Notice ID: c2596564f6384620ac077458dfa01fdbAward NoticeAwarded
Y1DA--PN: 636-18-304, Construct Combined Energy Plant Phase 1 (OM) 2237 - 636-22-4-5988-0002; 36C26322C0094
Awarded on July 21, 2022. Full description on SAM.gov.
Awarded tounder 36C26322C0094 (source: SAM.gov award notice)• $27.4M
Overview
- Posted
- July 25, 2022
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- VA Nebraska Western Iowa Health Care System 4101 Woolworth Avenue, Omaha, NE, 68105
- Last updated
- Sep 9, 2025
- Award date
- Jul 21, 2022
- Award amount (SAM.gov award notice)
- $27.4M
Identifiers
- Solicitation number
- 36C26322R0065
- Notice ID
- c2596564f6384620ac077458dfa01fdb
- Award number (PIID)
- 36C26322C0094
Description
Page 1 of 1 The Department of Veterans Affairs, NCO 23, Nebraska-Western Iowa Health Care System Construction Contracting Product Line Team 2 is soliciting for a construction project for the Omaha VA in Omaha, Nebraska that shall include, but not be limited to, furnishing all labor, materials, tools, equipment, transportation and supervision including demolition and removal of existing element indicated for removal, to perform work associated with this project as required by the drawings and specifications. The Project 636-18-304, Construct Combined Energy Plant Phase 1 (Chiller Plant), Omaha, Nebraska requires the construction of a new chiller plant adjacent to the boiler plant on the east side of campus. The chiller plant will house two (2) centrifugal chillers and relocate the temporary chiller from the existing plant next to the new building. It will also be constructed to be expandable for future campus growth needs. Removal of an existing metal storage shed is required to accommodate this construction. The estimated construction cost is $10M and $20M. Deductive Bid Alternates are included. Solicitation Number 36C26318B0065 for this effort will be posted to FedBizOpps (www.fedbizopps.gov) on or about February 8, 2022. This solicitation will contain all necessary specifications, drawings and other information necessary to bid the project. An Organized site visit will be held, see solicitation for date and time. The date for request for proposal is tentatively scheduled for Tuesday, March 8, 2022 (see solicitation when available for specific information.) The successful bidder will be required to provide a Performance Bond, Payment Bond, or Irrevocable Letter of Credit within 10 calendar days of award notification. The Period of Performance is 550 calendar days from the issuance of the Notice to Proceed. THIS SOLICITATION IS SET-ASIDE FOR SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (SDVOSBs) UNDER PUBLIC LAW 109-461.
Award Overview
Award Number
36C26322C0094
Award Amount (SAM.gov award notice)
$27.4M
Award Date
Jul 21, 2022
Awardee
Awardee UEI
RZDNMLWD95E5
Original Solicitation
Notice ID: c2596564f6384620ac077458dfa01fdb
Posted Date: Jul 25, 2022
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $3.8MSigned Aug 18, 2026
- $2.6MSigned Aug 18, 2026
- $6.2MSigned Jul 23, 2026
- $6.2MSigned Jul 23, 2026
- —Signed Jun 22, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C26322R0065- Pre-Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationJan 13, 2022
Y1DZ--PN: 636-18-304, Construct Combined Energy Plant Phase 1 (OM)
- AwardedCurrentJul 25, 2022
Y1DA--PN: 636-18-304, Construct Combined Energy Plant Phase 1 (OM) 2237 - 636-22-4-5988-0002; 36C26322C0094
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
438-21-403, Renovate First Floor Kitchen | - | Solicitation | 11/12/2026 |
Amendment 0001 incorporates a copy of the ICRA, Site Visit attendance sheet, responses to the Site Visit questions and a revised DBA Wage Determination. This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. All measurements/dimensions existing blueprints are approximate. Contractor must verify all measurements/dimensions. The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval. The Contractor shall match existing conditions at each location. The contractor will be responsible for and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials. | - | Solicitation | 09/02/2026 |
This is a Pre-Solicitation Notice regarding project: 438-21-403, Renovate First Floor Kitchen at the Sioux Falls VA Health Care System, Sioux Falls, South Dakota. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a solicitation for a Firm-Fixed-Price contract for this project. Note: This is a Pre-Solicitation Notice only, the Solicitation will not be posted for at least 15 days from the date of this notice. This is NOT a request for proposal. Estimated SOLICITATION DATE: on or about 08/20/2026 Estimated AWARD DATE: 10/31/2026 SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) NAICS: 236220, Commercial and Institutional Building Construction $45.0 Million PROJECT MAGNITUDE: Between $10,000,000 and $20,000,000. THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered, certified, and listed in the SBA certification database at  https://veterans.certify.sba.gov/ as a SDVOSB/VOSB. Only bids from verified SDVOSB s at SBA certification database at the time of proposal submission shall be deemed responsive. All non-responsive bids shall be rejected and ineligible for award. SCOPE OF WORK 438-21-403, Renovate First Floor for New Kitchen Sioux Falls VA Healthcare System GENERAL INFORMATION Base Bid: The Contractor must provide all supervision, tools, labor, materials, equipment, services, and testing necessary to accomplish the Renovate First Floor for New Kitchen project per the construction drawings and specifications. The project must be accomplished by the contract drawings and specifications for the project 438-21-403. Follow OSHA and all VA regulations as outlined in specifications 01 00 00. This work includes but is limited to: Demolition as described on the design plans and specifications. The contractor is responsible for locating all the existing utilities within the project site before any excavation or site work begins. Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. Construction consists of, but is limited to: Site work includes fencing, excavation, grading, paving, and protection of existing utilities. Demolition of walls, floors, ceilings, equipment, heating/cooling ventilation, and electrical. Construction consists of architectural, structural, mechanical and electrical improvements. Installation of owner furnished equipment The existing kitchen is located on the 2nd floor of building 5. The project consists of renovating first floor of building 5. There are phases to ensure the kitchen and VA staff provide meals for the impatient staff during the construction. Phasing is required to keep the existing kitchen operational. Additional construction projects will be occurring at the same time and near the kitchen renovation space. Contractors are expected to coordinate with the other contractors to minimize the disruption to the hospital. Owner furnished equipment will be provided for contractor installation. Once the equipment is received the contractor must store the equipment on site in a humidity and temperature-controlled storage unit. Maintain 50% relative humidity and a temperature of 60 - 70 degrees Fahrenheit. VA will be badging all construction employees. Badging requires background checks and personal information on each contract employee that will be on site. Forms to be filled out by the contractors and submitted for the badging process. Submittal exchange shall be procured and managed by the contractor for all submittals; Phasing is required to ensure the hospital is functional throughout the request for information (RFI), architectural supplemental information (ASI), VA purchased contractor installed equipment, shop drawings, and other project tracking needs for the duration of the project. Specification section 11 40 00 and plan sheet FS101 and plan sheet FS103 include the owner furnished kitchen equipment for a line item to be included in submittal exchange for review and acceptance. Night and weekend work will be expected to keep the campus fully functional during the construction activities that cannot be accomplished during business hours. After-hours are typically 5:00pm and before 6:00am. A dedicated site superintendent managing the construction effort and a site safety health officer shall be present during all construction activities. A dedicated quality control manager for the quality of the construction effort must be provided by the contractor per specification 01 45 00. Other construction will be occurring during the project. Coordination with other contractors is expected to ensure no disruption to the hospital s daily functions. Accuracy of the Planned Information: Bidders are highly encouraged to conduct a thorough site visit to investigate all as-built conditions of the project area in this SOW. Discrepancies in Planning Information: The prime contractor must promptly report to the Contracting Officer in writing any discrepancies between plans and specifications and as-built conditions. The Prime Contractor shall make no adjustments to their work due to discrepancies prior to review by the Contracting Officer. Ownership of Drawings: All designs, drawings, specifications, notes, and other work developed in the performance of this contract shall be the sole property of the US Government. The Prime Contractor shall provide a list of all items specified for which no substitutions will be accepted. This list shall identify each item with the specification section in which the item is defined. Performance Period:  The contractor shall complete the work required under this SOW, Monday through Friday in 550 calendar days or less from Notice to Proceed, unless otherwise directed by the Contracting Officer (CO). Construction at the Government site shall not take place on Federal holidays or weekends unless approved by the project engineer. Tentative Schedule:  Contract Award A Pre-construction Conference A+7 Notice to Proceed D (A+12) Construction Start D+22 Construction Completion D+550 | - | Pre-Solicitation | 09/01/2026 |
Amendment 2 for additional questions received | - | Solicitation | 08/03/2026 |
The purpose of this amendment is to: Respond to vendor questions Publish updated Evaluation Factor 2 Provide updated SOW for POC update Provide the sign-in sheet from the 7/8/2026 site visit. | - | Solicitation | 08/03/2026 |
Additional Details
Solicitation Number
36C26322R0065
Archive Date
Oct 23, 2022
Office Address
Saint Paul, MN, 55101