J045--PN: 568A4-26-SL001, Fire System Maintenance (HS)

Archived on July 19, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
10:00 AM CDT
Posted
June 5, 2026
Notice type
Sources Sought
NAICS
238220: Plumbing, Heating, and Air-Conditioning Contractors
Agency
Department of Veterans Affairs

Notice details

Office
NETWORK CONTRACT OFFICE 23 (36C263)
Place of performance
Department of Veterans Affairs Black Hills Health Care System, Hot Springs, South Dakota, 57747-1480
Last updated
Oct 30, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C26326Q0799
Notice ID
af73587cca1041e7816fd743ea9badf4

Description

Sources Sought Notice PN: 568A4-26-SL001, Fire System Maintenance FY26 A ** This is a Sources Sought Notice for the purpose of conducting Market Research. Proposals are NOT being requested, nor accepted at this time. Responses are being requested from Small Businesses. ** Purpose: The VA Black Hills Health Care System (VABHHCS), Hot Springs Campus in Hot Springs, South Dakota is seeking qualified potential contractors to provide all labor, equipment, materials and supervision necessary to complete Project 568A4-26-SL001 Fire System Maintenance FY26 A. Work includes repairing various components of the fire suppression & safety systems at the VABHHCS, Hot Springs Campus, in accordance with the contract documents. Period of Performance for this work is 30 Calendar Days from issuance of Notice to Proceed (NTP), including all lead times on equipment and materials. This is a Sources Sought Notice only and it is not a solicitation announcement. The purpose of this Sources Sought Notice is to gain knowledge of qualified potential contractors and their socio-economic size classification. Responses will be used by the Government to make appropriate acquisition decisions. After a review of the responses to this Sources Sought Notice, a solicitation announcement may be posted. A response to this Sources Sought Notice is not an adequate reply to a potentially forthcoming solicitation. Bonding: Bid, Performance and Payment Bonds are not anticipated to be required, unless the quote is over $35,000. North American Industry Classification System (NAICS) code: 238220 Plumbing, Heating, and Air-Conditioning, with a Size Standard of $19.0M. Magnitude of Construction: Less than $25,000.00. Cost Reimbursement: Response to this announcement is strictly voluntary. No reimbursement will be made for any costs associated with providing information in response to this Sources Sought Notice, nor any follow-up to information requests. Solicitation: At this time, VHA Network Contracting Office 23 anticipates issuing a competitive Request for Quote (RFQ) in July 2026; and awarding a single Firm-Fixed-Price (FFP) contract. Submittal Instructions: To respond to this Sources Sought Notice, please email that you are interested and provide a capability statement to the Contracting Officer and Contracting Specialist Team reply with subject line Response Form to Sources Sought Notice and email the information requested to Michael Freeman, Contracting Officer, at michael.freeman3@va.gov and Josie Swim, Contracting Specialist, at jocelyn.swim@va.gov. The closing date and time of this Sources Sought Notice is Friday, June 29, 2026, by 10:00 AM Central Time. This is not a solicitation and in no way obligates the Government to award any contract. Additionally, a response to this Sources Sought Notice is not a request to be added to a prospective bidders list or to receive a copy of any forthcoming solicitation.

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Sep 30, 2026

NAICS

238220

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Josie Swim
Contract Specialist

Documents

Files (1)

  • 36C26326Q0799.docx

    28 KBAdded in Sources Sought version 3Posted
    Download

Lifecycle

  1. 3
    Version 3Sources SoughtArchivedCurrent

    J045--PN: 568A4-26-SL001, Fire System Maintenance (HS)

    Notice af73587cca1041e7816fd743ea9badf4 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
The 28th Contracting Squadron, Ellsworth AFB, South Dakota, has issued this Solicitation, FA469026Q0027, to compete and award a single award Firm Fixed Price (FFP) contract using FAR Part 12-Acquisition of Commercial Items, for the maintenance of the Infrared Radiant Heating Systems on Ellsworth AFB. Further details of the requirement are included in the attached Performance Work Statement.This award will have one base year plus four option years. The projected Period of Performance is 8 December 2026 - 7 December 2031. This will be a 100% Small Business set aside solicited under North American Industry Classification System (NAICS) code 238220 with a size standard of $19M. To be eligible to compete for Small Business set-aside awards, vendors must be certified in accordance with current Small Business Administration (SBA) regulations.All interested and responsible entities are invited to submit a quote that will be considered by the 28th Contracting Office at Ellsworth AFB, South Dakota. The award will be based on the criteria established in the solicitation.Small Business contractors submitting a quote must have and list within the quote the vendors assigned Cage and be registered and ACTIVE in the System of Award Management (SAM) at www.sam.gov to receive an award for this procurement.
-Combined Synopsis10/28/2026
The United States Air Force at Ellsworth AFB is conducting Market Research, in accordance with FAR Part 10, to identify possible sources for the leasing and associated maintenance of IR Heat Maintenance Services for buildings on Ellsworth AFB. Details, instructions, and advisories for the Sources Sought are included in Attachment 1 entitled - Sources Sought - IR Heat Maintenance. Specifications and details for the requirement are included in Attachment 2 entitled - Draft PWS ? IR Heat Maintenance.
-Market Research05/22/2026
Install Chill Water System Filtration & Steam Condensate
-AwardedOpen
RFQ 36C24827Q0061 Amendment No. 1 This amendment is hereby issued to provide responses to questions and requests for information submitted by vendors, provide a revised PWS to address a correction on Boiler #2 description, as well as an updated Price/Cost Schedule reflecting the corrected description. Description of Boiler #2 contained on PWS and associated Line Items (LINs) of Price/Cost Schedule is hereby changed to read: Boiler Unit Number 2 (Local identifier): Fire tube steam boiler manufactured by York-Shipley; Serial number 96-19937-H-11618 The due date for Quote Submittal is changed from November 6, 2026, to November 10, 2026 at 10 AM AST. All other sections of the solicitation remain unchanged. RESPONSES TO QUESTIONS RECEIVED: Q1. Semiannual Safety-Device Testing: VHA Directive 1810, Appendix A, Section 2(a), establishes that safety devices requiring semiannual testing are ordinarily tested once annually by VA medical facility personnel and once annually by a qualified testing contractor, unless an alternative arrangement is approved. Does the Government require the contractor to perform both semiannual testing events under this solicitation? If so, has the alternative testing arrangement received the required approval? VACHS Boiler Plant personnel will perform the required semiannual safety-device testing. The Contractor shall perform the safety-device testing required under the PWS during its scheduled annual inspection and testing services. Q2. Monthly Safety Device Testing: PWS Section V(Q) includes safety-device tests for which the VHA Boiler and Associated Plant Safety Device Testing Manual establishes monthly testing frequencies, including primary and auxiliary low-water cutoffs, high- and low-water alarms, and the main flame-scanner flame-out test. Does the Government require the contractor to perform these tests monthly throughout the contract period, or will VACHS personnel continue performing the monthly tests while the contractor performs the scheduled maintenance and safety-device testing services? VACHS Boiler Plant personnel will perform the required monthly safety-device testing. Q3. Frequency of Nondestructive Testing, Component Replacement and Engineering Evaluations: PWS Sections V(I), V(L), V(U), V(V), and V(W) establish requirements involving component replacement, nondestructive testing (NDT), pressure-vessel inspections, and engineering evaluations, including ultrasonic thickness measurements, magnetic-particle examinations, and assessments of maximum allowable working pressure (MAWP) and remaining useful life. However, VHA Directive 1810, Appendix B, Table 2, establishes different inspection frequencies depending on the activity. For example, annual boiler inspections are required, whereas internal deaerator weld examinations using wet magnetic-particle testing are required at six-year intervals. Clarify the following: a. Nondestructive Testing: Are ultrasonic thickness measurements and magnetic-particle examinations required annually for each boiler and the deaerator, or are these examinations required only when indicated by inspection findings, equipment conditions, or established inspection intervals? The scope of this requirement applies to the Boilers only. b. Deaerator Weld Examination: Is the six-year internal deaerator weld examination required during the base contract period or any of the option years? If so, please identify the date of the most recent examination and the next scheduled examination. Not applicable. This service is cover under another service contract c. Engineering Evaluations: Are MAWP calculations, remaining-useful-life assessments, and deterioration-rate evaluations required annually for each boiler, deaerator, and condensate return tank, or only when inspection findings or equipment conditions warrant such evaluations? Not applicable. This service is not covered under this requirement. d. Component Replacement: Are component replacements identified in the PWS mandatory during each annual maintenance period, regardless of condition, or are replacements required only when inspection or testing establishes a deficiency, except where the PWS expressly requires replacement? Mandatory parts to be replaced annually during annual maintenance, regardless of its conditions: Sight glass with new seals, Compress air belt, oil filters, air filter, water gasket seal kits and fire side gaskets seal kit. e. Firetube Inspection Methods and Waterside Deterioration: PWS Section V(U) references fiberoptic inspection of boiler tubes, while Section V(V) establishes ultrasonic thickness measurement requirements. In a firetube boiler, fiberoptic examination from inside a tube primarily evaluates its fireside surface and does not directly establish the condition of the exterior waterside surface, where corrosion and pitting may occur. Please clarify whether the Government requires fiberoptic visual examination, ultrasonic thickness measurements, or additional examination methods capable of evaluating tube-wall deterioration affecting either surface. The Government requires the inspection methods specified in the Performance Work Statement (PWS). Fiberoptic inspection and ultrasonic thickness testing are complementary requirements, and both shall be performed. f. Boiler Tube Quantities and Technical Documentation: For each boiler, please identify the total number of firetubes, nominal tube diameter, original wall thickness or gauge, and applicable tube specifications. Please provide, if available, manufacturer drawings, tube-layout diagrams, pressure-vessel drawings, or other technical documentation identifying the shell, tube arrangements, tube sheets, and applicable pressure-retaining components, so that offerors can quantify the inspection scope. The Government has provided all available identifying information and that quotes/offers should be based on the PWS requirements and field verification. g. Extent of Tube Examination and Sampling Requirements: Does the Government require examination and wall-thickness measurements of every firetube in each boiler, or is an engineer-justified representative sampling program acceptable? If sampling is permitted, please identify any minimum sample quantity or percentage, prescribed examination locations, acceptance criteria, and requirements for expanding the examination when initial results reveal pitting, corrosion, thinning, or other deterioration. May the qualified inspecting engineer establish and justify the sampling methodology based on equipment condition, applicable standards, and inspection findings? The Government does not require examination or ultrasonic thickness measurements of every firetube. The Performance Work Statement requires inspection of a representative number of tubes and ultrasonic thickness testing of representative samples, with additional testing of areas exhibiting indications of corrosion, erosion, or other deterioration. The Contractor's Qualified Professional Inspector may establish and justify the sampling methodology using professional engineering judgment and applicable industry standards, provided the inspection is sufficient to assess equipment condition and support all required findings, calculations, and recommendations. h. Boiler shell examination and engineering certification: Please identify the required extent of ultrasonic thickness measurements and other nondestructive examinations of boiler shells, tube sheets, and other applicable pressure-retaining components. For the MAWP, deterioration-rate, and remaining-useful-life evaluations required by the PWS, does the Government require a formal report signed and sealed by a licensed Professional Engineer? Please identify any specified inspection coverage, minimum-thickness criteria, engineering standards, or historical thickness data to be used. Must the engineering determinations address the complete boiler pressure vessel, including firetubes and shell, or only components examined under the prescribed inspection program? The Government requires ultrasonic thickness testing of representative samples and all areas exhibiting signs of corrosion, erosion, or other deterioration. PWS does not prescribe specific inspection coverage percentages, minimum thickness criteria, historical thickness data, or a requirement for a signed and sealed Professional Engineer report. The Contractor shall use applicable ASME Code requirements, inspection findings, and professional judgment to perform the required MAWP, deterioration-rate, and remaining-life evaluations and document the results in the final report. Q4. The PWS incorporates maintenance, inspection, and testing requirements applicable to the deaerator (DA) and condensate return tank (CRT), as established by VHA Directive 1810 and the VHA Boiler and Associated Plant Safety Device Testing Manual. However, the solicitation provides pricing contract line items (CLINs) only for the three steam boilers and does not identify the DA and CRT equipment specifications. To establish the equipment covered by the contract and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the manufacturer, model, serial number, and quantity of each DA and CRT included within the contractual scope of work. b. Provide the vessel capacity, design pressure, normal operating pressure, and applicable ASME identification or nameplate information for each DA and CRT. c. Provide, if available, the applicable manufacturer maintenance instructions, equipment data sheets, and relevant drawings identifying the installed DA and CRT configurations. d. Should offerors allocate the costs associated with DA and CRT maintenance, inspection, and testing among the three existing boiler CLINs, or will the Government establish separate CLINs for these services? Not applicable. This service is not covered under this requirement. Q5. PWS Section V(I) requires the contractor to replace, calibrate, and test boiler steam safety valves, with calibration and/or testing performed onsite. The VHA Boiler and Associated Plant Safety Device Testing Manual also establishes testing requirements applicable to boiler, deaerator, and pressure-reducing valve (PRV) downstream safety valves. To determine the complete scope of testing, calibration, and replacement services and prepare an accurate firm-fixed-price quotation, please clarify the following: a. Identify the total number of steam safety valves included within the contractual scope of work, specifying their installed locations, including those associated with each steam boiler, the deaerator tank, and downstream of the steam pressure-reducing valve (PRV). Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. b. For each safety valve, provide the manufacturer, model, nominal inlet and outlet sizes, serial number or other identification, and applicable ASME/National Board certification information. Review the VHA Boiler and Associated Plant Safety Device Testing Manual for guidelines and for typical safety devices equipment in a Boiler. c. Identify the set pressure (psig), rated steam discharge capacity (lb/hr), and applicable pressure and temperature ratings for each valve. The Government does not have verified safety valve set pressures, steam discharge capacities, or pressure/temperature ratings available for distribution under this solicitation. Offerors shall base their quotes/offers on the requirements of PWS and the identified boiler equipment. Verification of valve nameplate data and equipment ratings shall be performed during the inspection and testing activities required under the contract. d. Please confirm whether each of the three steam boilers is equipped with two safety valves, reportedly set at 130 psig and 135 psig, respectively, and whether the deaerator system includes one safety valve installed on the tank and another downstream of the PRV. Please identify any additional safety valves included within the contractual scope. Each of the three boilers is equipped with two steam safety valves with nominal set pressures of 130 psig and 135 psig, respectively. The contractual scope includes the inspection, testing, calibration, and evaluation of these boiler safety valves and associated boiler safety devices identified in the PWS. The deaerator system and its associated safety valves are not included within the scope of this contract. Offerors shall base their quotations on the solicitation requirements. Verification of installed equipment, valve nameplate data, and operating condition shall be performed during contract execution. e. Does PWS Section V(I) require replacement of all existing boiler steam safety valves during each annual maintenance period, regardless of their condition, or is replacement required only when a valve fails inspection or testing? Please also clarify whether any replacement requirement applies to the deaerator and PRV downstream safety valves. The Government's intent is to inspect, test, and calibrate the boiler steam safety valves. Replacement is required only when a safety valve cannot be successfully calibrated, fails testing, or is otherwise determined to be defective or unserviceable. This requirement applies to the boiler steam safety valves within the scope of the PWS. f. Please identify whether the Government requires onsite testing and certification of all applicable safety valves, including the boiler, deaerator, and PRV downstream valves, and whether any valves must be removed for shop testing, repair, or recertification. The Government requires testing and calibration of the boiler safety valves in accordance with the PWS. Valve removal, shop testing, repair, recertification, or replacement shall only be required when a valve cannot be successfully tested, calibrated, or is otherwise determined to be defective or unserviceable. The PWS does not specifically require testing, certification, removal, repair, or replacement of deaerator or downstream PRV safety valves. g. Please provide an equipment schedule or existing valve inventory, if available, identifying the specifications and locations of all safety valves included within the contract. The Government does not have an equipment schedule or valve inventory available for distribution under this solicitation. The boiler scope includes six (6) steam safety valves total, consisting of two (2) safety valves per boiler with nominal set pressures of 130 psig and 135 psig. Offerors shall base their quotations on the solicitation requirements. Verification of valve specifications, nameplate data, and exact locations shall be performed during contract execution. Q6. The solicitation identifies the manufacturers and serial numbers of the three steam boilers; however, the Performance Work Statement does not identify whether the boilers and their associated systems remain in their original equipment manufacturer (OEM) configurations or have undergone subsequent alterations, modifications, equipment replacements, or retrofits. Clarify the following: a. Whether any of the three boilers have undergone modifications or alterations from their original OEM configurations, including replacement or retrofitting of the original burner assemblies. b. For each boiler with modifications or retrofits, identify the manufacturer, model, and configuration of the replacement equipment and describe the extent of the alterations necessary to integrate that equipment into the existing boiler system. c. Identify all additional, replacement, or modified components associated with such alterations, including, but not limited to, fuel pumps, fuel-pressure regulating or throttling valves, fuel-train components, piping arrangements, combustion controls, burner management systems, safety interlocks, instrumentation, electrical controls, and associated auxiliary equipment. d. Identify any additional equipment or components installed as part of these modifications that are included within the maintenance, inspection, calibration, testing, or repair requirements of the current PWS. e. Where the installed equipment differs from the original OEM configuration, identify the applicable manufacturer maintenance and testing requirements and provide, if available, current as-built drawings, equipment schedules, control diagrams, operating sequences, and documentation of the modifications. The Government does not have modification records, as-built drawings, equipment schedules, control diagrams, or other documentation available for distribution under this solicitation. Offerors shall base their quotations on the equipment identified in the PWS and the requirements specified therein. Any existing field modifications, retrofits, equipment replacements, or deviations from the original OEM configuration shall be identified and documented by the Contractor as part of the inspection, testing, and evaluation activities required under the contract Q7.PWS Section V(B) requires inspections, testing, and calibrations to comply with the written recommendations of the equipment manufacturers, the VHA Boiler and Associated Plant Safety Device Testing Manual, and applicable NFPA 85 requirements. The Superior Boiler manufacturer s maintenance instructions prescribe certain daily, weekly, and monthly operational and functional checks, as well as semiannual fireside cleaning and associated maintenance activities. However, VHA Directive 1810, Appendix B, Table 3B, establishes an annual fireside-cleaning frequency for high-pressure steam boilers. The Directive also distinguishes routine boiler-plant operational duties from inspections and testing that must be performed by qualified contractors. Please clarify the following: a. Are the daily, weekly, and monthly manufacturer-recommended operational and functional checks required to be performed by the contractor at the specified frequencies, or will these activities remain the responsibility of VACHS boiler-plant personnel? Daily, weekly, and monthly operational and functional checks identified in the manufacturer's operating and maintenance manuals are considered routine boiler plant operational activities and shall remain the responsibility of VACHS boiler plant personnel. The Contractor is not required to perform recurring daily, weekly, or monthly operational checks at the frequencies specified by the manufacturer unless such services are specifically included in the approved maintenance schedule developed under this contract. b. Does the Superior Boiler manufacturer s semiannual fireside-cleaning recommendation require the contractor to perform two complete fireside-cleaning services annually, rather than the single annual fireside-cleaning service established by VHA Directive 1810, Appendix B, Table 3B, or is one annual fireside-cleaning service sufficient to satisfy the contractual requirements? Contractor shall perform one comprehensive fireside cleaning and inspection annually in accordance with the PWS requirements and applicable VHA guidance. If, during the course of inspection or operation, conditions are identified that warrant additional cleaning, the Contractor shall document the condition and provide recommendations to the COR for review and consideration. c. Are other manufacturer-recommended maintenance activities exceeding the frequencies established by VHA Directive 1810 required to be performed by the contractor, or will the contractor s responsibilities be limited to the maintenance, inspections, calibrations, and safety-device testing specifically scheduled under the PWS? The Contractor shall comply with the maintenance, inspection, calibration, testing, evaluation, and reporting requirements specifically identified in the PWS. Manufacturer recommendations should be utilized as part of the Contractor's technical evaluation and execution of the required services. However, the contract does not require the Contractor to perform additional recurring maintenance activities at frequencies exceeding those established in the PWS unless specifically directed by the Government or otherwise determined to be necessary based on observed equipment condition. Q8. With reference to PWS Section V(O), will the Government provide an inventory of the installed boiler plant instrumentation requiring periodic calibration, including pressure gauges, thermometers, pressure and temperature transmitters, oxygen analyzers, and other applicable measuring and control devices? No. The Government will not provide an instrumentation inventory. Offerors shall base their quotations on the requirements of PWS, including calibration of all applicable measuring and control devices associated with the boiler systems. Verification and identification of installed instrumentation shall be performed during contract execution. Q9. If available, please identify each instrument s equipment location, manufacturer, model, measuring range, quantity, calibration frequency, and applicable acceptance tolerances. The Government does not have this information available for distribution under this solicitation. Offerors shall base their quotation on the requirements of the PWS. The Contractor shall identify the installed instrumentation requiring calibration and perform the required calibration, testing, and documentation in accordance with the manufacturer s recommendations and applicable industry standards. Q10. Clarify whether the contractor is responsible for replacing instruments that fail calibration or are determined to be defective, and whether such replacements are included in the firm-fixed-price maintenance scope or authorized separately as corrective work. The Contractor shall identify and document any instruments found to be defective or unable to be successfully calibrated and shall notify the COR. Replacement of defective instruments is not included in the firm-fixed-price maintenance scope and, if required, will be addressed separately by the Government Q11. Please confirm whether the boiler plant currently has an installed propane/combustible gas leak detection system, including the number and location of detectors, manufacturer and model, associated control panels, audible/visual alarms, and any connections to the boiler burner-management or fuel-gas safety-shutdown systems. The boiler plant is equipped with a propane/combustible gas detection alarm system. However, the gas detection system is independent of the boilers and their burner management systems and does not automatically initiate boiler shutdown or fuel shutoff functions. Q12. Please clarify whether the contractor is responsible for: a. Periodic inspection, calibration, and functional testing of the gas detectors. Limited to the detector that is part of the boiler safety or combustion control system that is specifically within the scope of the PWS. b. Verification of alarm setpoints and detector response. Only for those that are part of the equipment specifically covered by the PWS. c. Functional testing of associated alarms, gas shutoff valves, and boiler shutdown interlocks, where installed. The Contractor shall perform testing of safety devices, alarms, shutoff valves, and interlocks specifically identified in PWS Section V(Q). d. Replacement of defective or expired sensors or detectors. No. Replacement of defective, failed, expired, or obsolete gas detectors or sensors is not included in the firm-fixed-price scope of this contract. Any deficiencies identified during the performance of the work shall be documented and reported to the COR. Recommended corrective actions shall be provided for Government review. e. Providing calibration certificates and documented functional-test results. Calibration certificates and test results shall be provided for equipment and instruments calibrated and tested under the scope of the PWS. The Contractor shall document all testing, calibration, and inspection activities in the required service reports. If these services are required, please identify the applicable testing and calibration frequencies and whether replacement components are included in the firm-fixed-price maintenance scope or addressed separately as corrective work. See responses above for each one. Q13. Is this a brand-new contract, or is there an incumbent performing the services? If not brand new, please provide current/previous contract number? This is a follow-on contract being procured as a competitive set-aside for SDVOSB verified vendors. Latest contract number is 36C24822P0298. This information is publicly available on Federal Procurement Data System (FPDS) at www.sam.gov and/or US Spending at https://www.usaspending.gov/ Current contractor information may be requested and disclosed under Freedom of Information Act (FOIA) in accordance with 38 Code of Federal Regulations (CFR) 1.553(b). The VA accepts FOIA requests submitted via email. Email must be sent to SAJFOIA@va.gov , for additional information about FOIA regulations and procedures, please visit www.foia.va.gov Q14. PWS V.I requires the contractor to "replace, calibrate and test the steam safety valves." Must the safety valves be replaced every year, or only if they fail testing? Please provide the number, size and set pressure of the safety valves on each boiler. The intent of PWS Section V.I is to ensure that all steam safety valves are properly inspected, calibrated, tested, and capable of performing their intended safety function in accordance with applicable codes, standards, and manufacturer requirements. PWS does not require the automatic annual replacement of steam safety valves solely based on the passage of time. Safety valves shall be evaluated, calibrated, and tested as part of the required services. Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. The Government does not have the number, size, or pressure data for all installed safety valves readily available at this time. The Contractor shall verify the installed safety valve configuration, including quantity, size, capacity, set pressure, and condition, as part of the required inspection and assessment services and shall document this information in the inspection report. Any safety valves identified as deficient or requiring replacement shall be immediately reported to the COR, along with recommendations for corrective action. Q15. Please provide the horsepower, design pressure and fuels (natural gas, No. 2 fuel oil, LPG pilot) for each of the three boilers. Boiler #1; Size: 300HP; Boiler Operating Pressure: 110 psi Boiler #2; Size: 250HP; Boiler Operating Pressure: 110 psi Boiler #3; Size: 300HP; Boiler Operating Pressure: 110 psi Q16. Does the annual NDT scope in PWS V.V and V.W (ultrasonic thickness grid, magnetic particle testing, MAWP and remaining-life calculations) apply to the deaerator and condensate tanks every year, or only in certain contract years? The NDT requirements identified in PWS Sections V.V and V.W apply to the boilers and associated equipment within the scope of this contract. The deaerator (DA) and condensate receiver tank (CRT) inspections, testing, NDT evaluations, MAWP calculations, and remaining life assessments are covered under a separate service contract and are not included within the scope of this requirement. Q17. Will a site visit be offered before the closing date? If so, please provide the date, time and point of contact. Site Visit will not be conducted at this time. Prepare and submit Quotes/Offers at your best terms based on the information contained in the RFQ. Q18. Is there an incumbent contract for this requirement? If so, please provide the contract number. See Q13 response above. Q19. Replace Safety Valve: Will the cost of new Valves be covered by the site? Replacement shall be required if a valve fails testing, cannot be properly calibrated, exhibits deficiencies affecting safe or reliable operation, or is otherwise determined to be unsuitable for continued service. Q20. Replace Gage Glass: Will new Gage cost be covered by the site? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q21. Cleaning - Will Gaskets be provided by the Site or Contractor? No. The cost of replacement gage glasses shall be included in the Contractor's quotation and contract pricing. Q22. Testing - How often will Non-Destructive Testing be required? Annually, once over the 5-year period? Additionally, will NB Inspector be required on-site during Non-Destructive Testing? See Q16 response above. Q23. When was the last maintenance and testing done on each boiler? Boiler #1: February 2026 Boiler #2: December 2025 Boiler #3: June 2026 Q24. Is there a set maintenance and testing schedule? In accordance with PWS Section IV.J and Sections V.19 and V.20, the Contractor shall develop and submit a detailed schedule for the required inspections, testing, calibrations, and maintenance activities in coordination with the PM/COR. Q25. Will an on-site visit be required as soon as the contract is awarded and the contractor can align a technician to be on site? An immediate on-site visit upon contract award is not required by the PWS. However, the Contractor shall coordinate with the PM/COR and provide the required advance notice in accordance with the contract requirements prior to performing any inspection, testing, calibration, or maintenance activities. Following contract award, the Government anticipates coordinating a kickoff meeting and scheduling activities with the Contractor to facilitate execution of the work. The timing of any on-site visit shall be mutually coordinated between the Contractor and the PM/COR, taking into consideration boiler plant operations, facility needs, personnel availability, and the requirement that no more than one boiler be removed from service at a time. Q26. There is a detailed description of what is required for testing the boilers but not for maintenance. a. What is the maintenance schedule? Daily, monthly, quarterly, yearly? The Contractor shall perform the maintenance, inspections, testing, calibrations, and assessments required by the PWS during each contract year. The specific schedule for execution of the work shall be developed by the Contractor and coordinated with the PM/COR in accordance with PWS Sections IV.J, V.19, and V.20. The contract does not require the Contractor to perform daily, weekly, or monthly routine operational checks unless specifically identified in the PWS. b. Does the VA have an in-house technician that will be providing daily checks, and then the contractor for this contract does quarterly and yearly maintenance and testing? VACHS personnel perform the routine operation and monitoring of the boiler plant, including day-to-day operational activities. The Contractor's responsibilities under this contract are limited to the preventive maintenance, inspections, testing, calibrations, safety-device testing, evaluations, and reporting specifically required by the PWS. Q27. The CLN structure is currently set up as 1 all-inclusive price. What should be included in that price? a. What parts, if any, is the contractor expected to furnish? The Contractor shall furnish all labor, materials, consumables, tools, instrumentation, and equipment necessary to perform the services required by the PWS. This includes replacement parts and materials specifically identified in the PWS, such as gage glasses, gaskets, air compressor belts, refractory patching materials, and other consumable items necessary to complete the required maintenance, testing, and inspection activities. Repairs or major component replacements identified during the inspection process that are not specifically required by the PWS shall be documented and reported to the COR for review and disposition. b. Is there a certain number of hours of labor time that the VA would like us to include? If one contractor budgets 50 hours of labor while another budgets for 25 hours of labor, their pricing will vary drastically. This is a performance-based services acquisition, the Government expects Offerors to thoroughly review the PWS and submit their best quotation/offer based on their experience, and commercial practices. Offerors shall independently determine the labor resources necessary to perform complete preventive maintenance, inspection, testing, calibration, evaluation, and reporting service for each boiler in accordance with the PWS, applicable codes and standards, manufacturer recommendations, and VA requirements. The Government's expectation is that each boiler receives a complete maintenance and testing service as required by the contract. The maintenance activities will be scheduled throughout the year and coordinated with the PM/COR to avoid disruption to facility operations. c. How many visits are required per year? Same as labor, 1 contractor may budget 2 trips, and another contractor may budget 12 trips. This is a performance-based requirement, the Government has not established a minimum or maximum number of site visits. Offerors shall determine the number of visits necessary to perform all contract requirements and shall include all associated costs in their proposed price. The Contractor shall develop and coordinate the work schedule in accordance with the PWS. The Contractor is responsible for identifying the resources and site visits necessary to successfully perform the required services. d. Are we to include pricing for emergency work? Labor, parts, boiler rental in case of a catastrophic failure? No, PWS/SOW is for maintenance and testing, as described following applicable manufacturer recommendations. Q28. Are there any active and known problems or deficiencies with the boilers? Page 10 of the solicitation states The service required must restore steam boiler units back in service as described in the manufacturer s manual . If a boiler has a known problem, we will need to know what that is to accurately bid the project. If it is a simple part replacement, it may only cost $100 for parts and 2 hours of labor. If the boiler needs a new motor, that would most likely be thousands of dollars and at least 2 full days of labor. The Government does not maintain a list of known deficiencies and does not warrant the condition of any boiler, component, or ancillary equipment beyond the information provided in the solicitation. The Contractor is responsible for evaluating the condition of the boilers and associated equipment as part of the inspection, testing, maintenance, and assessment services required by the PWS. The intent of the requirement stating that the boilers be restored to service in accordance with manufacturer recommendations is to ensure that the Contractor performs the specified maintenance, testing, calibrations, inspections, and adjustments necessary to verify operational readiness and identify conditions affecting performance and reliability. Any deficiencies identified during performance shall be documented and promptly reported, together with the Contractor's recommendations for repair, replacement, or other corrective action. Repairs or major component replacements not specifically required by the PWS are not included in this contract and shall be addressed separately by the Government, as appropriate. Q29. Is an on-site SSHO or Superintendent required? Must the be directly employed by the contractor? If the awarded contractor use a subcontractor, could the SSHO/Sup be employed by the sub? The Contractor shall be responsible for providing adequate supervision and safety oversight necessary to perform the work safely and in compliance with all applicable federal, state, local, VA, OSHA, and facility safety requirements. The Contractor shall ensure that personnel performing the work possess the qualifications and certifications required by the PWS. Q30. Are there any geographic or linguistic requirements? Examples: Must the contractor turn in a Spanish and English copy of all reports? Must the on-site technician be fluent in Spanish? Must the on-site technician be a resident of Puerto Rico? No, all reports are to be turned in English, as English is the Federal Government official business language. Being able to communicate in Spanish may be beneficial but it is not required. There is no residency requirement, is up to the Contractor to determine the best approach based on their experience. Performance shall comply with the required frequency and required response time as per PWS/SOW.
-Combined Synopsis11/10/2026
Request for Quote (RFQ) #: 36C25927Q0048 Radiant Heating Panel Replacement RMR VAMC This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in RFO part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The Government reserves the right to make no award from this solicitation. * The deadline for all questions is 4:00pm ET, November 13, 2026. All questions must be submitted in writing no later than the question cut-off date marked above. All questions will be answered officially through an amendment to the solicitation. ** Quotes are to be provided to Christopher.Hollingsworth2@va.gov no later than 14:00pm ET, November 20, 2026. Quotes shall not be hand carried. Faxed quotes shall not be accepted. Emailed quotes are the only method of submitted quotes (4MB email limit). The Government reserves the right to make award solely on initial Quotes received. Offerors bear the burden of ensuring that all portions of the offer (and any authorized amendments) reach the designated office before the deadline specified in the solicitation. This RFQ shall be completed in its entirety, and signed and dated, failure shall not be considered for award. This is a Request for Quote (RFQ) and the solicitation number is 36C25927Q0048. The government anticipates awarding a firm-fixed price contract resulting from this solicitation. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2026-01 effective March 13, 2026.. The North American Industrial Classification System (NAICS) code for this procurement is 238220 with a small business size standard of $19.0 Million. This solicitation is a 100% set-aside for Small Businesses. List of Line Items; Line Item Description Quantity Unit of Measure Unit Price Total Price 0001 Radiant Heating Panel Replacement in accordance with SOW 1 JB $ $ Grand Total $ Description of Requirements for the items to be acquired; DEPARTMENT OF VETERANS AFFAIRS – Eastern Colorado Healthcare Hydronic Radiant Heating Panels at RMR Entrances PERFORMANCE WORK STATEMENT 1. Background The Rocky Mountain Regional VA Medical Center (RMRVAMC) has hydronic radiant heating panels at all the main entrances that have corroded and failed creating potential slip hazards and not keeping up with the heating of the spaces at our Colfax entrance, South entrance, North entrance and employee breeze way coming from employee garage. The contractor shall remove and replace the existing failed radiant panels and shall comply with this Performance Work Statement (PWS), all VA, local, state, and Federal policies, and regulations. 2. Objective: Radiant Heating Panels Replacement- One time request The objective of this service contract is to have a contractor to furnish all labor, materials, supplies, tools, equipment, and qualified personnel to remove all existing heating panels and replace for new approved like heating panels at all current locations. 3. Scope: Remove and dispose of failed heating panels – roughly 238’ of radiators Prep existing locations to ensure no failure points that may leak Install new heating panels at the same length and pressure as existing and connection points (see pictures below) Verify that required pressure is met Verify that there are no leaks on the new panels and connections Test and ensure full operation is restored Locations pictured: 4. Site Specific Equipment Information: Model: PRF Radiators to be rate for low, medium and high pressure for a working pressure of 74 PSIG Radiators should be supplied with all mounting backets for noise free operation Radiators to be supplied with standard ½” female tapered NPT female connections and 1/8” female tapered NPT air vent connections Radiator expansion not to exceed 0.016 inches at 215°F for Piping allowance for expansion and contraction 5. Contractor Qualifications and Responsibilities: Contractors shall be qualified and has skilled employees with previous work experience in removal and installation of all hydronic heating panels Contractors must demonstrate having performed labor, start-up and commissioning of these units Contractor shall take all precautions necessary to protect people and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees’ fault or negligence. Contractors shall maintain personal liability and property damage insurance prescribed by the laws of the Federal Government. The Government reserves the right to accept or reject Contractor’s employees for the rendering of services. Complaints concerning Contract Personnel’s performance or conduct will be dealt with by the Contractor and POC with the final decision being made by the Contracting Officer. 6. Report Requirements: Furnish report within one week of each space completion in “Microsoft Word” format by email to the FMS POC. 7. Resources: The Government will not furnish any resources for the fulfillment of the services required under this contract. The contractor must provide all tools, equipment, materials, transportation, professional expertise, personnel, and supervision for maintenance services required under this contract. The contractor shall remove all debris and trash from facility upon completion of work. 8. Hours of Work and Scheduling Scheduling The work will be performed Monday through Friday from 7:30am to 4:00pm. The majority of the work will have minimal impact on the operation of the VA Medical Center. Any potential disruption to ongoing medical center operations shall be coordinated 2 weeks in advance and shall be subject to review and approval by the CO/POC. Any other disruption of operations in any building shall be scheduled at least one week in advance with the CO/POC. Work shall be scheduled to allow continuous operation of all facilities to the greatest extent possible. Federal Holidays: New Year’s Day Martin Luther King Jr’s Day Presidents Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day If the holiday falls on a Sunday, the following Monday will be observed as a national holiday. When a holiday falls on a Saturday, the preceding Friday is observed as a National holiday by U.S. Government Agencies, and any day specifically declared by the President of the United States of America. Contractor Check-In All Contractor personnel working onsite at the VA facility shall check in and out with the POC located in Building L (ENC). Access to work areas, and performance monitoring, will be provided by the POC. In all cases, the CO/POC shall be notified of any changes which may affect the response time of vital equipment. 9. Place of Performance All work will be performed at Rocky Mountain Regional VA Medical Center at 1700 N. Wheeling Street, Aurora, Colorado, 80045 10. Invoicing and Payment: Payment of services rendered under this contract shall be made in arrears upon satisfactory completion of each service and receipt of a properly prepared invoice and submitted by the Contractor to the payment address specified by Contracting. Invoices shall reference the Contract Number and Purchase Order Number, Manifest Number(s), provide a complete and accurate description of services/ supplies delivered/ rendered, including dates of performance, amounts, unit prices, extended totals and any other data relevant for payment purposes. Payments also must be submitted through Tungsten to be paid 11. Records Management Language This clause applies to all contractors whose employees create, work with, or otherwise handle Federal records, as defined below: “Federal Record” as defined in 44 U.S.C. 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the information value of data in them. The term Federal Record: Includes (Agency) records. Does not include personal materials. Applies to records created, received, or maintained by Contractors to the (Agency) contract. May include deliverables and documentation as associated with deliverables. 12. TRAINING: All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take VHA provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. Delivery and acceptance is to be F.O.B Destination (FAR 52.247-34) at the Veterans Affairs Medical Center, located at Department of Veterans Affairs Rocky Mountain Regional VA Medical Center Aurora, CO 80045 52.212-1, Instructions to Offerors--Commercial Items applies to this acquisition Any award made as a result of this solicitation will be made on an All or Nothing Basis. State if quoted items are available and priced through offerors existing Government-wide Acquisition Contract (GWAC), GSA Multiple Award Schedule (MAS) contract, or VA-wide Acquisition Contract. If the acquisition is set-aside for SDVOSBs/VOSBs, their socioeconomic status must be verified and visible in the SBA Small Business Certification (SBS): https://search.certifications.sba.gov/ at the time of quote submission AND award, or will be considered non-responsive, and will NOT be considered for award. Offerors are warned against contacting any VA personnel other than the Contracting Officer and Contract Specialist prior to placement of any award made resulting from this RFQ. If such contact occurs and found to be prejudicial to competing contactors, the offeror making such contact may be excluded from award considerations. All proprietary information shall be clearly and properly marked. If the Offeror submits annexes, documentation, attachments or the like, not specifically required by this solicitation, such will count against the Offeror’s page limitations unless otherwise indicated in the specific volume instructions below. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the quote and provide an adequate basis for evaluation. Offerors are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of each quote. Submission of quote shall include the following volumes: (I) Technical capability or quality of the item offered to meet the Government requirement; (II) Price; (III) Past Performance; and (IV) Completion of VAAR 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction. Volume I - Technical capability or quality to meet the Government requirement. The offeror shall submit its quote demonstrating how it meets the requirements of the performance work statement (PWS) and solicitation. Volume II – Price Price - The offeror shall complete the pricing schedule provided in Section (v) above: Price/Cost Schedule. Volume III – Past Performance Offerors shall provide a maximum of three (3) recent and relevant past efforts (as defined below) to demonstrate their ability to perform the proposed work. If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted. If not providing CPARS evaluation past performance references must include contract numbers, amount of contract award, point of contact with email address, telephone numbers and other relevant information, and a description of product/work performed under the contract. To be relevant, the effort must be similar in nature of work, size, magnitude, complexity, and scope of this procurement. To be recent past performance is defined as not more than five years from the RFQ release date of this solicitation. Volume IV – VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction. The offeror shall complete the provision VAAR 852-219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction. Offeror must list any/all subcontractors (and their size standard IAW NAICS 238220) if they will be utilized for this requirement AND what they will be performing. How is your firm going to comply with Limitations on Subcontracting requirements? If no subcontractors will be used, please state “No Subcontractors will be used for this requirement” in the response. (End of Addendum to 52.212-1) 52.212-2, Evaluation--Commercial Items applies to this acquisition ADDENDUM to FAR 52.212-2 EVALUATION—COMMERCIAL ITEMS: The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government considering price and other factors. The following factors shall be used to evaluate quotations: Factor I. Technical capability or quality offered to meet the Government requirement Factor II. Price Factor III. Past Performance Factor IV. Completion of VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction. Evaluation Approach. The Government will evaluate proposals using the comparative evaluation process outlined in RFO 12.203(c), where proposals will be compared to one another to determine which provides the best benefit to the Government. The Government reserves the right to consider a proposal other than the lowest price that provides additional benefit(s). Proposals may exceed minimum requirements of the solicitation. The Government reserves the right to select a proposal that provides benefit to the Government that exceeds the minimum requirements of the solicitation but is not required to do so. Each response must meet the minimum requirements of the solicitation. The Government is not requesting or accepting alternate proposals. The evaluation will consider the following: Factor I. Technical capability or quality offered to meet the Government requirement: The quotation will be evaluated to the extent to which it can meet and/or exceed the Government’s requirements as outlined in the solicitation and based on the information requested in the instructions to quoters section of the solicitation. Factor II. Price: The Government will evaluate the price by adding the total of all line-item prices, including all options. The Government may use various price analysis techniques and procedures to make a price reasonableness determination. Offers that do not meet or exceed the technical capability or quality of the service offered to the Government requirement, as stated in Factor 1 shall not be selected regardless of price. Factor III. Past Performance: The Government will evaluate on how well the offeror identified performance relates to the requirement procured under the PWS for this procurement to determine relevancy. How well the offeror performed on identified contracts shall be used to assess performance confidence. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance. The Government may use other methods to evaluate past performance, including but not limited to review of Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and as appropriate, the Defense Contract Management Agency (DCMA) Acquisition Information Repository, accessible through the Defense Technical Information Center website. Factor IV. Completion of “Attachment - VAAR 852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.”: The Government will evaluate the responses an offeror makes to Attachment - VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting-Certificate of Compliance for Services and Construction” for completeness. If an offeror fails to complete Attachment - VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting-Certificate of Compliance for Services and Construction” their quote will be determined ineligible for award. If offeror does not provide all volumes as outlined in RFO 52.212-1 Instructions, the offer may be considered non-responsive. (End of Addendum to 52.212-2) 52.212-4, Contract Terms and Conditions--Commercial Items – applies to this acquisition Any inconsistencies in this solicitation or contract shall be resolved by giving precedence IAW 52.212-4(r). By submitting a quote, the offeror understands that quotes will not be referenced in 1449 and clauses incorporated in the solicitation will dictate the contract. All offerors shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under the contract IAW RFO 52.212-4(q). The Government reserves the right to deny requests for clause changes that are not included in this solicitation should the request be inconsistent with the RFO or VAAR. The following RFO clauses are incorporated by reference: Applicable (X) Number Title Source 52.203-6 with Alt I Restrictions on Subcontractor Sales to the Government Statute 52.203-13 Contractor Code of Business Ethics and Conduct Statute X 52.203-17 Contractor Employee Whistleblower Rights Statute X 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements Statute 52.204-9 Personal Identity Verification of Contractor Personnel Other X 52.204-13 System for Award Management—Maintenance Statute 52.204-91 Contractor identification Other X 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment Statute 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters Statute X 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations Statute 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns Statute x 52.219-6 Notice of Total Small Business Set-Aside Statute 52.219-6 with Alt I Notice of Total Small Business Set-Aside, with Alternate I Statute 52.219-8 Utilization of Small Business Concerns Statute 52.219-9 Small Business Subcontracting Plan Statute 52.219-9 with Alt I Small Business Subcontracting Plan, with Alternate I Statute 52.219-9 with Alt II Small Business Subcontracting Plan, with Alternate II Statute 52.219-9 with Alt III Small Business Subcontracting Plan, with Alternate III Statute 52.219-9 with Alt IV Small Business Subcontracting Plan, with Alternate IV Statute 52.219-14 Limitations on Subcontracting Statute 52.219-16 Liquidated Damages—Subcontracting Plan Statute 52.219-33 Nonmanufacturer Rule Statute X 52.222-3 Convict Labor EO X 52.222-19 Child Labor—Cooperation with Authorities and Remedies EO 52.222-35 Equal Opportunity for Veterans Statute 52.222-35 with Alt I Equal Opportunity for Veterans, with Alternate I Statute X 52.222-36 Equal Opportunity for Workers with Disabilities Statute 52.222-36 with Alt I Equal Opportunity for Workers with Disabilities, with Alternate I Statute X 52.222-37 Employment Reports on Veterans Statute X 52.222-40 Notification of Employee Rights Under the National Labor Relations Act EO X 52.222-41 Service Contract Labor Standards Statute X 52.222-42 Statement of Equivalent Rates for Federal Hires Employee Class Monetary Wage-Fringe Benefits 23410 $34.38 . _____________ __________________________ Statute X 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) Statute 52.222-44 Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment Statute X 52.222-50 Combating Trafficking in Persons Statute 52.222-50 with Alt I Combating Trafficking in Persons, with its Alternate I Statute 52.222-51 Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements Other 52.222-53 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements Other 52.222-54 Employment Eligibility Verification EO X 52.222-62 Paid Sick Leave Under Executive Order 13706 EO X 52.222-90 Addressing DEI Discrimination by Federal Contractors EO 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items Statute 52.223-9 with Alt I Estimate of Percentage of Recovered Material Content for EPA-Designated Items, with Alternate I Statute 52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons Statute 52.223-12 Maintenance Statute 52.223-20 Aerosols Statute 52.223-21 Foams Statute X 52.223-23 Sustainable Products and Services Statute 52.224-3 Privacy Training Statute 52.224-3 with Alt I Privacy Training, with Alternate I Statute X 52.225-1 Buy American-Supplies Statute 52.225-1 with Alt I Buy American-Supplies, with Alternate I Statute 52.225-3 Buy American-Free Trade Agreements-Israeli Trade Act Statute 52.225-3 with Alt II Buy American-Free Trade Agreements-Israeli Trade Act, with Alternate II Statute 52.225-3 with Alt III Buy American-Free Trade Agreements-Israeli Trade Act, with Alternate III Statute 52.225-3 with Alt IV Buy American-Free Trade Agreements-Israeli Trade Act, with Alternate IV Statute 52.225-5 Trade Agreements Statute 52.225-19 Contractor Personnel in a Designated Operational Area or Supporting a Diplomatic or Consular Mission outside the United States Other 52.225-26 Contractors Performing Private Security Functions Outside the United States Statute 52.226-4 Notice of Disaster or Emergency Area Set-Aside Statute 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area Statute X 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving EO 52.229-12 Tax on Certain Foreign Procurements Statute 52.232-29 Terms for Financing of Commercial Products and Commercial Services Statute 52.232-30 Installment Payments of Commercial Products and Commercial Services Statute X 52.232-33 Payment by Electronic Funds Transfer—System for Award Management Statute 52.232-34 Payment by Electronic Funds Transfer—Other than System for Award Management Statute 52.232-36 Payment by Third Party Statute X 52.232-40 Providing Accelerated Payments to Small Business Subcontractors Statute 52.232-90 Fast Payment Procedure Statute X 52.233-3 Protest After Award Statute X 52.233-4 Applicable Law for Breach of Contract Claim Statute X 52.240-91 Security Prohibitions and Exclusions Statute 52.240-91 with Alt I Security Prohibitions and Exclusions, with Alternate I Statute 52.240-92 Security Requirements Other 52.240-92 with Alt II Security Requirements with Alternate II Other 52.240-93 Basic Safeguarding of Covered Contractor Information Systems X 52.244-6 Subcontracts for Commercial Products and Commercial Services Statute 52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels Statute 52.247-64 with Alt I Preference for Privately Owned U.S.-Flag Commercial Vessels, with Alternate I Statute 52.247-64 with Alt II Preference for Privately Owned U.S.-Flag Commercial Vessels, with Alternate II Statute Additional contract requirements or terms and conditions: 852.212-70, Provisions and Clauses Applicable to VA Acquisition of Commercial Items (Apr 2020) VAAR 852.203-70 Commercial Advertising (OCT 2026) VAAR 852.232-72 Electronic Submission of Payment Requests (OCT 2026) VAAR 852.233-70 Agency Protests (OCT 2026) VAAR 846.370-1 Rejected Goods (OCT 2026) RFO 52.252-1 Solicitation Provisions Incorporated by Reference The following provisions or clauses incorporated by reference in this solicitation must be completed by the offeror or prospective contractor and submitted with the quotation or offer. Copies of these provisions or clauses are available on the Internet at the web sites provided in the provision at RFO 52.252-1, Solicitation Provisions Incorporated by Reference. Copies may also be obtained from the contracting officer. https://www.acquisition.gov/far-overhaul https://www.acquisition.gov/vaar The following RFO provisions are to be incorporated by reference: Applicable (X) Number Title Source 52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions Statute X 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation Statute X 52.204-7 System for Award Management—Registration Statute 52.204-7 with Alt I System for Award Management—Registration, with Alternate I Statute 52.204-90 Offeror Identification Statute 52.207-6 Solicitation of Offers from Small Business Concerns and Small Business Teaming Arrangements or Joint Ventures (Multiple-Award Contracts) Statute 52.209-12 Certification Regarding Tax Matters Statute 52.219-2 Equal Low Bids Statute 52.222-18 Certification Regarding Knowledge of Child Labor for Listed End Products E.O. 52.222-48 Exemption from Application of the Service Contract Labor Standards for Maintenance, Calibration, or Repair of Certain Equipment–Certification Other 52.222-52 Exemption from Application of the Service Contract Labor Standards for Certain Services-Certification Other 52.222-56 Certification Regarding Trafficking in Persons Compliance Plan Statute 52.223-4 Recovered Material Certification Statute 52.225-2 Buy American Certificate Statute 52.225-4 Buy American-Free Trade Agreements-Israeli Trade Act Certificate Statute 52.225-6 Trade Agreements-Certificate Statute 52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan-Certification Statute 52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-Representation and Certifications Statute 52.226-3 Disaster or Emergency Area Representation Statute 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation Statute X 52.240-90 Security Prohibitions and Exclusions Representations and Certifications Statute The Defense Priorities and Allocations System (DPAS) does not apply. Date and Time offers are due to Christopher.hollingsworth2@va.gov by 14:00pm ET, November 20, 2026. Name and email of the individual to contact for information regarding the solicitation: Chris Hollingsworth Christopher.Hollingsworth2@va.gov
-Combined Synopsis11/20/2026

Additional Details

Solicitation Number

36C26326Q0799

Archive Date

Jul 19, 2026

Office Address