GovChime
Notice ID: 176d676e549a416ab732cd2d13686c78Award NoticeAwardedArchived

Y1DA--656-20-130, Repair Building 50 Basement Kitchen 36C26326C0022 PO; 656C0058

Awarded on February 26, 2026. Full description on SAM.gov.

Awarded tounder 36C26326C0022 (source: SAM.gov award notice)• $2.9M

Overview

Posted
February 26, 2026
Notice type
Award Notice
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Office
NETWORK CONTRACT OFFICE 23 (36C263)
Place of performance
Saint Cloud VA HCS 4801 Veterans Dr, St Cloud,, Minnesota, 56303
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov
Award date
Feb 26, 2026
Award amount (SAM.gov award notice)
$2.9M

Identifiers

Solicitation number
36C26326B0009
Notice ID
176d676e549a416ab732cd2d13686c78
Award number (PIID)
36C26326C0022

Description

The Contractor shall furnish all labor, materials, tools and equipment required to remodel the existing Dish room and Tray Service Line for the repair Building 50 basement Kitchen project. This project will focus on the failing Architectural, Mechanical, Electrical, Plumbing (MEP) and Heating Ventilating and Air Conditioning (HVAC) Systems that are nearing their end of life. Currently, the walls, ceiling and flooring finishes are continuously separating from the substrate and are beyond reasonable maintenance repair. This project will include a phased implementation of two (2) phases or less. An estimated square footage of remodeled space impact and phasing space is roughly 4,000 square feet remodeled for Nutrition and Foods, 2,000 square feet of common (mechanical rooms and phasing/impacted space). Incorporated in the construction, site prep for new kitchen equipment which will be evaluated accordingly by the A/E of record in the contract drawings. The kitchen and dish room located in building 50 basement are currently occupied, requiring construction phasing plans that would lessen the impact on all current operations and departments. The PoP is 320 Days

Full description on SAM.gov

Award Overview

Award Number

36C26326C0022

Award Amount (SAM.gov award notice)

$2.9M

Award Date

Feb 26, 2026

Awardee

Awardee UEI

J96QTKC5KVD4

Awardee CAGE Code

5B1A9

Awardee Address

WEST FARGO, ND 58078, ND

Original Solicitation

Notice ID: 176d676e549a416ab732cd2d13686c78

Posted Date: Feb 26, 2026

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 36C26324N0770
    MDM CONSTRUCTION, LLC
    Department of Veterans AffairsNAICS 236220
    $6.4MSigned Nov 4, 2026
  • 36C77625C0068
    MDM CONSTRUCTION LLC
    Department of Veterans AffairsNAICS 236220
    $13.9MSigned Oct 20, 2026
  • 36C77625C0068
    MDM CONSTRUCTION LLC
    Department of Veterans AffairsNAICS 236220
    $13.8MSigned Oct 9, 2026
  • 36C77625C0109
    MDM CONSTRUCTION LLC
    Department of Veterans AffairsNAICS 236220
    $23.2MSigned Oct 6, 2026
  • 36C77625C0109
    MDM CONSTRUCTION LLC
    Department of Veterans AffairsNAICS 236220
    $22.9MSigned Sep 11, 2026

Contacts

Contracting Officer

Primary Contact

Daniel R Dobler
Contract Specialist

Documents

Files (1)

  • 36C26326C0022_1.docx

    13 KBAdded in Award Notice version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    Y1DA--656-20-130, Repair Building 50 Basement Kitchen 36C26326C0022 PO; 656C0058

    Notice 176d676e549a416ab732cd2d13686c78 on SAM.gov

Other notices for this solicitation

  1. Pre-SolicitationRelated noticeNov 26, 2025

    Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002

    Notice 53c911566e454712b9dfb6f85f11a8e4 on SAM.gov

  2. SolicitationRelated noticeDec 30, 2025

    Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002

    Notice fb05d5b79d674f68970ea67072f029ba on SAM.gov

  3. SolicitationRelated noticeJan 2, 2026

    Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002

    Notice a21d05e1a1d840de888519ed6a9455a7 on SAM.gov

  4. SolicitationRelated noticeJan 5, 2026

    Y1AA--656-20-130 Repair Building 50 Basement Kitchen 656-26-2-3204-0002

    Notice da8b4e10559843d5a1d877c0b8be91e1 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Work shall include, but shall not be limited to providing all abor, materials, equipment, etc necessary to complete Fargo VA Health Care System project 437- 22-108, Place Chilled Water Pumps on Emergency Power, in accordance with this Scope of Work, NEC, VHA Directive 1028 (Electrical Power Distribution Systems), the contract documents, all applicable federal, state and local codes as well as all NFPA requirements. Work shall include, but shall not be limited to, installation and commissioning of anew automatic transfer switch for the five (5) 40 hp chilled water pumps (CHWP#1-5) in BE-27 mechanical room to maintain an emergency equipment branchpower path (from panel in ) and a normal branch power path (from panel in), aswell as breaker location switching and replacement for pumps 8, 9, 12, 13, 14,15, 16, 17, 18, and 19, with Motor Control Center (MCC) bucket swapping and relocation for pumps 8 and 9, with all necessary conduit and wire demolition, intercepting, rerouting, and installation to bring them onto emergency equipment branch power. Some pieces of electrical distribution equipment will require commissioning services to be obtained by the Contractor and include at a minimum, the automatic transfer switch. The Contractor shall account for and be prepared to replace all necessary devices, cabling, and conduit as needed and per specifications. As part of commissioning, the Contractor shall be responsible for testing all equipment installed per NEC, and the best practices and standards issued by the National Electrical Testing Association (NETA), and the Institute of Electrical and Electronics Engineers (IEEE). Period of Performance =270 calendar Days
-Pre-Solicitation02/06/2026
438-21-403, Renovate First Floor Kitchen
-Solicitation11/12/2026
Amendment 0001 incorporates a copy of the ICRA, Site Visit attendance sheet, responses to the Site Visit questions and a revised DBA Wage Determination. This project includes all labor, management, and materials to replace the existing carpet and base with Luxury Vinyl Plank and new Rubber Cove Base in Building 1,on the 3rd and 2nd Floors. All measurements/dimensions existing blueprints are approximate. Contractor must verify all measurements/dimensions. The Contractor shall inspect the area under contract prior to commencing work and identify any pre-existing damage and provide an Existing Site Conditions report with related photos to the Contracting Officer for review and approval. The Contractor shall match existing conditions at each location. The contractor will be responsible for and shall repair any excessive damage caused by the removal/demolition of existing materials or the installation of new materials.
-Solicitation09/02/2026
This is a Pre-Solicitation Notice regarding project: 438-21-403, Renovate First Floor Kitchen at the Sioux Falls VA Health Care System, Sioux Falls, South Dakota. The Department of Veterans Affairs, Network Contracting Office 23 (NCO 23), is preparing to issue a solicitation for a Firm-Fixed-Price contract for this project. Note: This is a Pre-Solicitation Notice only, the Solicitation will not be posted for at least 15 days from the date of this notice. This is NOT a request for proposal. Estimated SOLICITATION DATE: on or about 08/20/2026 Estimated AWARD DATE: 10/31/2026 SET-ASIDE: 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) NAICS: 236220, Commercial and Institutional Building Construction $45.0 Million PROJECT MAGNITUDE: Between $10,000,000 and $20,000,000. THIS IS A TOTAL 100% SERVICE-DISABLED VETERAN OWNED SMALL BUSINESS (SDVOSB) SET-ASIDE. In accordance with Public Law 109-461 and VAAR 819.7003 (b), bidders must be registered, certified, and listed in the SBA certification database at  https://veterans.certify.sba.gov/ as a SDVOSB/VOSB. Only bids from verified SDVOSB s at SBA certification database at the time of proposal submission shall be deemed responsive. All non-responsive bids shall be rejected and ineligible for award. SCOPE OF WORK 438-21-403, Renovate First Floor for New Kitchen Sioux Falls VA Healthcare System GENERAL INFORMATION Base Bid: The Contractor must provide all supervision, tools, labor, materials, equipment, services, and testing necessary to accomplish the Renovate First Floor for New Kitchen project per the construction drawings and specifications. The project must be accomplished by the contract drawings and specifications for the project 438-21-403. Follow OSHA and all VA regulations as outlined in specifications 01 00 00. This work includes but is limited to: Demolition as described on the design plans and specifications. The contractor is responsible for locating all the existing utilities within the project site before any excavation or site work begins. Contractor shall remove from the VA site and dispose of all equipment and materials not scheduled to be reused. Construction consists of, but is limited to: Site work includes fencing, excavation, grading, paving, and protection of existing utilities. Demolition of walls, floors, ceilings, equipment, heating/cooling ventilation, and electrical. Construction consists of architectural, structural, mechanical and electrical improvements. Installation of owner furnished equipment The existing kitchen is located on the 2nd floor of building 5. The project consists of renovating first floor of building 5. There are phases to ensure the kitchen and VA staff provide meals for the impatient staff during the construction. Phasing is required to keep the existing kitchen operational. Additional construction projects will be occurring at the same time and near the kitchen renovation space. Contractors are expected to coordinate with the other contractors to minimize the disruption to the hospital. Owner furnished equipment will be provided for contractor installation. Once the equipment is received the contractor must store the equipment on site in a humidity and temperature-controlled storage unit. Maintain 50% relative humidity and a temperature of 60 - 70 degrees Fahrenheit. VA will be badging all construction employees. Badging requires background checks and personal information on each contract employee that will be on site. Forms to be filled out by the contractors and submitted for the badging process. Submittal exchange shall be procured and managed by the contractor for all submittals; Phasing is required to ensure the hospital is functional throughout the request for information (RFI), architectural supplemental information (ASI), VA purchased contractor installed equipment, shop drawings, and other project tracking needs for the duration of the project. Specification section 11 40 00 and plan sheet FS101 and plan sheet FS103 include the owner furnished kitchen equipment for a line item to be included in submittal exchange for review and acceptance. Night and weekend work will be expected to keep the campus fully functional during the construction activities that cannot be accomplished during business hours. After-hours are typically 5:00pm and before 6:00am. A dedicated site superintendent managing the construction effort and a site safety health officer shall be present during all construction activities. A dedicated quality control manager for the quality of the construction effort must be provided by the contractor per specification 01 45 00. Other construction will be occurring during the project. Coordination with other contractors is expected to ensure no disruption to the hospital s daily functions. Accuracy of the Planned Information: Bidders are highly encouraged to conduct a thorough site visit to investigate all as-built conditions of the project area in this SOW. Discrepancies in Planning Information: The prime contractor must promptly report to the Contracting Officer in writing any discrepancies between plans and specifications and as-built conditions. The Prime Contractor shall make no adjustments to their work due to discrepancies prior to review by the Contracting Officer. Ownership of Drawings: All designs, drawings, specifications, notes, and other work developed in the performance of this contract shall be the sole property of the US Government. The Prime Contractor shall provide a list of all items specified for which no substitutions will be accepted. This list shall identify each item with the specification section in which the item is defined. Performance Period:  The contractor shall complete the work required under this SOW, Monday through Friday in 550 calendar days or less from Notice to Proceed, unless otherwise directed by the Contracting Officer (CO). Construction at the Government site shall not take place on Federal holidays or weekends unless approved by the project engineer. Tentative Schedule:  Contract Award A Pre-construction Conference A+7 Notice to Proceed D (A+12) Construction Start D+22 Construction Completion D+550
-Pre-Solicitation09/01/2026
-Solicitation08/03/2026

Additional Details

Solicitation Number

36C26326B0009

Archive Date

Apr 27, 2026

Office Address

Saint Paul, MN, 55101