GovChime
Notice ID: f19496c35a644dca9f906ba1d8bb6c50Award NoticeAwarded

J059--LOTO SYSTEM EVAL-TRAINING - POP (09/01/2024 - 08/31/2025)

Awarded on August 28, 2024. Full description on SAM.gov.

Awarded tounder 36C26224P2113 (source: SAM.gov award notice)• $27.7K

Overview

Posted
August 29, 2024
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
541330: Engineering Services
Agency
Department of Veterans Affairs

Notice details

Place of performance
Department of Veterans Affairs Loma Linda VA Health Care System Facilities Maintenance Service 11201 Benton St., Loma Linda, 92357
Last updated
Sep 9, 2025
Award date
Aug 28, 2024
Award amount (SAM.gov award notice)
$27.7K

Identifiers

Solicitation number
36C26224Q0819
Notice ID
f19496c35a644dca9f906ba1d8bb6c50
Award number (PIID)
36C26224P2113

Description

Summary of Tasks: The firm shall provide all tools, supplies, materials, labor, supervision, transportation, and project management to perform: Periodic LOTO system evaluations at VALLHS either biennially or annually (base plus four) which will be determined by the medical center at the task order level. The evaluation will consist of 5 parts: a review of all policies and standard operating procedures (SOP) (VISN, medical center, facilities management service (FMS), a review of the inventory of written LOTO procedures, an evaluation of a sampling of the facility’s LOTO system, an assessment of the authorized employees’ LOTO system knowledge, skills, and abilities (KSA). an audit LOTO system training program. LOTO system training on an as-needed basis. Training frequency will be determined at the Task Order level. Develop written LOTO procedures as needed for designated equipment. The frequency will be determined at the Task Order level. Additionally, the firm is requested to identify and report effective techniques and procedures which are not standardized in the SOP or Policy and identify and report non-compliant patterns which are not specifically covered by this BPA.

Full description on SAM.gov

Award Overview

Award Number

36C26224P2113

Award Amount (SAM.gov award notice)

$27.7K

Award Date

Aug 28, 2024

Awardee

Awardee UEI

SACMT7MBGLA1

Original Solicitation

Notice ID: f19496c35a644dca9f906ba1d8bb6c50

Posted Date: Aug 29, 2024

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C26224Q0819
  1. Market Research
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Market ResearchMar 14, 2024

    J059--Lock Out Tag Out System Evaluations, Training, Procedures - FY24 Loma Linda VA Health Care System, California USA

    Notice ac93ace32d41471286b63506b187c88e on SAM.gov

  2. SolicitationJun 13, 2024

    J059--Lock Out Tag Out System Evaluations, Training, Procedures - FY24 Loma Linda VA Health Care System, California USA

    Notice f189f430f6aa4f53a6bb30d6d95d85e6 on SAM.gov

  3. AwardedCurrentAug 29, 2024

    J059--LOTO SYSTEM EVAL-TRAINING - POP (09/01/2024 - 08/31/2025)

    Notice f19496c35a644dca9f906ba1d8bb6c50 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Fire Alarm, Suppression Systems, and Hood Testing, Inspection, and Certification Services - SAVAHCS
-Combined Synopsis11/12/2026
36C26227Q0022 ******* The purpose of this amendment is to: 1. Respond to questions asked regarding this solicitation. 2. Change the Period of Performance (POP) start date from 11/20/2026 to 12/01/2026. Base: 12/01/2026 09/30/2027 OY 1: 10/01/2027 09/30/2028 OY 2: 10/01/2028 09/30/2029 OY 3: 10/01/2029 09/30/2030 OY 4: 10/01/2030 09/30/2031 3. Change the response due date from 11/09/2026 to 11/12/2026. Questions and Answers: Q. Can you please let me know the total number of outlets to be tested. A. 3,000 Total. Q. # vacuum inlets A. 3,000 Q. # of medical gas system source equipment & location Bulk Oxygen, Med air, Vacuum, Nitrogen, WAGD, Dental Air, Dental Vacuum, Carbon Dioxide. Locations Main Hospital and Building 32 (cancer center) Q. # of medical gas booms/columns A. 38, Please see attachment named BOOM INVENTORY . Q. Could you please clarify whether the prime contractor must independently hold the ASSE 6020 Medical Gas Inspector and ASSE 6030 Medical Gas Verifier certifications, or whether these requirements can be satisfied through a qualified subcontractor whose personnel possess the required certifications? A. ASSE 6020 and ASSE 6030 certifications are required. Q. What are the manufacturer, model, and serial number of the boom equipment, source equipment, vacuum and air system? At a minimum, we need a manufacturer, model #, serial number for each system and each motor/compressor. Would providing photos of the source equipment be possible? A. We do not have the serial numbers or photos of the boom equipment but please see Exell spreadsheet attached Boom Inventory which has the Make, Model and location. Q. The Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No, we cannot provide the inspection report but we are providing the boom inventory. Please see Exell spreadsheet attached Boom Inventory . Q. Can the Government provide the most recent annual medical gas inspection report, or an inventory showing quantities of outlets/inlets by gas type, zone valve boxes, area alarm panels, master alarm panels and source equipment? A. No Q. If this is a follow-on requirement, what is the prior contract number? A. Prior Contract No. : 36C26222C0020 Q. Which gases and systems are in scope (oxygen, medical air, vacuum, nitrous oxide, nitrogen, carbon dioxide, WAGD, instrument air)? A. Please refer to statement of work section V. Scope Q. Is the bulk oxygen tank owned and maintained by the gas supplier, with the contractor s scope limited to the pipeline side? A. The bulk oxygen is owned and maintained by the supplier. Q. Are Category 3 systems, such as dental air and vacuum, in scope? A. Yes Q. Does the Government expect only annual periodic inspection and testing, or a full NFPA 99 system verification each year? A. Only Annual. Q. Does each annual CLIN cover a single inspection event per year? A. Yes Q. May the ASSE 6020 and 6030 credentials be held by subcontractor personnel instead of the prime s employees? A. Certs. Must be held by the prime and subcontractor. Q. Must the field team include both a 6020 inspector and a 6030 verifier, or is credential acceptable for annual testing? A. Yes Q. Should pricing assume evening or weekend work for the ICU, OR, SICU and ED zones? A. Yes. Q. If a master alarm sensor is not on a demand check fitting, will the VA allow a brief isolation to test it, or is that test excluded? A. Yes, a brief moment. Q. Are photos required for every outlet/inlet, or only for sources, alarm panels, zone valves and deficiencies? A. Only deficiencies. Q. How many particulate and dewpoint sample points are expected, based on the number of floors in the Main Hospital and Buildings 30, 31 and 32? A. No. This test will only to be performed for installation, repair, or modification of any medical gas piping systems, Building 29, 30 has no medical gas. Q. When was the last annual inspection done, and when was the first inspection due under this contract? A. The last inspection was completed on 11/24/25 - 2026 inspection needs to be completed before 12/21/26. Q. Oxygen particulate analysis: This filter test is typically performed as a pre-test during construction projects under NFPA 99. The results would generally be expected to remain unchanged unless the pipeline is breached during construction. Please confirm whether this test is required as part of the annual inspection. A. No particulate test performed during verification of newly installed or modified medical gas piping systems only. Q. ASSE 6010 certification: Please confirm whether ASSE 6010 certification is required. Our understanding is that this is a medical gas installer certification, rather than an annual inspection requirement under NFPA 99. A. No, only if repairs need to be performed, contractor shall be 6010 certified to make repairs. Q. Boom testing frequency: Please confirm whether boom testing is required annually. Our understanding is that NFPA 99 recommends testing every 18 months. A. VA requires this test to be performed annually. Q. Boom testing scope: Please confirm whether the testing includes disassembly of the booms to inspect for leaks and dry rot. A. Yes Q. Boom testing report: Please confirm whether the detailed report should include photographs of disassembled booms and a comprehensive list of recommended repairs. A. Yes, if any deficiencies are found. Q. Building confirmation: Mr. Stockman indicated that Eye Clinic Building 32 and Audiology Building 30 should be excluded from the proposal. Please confirm. A. Only main Hospital and building 31 (cancer center) will be tested annually. Q. Could you please clarify what repair work, if any, must be included in the annual fixed price? Specifically, should the contractor include any routine repairs or corrective maintenance, or will all repairs, replacement parts, and installation services be treated as separately authorized work under Section VI? A. This solicitation is only for Inspection, not for repairs. In the Statement of Work (Section VII) we have to include "Over and Above Repair" to clarify that the contractor must notify the POC immediately if any repairs needs to be made.
-Combined Synopsis11/12/2026
The mock audits, actions and recommendations requested must be performed in accordance with The Joint Commission's (TJC) Physical Environment (PE) components as well as all current Memoranda of Understanding (MOUs) and categorical waivers to certain requirements between VHA and the Joint Commission. An assessment is conducted as it relates to the National Fire Protection Association (NFPA) 101 Life Safety Code (LSC) and upon conclusion advises the facility any EC/LS deficiencies to EC and LS accreditation requirements to prepare for the unannounced or announced Accreditation Survey by TJC.
-Solicitation11/20/2026
Fire Alarm, Suppression Systems, and Hood Testing, Inspection, and Certification Services - SAVAHCS
-Combined Synopsis08/14/2026
Modification 2 to Presolicitation Notice 36C25527R0013 This modification provides answers to RFIs received and revised the evaluation criteria to be used for this project. RFIs Received for Project # 657A5-24-108, Replace Medium Voltage Feeder 3 and Transformers 1. Factor 4 Past Performance / Section F Project Eligibility  The solicitation states that projects submitted for past performance consideration must have completed both design and construction, and that projects not constructed will not be considered. Would the VA consider accepting relevant electrical infrastructure studies or assessments in Section F, particularly those involving medium-voltage distribution systems and feeder evaluations, that demonstrate directly applicable technical expertise but did not result in construction? We prefer to keep it as projects that were designed AND constructed. Since this is a construction project and not a study, we want projects that have been finished to be used for past performance criteria.  2. Factor 2 Specialized Experience and Technical Competence / Laboratory Requirements  Factor 2 references the firm's technical capabilities in design quality management procedures, CADD/BIM, equipment resources, and laboratory requirements. Given that the project scope primarily involves medium-voltage electrical feeder and transformer replacements, could the VA clarify the applicability of laboratory requirements to this project? We respectfully request that this criterion be removed from the evaluation requirements, as it does not appear directly relevant to the stated scope of work. Laboratory requirements were deleted. Please see revised evaluation criteria below.  3. Request for Submission Deadline Extension Given the technical scope of the project and the level of detail required to address the evaluation criteria, we respectfully request a one-week extension of the SF330 submission deadline, from November 10, 2026, to November 17, 2026. This additional time would allow interested firms to prepare comprehensive qualifications packages that fully address the solicitation requirements. SF330 submission due date extended from 11/10/2026 to 11/172026. End of RFIs.
-Pre-Solicitation11/17/2026

Additional Details

Solicitation Number

36C26224Q0819

Archive Date

Sep 28, 2024

Office Address

Gilbert, AZ, 85297