Notice ID: 4a6e7b36ebe84141b5036e14635f5915Solicitation
H391--SDVOSB Set Aside - St Cloud - Underground Storage Tank Inspection
Archived on December 2, 2022. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM UTC−05:00
- Posted
- October 28, 2022
- Notice type
- Solicitation
- NAICS
- 541380: Testing Laboratories and Services
- Agency
- Department of Veterans Affairs
Notice details
- Office
- NETWORK CONTRACT OFFICE 23 (36C263)
- Place of performance
- St Cloud VAMC 4801 Veterans Dr, Saint Cloud, 56303
- Last updated
- Dec 6, 2025
Identifiers
- Solicitation number
- 36C26323Q0046
- Notice ID
- 4a6e7b36ebe84141b5036e14635f5915
Description
Q&A Underground Storage Tank Inspection and Maintenance Saint Cloud, MN 1. Do the ASTs from the original documents still need to be inspected? No 2. Do you need cathodic protection inspections on the piping? Is it a sacrificial anode or impressed current system? Yes. It is possible that we have both systems. 3. Do you want any fuel sampling? No 4. Is the existing piping system set up to do testing, with test ports and the necessary connections? Or does the ATG conduct a monthly leak test? The Omntec is set up for alarming of interstitial and sump, but not aware of any other testing . We print reports that will show volume changes and water level etc Per the solicitation: Minnesota UST rules require two types of release detection on pressurized piping: A mechanism or method to detect a "large" leak at a rate of 3 gallons per hour; and A mechanism or method to detect a "small" leak at a rate of 0.2 gallon per hour monthly or 0.1 gallon per hour yearly. Our Generator Day Tank has a pump pulling from the UST. This system has a return but don t know if you consider that a pressurized piping . We are not aware of any test ports for this test. Reports from the tank monitoring do have a G/H pass/fail. 1. Do you have current documentation with results? Yes 5. What is your current ATG system? OMNTEC
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Contract end date
Nov 27, 2023
NAICS
541380
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C26323Q0046- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationOct 18, 2022
H391--SDVOSB Set Aside - St Cloud - Underground Storage Tank Inspection
- 3×SolicitationCurrentOct 19, 2022
H391--SDVOSB Set Aside - St Cloud - Underground Storage Tank Inspection
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
| - | Awarded | Open | |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, quotes are being requested. Solicitation number 36C26326Q0973 is issued as a request for quotes (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2019-01. The NAICS code for the solicitation is 541380 with a size standard of $19.0 million. A list of the contract line items, quantities, and units of measure are listed within the attached solicitation documentation. The VA anticipates a firm fixed price contract award to provide services to VA Saint Cloud Health Care System, 4801 Veterans Dr., Saint Cloud, MN 56303. The period of performance is 01-15-2027 to 01-14-2028 for the base year period of performance. There are four (4) one-year option periods available at the government s discretion. FAR provisions 52.212-1 and 52.212-2 apply to this procurement and are detailed within the attached solicitation document. FAR clauses 52.212-4 apply to this procurement and are included within the attached solicitation document. Additional requirements are listed within the attached solicitation document. The Defense Priorities and Allocations System (DPAS) does not apply to this acquisition. Submission of Quotes Technical Questions are due to the Contracting Officer by 09/08/2026 at 12:00 PM Central Time. Quotes are due to the Contracting Office by 09/14/2026 at 12:00 PM Central Time. Quotes are required to be emailed to John.Milroy@VA.GOV in .pdf or .docx format only prior to the solicitation closing date and time. Offeror shall submit offers by Due Date/Time specified in Block 8 of Standard Form (SF) 1449 of solicitation to John Milroy, Contracting Officer, at john.milroy@va.gov with Solicitation 36C26326Q0973 in subject line. It is the responsibility of the offeror to ensure their quote is received in its entirety before the solicitation closing. Contact John Milroy, Contract Specialist at john.milroy@va.gov or 605-336-3230 ext. 7719 for information regarding the solicitation. | - | Combined Synopsis | 09/18/2026 |
Amendment 0002 to RFQ 36C26326Q0188 Adding Technical questions and answers Adding S02. RFQ 36C26326Q0188 Amended | - | Combined Synopsis | 08/21/2026 |
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section. | - | Solicitation | 11/18/2026 |
This is a PRE-SOLICITATION NOTICE. It is NOT a request for quotes (RFQ), invitation for bids (IFB), or request for proposals (RFP). This notice is provided for information and planning purposes only. It does not obligate the Government to any contractual action, including issuing a solicitation or awarding a contract. This is a statement that the Government intends to issue a Request for Quotes (RFQ) solicitation in the near future. The U.S. Army Corps of Engineers - St. Paul District will issue a Request for Quotes (RFQ) solicitation for a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation will be 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. | - | Pre-Solicitation | Open |
Additional Details
Solicitation Number
36C26323Q0046
Archive Date
Dec 2, 2022
Office Address
Saint Paul, MN, 55101