GovChime
Notice ID: 0717d69cda7548cfabf558283c1a043fAward NoticeAwardedArchived

Hospital Grade Mattress Inspection Services - STC

Awarded on June 1, 2026. Full description on SAM.gov.

Awarded tounder 36C26326P0496 (source: SAM.gov award notice)• $53.9K

Overview

Posted
June 1, 2026
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
561210: Facilities Support Services
Agency
Department of Veterans Affairs

Notice details

Office
NETWORK CONTRACT OFFICE 23 (36C263)
Place of performance
Saint Cloud, Minnesota, 56303
Last updated
Oct 29, 2026
First published
Last updated on SAM.gov
Award date
Jun 1, 2026
Award amount (SAM.gov award notice)
$53.9K

Identifiers

Solicitation number
36C26326P0496
Notice ID
0717d69cda7548cfabf558283c1a043f
Award number (PIID)
36C26326P0496

Description

Award Overview

Award Number

36C26326P0496

Award Amount (SAM.gov award notice)

$53.9K

Award Date

Jun 1, 2026

Awardee

Awardee UEI

MDMRHWWHK4J1

Awardee CAGE Code

7WFZ7

Awardee Address

Inver Grove Heights, MN 55077, UNITED STATES

Original Solicitation

Notice ID: 0717d69cda7548cfabf558283c1a043f

Posted Date: Jun 1, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Becky De Los Santos

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    Hospital Grade Mattress Inspection Services - STC

    Notice 0717d69cda7548cfabf558283c1a043f on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a written solicitation document will not be issued. This solicitation is issued as an RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-01. The Department of Veterans Affairs (VA) Network Contracting Office (NCO 10) has a requirement for an Annual Inspection of Energy Control Procedures Lockout/Tagout for the Battle Creek VA Medical Center located in Battle Creek, Michigan. Contractor will perform an annual inspection of Lockout/Tagout (Energy-Control) Procedures per the requirements of OSHA1910-147 (VA-Required) to document the following: Ensure accuracy of Lockout Procedures and Tags in place Identify Lockout Procedures and Tags that are in place, but inaccurate due to equipment reconfigurations and/or relocations or are missing Create new machines/equipment LOTO Procedures and Tags for those requiring one. The Associated North American Industrial Classification System code for this procurement is 561210, Facilities Support Services, with a small business size standard of $47 Million. The Product Service Code for this procurement is H942, Other Quality Control Testing, and Inspection Fire Fighting, Rescue, and Safety Equipment. This requirement is a total SDVOSB set aside. See attached documents for detailed information and instructions to quoters
56%
Combined Synopsis08/27/2026
Fire Alarm Testing and Maintenance Amendment
49%
Combined Synopsis09/14/2026
PURPOSE: The purpose of the sources sought is to identify available authorized businesses to provide Fall Arrest System Inspection Services. This sources sought notice is for informational and planning purposes only. Pricing information is not being requested at this time. It does not constitute a solicitation and is not to be considered as a commitment by the Government. REQUIREMENT: This notice is issued by the U.S. Air Force, 92d Contracting Squadron, Fairchild AFB, WA. This sources sought is seeking to identify responsible potential sources to provide Fall Arrest System Inspection Services. The inspections must be in accordance with the draft Statement of Work. ANTICIPATED NAICS/SIZE STANDARD: This requirement falls under the NAICS Code of 561210 - Facilities Support Services, with a size standard of $47 Million. SUBMISSION OF INFORMATION: All firms responding to this sources sought notice are advised that their response to this notice is not a request that will be considered for contract award. All interested parties will be required to respond to the resultant solicitation separately from their response to this sources sought notice. A responsible potential source shall have registered with the System for Award Management (SAM). The response should be no more than five pages providing the following information: Business name, address, CAGE code/UEI Size and socioeconomic classification based on NAICS size standard If claiming a specific small business category, provide supporting documentation Point of contact including email and phone number
44%
Market Research11/26/2026
White City Boiler Inspection Services Solicitation Number 36C26026Q0977 Due to a large number of questions, as the CO, I am extending the offer due date to 11/13/2026. I will allow questions for 1 week starting on 11/02/2026 – 11/06/2026. This Solicitation (36C26026Q0977) will remain an SDVOSB 100% total set aside. If you have any questions please email: Jeremiah.Middleton2@VA.GOV ________________________________________________________________________________________________________ The objective of this solicitation is to provide VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) with Boiler Plant Inspection Services. The period of performance shall be as follows: Base Year: 12/1/2026 to 11/30/2027 Option Year 1: 12/1/2027 to 11/30/2028 Option Year 2: 12/1/2028 to 11/30/2029 Option Year 3: 12/1/2029 to 11/30/2030 Option Year 4: 12/1/2030 to 11/30/2031 Background: The VA SORCC has three Power boilers, each rated at 250HP operating at low pressure (<15 psi), gas and oiled fired. Yearly state inspections are required on all three boilers, one deaerator/ feed water tank (DA/FWT), one heat recovery tank (HRT), one condensate storage tank (CST), and one bottom blow tank (BBT). ******Option year three will require the yearly state inspections on all three boilers, one deaerator/ feed water tank, one heat recovery tank, one condensate tank, and one bottom blow tank and have a Non-Destructive Test (NDT), And a Life Expectancy report performed on the DA/FWT ******. A NEW PWS HAS BEEN UPLOADED TO SAM.GOV ON 11/1/2026 A NEW 1449 SOLICITATION HAS BEEN UPLOADED TO SAM.GOV ON 11/1/2026 Amendment 0002 is no longer valid due to a new PWS being issued on this solicitation. Before you send any questions please make sure you have read all of the amendments, PWS and 1449.
44%
Solicitation11/13/2026
The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus. Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic. Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work. Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB. A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA. All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal. Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance. A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition. Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines. Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director. Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
42%
Pre-Solicitation12/14/2026

Additional Details

Solicitation Number

36C26326P0496

Archive Date

Jul 1, 2026

Office Address

Saint Paul, MN, 55101