618-26-702 EHRM Install DDPO 2
Responses closed . Solicitation posted by VETERANS AFFAIRS, DEPARTMENT OF on May 5, 2026. Solicitation 36C26326B0030.
NAICS 238210 (Electrical Contractors and Other Wiring Installation Contractors). Set-aside: Service-Disabled Veteran-Owned Small Business Set Aside. Place of performance: Minneapolis, Minnesota. Original response deadline: . Full description on SAM.gov.
Description
The intent of this project is to provide construction services for a Department of Veteran Affairs Electronic Health Records Modernization (EHRM) project initiative and a 2026 Current State Review (CSR) at the Minneapolis VA Medical Center, One Veterans Drive, Minneapolis, MN 55417-2309. The initiative is an implementation and the deployment of new Electronic Health Record (EHR) system across federal entities and install additional Data Drop and Power Outlets (DDPO’s) as identified during the CSR assessment.
- The construction contractor shall supply all equipment, labor, materials, and supervision to complete project upgrades which includes the installation of Data Drops and Power Outlets, mounting of Over-Current Elements (OCE’s), Tracking Boards and Wall mounts.
- Conduct and incorporate pre-construction risk assessments (PCRA) and Infection Control Risk Assessments (ICRA) for air quality, infection control, noise, vibration, or any other hazards applicable to their work per Veterans Affairs (VA) Standard Environment of Care Standard (EC) 02 06 05. See ICRA Matrix of Precautions for Construction and Renovation. See Attachment 3 ICRA Assessments, Level 2 through 4 (three [3] total).
- Power and transmission cable pulls will be installed in separate raceways/conduits/ and or separated, per manufacturer performance data information.
- All data cabling to be Category CAT 6A.
- Install quantity (QTY) (29) CAT 6A cable drops from new Telecommunication Rooms (TRs) to identified locations. See Building Plan Views for 618-26-702 for room and wall locations of installs.
- Telecommunication Cable pulls/drops not to exceed 300 feet for estimating purposes.
- QTY (1) cable drop location will require QTY (29) CAT 6A cables to be pulled.
- The QTY (29) cable drops installed within wall space to be protected in conduit requiring demolition of a wall section, repair and paint finishing.
- Furnish and install wall boxes and cover plates as needed for network connections or power installations.
- Follow current telecommunication or efficient routing paths above or below ceiling from Telecommunications Room (TR) patch panels to wall room outlets. All cables shall be in continuous lengths for origin to destination and secured to cable support structures per National Electric Code (NEC) requirements. (Any and all Cable splices will have to be approved by the COR)
- All new CAT 6A cable installations shall be tested and certified. Certification reports shall be submitted to the COR Bi-Weekly.
- All new cable pulls to be terminated at both ends. Termination locations in TR closets will be identified by site Subject Matter Experts (SME’s)
- Contractor to follow current VA Standards for cable, patch panel, and outlet labeling. All labels to be machine generated (not hand-written) using labeling software or machine.
- Install QTY (50) duplex 120 Volts Alternating Current (VAC) emergency power sourced outlets.
- Contractor to consider emergency power installations not to exceed 250 feet.
-
- Contractor to conduct a load test in the nearest junction box to verify the suitability for both new and existing outlets.
- The combined loads in a circuit shall not exceed 80% of the circuit’s total load capacity.
- If extending from an existing junction box to surface mounted raceway, flexible conduit may be used if it does not exceed 6 feet in length.
-
- Analog Phone List. Contractor to complete all work in accordance with:
- VA standards and Construction Specifications.
- NEC Standards
- Office of Electronic Health Record Modernization (OEHRM) Site Infrastructure, and End user Device (EUD) requirements (Latest Revision)
- Office of Information Technology (OIT) Design Guide, and design templates
- Infrastructure Standard for Telecommunication Spaces (ISTS) (Latest Version).
- Replace any damaged ceiling tiles due to the course of work.
- Touchup/repair/paint and damaged walls or ceilings due to new installation of wire and cable, conduit installations,etc. This project shall be completed within Ninety-Five (95) calendar days once NTP is issued.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Showing 10 of 10 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Presolicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 125.82 KB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 105.55 KB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 289.6 KB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 4.92 MB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 72.92 KB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 290 KB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 377.78 KB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 289.48 KB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 1.44 MB | |||
| Solicitation | VETERANS AFFAIRS, DEPARTMENT OF | May 5, 2026 | 917.76 KB |
Lifecycle
36C26326B0030- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationApr 22, 2026
618-26-702 EHRM Install DDPO 2
- SolicitationCurrentMay 5, 2026
618-26-702 EHRM Install DDPO 2
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
award notice | Awarded | 238210 | Service-Disabled Veteran-Owned Small Business Set-Aside | 09/04/2026 | Open | Minneapolis, MN | |
The purpose of Amendment 0002 is as follows: 1. Publish the "Questions & Answers" document as Invitation for Bid (IFB) 36C26326B0040 618-26-702 DDPO-2 Install, MPLS Technical Questions. The due date for proposals is unchanged, due not later than 10:00am (CST), August 25, 2026, to Contracting Officer, Dwayne Brauch, dwayne.brauch@va.gov. | Solicitation | 238210 | Service-Disabled Veteran-Owned Small Business Set-Aside | 08/20/2026 | 08/25/2026 | Minneapolis, MN | |
Update "DELIVERY OF BIDS" section (7 of 19) to Contracting Officer, Dwayne Brauch, dwayne.brauch@va.gov update wage rate and determination for Hennepin County 7.30.2026 Bid opening remains unchanged August 25,2026 at 10:00am. | Solicitation | 238210 | Service-Disabled Veteran-Owned Small Business Set-Aside | 08/04/2026 | 08/25/2026 | Minneapolis, MN | |
The Contractor shall furnish all labor, materials, equipment, and supervision to complete project upgrades which includes the installation of Data Drops and Power Outlets, mounting of Integrated Over-Current Elements (OCE’s), Tracking Boards and Wall Mounts for the MVAHCS, located at One Veterans Drive, Minneapolis, MN 55417-2309. In accordance with the Scope of Work, all contract documents including drawings and specifications, and in compliance with federal, state, and local codes and law. Work shall include, but shall not be limited to providing all labor, materials, and equipment necessary to complete MVAHCS Project 618-26-702 Electronic Health Record Modernization (EHRM) Data Drops and Power Outlets (DDPO) 2.0 in accordance with the Scope of Work, NEC, VHA Directive 1028 Electrical Power Distribution Systems, the contract documents, all applicable federal, state, and local codes as well as all National Fire Protection Association (NFPA) requirements. Period of Performance is 95 calendar days | Solicitation | 238210 | Service-Disabled Veteran-Owned Small Business Set-Aside | 07/22/2026 | 08/25/2026 | Minneapolis, MN | |
The construction contractor shall supply all equipment, labor, materials, and supervision to complete project upgrades which includes the installation of Data Drops and Power Outlets, mounting of Integrated Outpatient Code Editor(IOCE}, Tracking Boards and Wall mounts. The initiative is an implementation and the deployment of new Electronic Health Record (EHR) system across federal entities and install additional Data Drop and Power Outlets (DDPO's) as identified during the CSR assessment. The period of performance for this work is ninety (90) calendar days from issuance of Notice to Proceed. | Pre-Solicitation | 238210 | Service-Disabled Veteran-Owned Small Business Set-Aside | 07/08/2026 | 07/22/2026 | Minneapolis, MN |
Additional Details
Solicitation Number
36C26326B0030
Archive Date
Dec 31, 2026
Office Address
Saint Paul, MN, 55101