in a live condition prior to commencement of the survey, SAVAHCS cannot ensure that all traps will be live. 4.2. Utilities: The Government will provide access to electricity or water if they are required for performance of services. The Contractor shall instruct employees in utilities conservation practices. The Contractor is responsible for operating under conditions that preclude the waste of utilities. 4.3 Materials: The Government will not provide any materials 5. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: 5.1 General: The Contractor shall furnish all supplies, parts, equipment, facilities, and services required to perform work under this contract that are not listed under Section III of this PWS. 5.2. Materials: Parts for the repair or replacement of steam traps, or added or removed, must be in accordance with VA specifications for the existing steam and condensate system. 5.3. Equipment: The Contractor shall provide all equipment, tools, PPE, ladders, etc. to perform the steam trap survey, maintenance, or replacement 6. SPECIFIC TASKS: First Year of Service: The first year of service shall be completed in two phases. 6.1.a Phase 1 is comprehensive and includes identifying, cataloguing, tagging, and testing the SAVAHCS steam traps. To accomplish this task, a system-wide steam trap field investigation (survey) shall be conducted by the Contractor examining and identifying, via ultrasonic testing and thermal testing, blow-through, cold plugged, leaking, and misapplied traps (including wrong type, wrong size, wrong application, wrong pressure, and wrong installation). Submissions for Phase 1 include: The Steam Trap Survey Inventory (Put onto an Excel Format; refer to Item a. on the next page below under Steam trap survey) A Steam Trap Recommendations Report including estimates of the recommended work (refer to Item B. below under option years). Traps needing repair or replacement shall be ranked by severity. For traps needing repair, include information regarding the proposed repair. For steam traps needing replacement, include cut sheets for the proposed replacements; and An Energy Savings section detailing cost savings and Return on Investment based upon the proposed repairs or replacements. These submissions will be reviewed by the VA and discussed with the Contractor. Based on the submissions and discussion, a Steam Trap Repair/Replacement Plan and a schedule shall be agreed upon by the VA and the Contractor (refer to Phase 2 below). Steam Trap Survey - The Contractor shall provide labor and materials to perform a detailed steam trap survey. The Contractor will locate, identify, test, and tag every accessible steam trap in the facility. The Contractor will prepare a steam trap inventory. This work should be done on an annual basis. If the Contractor finds steam traps that are inaccessible, the Contractor shall inform the VA COR and include as much information as possible regarding those traps in the detailed steam trap survey. Traps that are not activate at time of survey (e.g., cold or not in use ), will be tagged and logged as Out-of-Service. Out-of-Service tags shall very visible (e.g., red, and white). The Contractor shall attach permanent, sequentially numbered tags to each steam trap to ensure that each trap is uniquely identified. The numbering scheme will be agreed to by the VA; for instance, the VA may want to begin each tag based on the building e.g., B57-1, B30-4. Metal tags shall be stainless steel and shall be a minimum of 1 in diameter. Old or extraneous tag shall be removed, and the information logged. Contractor shall identify failed or problematic traps (e.g., traps that are blowing through, plugged, leaking, incorrect type, incorrectly sized, incorrectly applied, incorrectly installed). At a minimum, the following data will be inventoried for each steam trap surveyed: Trap location (e.g., building, floor, room) Trap type Tag number Manufacturer/Model Identification Connection size and type Trap application and the equipment being served Piping configurations to include notation of dead legs Insulation type or deficiency Steam system pressure Trap testing method and date (i.e., ultrasonic, thermal imaging) Trap condition Trap problems (e.g., Failed Open, Failed Closed, Rapid Cycle, Isolated Closed, or other noted issue) Other steam trap or steam system comments (if any) Estimated hours of operation (per day or per week) As applicable for recommended steam trap repair or replacement, for each repair or replacement: Estimated steam savings per hour (lbs.) Estimated steam savings per year (lbs.) Estimated dollar savings per hour Estimated dollar savings per year Return-on-Investment calculations Estimated Greenhouse Gas (GHG) Emission reductions per hour Estimated GHG Emission reductions per year Selection of Replacement Steam Traps (or Repair) - The Contractor shall prepare a steam trap repair or replacement recommendations. Each proposed replacement trap shall be selected based on the application setting with consideration for the appropriate pressure rating. Traps shall be float and thermostatic (cast iron); or thermodynamic (i.e., thermostatic disc; Stainless). Fixed orifice type traps such as venturi traps are not acceptable. Each type of trap shall be the product of a single manufacturer. Floats and linkages shall provide sufficient force to open trap valve over full operating pressure range available to the system. Unless otherwise indicated, traps shall be sized for capacities indicated at minimum pressure drop as follows: For equipment with modulating control valve: 1.7 kPa (1/4 psig), based on a condensate leg of 300 mm (12 inches) at the trap inlet and gravity flow to the receiver. For main line drip trap sets and other trap sets at steam pressure: Up to 70 percent of design differential pressure. Condensate may be lifted to the return line. For systems without relief, valve traps shall be rated for the pressure upstream of the PRV supplying the system. Balanced pressure thermostatic elements: Phosphor bronze, stainless steel or monel metal. Trap bodies: Bronze, cast iron, or semi-steel, constructed to permit ease of removal and servicing working parts without disturbing connecting piping. Valves and seats: Suitable hardened corrosion resistant alloy. Mechanism: Brass, stainless steel, or corrosion resistant alloy. Floats: Stainless steel. 6.1.b Phase 2 is the repair or replacement of an estimated 12 steam traps (the specific steam traps to be replaced and the specific number to be replaced will be agreed upon by the VA and the Contractor. Prepare and submit a steam trap repair/replacement plan and schedule. Replace failed or problematic steam traps - The Contractor shall provide labor, equipment, and materials to repair or replace the agreed upon steam traps. For every repaired or replaced steam trap, the Contractor will: Ensure that each repaired or replaced trap is properly tagged and inventoried. After the Contractor has completed the installation of the repaired or replaced steam trap, the Contractor shall schedule and document inspection and testing in the presence of a VA representative (e.g., Pipefitter, Plumber, COR). A copy of the documentation is to be submitted to the VA. Update the steam trap survey inventory with all appropriate information (e.g., new trap type, trap number, testing date, and method) Upon completion and acceptance of work by VA, Contractor shall conduct a 2-hour training session with VA O&M personnel in the operation and maintenance of the steam traps. Option Years: Option Years shall follow the Phase 1 and Phase 2 approach outlined above. Throughout the year, as construction is completed on the SAVAHCS campus, the Government will update the Steam Trap Survey Inventory in preparation for the Contractor s annual Steam Trap Survey and Testing. The Government prefers that the annual Steam Trap Survey and Testing occurs at the start of the cooling season each year (e.g., September, October, or early November). It is anticipated that the level of effort needed to complete the Steam Trap Survey will be nominal because the steam trap inventory from 2022 already exist. It is anticipated that the level of effort needed to repair or replace steam traps in subsequent years will be less than the first year because the steam traps will be surveyed annually and repaired or replaced as needed. For estimating purposes, it is assumed that 10 steam traps will be replaced in each Option Year. Activity or Deliverables Proposed Schedule the timeframes proposed below may be adjusted based on discussion between the Contractor and VA Contracting. Specific Activity or Deliverable Format Physical Format Proposed Timeframe NTP N/A N/A N/A N/A Phase 1 Conduct Steam Trap Survey N/A N/A NTP + 5 weeks Steam Trap Survey Microsoft Excel Three hard- NTP + 7 weeks Inventory (Probably on 11 x 17) copies and one electronic format copy Recommendations Report Microsoft Word Three hard- copies and one electronic format copy NTP + 10 weeks Energy Savings Report (may be included in the Recommendations Report) Microsoft Word Three hard- copies and one electronic format copy NTP + 10 weeks Review Meeting to determine Replacement Plan and Schedule N/A N/A NTP + 11 weeks Phase 2 Replacement Plan and Schedule Microsoft Word Three hard- copies and one electronic format copy NTP + 12 weeks Begin steam trap replacement or repair N/A N/A NTP + 16 weeks Finish steam trap replacement or repair PDF of steam trap inspection and testing sheets and updated steam trap survey inventory Three hard-copies and one electronic format copy NTP + 19 weeks TECHNICAL EXHIBIT 1 Performance Requirements Summary (PRS): The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success. Performance Objective Standard Performance Threshold Method of Surveillance PRS # 1 The Contractor shall check-in and check-out during each visit to the facility. ALL SERVICE: Contractor personnel shall check-in and check-out with the M&O Shop Work Order Control Clerk for each visit to the SAVAHCS facility. 100% conformance Periodic surveillance PRS # 2 The Contractor shall conduct timely Steam Trap Surveys and Steam Trap repair The Contractor provided the survey and repairs/replacement per the agreed upon timeline. 100% conformance (anticipate only one steam trap survey per year and one replace or repair activity per year) 100 percent inspection PRS # 3 The Contractor shall provide timely documentation. The Contractor provided the required reports per the agreed upon timeline. Refer to for a proposed timeline. 75% conformance (3 out of 4) 100 percent inspection PRS # 4 Supplies and Services as Needed The Contractor shall coordinate the Supplies and Services as Needed in the timeframe agreed to between the Contractor and Contracting. 90% conformance 100 percent inspection 7. DEFINITIONS & ACRONYMS: 7a. Definitions: 1) Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime. 2) Contracting Officer: A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The Contracting Officer is the only individual who can legally bind the government. 3) Contracting Officer s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract. 4) Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement. 5) Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports. 6) Key Personnel: Contractor personnel that are employed in the performance of contract work. 7) Maintenance: Activities required or undertaken to conserve the original asset or resource. 8) Physical Security: Actions that prevent the loss or damage of Government property. 9) Repair: Activities required or undertaken to replace a broken, damaged, or failed device or equipment to return the device or equipment to an operating or usable condition. 10) Subcontractor: One that enters into a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor. 11) Workday: The number of hours per day the Contractor provides services in accordance with the contract requirements. 12) Work Week: Monday through Friday, unless specified otherwise. 7b. ACRONYMS: ACOR Alternate Contracting Officer's Representative CFR Code of Federal Regulations COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf FAR Federal Acquisition Regulation CO Contracting Officer OCI Organizational Conflict of Interest ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement TE Technical Exhibit

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C26223Q0900
  1. Market Research

Pre-solicitation or formal solicitation typically follows within 30–180 days. (estimate)

  1. Market ResearchCurrentApr 19, 2023

    J045--Steam Trap Testing, Maintenance, and Repair Services

    Notice b0935520d9c745eeb81d9c5a0f3b32e0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a combined synopsis/solicitation for commercial products and commercial services prepared in accordance with the format Revolutionary FAR Overhaul (RFO) in Federal Acquisition Regulation (FAR) subpart 12.202, “Streamlined Procedures for Evaluation and Solicitation for Commercial Products and Commercial Services,” as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2025-06, effective 8/26/2025. This solicitation is set-aside for 100% total Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The associated North American Industrial Classification System (NAICS) code for this procurement is 238220 with a small business size standard of $19.0 Million. The FSC/PSC is J041. The award will be made to the quote most advantageous to the Government and best meets the requirement described in the Statement of Work (SOW). Price and Other Factors: See Attachment 2, FAR 52.212-2 “Evaluation” The Long Beach Veterans Affairs Healthcare System (LBVAHCS) is seeking Preventative Maintenance, Inspection, and Repair Services (PMI&R) for Government-Owned Fume Hood/Safety Cabinets. All Solicitation inquiries are due on November 16, 2026, and all proposal responses are due on November 23, 2026, by email to Contracting Officer Daniel Kneizeh, daniel.kneizeh@va.gov. Please reference the details below and the Solicitation attachments for further information.
-Combined Synopsis12/04/2026
Install Chill Water System Filtration & Steam Condensate
-AwardedOpen
RFQ 36C24827Q0061 Amendment No. 1 This amendment is hereby issued to provide responses to questions and requests for information submitted by vendors, provide a revised PWS to address a correction on Boiler #2 description, as well as an updated Price/Cost Schedule reflecting the corrected description. Description of Boiler #2 contained on PWS and associated Line Items (LINs) of Price/Cost Schedule is hereby changed to read: Boiler Unit Number 2 (Local identifier): Fire tube steam boiler manufactured by York-Shipley; Serial number 96-19937-H-11618 The due date for Quote Submittal is changed from November 6, 2026, to November 10, 2026 at 10 AM AST. All other sections of the solicitation remain unchanged. RESPONSES TO QUESTIONS RECEIVED: Q1. Semiannual Safety-Device Testing: VHA Directive 1810, Appendix A, Section 2(a), establishes that safety devices requiring semiannual testing are ordinarily tested once annually by VA medical facility personnel and once annually by a qualified testing contractor, unless an alternative arrangement is approved. Does the Government require the contractor to perform both semiannual testing events under this solicitation? If so, has the alternative testing arrangement received the required approval? VACHS Boiler Plant personnel will perform the required semiannual safety-device testing. The Contractor shall perform the safety-device testing required under the PWS during its scheduled annual inspection and testing services. Q2. Monthly Safety Device Testing: PWS Section V(Q) includes safety-device tests for which the VHA Boiler and Associated Plant Safety Device Testing Manual establishes monthly testing frequencies, including primary and auxiliary low-water cutoffs, high- and low-water alarms, and the main flame-scanner flame-out test. Does the Government require the contractor to perform these tests monthly throughout the contract period, or will VACHS personnel continue performing the monthly tests while the contractor performs the scheduled maintenance and safety-device testing services? VACHS Boiler Plant personnel will perform the required monthly safety-device testing. Q3. Frequency of Nondestructive Testing, Component Replacement and Engineering Evaluations: PWS Sections V(I), V(L), V(U), V(V), and V(W) establish requirements involving component replacement, nondestructive testing (NDT), pressure-vessel inspections, and engineering evaluations, including ultrasonic thickness measurements, magnetic-particle examinations, and assessments of maximum allowable working pressure (MAWP) and remaining useful life. However, VHA Directive 1810, Appendix B, Table 2, establishes different inspection frequencies depending on the activity. For example, annual boiler inspections are required, whereas internal deaerator weld examinations using wet magnetic-particle testing are required at six-year intervals. Clarify the following: a. Nondestructive Testing: Are ultrasonic thickness measurements and magnetic-particle examinations required annually for each boiler and the deaerator, or are these examinations required only when indicated by inspection findings, equipment conditions, or established inspection intervals? The scope of this requirement applies to the Boilers only. b. Deaerator Weld Examination: Is the six-year internal deaerator weld examination required during the base contract period or any of the option years? If so, please identify the date of the most recent examination and the next scheduled examination. Not applicable. This service is cover under another service contract c. Engineering Evaluations: Are MAWP calculations, remaining-useful-life assessments, and deterioration-rate evaluations required annually for each boiler, deaerator, and condensate return tank, or only when inspection findings or equipment conditions warrant such evaluations? Not applicable. This service is not covered under this requirement. d. Component Replacement: Are component replacements identified in the PWS mandatory during each annual maintenance period, regardless of condition, or are replacements required only when inspection or testing establishes a deficiency, except where the PWS expressly requires replacement? Mandatory parts to be replaced annually during annual maintenance, regardless of its conditions: Sight glass with new seals, Compress air belt, oil filters, air filter, water gasket seal kits and fire side gaskets seal kit. e. Firetube Inspection Methods and Waterside Deterioration: PWS Section V(U) references fiberoptic inspection of boiler tubes, while Section V(V) establishes ultrasonic thickness measurement requirements. In a firetube boiler, fiberoptic examination from inside a tube primarily evaluates its fireside surface and does not directly establish the condition of the exterior waterside surface, where corrosion and pitting may occur. Please clarify whether the Government requires fiberoptic visual examination, ultrasonic thickness measurements, or additional examination methods capable of evaluating tube-wall deterioration affecting either surface. The Government requires the inspection methods specified in the Performance Work Statement (PWS). Fiberoptic inspection and ultrasonic thickness testing are complementary requirements, and both shall be performed. f. Boiler Tube Quantities and Technical Documentation: For each boiler, please identify the total number of firetubes, nominal tube diameter, original wall thickness or gauge, and applicable tube specifications. Please provide, if available, manufacturer drawings, tube-layout diagrams, pressure-vessel drawings, or other technical documentation identifying the shell, tube arrangements, tube sheets, and applicable pressure-retaining components, so that offerors can quantify the inspection scope. The Government has provided all available identifying information and that quotes/offers should be based on the PWS requirements and field verification. g. Extent of Tube Examination and Sampling Requirements: Does the Government require examination and wall-thickness measurements of every firetube in each boiler, or is an engineer-justified representative sampling program acceptable? If sampling is permitted, please identify any minimum sample quantity or percentage, prescribed examination locations, acceptance criteria, and requirements for expanding the examination when initial results reveal pitting, corrosion, thinning, or other deterioration. May the qualified inspecting engineer establish and justify the sampling methodology based on equipment condition, applicable standards, and inspection findings? The Government does not require examination or ultrasonic thickness measurements of every firetube. The Performance Work Statement requires inspection of a representative number of tubes and ultrasonic thickness testing of representative samples, with additional testing of areas exhibiting indications of corrosion, erosion, or other deterioration. The Contractor's Qualified Professional Inspector may establish and justify the sampling methodology using professional engineering judgment and applicable industry standards, provided the inspection is sufficient to assess equipment condition and support all required findings, calculations, and recommendations. h. Boiler shell examination and engineering certification: Please identify the required extent of ultrasonic thickness measurements and other nondestructive examinations of boiler shells, tube sheets, and other applicable pressure-retaining components. For the MAWP, deterioration-rate, and remaining-useful-life evaluations required by the PWS, does the Government require a formal report signed and sealed by a licensed Professional Engineer? Please identify any specified inspection coverage, minimum-thickness criteria, engineering standards, or historical thickness data to be used. Must the engineering determinations address the complete boiler pressure vessel, including firetubes and shell, or only components examined under the prescribed inspection program? The Government requires ultrasonic thickness testing of representative samples and all areas exhibiting signs of corrosion, erosion, or other deterioration. PWS does not prescribe specific inspection coverage percentages, minimum thickness criteria, historical thickness data, or a requirement for a signed and sealed Professional Engineer report. The Contractor shall use applicable ASME Code requirements, inspection findings, and professional judgment to perform the required MAWP, deterioration-rate, and remaining-life evaluations and document the results in the final report. Q4. The PWS incorporates maintenance, inspection, and testing requirements applicable to the deaerator (DA) and condensate return tank (CRT), as established by VHA Directive 1810 and the VHA Boiler and Associated Plant Safety Device Testing Manual. However, the solicitation provides pricing contract line items (CLINs) only for the three steam boilers and does not identify the DA and CRT equipment specifications. To establish the equipment covered by the contract and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the manufacturer, model, serial number, and quantity of each DA and CRT included within the contractual scope of work. b. Provide the vessel capacity, design pressure, normal operating pressure, and applicable ASME identification or nameplate information for each DA and CRT. c. Provide, if available, the applicable manufacturer maintenance instructions, equipment data sheets, and relevant drawings identifying the installed DA and CRT configurations. d. Should offerors allocate the costs associated with DA and CRT maintenance, inspection, and testing among the three existing boiler CLINs, or will the Government establish separate CLINs for these services? Not applicable. This service is not covered under this requirement. Q5. PWS Section V(I) requires the contractor to replace, calibrate, and test boiler steam safety valves, with calibration and/or testing performed onsite. The VHA Boiler and Associated Plant Safety Device Testing Manual also establishes testing requirements applicable to boiler, deaerator, and pressure-reducing valve (PRV) downstream safety valves. To determine the complete scope of testing, calibration, and replacement services and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the total number of steam safety valves included within the contractual scope of work, specifying their installed locations, including those associated with each steam boiler, the deaerator tank, and downstream of the steam pressure-reducing valve (PRV). Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. b. For each safety valve, provide the manufacturer, model, nominal inlet and outlet sizes, serial number or other identification, and applicable ASME/National Board certification information. Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. c. Identify the set pressure (psig), rated steam discharge capacity (lb/hr), and applicable pressure and temperature ratings for each valve. The Government does not have verified safety valve set pressures, steam discharge capacities, or pressure/temperature ratings available for distribution under this solicitation. Offerors shall base their quotes/offers on the requirements of PWS and the identified boiler equipment. Verification of valve nameplate data and equipment ratings shall be performed during the inspection and testing activities required under the contract. d. Please confirm whether each of the three steam boilers is equipped with two safety valves, reportedly set at 130 psig and 135 psig, respectively, and whether the deaerator system includes one safety valve installed on the tank and another downstream of the PRV. Please identify any additional safety valves included within the contractual scope. Each of the three boilers is equipped with two steam safety valves with nominal set pressures of 130 psig and 135 psig, respectively. The contractual scope includes the inspection, testing, calibration, and evaluation of these boiler safety valves and associated boiler safety devices identified in the PWS. The deaerator system and its associated safety valves are not included within the scope of this contract. Offerors shall base their quotations on the solicitation requirements. Verification of installed equipment, valve nameplate data, and operating condition shall be performed during contract execution. e. Does PWS Section V(I) require replacement of all existing boiler steam safety valves during each annual maintenance period, regardless of their condition, or is replacement required only when a valve fails inspection or testing? Please also clarify whether any replacement requirement applies to the deaerator and PRV downstream safety valves. The Government's intent is to inspect, test, and calibrate the boiler steam safety valves. Replacement is required only when a safety valve cannot be successfully calibrated, fails testing, or is otherwise determined to be defective or unserviceable. This requirement applies to the boiler steam safety valves within the scope of the PWS. f. Please identify whether the Government requires onsite testing and certification of all applicable safety valves, including the boiler, deaerator, and PRV downstream valves, and whether any valves must be removed for shop testing, repair, or recertification. The Government requires testing and calibration of the boiler safety valves in accordance with the PWS. Valve removal, shop testing, repair, recertification, or replacement shall only be required when a valve cannot be successfully tested, calibrated, or is otherwise determined to be defective or unserviceable. The PWS does not specifically require testing, certification, removal, repair, or replacement of deaerator or downstream PRV safety valves. g. Please provide an equipment schedule or existing valve inventory, if available, identifying the specifications and locations of all safety valves included within the contract. The Government does not have an equipment schedule or valve inventory available for distribution under this solicitation. The boiler scope includes six (6) steam safety valves total, consisting of two (2) safety valves per boiler with nominal set pressures of 130 psig and 135 psig. Offerors shall base their quotations on the solicitation requirements. Verification of valve specifications, nameplate data, and exact locations shall be performed during contract execution. Q6. The solicitation identifies the manufacturers and serial numbers of the three steam boilers; however, the Performance Work Statement does not identify whether the boilers and their associated systems remain in their original equipment manufacturer (OEM) configurations or have undergone subsequent alterations, modifications, equipment replacements, or retrofits. Clarify the following: a. Whether any of the three boilers have undergone modifications or alterations from their original OEM configurations, including replacement or retrofitting of the original burner assemblies. b. For each boiler with modifications or retrofits, identify the manufacturer, model, and configuration of the replacement equipment and describe the extent of the alterations necessary to integrate that equipment into the existing boiler system. c. Identify all additional, replacement, or modified components associated with such alterations, including, but not limited to, fuel pumps, fuel-pressure regulating or throttling valves, fuel-train components, piping arrangements, combustion controls, burner management systems, safety interlocks, instrumentation, electrical controls, and associated auxiliary equipment. d. Identify any additional equipment or components installed as part of these modifications that are included within the maintenance, inspection, calibration, testing, or repair requirements of the current PWS. e. Where the installed equipment differs from the original OEM configuration, identify the applicable manufacturer maintenance and testing requirements and provide, if available, current as-built drawings, equipment schedules, control diagrams, operating sequences, and documentation of the modifications. The Government does not have modification records, as-built drawings, equipment schedules, control diagrams, or other documentation available for distribution under this solicitation. Offerors shall base their quotations on the equipment identified in the PWS and the requirements specified therein. Any existing field modifications, retrofits, equipment replacements, or deviations from the original OEM configuration shall be identified and documented by the Contractor as part of the inspection, testing, and evaluation activities required under the contract Q7.PWS Section V(B) requires inspections, testing, and calibrations to comply with the written recommendations of the equipment manufacturers, the VHA Boiler and Associated Plant Safety Device Testing Manual, and applicable NFPA 85 requirements. The Superior Boiler manufacturer s maintenance instructions prescribe certain daily, weekly, and monthly operational and functional checks, as well as semiannual fireside cleaning and associated maintenance activities. However, VHA Directive 1810, Appendix B, Table 3B, establishes an annual fireside-cleaning frequency for high-pressure steam boilers. The Directive also distinguishes routine boiler-plant operational duties from inspections and testing that must be performed by qualified contractors. Please clarify the following: a. Are the daily, weekly, and monthly manufacturer-recommended operational and functional checks required to be performed by the contractor at the specified frequencies, or will these activities remain the responsibility of VACHS boiler-plant personnel? Daily, weekly, and monthly operational and functional checks identified in the manufacturer's operating and maintenance manuals are considered routine boiler plant operational activities and shall remain the responsibility of VACHS boiler plant personnel. The Contractor is not required to perform recurring daily, weekly, or monthly operational checks at the frequencies specified by the manufacturer unless such services are specifically included in the approved maintenance schedule developed under this contract. b. Does the Superior Boiler manufacturer s semiannual fireside-cleaning recommendation require the contractor to perform two complete fireside-cleaning services annually, rather than the single annual fireside-cleaning service established by VHA Directive 1810, Appendix B, Table 3B, or is one annual fireside-cleaning service sufficient to satisfy the contractual requirements? Contractor shall perform one comprehensive fireside cleaning and inspection annually in accordance with the PWS requirements and applicable VHA guidance. If, during the course of inspection or operation, conditions are identified that warrant additional cleaning, the Contractor shall document the condition and provide recommendations to the COR for review and consideration. c. Are other manufacturer-recommended maintenance activities exceeding the frequencies established by VHA Directive 1810 required to be performed by the contractor, or will the contractor s responsibilities be limited to the maintenance, inspections, calibrations, and safety-device testing specifically scheduled under the PWS? The Contractor shall comply with the maintenance, inspection, calibration, testing, evaluation, and reporting requirements specifically identified in the PWS. Manufacturer recommendations should be utilized as part of the Contractor's technical evaluation and execution of the required services. However, the contract does not require the Contractor to perform additional recurring maintenance activities at frequencies exceeding those established in the PWS unless specifically directed by the Government or otherwise determined to be necessary based on observed equipment condition. Q8. With reference to PWS Section V(O), will the Government provide an inventory of the installed boiler plant instrumentation requiring periodic calibration, including pressure gauges, thermometers, pressure and temperature transmitters, oxygen analyzers, and other applicable measuring and control devices? No. The Government will not provide an instrumentation inventory. Offerors shall base their quotations on the requirements of PWS, including calibration of all applicable measuring and control devices associated with the boiler systems. Verification and identification of installed instrumentation shall be performed during contract execution. Q9. If available, please identify each instrument s equipment location, manufacturer, model, measuring range, quantity, calibration frequency, and applicable acceptance tolerances. The Government does not have this information available for distribution under this solicitation. Offerors shall base their quotation on the requirements of the PWS. The Contractor shall identify the installed instrumentation requiring calibration and perform the required calibration, testing, and documentation in accordance with the manufacturer s recommendations and applicable industry standards. Q10. Clarify whether the contractor is responsible for replacing instruments that fail calibration or are determined to be defective, and whether such replacements are included in the firm-fixed-price maintenance scope or authorized separately as corrective work. The Contractor shall identify and document any instruments found to be defective or unable to be successfully calibrated and shall notify the COR. Replacement of defective instruments is not included in the firm-fixed-price maintenance scope and, if required, will be addressed separately by the Government Q11. Please confirm whether the boiler plant currently has an installed propane/combustible gas leak detection system, including the number and location of detectors, manufacturer and model, associated control panels, audible/visual alarms, and any connections to the boiler burner-management or fuel-gas safety-shutdown systems. The boiler plant is equipped with a propane/combustible gas detection alarm system. However, the gas detection system is independent of the boilers and their burner management systems and does not automatically initiate boiler shutdown or fuel shutoff functions. Q12. Please clarify whether the contractor is responsible for: a. Periodic inspection, calibration, and functional testing of the gas detectors. Limited to the detector that is part of the boiler safety or combustion control system that is specifically within the scope of the PWS. b. Verification of alarm setpoints and detector response. Only for those that are part of the equipment specifically covered by the PWS. c. Functional testing of associated alarms, gas shutoff valves, and boiler shutdown interlocks, where installed. The Contractor shall perform testing of safety devices, alarms, shutoff valves, and interlocks specifically identified in PWS Section V(Q). d. Replacement of defective or expired sensors or detectors. No. Replacement of defective, failed, expired, or obsolete gas detectors or sensors is not included in the firm-fixed-price scope of this contract. Any deficiencies identified during the performance of the work shall be documented and reported to the COR. Recommended corrective actions shall be provided for Government review. e. Providing calibration certificates and documented functional-test results. Calibration certificates and test results shall be provided for equipment and instruments calibrated and tested under the scope of the PWS. The Contractor shall document all testing, calibration, and inspection activities in the required service reports. If these services are required, please identify the applicable testing and calibration frequencies and whether replacement components are included in the firm-fixed-price maintenance scope or addressed separately as corrective work. See responses above for each one. Q13. Is this a brand-new contract, or is there an incumbent performing the services? If not brand new, please provide current/previous contract number? This is a follow-on contract being procured as a competitive set-aside for SDVOSB verified vendors. Latest contract number is 36C24822P0298. This information is publicly available on Federal Procurement Data System (FPDS) at www.sam.gov and/or US Spending at https://www.usaspending.gov/ Current contractor information may be requested and disclosed under Freedom of Information Act (FOIA) in accordance with 38 Code of Federal Regulations (CFR) 1.553(b). The VA accepts FOIA requests submitted via email. Email must be sent to SAJFOIA@va.gov , for additional information about FOIA regulations and procedures, please visit www.foia.va.gov Q14. PWS V.I requires the contractor to "replace, calibrate and test the steam safety valves." Must the safety valves be replaced every year, or only if they fail testing? Please provide the number, size and set pressure of the safety valves on each boiler. The intent of PWS Section V.I is to ensure that all steam safety valves are properly inspected, calibrated, tested, and capable of performing their intended safety function in accordance with applicable codes, standards, and manufacturer requirements. PWS does not require the automatic annual replacement of steam safety valves solely based on the passage of time. Safety valves shall be evaluated, calibrated, and tested as part of the required services. Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. The Government does not have the number, size, or pressure data for all installed safety valves readily available at this time. The Contractor shall verify the installed safety valve configuration, including quantity, size, capacity, set pressure, and condition, as part of the required inspection and assessment services and shall document this information in the inspection report. Any safety valves identified as deficient or requiring replacement shall be immediately reported to the COR, along with recommendations for corrective action. Q15. Please provide the horsepower, design pressure and fuels (natural gas, No. 2 fuel oil, LPG pilot) for each of the three boilers. Boiler #1; Size: 300HP; Boiler Operating Pressure: 110 psi Boiler #2; Size: 250HP; Boiler Operating Pressure: 110 psi Boiler #3; Size: 300HP; Boiler Operating Pressure: 110 psi Q16. Does the annual NDT scope in PWS V.V and V.W (ultrasonic thickness grid, magnetic particle testing, MAWP and remaining-life calculations) apply to the deaerator and condensate tanks every year, or only in certain contract years? The NDT requirements identified in PWS Sections V.V and V.W apply to the boilers and associated equipment within the scope of this contract. The deaerator (DA) and condensate receiver tank (CRT) inspections, testing, NDT evaluations, MAWP calculations, and remaining life assessments are covered under a separate service contract and are not included within the scope of this requirement. Q17. Will a site visit be offered before the closing date? If so, please provide the date, time and point of contact. Site Visit will not be conducted at this time. Prepare and submit Quotes/Offers at your best terms based on the information contained in the RFQ. Q18. Is there an incumbent contract for this requirement? If so, please provide the contract number. See Q13 response above. Q19. Replace Safety Valve: Will the cost of new Valves be covered by the site? Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. Q20. Replace Gage Glass: Will new Gage cost be covered by the site? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q21. Cleaning - Will Gaskets be provided by the Site or Contractor? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q22. Testing - How often will Non-Destructive Testing be required? Annually, once over the 5-year period? Additionally, will NB Inspector be required on-site during Non-Destructive Testing? See Q16 response above. Q23. When was the last maintenance and testing done on each boiler? Boiler #1: February 2026 Boiler #2: December 2025 Boiler #3: June 2026 Q24. Is there a set maintenance and testing schedule? In accordance with PWS Section IV.J and Sections V.19 and V.20, the Contractor shall develop and submit a detailed schedule for the required inspections, testing, calibrations, and maintenance activities in coordination with the PM/COR. Q25. Will an on-site visit be required as soon as the contract is awarded and the contractor can align a technician to be on site? An immediate on-site visit upon contract award is not required by the PWS. However, the Contractor shall coordinate with the PM/COR and provide the required advance notice in accordance with the contract requirements prior to performing any inspection, testing, calibration, or maintenance activities. Following contract award, the Government anticipates coordinating a kickoff meeting and scheduling activities with the Contractor to facilitate execution of the work. The timing of any on-site visit shall be mutually coordinated between the Contractor and the PM/COR, taking into consideration boiler plant operations, facility needs, personnel availability, and the requirement that no more than one boiler be removed from service at a time. Q26. There is a detailed description of what is required for testing the boilers but not for maintenance. a. What is the maintenance schedule? Daily, monthly, quarterly, yearly? The Contractor shall perform the maintenance, inspections, testing, calibrations, and assessments required by the PWS during each contract year. The specific schedule for execution of the work shall be developed by the Contractor and coordinated with the PM/COR in accordance with PWS Sections IV.J, V.19, and V.20. The contract does not require the Contractor to perform daily, weekly, or monthly routine operational checks unless specifically identified in the PWS. b. Does the VA have an in-house technician that will be providing daily checks, and then the contractor for this contract does quarterly and yearly maintenance and testing? VACHS personnel perform the routine operation and monitoring of the boiler plant, including day-to-day operational activities. The Contractor's responsibilities under this contract are limited to the preventive maintenance, inspections, testing, calibrations, safety-device testing, evaluations, and reporting specifically required by the PWS. Q27. The CLN structure is currently set up as 1 all-inclusive price. What should be included in that price? a. What parts, if any, is the contractor expected to furnish? The Contractor shall furnish all labor, materials, consumables, tools, instrumentation, and equipment necessary to perform the services required by the PWS. This includes replacement parts and materials specifically identified in the PWS, such as gage glasses, gaskets, air compressor belts, refractory patching materials, and other consumable items necessary to complete the required maintenance, testing, and inspection activities. Repairs or major component replacements identified during the inspection process that are not specifically required by the PWS shall be documented and reported to the COR for review and disposition. b. Is there a certain number of hours of labor time that the VA would like us to include? If one contractor budgets 50 hours of labor while another budgets for 25 hours of labor, their pricing will vary drastically. This is a performance-based services acquisition, the Government expects Offerors to thoroughly review the PWS and submit their best quotation/offer based on their experience, and commercial practices. Offerors shall independently determine the labor resources necessary to perform complete preventive maintenance, inspection, testing, calibration, evaluation, and reporting service for each boiler in accordance with the PWS, applicable codes and standards, manufacturer recommendations, and VA requirements. The Government's expectation is that each boiler receives a complete maintenance and testing service as required by the contract. The maintenance activities will be scheduled throughout the year and coordinated with the PM/COR to avoid disruption to facility operations. c. How many visits are required per year? Same as labor, 1 contractor may budget 2 trips, and another contractor may budget 12 trips. This is a performance-based requirement, the Government has not established a minimum or maximum number of site visits. Offerors shall determine the number of visits necessary to perform all contract requirements and shall include all associated costs in their proposed price. The Contractor shall develop and coordinate the work schedule in accordance with the PWS. The Contractor is responsible for identifying the resources and site visits necessary to successfully perform the required services. d. Are we to include pricing for emergency work? Labor, parts, boiler rental in case of a catastrophic failure? No, PWS/SOW is for maintenance and testing, as described following applicable manufacturer recommendations. Q28. Are there any active and known problems or deficiencies with the boilers? Page 10 of the solicitation states The service required must restore steam boiler units back in service as described in the manufacturer s manual . If a boiler has a known problem, we will need to know what that is to accurately bid the project. If it is a simple part replacement, it may only cost $100 for parts and 2 hours of labor. If the boiler needs a new motor, that would most likely be thousands of dollars and at least 2 full days of labor. The Government does not maintain a list of known deficiencies and does not warrant the condition of any boiler, component, or ancillary equipment beyond the information provided in the solicitation. The Contractor is responsible for evaluating the condition of the boilers and associated equipment as part of the inspection, testing, maintenance, and assessment services required by the PWS. The intent of the requirement stating that the boilers be restored to service in accordance with manufacturer recommendations is to ensure that the Contractor performs the specified maintenance, testing, calibrations, inspections, and adjustments necessary to verify operational readiness and identify conditions affecting performance and reliability. Any deficiencies identified during performance shall be documented and promptly reported, together with the Contractor's recommendations for repair, replacement, or other corrective action. Repairs or major component replacements not specifically required by the PWS are not included in this contract and shall be addressed separately by the Government, as appropriate. Q29. Is an on-site SSHO or Superintendent required? Must the be directly employed by the contractor? If the awarded contractor use a subcontractor, could the SSHO/Sup be employed by the sub? The Contractor shall be responsible for providing adequate supervision and safety oversight necessary to perform the work safely and in compliance with all applicable federal, state, local, VA, OSHA, and facility safety requirements. The Contractor shall ensure that personnel performing the work possess the qualifications and certifications required by the PWS. Q30. Are there any geographic or linguistic requirements? Examples: Must the contractor turn in a Spanish and English copy of all reports? Must the on-site technician be fluent in Spanish? Must the on-site technician be a resident of Puerto Rico? No, all reports are to be turned in English, as English is the Federal Government official business language. Being able to communicate in Spanish may be beneficial but it is not required. There is no residency requirement, is up to the Contractor to determine the best approach based on their experience. Performance shall comply with the required frequency and required response time as per PWS/SOW.
-Combined Synopsis11/10/2026
RFQ 36C26327Q0060 Amendment 0002 Questions and Answers for solicitation posting
-Combined Synopsis11/10/2026
Amendment to cancel requirement. See SF 30
-Solicitation11/04/2026

Additional Details

Solicitation Number

36C26223Q0900

Archive Date

Jul 2, 2023

Office Address