GovChime
Notice ID: da584577b3944191a3aa40008c6a0da6Combined Synopsis/Solicitation

J042--Fire Inspection and Maintenance Services

Archived on November 4, 2023. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM UTC−05:00
Posted
July 21, 2023
Notice type
Combined Synopsis/Solicitation
Set-aside
Veteran-Owned Small Business Set-Aside (specific to Department of Veterans Affairs)
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Veterans Affairs

Notice details

Office
NETWORK CONTRACT OFFICE 23 (36C263)
Place of performance
Department of Veterans Affairs Omaha NE VA Hospital 4101 Woolworth Ave, Omaha, 68105
Last updated
Dec 6, 2025

Identifiers

Solicitation number
36C26323Q0714
Notice ID
da584577b3944191a3aa40008c6a0da6

Description

Solicitation RFQ 36C26323Q0714 Amendment List of Changes Updated Solicitation Extension due date for responses to 7/28/2023, 10:00AM CST. Added site inspection sheets per questions.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C26323Q0714
  1. Combined Synopsis
  1. 3×
    Combined SynopsisCurrentJun 22, 2023

    J042--Fire Inspection and Maintenance Services

    Notice da584577b3944191a3aa40008c6a0da6 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
-AwardedOpen
RFQ 36C26327Q0060 Amendment 0002 Questions and Answers for solicitation posting
-Combined Synopsis11/10/2026
SOURCES SOUGHT NOTICE Grand Island VAMC Chiller #3 Controls Upgrade SUPPLY REQUIREMENT REPLACEMENT EQUIPMENT WITH INSTALLATION NAICS: 238220 | PSC: J041 | Small Business Size Standard: $19 million NOTICE PURPOSE The Department of Veterans Affairs (VA), Network Contracting Office (NCO) 23, is conducting market research to identify businesses capable of supplying replacement equipment for the existing YORK Chiller #3 controls at the Grand Island VA Medical Center, including associated installation, integration, testing, and startup. This is a sources sought notice only and is not a solicitation or request for quotations. No award will be made from responses to this notice, and the Government will not reimburse response costs. GENERAL REQUIREMENT The anticipated requirement includes furnishing YORK OEM variable-speed-drive (VSD) and associated controls components, including an OptiView control interface, for the existing chiller. Associated work includes removal of existing components, installation, integration with the facility s Johnson Controls Metasys building automation system, and manufacturer-authorized startup and verification. The Government is seeking information on whether businesses other than Johnson Controls can provide these supplies and associated services, including through authorized sources or subcontractors. PLACE OF PERFORMANCE Grand Island VA Medical Center, 2201 N Broadwell Avenue, Grand Island, NE 68803. INFORMATION REQUESTED Business name, address, UEI, point of contact, telephone number, and email address. Business size and socioeconomic status (including whether SBA-certified as an SDVOSB or VOSB). Brief description of capability to furnish the required YORK OEM components and coordinate installation, controls integration, and authorized factory startup. Whether the firm is a YORK-authorized supplier or service provider, or would use an authorized subcontractor; identify the anticipated arrangement and provide available supporting information. Relevant experience with similar chiller control equipment replacements. RESPONSE INSTRUCTIONS Submit responses by email no later than October 28, 2026, at 10:00 a.m. Central Time to amanda.patterson-elliott@va.gov. Include Grand Island Chiller #3 Controls Upgrade Sources Sought in the subject line. No phone calls. Technical questions will not be accepted at this market research stage. Responses are for planning purposes only and do not constitute offers. The Government has not determined that only one source is capable of meeting the requirement. ACQUISITION CLASSIFICATION REVIEW The NAICS, PSC, and size standard shown above reflect the currently identified codes and are subject to Contracting review for consistency with the intended supply classification before publication. DISCLAIMER This RFI is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this RFI that is marked as proprietary will be handled accordingly. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this RFI.
-Market Research10/28/2026
Presolicitation Notice Presolicitation Notice Page 4 of 4 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 4 This is a Pre-Solicitation Notice regarding Project Number: 636-27-101, Design-Build, Install Temporary Chillers {OM} for the VA Nebraska-Western Iowa Health Care System (VANWIHCS) at the Omaha VA Medical Center in Omaha, Nebraska. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a Two-Phase solicitation for a Design-Build contract for this project. Note: This is a Pre-Solicitation Notice only, the Solicitation will be posted for at least 15 days from the date of this notice. This is NOT a Request for Proposal (RFP). ESTIMATED (On or Around) SOLICITATION DATE (Phase I): on or about 11/9/2026 ESTIMATED (On or Around) AWARD DATE: 03/31/2027 SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) NAICS: 238220, Commercial and Institutional Building Construction $19.0 Million PROJECT MAGNITUDE: Between $2,000,000 and $5,000,000. THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered, certified, and listed in the SBA certification database at  https://veterans.certify.sba.gov/ as a SDVOSB/VOSB. Only bids from verified SDVOSB s at SBA certification database at the time of proposal submission shall be deemed responsive. All non-responsive bids shall be rejected and ineligible for award. Project Overview The project will require the selected contractor to provide all design, labor, materials, tools and equipment, and construction services necessary for the design and construction of the Project Number: 636-27-101, Design-Build, Install Temporary Chillers {OM} for the VA Nebraska-Western Iowa Health Care System (VANWIHCS) at the Omaha VA Medical Center in Omaha, Nebraska as defined by the Performance of Work Statement (PWS). The Two-Phase Design-Build solicitation and evaluation process shall be conducted in accordance with Revolutionary FAR Overhaul (RFO) 36.101-2 -Two-Phase Design-Build Selection Procedures. The issued Request for Proposal (RFP) shall set forth the requirements for responding to Phase I of the solicitation, as well as all technical evaluation factors and sub-factors for both Phase I and Phase II. At the closing date of the Phase I Solicitation, the government shall evaluate responsive proposals received in response to Phase I of the solicitation. No more than five (5) contractors will move forward to Phase II. Only those successful firms selected as a result of Phase I evaluations will be requested to submit technical and pricing proposals for Phase II. Phase II proposals shall be evaluated in accordance with the Phase II Evaluation Process. Background. This project requires a Design-Build (DB) Team to provide all professional design services, construction/installation, and commissioning necessary to integrate two government furnished-contractor installed Trane 1250-ton chillers into the Omaha VA Medical Center s central chilled-water system. Additionally, the scope of work includes the design and construction/installation of weatherproof chiller enclosures, associated mechanical/electrical infrastructure and all required civil (site preparation) and architectural improvements (new and existing buildings/enclosures) to support the installation. The contractor will utilize the supplied construction drawings and specifications from project 636-10-110 (enclosure 2) as Bridge Documents showing the general intent of this project and review the inventory list (enclosure 1) detailing all existing electrical, mechanical, structural, and other relevant components that are currently stored by the VA. It is the VA s preference that wherever feasible the design-build team incorporate these stored materials and equipment into the project. The D-B Team shall review the provided inventory list and assess the suitability of each item for reuse within the project scope. Successful offeror must be an integrated Design-Build team including licensed Architects, Engineers, and Construction specialists. At minimum, design disciplines shall include architectural, civil, structural, mechanical, electrical, plumbing, environmental, and fire protection engineering. Flowdown Requirements: All subcontractors shall adhere to the same requirements, with written acknowledgment required. NOTE: This Performance of Work Statement (PWS) will refer to the collective Design-Build Team, which includes both Design and Construction, for performance requirements pertaining to the entire scope of work. Where appropriate, Design Team or Construction Team may be used for specificity. All elements of design, construction, and post-construction are included in this PWS. Anticipated Period of Performance: The contract Period of Performance for the design phase shall be 120 calendar days from the Notice of Proceed. Period of Performance for total design and construction is 260 calendar days from the Notice of Proceed. The time stated for completion includes final cleanup of the premises, as-builts and closeout documents. If construction completion occurs during winter or other conditions that prevent immediate commissioning, the Contractor shall demobilize after completing the installation, connections, and equipment readiness requirements. The Contractor shall return to the site when conditions permit to perform commissioning, functional testing, punch-list completion, and as-built verification. The total period of performance shall not exceed 360 calendar days after issuance of the Notice to Proceed, unless otherwise authorized in writing by the Contracting Officer. All prospective bidders must have a Unique Entity Identifier (UEI) and must be registered and active in the SAM database (http://www.sam.gov). All prospective bidders must complete electronic online Representations and Certifications within SAM. The eventual awardee shall also have on file a current Department of Labor VETS4212 Federal Contractor Reporting filing at https://www.dol.gov/agencies/vets/programs/vets4212 (if applicable).
-Pre-Solicitation10/30/2026
-AwardedOpen

Additional Details

Solicitation Number

36C26323Q0714

Archive Date

Nov 4, 2023

Office Address

Saint Paul, MN, 55101