GovChime
Notice ID: ccd5ea92df674b73a4e119cfc85d4196Combined Synopsis/Solicitation

Uninterruptible Power Supply (UPS) Preventative Maintenance, Inspection, Repair, and Testing Services- Northern Arizona VA Healthcare System (NAVAHCS)

Archived on May 31, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−07:00
Posted
May 10, 2024
Notice type
Combined Synopsis/Solicitation
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
238210: Electrical Contractors and Other Wiring Installation Contractors
Agency
Department of Veterans Affairs

Notice details

Office
262-NETWORK CONTRACT OFFICE 22 (36C262)
Place of performance
Prescott, AZ, 86313
Last updated
Dec 4, 2025

Identifiers

Solicitation number
36C26224Q1049
Notice ID
ccd5ea92df674b73a4e119cfc85d4196

Description

The Contractor shall provide all necessary labor, materials, supplies, parts, software, tools, equipment, travel, transportation expenses and other related costs to provide semi-annual checks and services for stored electrical energy systems maintenance, inspections, and testing to be performed on facility stored electrical power equipment and uninterruptible power supply (UPS) systems located at the Northern Arizona VA Healthcare System (NAVAHCS).

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Jun 30, 2026

NAICS

238210

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C26224Q1049
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentMay 7, 2024

    Uninterruptible Power Supply (UPS) Preventative Maintenance, Inspection, Repair, and Testing Services- Northern Arizona VA Healthcare System (NAVAHCS)

    Notice ccd5ea92df674b73a4e119cfc85d4196 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The purpose of this amendment is to provide answers to the questions received prior to the cutoff date. In addition to providing answer to the questions, a site visit is also set for 0900 on Tuesday 27 October 2026 at the Louis Stokes Cleveland VA Medical Center 10701 East Boulevard, Cleveland, Ohio 44106-1702. We will meet at the information desk, first floor of the Atrium. This is directly across from the parking garage. Is this a new requirement or a recompete? If a recompete, please identify the incumbent contractor, the previous contract number, and the prior contract value. The final option year of the previous contract 36C25022F0010 has expired. Can prior test reports (most recent tri-annual cycle, IR survey, oil analysis) be provided to help establish equipment condition and test history? Prior test reports will not be shared outside of authorized staff. What is the estimated contract value or funding range for this requirement? This is not a construction requirement and therefore we do not have a project magnitude. The circuit breaker testing schedules for Option Year 1 (November 1, 2027 October 31, 2028) and Option Year 4 (November 1, 2030 October 31, 2031) appear to omit the quantity column shown in the other annual schedules. Could the Government provide revised schedules identifying the quantities for each listed circuit breaker in these two option years? Edited spreadsheet for breaker listing provided below. The SOW identifies working hours of 7:00 a.m. 11:30 p.m. Monday through Friday and 6:00 a.m. 6:00 p.m. Saturday and Sunday when maintenance requires an electrical power interruption. However, we could not locate an equipment schedule distinguishing Normal (Monday Friday) equipment from Critical (Saturday Sunday) equipment. Could the Government provide this classification or confirm how contractors should determine which equipment requires weekend work for pricing purposes? Any work that requires power to be interrupted will be completed on Sunday s, during daylight hours. Work that does not require power interruption, i.e. IR scan or transformer oil samples can be completed M-F during normal working hours. The section requires electrical contracting to be the primary specialty of the contractor's business and references properly trained and licensed permanent staff. Would the VA consider a qualified small-business prime contractor that provides contract management, coordination, quality assurance, and oversight while utilizing an experienced electrical testing subcontractor with the required NETA certifications, licensed personnel, equipment, and relevant past performance? This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations. Technician certification equivalence: the statement of work requires technicians certified to NETA standards or an equivalent certifying organization. Would NICET-certified technicians performing testing to the latest NETA MTS standards be accepted as equivalent for this requirement? NICET-certified technicians may be accepted as meeting the "equivalent certifying organization" requirement, provided the certification is in a relevant electrical testing, maintenance, or power-distribution-related subfield and the individual possesses the knowledge, training, and experience necessary to perform the testing, inspection, maintenance, and troubleshooting activities required under this contract. Consistent with the SOW requirements, personnel performing the work shall have a minimum of five (5) years of relevant documented experience and shall perform all testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS). Additionally, NICET Level III or higher in an applicable electrical power testing or power distribution discipline will be considered equivalent to the NETA certification requirement. Additionally, would the VA consider the subcontractor's technical qualifications and past performance when evaluating the prime contractor's technical capability? This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While subcontractors may be utilized as permitted by the solicitation, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Evaluation of technical capability and past performance will be conducted in accordance with the evaluation criteria specified in the solicitation. Finally, please confirm which limitation on subcontracting applies to this procurement under NAICS 238210. The NAICS for this requirement is 238210 Offer due date: The SAM.gov notice header lists a response date of October 19, 2026, but the solicitation text says quotes are due October 23, 2026 at 3:00 PM ET. Please confirm which date and time govern. SAM was corrected within 4 hours of the posting to reflect 10/23/2026 at 15:00 which matches the solicitation that was posted. Period of performance: The SOW lists a base year of November 1, 2026 through October 31, 2027, plus four option years. Please confirm the anticipated award date that supports a November 1 start. The current need is to start 11/1/2026. The period of performance will start as soon as possible if not on 11/1/2026. The SOW requires NETA-certified technicians "or equivalent." Please confirm whether the certification may be held by the subcontractor's technicians doing the testing, and which other certifications are acceptable as equivalent. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary testing, inspection, maintenance, and troubleshooting activities required under this contract. The use of qualified subcontractors is permitted; however, the prime contractor shall maintain an active onsite role and directly perform a substantial portion of the work with its own qualified personnel. The prime contractor's role shall not be limited solely to contract administration, project management, quality assurance, or oversight functions. For personnel qualification purposes, NETA-certified technicians are acceptable. As an equivalent certification, the Government will accept NICET Level III or higher certification in an applicable electrical power testing or power distribution discipline, provided the technician has a minimum of five (5) years of documented relevant experience and performs testing in accordance with the latest edition of the NETA Maintenance Testing Specifications (MTS). Limitations on subcontracting: The solicitation includes FAR 52.219-14. Please confirm that the services limit applies (no more than 50% of the amount paid may go to subcontractors that are not similarly situated). Yes the clause applies to this requirement. Payment: The solicitation includes clause 52.232-90 Fast Payment Procedure, which covers supply deliveries. Please confirm how invoicing will work for this service: after each testing event is completed and accepted, or monthly in arrears. Invoice upon completion, not more than Monthly. The evaluation weighs technical capability and requires references. Is there a prescribed format or minimum number of references quoters should submit, and should the references be healthcare or VA facility electrical testing work? The relevance of references, due to the complexity of performing electrical testing, maintenance, and outage activities within an operating healthcare environment, the Government recommends that offerors provide references demonstrating experience performing work of similar scope, complexity, and operational criticality whenever available. References involving healthcare facilities, VA medical facilities, or other mission-critical facilities are preferred but are not required. Please clarify whether the equipment quantities listed on Page 20 of 65 under Infra-Red Line Items for Inspection are also included in the testing and maintenance scope, or whether the listed equipment requires infrared inspection only. If testing and maintenance are required, please provide the equipment type and voltage level for each item. The equipment listed under "Infra-Red Line Items for Inspection" is included for infrared inspection purposes only under Section 5.4 and is not included in the testing and maintenance scope unless specifically identified elsewhere in the SOW. Accordingly, no additional equipment type or voltage information is required for these line items. Please confirm whether protective relay testing is required under this solicitation. If so, please provide the quantity, manufacturer, model, and voltage level for the protective relays to be serviced. Yes. Protective relay testing is included under this Statement of Work. Specifically, Section 5.5, "Medium Voltage Relay Testing," requires the contractor to inspect, clean, test, calibrate, and maintain adjustable protective relays. The protective relays to be serviced are associated with the facility's 11 kV switchgear and consist of approximately 37 relays. The manufacturer is Schweitzer Engineering Laboratories (SEL). Known relay models include: SEL-351 SEL-587A SEL-551 Voltage Level: 11 kV. Offerors should base their proposals on the testing, calibration, inspection, and maintenance of these protective relays as required by the SOW. Please clarify whether the cost of replacing or refilling transformer cooling liquid is the responsibility of the contractor or the VA. If it is the contractor s responsibility, please provide a cost allowance for this work. Yes. Replacement or refilling of transformer cooling liquid shall be the contractor's responsibility when testing indicates the liquid no longer meets the manufacturer's specifications, as required by the SOW. No separate cost allowance will be provided by the Government, and offerors shall include all costs associated with this requirement in their proposal. The facility currently has four (4) oil-filled transformers with approximate oil capacities as follows: Energy Center Transformer: 704 gallons Research Transformer: 292 gallons Penthouse Transformer #1: 151 gallons Penthouse Transformer #2: 151 gallons The most recent transformer oil sample testing did not recommend oil replacement for any of these transformers. Copies of recent oil sample reports may be provided upon request. Please confirm if the permitted working hours, including shutdown hours, for this contract will be after business hours or from Monday through Friday, 7:00 a.m. to 11:30 p.m. or Saturday and Sunday, 6:00 a.m. to 6:00 p.m. Work requiring electrical power interruptions and planned shutdowns is anticipated to occur on assigned Sundays during daylight hours. Specific outage dates and work schedules will be coordinated by the Government based on facility operational requirements and the impact of the outage on medical center operations. Work activities that do not require interruption of electrical service may be performed during the normal operating hours identified in the SOW. Please provide the quantity of battery systems requiring inspection, testing, and maintenance under this solicitation. The solicitation includes one (1) medium-voltage switchgear battery backup system and charger requiring inspection, testing, and maintenance. Battery system details are as follows: Quantity: One (1) battery system Application: Medium-voltage switchgear control power system Manufacturer: ALCAD Configuration: 96-cell battery bank Nominal Voltage: 129 VDC Battery Model: XHP130 The contractor shall perform inspection, testing, and maintenance of this battery system in accordance with the requirements of the Statement of Work. Please confirm whether Automatic Transfer Switches (ATSs) are included in the required testing and maintenance scope. If so, please provide the quantity, their rated power, and clarify whether testing is required annually or once every three years. Automatic Transfer Switches (ATSs) are included in the infrared inspection requirements of this contract. Infrared inspections, including ATS infrared inspections, shall be performed annually in accordance with Section 5.4 of the SOW. ATS testing, maintenance, and repair are not included in the scope of this SOW and are covered under a separate maintenance agreement. Therefore, ATS quantities, ratings, and testing frequencies for maintenance and testing purposes are not applicable to this solicitation. Can you provide the one-line diagram of the facility and the previous electrical study report? Facility power diagrams will not be shared outside of authorized staff. Is there a required format, page limit, or volume structure for the technical and price quotes? The solicitation states that failure to follow the document format will render a quote non-responsive. Submission must be complete and contain an appropriate level of detail to allow the evaluator to determine technical acceptability and Compliance with the RFQ. Please confirm that "tri-annual" means once every three years (triennial), with the equipment rotating per the Section 5.10 lists (Base/OY3, OY1/OY4, OY2). Correct. For the purposes of this SOW, "tri-annual" means once every three (3) years. Equipment identified in Section 5.10 is tested and maintained on a three-year rotational schedule as outlined in the Base Year/Option Year 3, Option Year 1/Option Year 4, and Option Year 2 equipment lists. Several items lack kVA ratings (Surgery transformers, Parking Garage oil transformer). Please provide kVA and voltage ratings. Please also confirm the EC1 MV switch quantity shown as "6-Jun" in the Option Year 3 list. EC1 MV switch quantity = 1 Surgery Sub 1,000 kVA Parking Garage 300 kVA What is the medium-voltage service level (e.g., 5 kV, 15 kV), and how many MV switches, relays, and battery systems are in scope? The medium-voltage distribution system covered under this solicitation operates at 11 kV. The equipment currently in scope includes: Medium-Voltage (MV) Switches: 33 Protective Relays: 37 Schweitzer Engineering Laboratories (SEL) protective relays Battery Systems: One (1) medium-voltage switchgear battery backup system Offerors should base their proposals on the inspection, testing, maintenance, and related services associated with the above equipment. Section 5.2 covers breakers 400A and above, but the lists include breakers below 400A (e.g., 100A 300A MCCBs). Are breakers under 400A in scope for testing? Circuit breakers rated below 400 amps are not included in the testing requirements of Section 5.2. Breakers rated below 400 amps that are listed and located within distribution equipment containing breakers rated 400 amps and above shall be manually exercised during the maintenance activity but are not required to undergo testing. The IR line item list skips items 157 163. Are these intentionally excluded or missing? Appears to be a numbering error where equipment has been added or removed during unrelated construction projects. Section 5.4 states problem connections shall be replaced or tightened. Is connector replacement included in the firm-fixed price, or handled as an out-of-scope repair? Please define "basic repair." Connector replacement required under Section 5.4 is included in the firm-fixed-price scope. "Basic repair" refers to minor corrective actions that can be completed without additional material costs beyond incidental consumables and without extending the scheduled work effort. Any repair involving replacement of equipment other than connectors, significant additional labor, or material costs not contemplated by the SOW will be considered out-of-scope work. For liquid-filled transformers, is fluid replacement and refill (and disposal of used oil) included in the fixed price or treated as additional work? Fluid replacement, refill, and disposal of used oil, when required based on testing results, are included within the firm-fixed-price scope of this contract and are the contractor's responsibility. As specified in the SOW, liquid-filled transformers shall have the cooling liquid tested and replaced when testing indicates the liquid no longer meets the manufacturer's specifications, and the transformer shall be refilled to the manufacturer's specified levels. ** Section 5.9 notes that if breaker or ATS settings are not available, the contractor may conduct a study. Is a coordination study in scope for pricing? Are current coordination and arc flash studies available? The most recent coordination study and arc flash study will not be shared outside of authorized staff. Offerors shall base their pricing on the information provided by the VA. Any additional coordination or arc flash studies performed by the contractor shall be at the contractor's expense and at no additional cost to the Government. Section 5.8 (4-hour outage test, 2029): please identify the local utility provider and confirm the services the contractor is expected to pay for. The planned outage is expected to occur between 7:30 a.m. and 11:30 a.m. on the assigned Sunday. The contractor shall include in its firm-fixed-price proposal onsite support from 7:00 a.m. to 3:00 p.m. to provide emergency response, troubleshooting, and technical support for power-distribution equipment covered by this SOW. A NETA-certified technician, qualified to troubleshoot and support the equipment included in this SOW, shall be onsite for the duration of the scheduled outage and restoration period. Should the outage extend beyond the planned 4-hour duration due to a malfunction of power-distribution equipment, the contractor shall continue to provide troubleshooting and technical support necessary to assist the Government in restoring electrical service. The Government will coordinate the outage with Cleveland Public Power and will be responsible for all utility-provider fees and outage-related costs. The contractor shall not be responsible for the cost of replacement parts, materials, or repairs that require work outside the scope of this contract. Any such work shall be handled in accordance with the contract provisions for additional work and shall require Government approval prior to execution. The Inspection and Acceptance section references "monthly inspection" and "response to service call." Neither appears elsewhere in the SOW. Are monthly inspections or emergency service calls required? If so, what are the response times? This requirement is not applicable to this solicitation. The references to "monthly inspection" and "response to service call" in the Inspection and Acceptance section were included in error and will be removed from the SOW. No monthly inspections or emergency service-call response requirements are included under this contract. The deliverables table lists ">30 days" and "14 days," while Section 6 requires reports within 7 days. Please clarify the required report turnaround times. The report turnaround times identified in the Deliverables table shall govern. The requirement in Section 6 stating that reports must be submitted within seven (7) days was included in error and will be corrected in the SOW. Contractors shall adhere to the report submission timelines specified in the Deliverables table. How many planned outages/shutdowns will be allowed per year, and will work requiring de-energization be limited to weekends (6 AM 6 PM)? Will VA perform switching and lockout, or is the contractor responsible? Planned outages will be scheduled as required to support the testing and maintenance activities identified in Section 5.10. Multiple pieces of equipment may be combined and tested during a single outage or testing day when determined to be beneficial to the Government. The exact outage schedule for each contract year will be determined by facility operational requirements, equipment availability, and the impact of the outage on medical center operations. When de-energization is required, outages are anticipated to occur on assigned Sundays during daylight hours. Specific dates and outage durations will be coordinated by the Government. The VA will perform all switching operations and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements. Will VA staff be available to support switching and load transfers during testing? VA staff will perform all switching operations, load transfer, and lockout/tagout (LOTO) of facility electrical equipment. Contractors shall not perform switching operations. During the maintenance period, contractor personnel shall apply their personal locks to the group lock box or other VA-approved LOTO device in accordance with applicable safety requirements. Are there any background investigation, PIV badge, or TB/vaccination requirements for contractor personnel? Contractor will need to complete background investigation and be issued a contractor badge. Please confirm the contract type is firm-fixed-price. Yes this will be awarded as a firm fixed-price contract. Please provide the applicable Service Contract Act wage determination for Cuyahoga County, OH. Service Contract Act WD #: 2015-4727 Please confirm whether 52.219-9 (Small Business Subcontracting Plan) applies, given the 100% small business set-aside. After further review 52.219-9 will not apply to this requirement. Section 52.212-2 references past performance, but the listed evaluation factors are Technical Capability and Price. Will past performance be evaluated as a separate factor? CPARS will be reviewed for negative past performance. Qualifications and experience: Under SOW Sections 7(C) (F) and 14(B) (C), may the electrical-contracting specialty, permanent licensed technical staff, technician certifications, and required experience and references be demonstrated through the proposed performing subcontractor? Or must the prime contractor independently satisfy those requirements? We understand that all applicable limitations on subcontracting would still need to be met. This requirement is intended for contractors whose primary business specialty is electrical testing, inspection, maintenance, and repair of electrical power distribution systems. The Government expects the prime contractor to possess the technical qualifications, experience, and personnel necessary to directly perform the primary work requirements identified in this SOW. While the use of subcontractors is not prohibited, the Government does not intend for the prime contractor's role to be limited solely to contract administration, quality assurance, and oversight while substantially all technical work is performed by a subcontractor. Offerors shall comply with all applicable subcontracting and performance requirements identified in the solicitation and applicable regulations. Evaluation of offeror qualifications and experience will be conducted in accordance with the solicitation requirements and evaluation criteria. Are you able to provide the equipment list for the hospital? The equipment included in the scope of this contract is identified in Section 5.10 and other applicable sections of the SOW. No separate equipment list will be provided. Offerors should use the information contained within the SOW for proposal preparation. Are you able to provide the most recent inspection and/or maintenance report? Prior test reports will not be shared outside of authorized staff. Can the Government clarify what constitutes minor repairs included in the fixed-price requirement versus repairs requiring a separate contract modification? Minor repairs are those corrective actions that are incidental to the testing, inspection, and preventive maintenance services specifically identified in the SOW and that can be completed as part of the scheduled maintenance effort without requiring replacement of major equipment or components. Examples include tightening electrical connections, torquing hardware, cleaning, lubrication, adjustment, calibration, minor housekeeping activities, and similar corrective actions identified during testing and inspection. The SOW expressly includes "onsite testing, inspection, minor repair, and housekeeping" as part of the required services. Repairs that exceed basic or minor repair, including major component replacement, equipment refurbishment, or other work outside the defined maintenance and testing scope, shall not be performed under the fixed-price requirement. The contractor shall submit a cost estimate and scope of work to the COR for review and routing to the Contracting Officer (CO). Such work requires CO approval and may require a separate order/contract or contract modification and funding authorization before performance. As stated in the SOW, "In the event faults or repairs identified during maintenance or inspection exceed basic repair, Contractor shall submit cost estimate and Scope of Work to COR for routing to CO for approval and contract modification. No repairs or work outside the scope of this contract shall be performed prior to CO approval and fund allocation."
79%
Combined Synopsis10/30/2026
SUMMARY The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Network Contracting Office (NCO) 5, is issuing this Sources Sought Notice to identify vendors that are interested in and capable of providing the required services. The Louis A. Johnson VA Medical Center, located in Clarksburg, WV, requires a contractor to provide Triennial Electrical System Inspection, Testing, and Maintenance for the facility. Interested vendors should review the Statement of Work (SOW) to determine the specific services required. NCO 5 is seeking responses from firms that are interested in this procurement and possess the resources, capabilities, and qualifications necessary to perform these services. Anticipated NAICS CODE 238210, PSC CODE J061 Please submit your capabilities statement and provide responses to all questions listed below. SOURCES SOUGHT NOTICE: 36C24527Q0039 1. Business name (including Unique Entity ID (SAM.gov) 2. Business type, socio-economic status (e.g., Veteran-Owned, Woman-Owned, Disadvantaged Small Business, 8(a), etc.), and 3. Person of contact (including telephone number & email address). 4. Capability statement and summary of previous experience providing these types of services for the Veterans Health Administration or other similar facilities. 5. Available contract vehicles (GSA FSS, etc.) for use by Department of VA (including applicable NAICS) 6. Brief Summary of categories of services that your company can/cannot provide. 7. Certification(s) / Licenses for meeting the local requirements to provide these services at the DC VAMC (if applicable) 8. Confirmation that your organization has the capability and expertise to meet the performance requirements while complying with applicable limitations in subcontracting by responding to the questions below with your response: a. Do you intend to self-perform this effort? b. If you are located outside the immediate area, how will you self-perform? c. Or do you intend to subcontract work under this contract? If you intend to subcontract work under this contract, how will you ensure compliance with the limitations on subcontracting? Response Instructions: Respond to this Notice 36C24527Q0039 by 11-05-2026 @ 10 AM ET. Send all responses to Billie.Pratt@va.gov Subject line on email: 36C24527Q0039 Sources Sought Notice | Company Name STATEMENT OF WORK Triennial Electrical System Inspection, Testing, and Maintenance Louis A. Johnson VA Medical Center (688) 1 Medical Center Drive Clarksburg, WV 26301 Document Number ENG-SOW-2026-ELEC-TRI-001 Revision Rev 1 Generator load bank, arc flash, and power quality scope removed (separate contracts) Date Issued May 2026 Originating Activity Engineering Service (138), LAJ VAMC Cognizant Official Contracting Office VISN 5 Network Contracting Office Anticipated Vehicle Firm-Fixed-Price (FFP), Single-Award Set-Aside To be determined by Contracting Officer (SDVOSB priority per VAAR 819.7004) Period of Performance 180 calendar days from NTP, with mobilization NLT 30 days from award 1.0 GENERAL INFORMATION 1.1 Purpose The Department of Veterans Affairs (VA) requires a qualified electrical testing contractor to perform the triennial inspection, testing, and preventive maintenance of the normal and Essential Electrical System (EES) distribution and support equipment at the Louis A. Johnson VA Medical Center (LAJ VAMC), Clarksburg, West Virginia. The intent of this work is to verify the integrity, reliability, and code compliance of the in-scope electrical equipment, identify and correct deficiencies, and provide the documentation required to satisfy The Joint Commission (TJC), CMS Conditions of Participation, NFPA, and VA accreditation/inspection requirements for the elements within scope. 1.2 Background LAJ VAMC is a VHA Complexity Level 2 medical center within VISN 5. The campus electrical distribution serves Type 1 Essential Electrical Systems under NFPA 99 (Life Safety, Critical, and Equipment Branches). Buildings within scope include the main hospital, Boiler Plant, building 7, Building 20, the Clinical Addition, and supporting structures. The previous comprehensive triennial electrical inspection was performed in CY 2023; this procurement covers the CY 2026 cycle for the in-scope equipment. Generator triennial preventive maintenance and 3-year load bank testing (NFPA 110-2025 §8.4.2), the arc flash risk assessment / coordination study refresh, and any campus power quality / harmonics survey are being procured under separate contract vehicles and are NOT within the scope of this SOW. 1.3 Objective Achieve and document one hundred percent (100%) compliance with all applicable codes and standards listed in Section 3.0 for the equipment categories within scope, including but not limited to NFPA 70-2023 (NEC), NFPA 70B-2023, NFPA 70E-2024, NFPA 99-2024, NFPA 101-2024, NFPA 111-2022, ANSI/NETA MTS-2023, VHA Directive 1028, and VA PG-18-10. 1.4 Definitions and Acronyms Acronym Definition AHJ Authority Having Jurisdiction ATS Automatic Transfer Switch CHENG / DCE Chief Engineer / Deputy Chief Engineer COR Contracting Officer's Representative EES Essential Electrical System (NFPA 99 Type 1) GFCI Ground-Fault Circuit Interrupter IRT Infrared Thermography LAJ VAMC Louis A. Johnson VA Medical Center, Clarksburg, WV NETA InterNational Electrical Testing Association PM Preventive Maintenance SOW Statement of Work UAN / UAC Utility Advisory Notice / Utility Advisory Committee UPS Uninterruptible Power Supply VLF Very Low Frequency (cable test method) NF 2.0 SCOPE OF WORK The Contractor shall furnish all labor, supervision, NETA-certified personnel, licensed electricians, professional engineering oversight, test equipment, calibrated instrumentation, materials, transportation, lodging, per diem, and incidentals necessary to perform the triennial inspection, testing, cleaning, and minor corrective maintenance of the in-scope electrical distribution and support equipment at LAJ VAMC, in accordance with Sections 3.0 and 4.0 of this SOW. 2.1 General Scope Summary Work shall include, but is not limited to: Visual, mechanical, and electrical testing of medium-voltage (MV) and low-voltage (LV) switchgear, switchboards, panelboards, motor control centers (MCCs), distribution and unit substations, dry-type and liquid-filled transformers, busway, and feeder cables. Functional testing and exercising of all Automatic Transfer Switches (ATSs) on the Life Safety, Critical, and Equipment Branches. Protective relay testing, calibration, and trip-curve verification on all MV and selected LV electronic-trip breakers (settings verified against the existing Government-furnished coordination study; no study revision performed under this SOW). Insulation resistance, contact resistance, and primary injection testing of LV power circuit breakers; secondary injection where applicable. Ground electrode and grounding system resistance testing (3-point fall-of-potential). Energized infrared thermographic survey of all electrical equipment from service entrance through branch panelboards. Patient care space receptacle testing in accordance with NFPA 99-2024 §6.3.3.3 (line voltage, polarity, grounding integrity, retention force). UPS battery system inspection and testing in accordance with NFPA 111-2022 and IEEE 1188 (VRLA) / IEEE 450 (vented). Documentation reconciliation of in-scope equipment maintenance records, deficiency reporting, and final triennial test report package. 2.2 Out of Scope (Procured Under Separate Contracts) The following are EXCLUDED from this contract and are being procured under separate contract vehicles: Generator triennial preventive maintenance and the NFPA 110-2025 §8.4.2 three-year load bank testing of the four (4) facility emergency standby generators. Arc Flash Risk Assessment update and Short-Circuit / Time-Current Coordination Study refresh, including arc flash labeling. (The Contractor under this SOW shall use the Government-furnished current arc flash study and labels for PPE selection only.) Campus Power Quality / harmonics survey, including IEEE 519 evaluation, transient capture, voltage sag/swell logging, and any related instrumentation. Replacement of major equipment (e.g., generators, transformers, switchgear) beyond the minor consumables and corrective work allowed under CLIN 0013. New construction, renovation, or substantial design work. Medium-voltage cable replacement (testing only is in scope). Lightning protection system inspection (separate NFPA 780 contract). Fire alarm system testing (separate NFPA 72 contract). Repairs exceeding $2,500 per item without prior written authorization from the Contracting Officer. 3.0 APPLICABLE DOCUMENTS, CODES, AND STANDARDS All work shall conform to the latest edition adopted by the AHJ as of the date of award. Where standards conflict, the most stringent shall govern. Contractor shall verify edition currency with the COR prior to mobilization. NFPA 110 and NFPA 70E are listed for limited reference (documentation reconciliation, contractor electrical safety) only; no testing under those standards is performed under this SOW. 3.1 National Fire Protection Association (NFPA) Standard Title Edition NFPA 70 National Electrical Code (NEC) 2023 NFPA 70B Standard for Electrical Equipment Maintenance (mandatory) 2023 NFPA 70E Electrical Safety in the Workplace (contractor safety only) 2024 NFPA 99 Health Care Facilities Code 2024 NFPA 101 Life Safety Code 2024 NFPA 110 Emergency & Standby Power (ATS / documentation reference only) 2025 NFPA 111 Stored Electrical Energy Emergency and Standby Power Systems 2022 3.2 Department of Veterans Affairs (VA) VHA Directive 1028 (current) Electrical Power Distribution Systems VA Master Construction Specifications, Division 26 Electrical (current) VA PG-18-10 Electrical Design Manual for VA Hospital Facilities (current) VA PG-18-3 Topic 3, Design and Construction Procedures 3.3 Industry Standards ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications for Electrical Power Equipment and Systems ANSI/NETA ETT-2022 Standard for Certification of Electrical Testing Technicians IEEE 43 Recommended Practice for Testing Insulation Resistance of Electric Machinery IEEE 80 / 81 Substation Grounding / Earth Resistance Measurement IEEE 400.2 Field Testing of Shielded Power Cable Systems Using VLF ( 0.1 Hz) IEEE 450 Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries IEEE 1188 Maintenance, Testing, and Replacement of VRLA Batteries IEEE C57.12.90 Test Code for Liquid-Immersed Distribution Transformers IEEE C57.106 Guide for Acceptance and Maintenance of Insulating Oil IEEE C2 (NESC) National Electrical Safety Code ASTM D877 / D1816 Dielectric Breakdown of Insulating Liquids 3.4 Regulatory and Accreditation The Joint Commission (TJC) Environment of Care: EC.02.05.03, EC.02.05.05, EC.02.05.07, EC.02.05.09 (in-scope elements only) CMS Conditions of Participation, 42 CFR §482.41 Physical Environment OSHA 29 CFR 1910.137 Electrical Protective Equipment OSHA 29 CFR 1910.269 Electric Power Generation, Transmission, and Distribution OSHA 29 CFR 1910 Subpart S Electrical OSHA 29 CFR 1926 Subpart K Electrical (Construction) 4.0 TECHNICAL REQUIREMENTS Each subsystem below corresponds to a Contract Line Item Number (CLIN) in Section 12.0. All testing shall conform to the visual, mechanical, and electrical test procedures and pass/fail acceptance criteria of ANSI/NETA MTS-2023 unless a more stringent VA or NFPA requirement applies. 4.1 Medium-Voltage (15 kV Class) Switchgear and Distribution Applies to the campus 15 kV-class metal-clad/metal-enclosed switchgear, primary disconnects, MV cable, and step-down transformers feeding the main hospital service. 4.1.1 Visual and Mechanical (NETA MTS §7.1) De-energize, lock-out / tag-out (LOTO), clean (vacuum and approved solvent) all compartments; inspect for arc tracking, contamination, corona, mechanical damage, hardware torque per manufacturer. Verify nameplate, mechanical interlocks, key interlock schemes, racking mechanisms, shutters, and viewing windows. Inspect grounding, bonding, and ground bus continuity. Lubricate per manufacturer; replace consumables (filters, desiccants, indicator lamps). 4.1.2 Electrical Tests (NETA MTS §7.1) Insulation resistance phase-to-phase and phase-to-ground, 1 minute (5,000 VDC for 15 kV class). AC overpotential / VLF withstand on MV cables per IEEE 400.2 (0.1 Hz, 22 kV peak for 15 kV class), if cable age exceeds 10 years. Contact resistance (ductor) on bus connections ( +50% of like-equipment baseline). Vacuum bottle integrity test (DC overpotential) on vacuum interrupters. Power factor / dissipation factor on MV bushings, CTs, and transformers (Doble M4000 or equivalent). 4.2 Low-Voltage Switchgear, Switchboards, and Panelboards 4.2.1 Visual and Mechanical (NETA MTS §7.1, §7.5, §7.6) Open and inspect every switchboard, distribution panel, and lighting panelboard not exceeding 24 months since last internal inspection (priority: service entrance, EES gear, ICU, OR, ED panels). Torque-check all bolted bus connections to manufacturer specification or NETA Table 100.12; document with calibrated torque wrench. Verify breaker-to-bus stab integrity, bracing, and bonding. 4.2.2 Electrical Tests Insulation resistance, phase-to-phase and phase-to-ground, 1,000 VDC minimum for 600 V class. Primary current injection on all main, tie, and feeder LV power circuit breakers 800 A frame; secondary injection on solid-state trip units. Settings shall be verified against Government-furnished current Coordination Study; deviations shall be reported as deficiencies. Contact / pole resistance on every LV power breaker; compare to baseline. GFCI testing on all required circuits (operability + 6 mA trip per UL 943). Verify and tighten neutral and ground bonding; verify single-point bonding at separately derived systems per NEC 250.30. 4.3 Distribution and Unit Substation Transformers Includes campus dry-type transformers and any liquid-filled units within scope. Visual inspection: enclosures, ventilation, bushings, indicators, sound level, infrared baseline. Insulation resistance (1 min / 10 min, polarization index) per IEEE 43. Turns-ratio test (TTR) all taps, all phases. Winding resistance (DC) per IEEE C57.12.90. For liquid-filled: dielectric breakdown (ASTM D877/D1816), Dissolved Gas Analysis (DGA) per IEEE C57.104, water content, acidity, IFT, and color. Verify and torque all bolted connections. 4.4 Automatic Transfer Switches (ATS) Life Safety, Critical, Equipment Branches Inspect contacts, mechanism, controllers, and wiring on every ATS. Verify timing settings: TDNE (time delay normal-to-emergency), TDEN, TDES, TDEC; document against NFPA 110 §6.2.6 and facility settings. Perform load-side and source-side voltage and phase rotation checks. Functional transfer test under no-load and (Government-coordinated) under-load; document transfer times. Bypass-isolation operation (where equipped) exercise both bypass and isolation positions. Replace consumable contacts where pitting > 25% per manufacturer. NOTE: Generator starting and the load-side EPSS performance test under NFPA 110-2025 §8.4.2 are excluded from this SOW (separate contract). ATS-side functional verification shall be coordinated with the generator contractor's testing window where practical. 4.5 Protective Relay Testing Test all MV protective relays (50/51, 50/51N, 87, 27/59, 81, etc.) per ANSI C37.90 and NETA MTS §7.9. Verify settings against the Government-furnished current Coordination Study any deviation reported as a deficiency. (Study revision and arc flash incident energy recalculation are out of scope; see §2.2.) Functional trip test through the breaker (system test) on at least one device per protection zone. Provide before-and-after settings record and certified test reports. 4.6 Grounding System Three-point fall-of-potential test on the main service ground per IEEE 81; target 5 ohms per VA PG-18-10. Two-point bond-resistance testing on equipment grounds and lightning ground ring tie-ins (visual only for LP system). Verify isolated ground (IG) integrity in patient care spaces and IT/data closets. 4.7 Infrared Thermographic Survey Energized scan with calibrated radiometric camera ( 0.05°C NETD, 50 V; permit must be approved by the DCE or CHENG. LOTO procedures shall conform to 29 CFR 1910.147 and the LAJ VAMC LOTO program; group lockout for multi-employer work. 9.2 PPE Arc-rated PPE selected from the Government-furnished current site-specific arc flash labels and study; if any in-scope equipment is missing a current label, work on that equipment shall STOP and the COR notified. Voltage-rated rubber gloves (Class 0/2/4 as appropriate), tested within last 6 months. Insulated tools rated for system voltage. 9.3 Test Equipment All instruments shall be calibrated within the last 12 months by a NIST-traceable lab; calibration stickers and certificates shall be available on request. Use only Cat III / Cat IV-rated meters appropriate to the system voltage. 9.4 Reporting Any near-miss, injury, or property damage shall be reported to the COR within 1 hour. Daily safety briefings (tailgates) documented and provided to the COR weekly. 10.0 ACCEPTANCE, WARRANTY, AND QUALITY ASSURANCE 10.1 Acceptance Criteria All test results meet the pass/fail thresholds of ANSI/NETA MTS-2023 and the manufacturer's published values. All deficiencies discovered are documented, classified (Priority 1 4), and either corrected within scope or reported with Class A engineering recommendations. All required documentation submitted, accepted, and incorporated into the LAJ VAMC Engineering record set and TJC EOC binder. Compliance crosswalk demonstrates 100% coverage of NFPA 70 / 70B / 99 / 111, TJC EC.02.05.x (in-scope elements), CMS §482.41, and VHA Directive 1028 line-items in scope. 10.2 Warranty Workmanship warranty: minimum twelve (12) months from date of Government acceptance of final report. Any retest required to validate corrected deficiencies during the warranty period shall be performed at no additional cost. 10.3 Quality Assurance Surveillance Plan (QASP) The Government will administer the QASP through the COR, with surveillance methods including: 100% inspection of submittals, random sampling of field test data sheets ( 10%), customer complaint resolution, and final acceptance review. Performance metrics: Schedule adherence: 95% of Level-2 schedule milestones met. Submittal quality: 5% return rate for revision. Safety: zero recordable incidents; zero electrical-contact events. Compliance: 100% of in-scope code requirements addressed and documented. 11.0 GOVERNMENT-FURNISHED PROPERTY AND INFORMATION The Government will provide: Existing single-line diagrams, prior triennial reports, current Arc Flash Study and labels, current Coordination Study, and EPSS records (electronic copies). Access to the facility, equipment rooms, and key control during the Period of Performance. Designated laydown / staging area outside the building footprint. Trash/recycling and standard sanitary facilities. PIV/contractor flash credentials following completion of background investigations. The Government will NOT provide: Tools, instruments, calibration services, consumables, PPE, or test equipment. Lodging, meals, transportation, or per diem. 12.0 CONTRACT LINE ITEM NUMBER (CLIN) STRUCTURE The IGCE issued under separate cover (ENG-IGCE-2026-ELEC-TRI-001 Rev 1) reflects the following 14-CLIN structure. Offerors shall price each CLIN as Firm-Fixed-Price (FFP) except where noted. CLIN Description Type / Unit 0001 Project Management, Submittals, and Mobilization FFP / Lot 0002 Medium-Voltage Switchgear & MV Cable Testing FFP / Lot 0003 Low-Voltage Switchgear, Switchboards, Panelboards FFP / Lot 0004 Distribution & Unit Substation Transformers FFP / Lot 0005 Automatic Transfer Switches (all branches) FFP / Lot 0006 Protective Relay Testing & Calibration FFP / Lot 0007 Grounding System Testing FFP / Lot 0008 Infrared Thermographic Survey FFP / Lot 0009 Patient Care Receptacle Testing (NFPA 99 §6.3.3.3) FFP / Lot 0010 UPS / Battery Systems (NFPA 111) FFP / Lot 0011 Documentation Reconciliation & Compliance Crosswalk FFP / Lot 0012 Final Reporting & Project Closeout FFP / Lot 0013 Contingency for Minor Corrective Maintenance (NTE) T&M / NTE 0014 Optional After-Hours / Weekend Premium Pool Option / NTE 13.0 COMPLIANCE CROSSWALK (100% MAP IN-SCOPE ELEMENTS) The following matrix maps each in-scope element to the governing standard. Generator/EPSS, arc flash, and power quality compliance are addressed by separate contracts. Scope Element / CLIN Primary Standard(s) Accreditation Tie-In MV Switchgear (CLIN 0002) NETA MTS §7.1; NFPA 70 Art. 110, 230, 240; NFPA 70B §11 TJC EC.02.05.05; VHA Dir 1028 LV Distribution (CLIN 0003) NETA MTS §7.5, §7.6; NFPA 70 Art. 408, 240; NFPA 70B §11 TJC EC.02.05.05; CMS §482.41 Transformers (CLIN 0004) NETA MTS §7.2; IEEE C57; NFPA 70B §13 TJC EC.02.05.05 ATS (CLIN 0005) NETA MTS §7.22; NFPA 110 §6.2; NFPA 99 §6.7 TJC EC.02.05.07; VHA Dir 1028 Relays (CLIN 0006) NETA MTS §7.9; ANSI C37.90; IEEE C37.2 TJC EC.02.05.05 Grounding (CLIN 0007) NETA MTS §7.13; IEEE 81; NEC Art. 250 VA PG-18-10 IRT (CLIN 0008) NFPA 70B Annex L; NETA MTS §9 TJC EC.02.05.05 Patient Receptacles (CLIN 0009) NFPA 99-2024 §6.3.3.3; NEMA WD-6 TJC EC.02.05.05; CMS §482.41 UPS / Batteries (CLIN 0010) NFPA 111-2022; IEEE 450 / 1188 TJC EC.02.05.07 Documentation (CLIN 0011, 0012) NFPA 70B §8 TJC EC.02.05.01 13.1 Compliance Coverage Boundary Statement This SOW achieves 100% compliance for all in-scope equipment listed above. The complete LAJ VAMC electrical compliance posture for the CY 2026 cycle is achieved through the combined deliverables of THIS contract plus the following separate contracts: (a) Generator triennial PM and 3-year load bank (NFPA 110-2025 §8.4.2) covering EPSS testing; (b) Arc flash risk assessment update and short-circuit/coordination study refresh (NFPA 70E §130.5; IEEE 1584); and (c) Campus power quality / harmonics survey (IEEE 519). The Engineering Service is responsible for the integrated compliance crosswalk across all three procurements.
73%
Market Research11/05/2026
72%
Solicitation11/02/2026
This is a Notice of Intent to Sole Source published in accordance with Federal Acquisition Regulation (FAR) RFO 5.101(a) Pre-solicitation notice requirements and (FAR) RFO 12.102 Restricting Competition. This Notice of Intent is for a proposed award of an open market sole source award to EATON CORPORATION for a Service and Preventative Maintenance contract for the following UPS equipment. EATON UPS MODEL 9390-160 - EH456CBC09 9390-160 EE423CAB13 93PM EN493UXX02 93PM EN373UXX02 93PM ES265UXX06 93PM ES262UXX03 93PM ET074UXX02 93PM ES255UXX04 The location of service will be at the Hershel "Woody" Williams VA Medical Center 1540 Spring Valley Drive Huntington, WV 25704-9300. The proposed award is for EATON CORPORATION UEI: NP3NSFVMNUM3. As the original equipment manufacturer (OEM), and an ISO9001 certified supplier, Eaton Corporation (formerly: Eaton Electrical Inc. and Powerware ) is the provider of factory-supported, factory trained, factory authorized and factory certified service for your critical UPS (Uninterruptible Power Supply) equipment. Eaton offers power quality services for its UPS products, as well as for related equipment such as power distribution units (PDUs), batteries, alternative energy devices and Cutler-Hammer switchgear. Eaton also services products from legacy brands, including Powerware, Exide Electronics, Best Power, IPM, Deltec and Lortec. Eaton is the only authorized provider of service support with the Eaton developed proprietary service software for 3-phase Eaton UPS products. Eaton does not train, certify or support independent third party service providers to deliver or service Eaton UPS and power quality products. Due to its lack of training on competitor s platforms Eaton does not service non-Eaton branded power quality equipment. Eaton only works on its own branded equipment or devices it s been certified to fully support and maintain (e.g., flywheels, static transfer switches). No other service supplier is authorized to possess Eaton proprietary (copyrighted) software, repair documentation, processes or materials. The Period of Performance is for 1 year / 12 months of service. Flex Plan with Two UPS and Two Battery Preventive Maintenance Checks for all 8 systems. The North American Industry Classification System (NAICS) code for this service is 238210 (Electrical Contractors and Other Wiring Installation Contractors). The Product Service Code (PSC) is J061 (Maint/Repair/Rebuild of Equipment- Electric Wire and Power Distribution Equipment). Small business size standard is $19 Million. While this synopsis does not constitute a solicitation, interested vendors may identify their interest and capability to satisfy the requirement. All responsible sources may submit a capability statement, which shall be considered by the agency, by emailing such statement and supporting documentation by NLT 10:00 AM Eastern Time (ET), 11/12/2026 to William Pratt at billie.pratt@va.gov . Please reference the announcement number (36C24527Q0046) in the subject line of the e-mail. Such documentation will be reviewed solely for the purpose of determining whether or not to conduct the procurement on a competitive basis. A determination not to compete this requirement, based upon responses to this notice, is solely within the discretion of the Government under authorities cited above. See attached: UPS OEM Sourcing Letter Eaton Corp.
71%
Pre-Solicitation11/12/2026
(i) This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. (ii) This solicitation is issued as a request for quotations (RFQ) # 36C24927Q0027. (iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2026-01 (eff. 03/13/2026) FAR Deviation APR 2026 (eff. 04/23/2026) VAAR DEVIATION OCT 2026 (eff. 10/01/2026) VAAM Alert 26-01 (eff. 10/01/2025) Acquisition Policy Flash 27-02 eff. 10/01/2026). (iv) This procurement is a 100% Service-Disabled Veteran-Owned Small Business Set-Aside. The associated North American Industrial Classification System (NAICS) code for this requirement is NAICS Code 238210 Electrical Contractors and Other Wiring Installation Contractors ($19 million dollars) SBA Size Standard. Business size status shall be listed and verified with the US Small Business Administration's Small Business Search at https://search.certifications.sba.gov/, at the time of quote submission and award. (v) This is a base plus four one-year option service contract to provide annual preventative maintenance and load bank testing on power generators and fuel tanks as listed below. Below is a template for pricing. Contractors may provide their own pricing document, but it must be broken down to allow for lowest price technically acceptable determination. (vi) The following solicitation provisions apply to this acquisition: 1. FAR 52.212-1, Instructions to Quoters Commercial Items (Addendum attached) 2. FAR 52.212-2, Evaluation-Simplified Acquisition Procedures 3. FAR 52.212-3, Offerors Representations and Certifications Commercial Items (www.sam.gov registration is required to be complete at time of submission of response) (vii) The following clauses are applicable to this acquisition: FAR 52.212-4, Contract Terms and Conditions-Commercial Products and Commercial Services and any addenda to the clause. FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services and regarding which, if any, of the additional FAR clauses cited in the clause are applicable to this acquisition. (viii) Quotes are due November 19, 2026 by 12:00 PM CT. Quotes shall be submitted via email to: adrian.king@va.gov. Quotes received after this date and time will be considered late in accordance with FAR Provision 52.212-1 and will not be evaluated unless the Contracting Officer determines the late quote will be accepted IAW FAR 52.212-1(f)(2)(i)(A-C). Instructions are listed on page 7-9. Quoters shall review the Statement of Work (SOW) below and provide pricing using the following Price/Cost Schedule.
71%
Combined Synopsis12/09/2026

Additional Details

Solicitation Number

36C26224Q1049

Archive Date

May 31, 2024

Office Address

Gilbert, AZ, 85297