Notice ID: edcac33489204fa7843795b46f411364Award NoticeAwarded
7510--SUPPLY - AUTO-BAGS - CHARLESTON CMOP (766A)
Awarded on July 29, 2024. Full description on SAM.gov.
Awarded tounder 36C77024P0262 (source: SAM.gov award notice)• $1.2M
Overview
- Posted
- August 5, 2024
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 326111: Plastics Bag and Pouch Manufacturing
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- CMOP CHARLESTON (766A) 4136 CAROLINA COMMERCE PARKWAY, Ladson, SC, 29456
- Last updated
- Dec 4, 2025
- Award date
- Jul 29, 2024
- Award amount (SAM.gov award notice)
- $1.2M
Identifiers
- Solicitation number
- 36C77024Q0153
- Notice ID
- edcac33489204fa7843795b46f411364
- Award number (PIID)
- 36C77024P0262
Description
Description
Award Overview
Award Number
36C77024P0262
Award Amount (SAM.gov award notice)
$1.2M
Award Date
Jul 29, 2024
Awardee
Awardee UEI
FJJXT471UM24
Awardee CAGE Code
85XU1
Original Solicitation
Notice ID: edcac33489204fa7843795b46f411364
Posted Date: Aug 5, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $307.2KSigned Oct 2, 2026
- $144.3KSigned May 1, 2026
- $307.2KSigned Apr 2, 2026
- $537.5KSigned Mar 10, 2026
- $307.2KSigned Feb 5, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C77024Q0153- Market Research
- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Market ResearchFeb 8, 2024
Fanfold Auto-Bags for Charleston CMOP (766A)
- AwardedCurrentAug 5, 2024
7510--SUPPLY - AUTO-BAGS - CHARLESTON CMOP (766A)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Proposed procurement for NSN 4210015614991 EXTINGUISHER,FIRE: Line 0001 Qty 19 UI EA Deliver To: W1A8 DLA DIST SAN JOAQUIN By: 0167 DAYS ADO Approved sources are 0KDP7 86-210005-001; 66073 10-JG5565-001 REV.- IT.NO.5. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | - | Combined Synopsis | 11/23/2026 |
Proposed procurement for NSN 4210016083387 EXTINGUISHER,FIRE: Line 0001 Qty 150 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0043 DAYS ADO Line 0002 Qty 350 UI EA Deliver To: W1A8 DLA DISTRIBUTION By: 0043 DAYS ADO Approved source is 03670 429011. The solicitation is an RFQ and will be available at the link provided in this notice. Hard copies of this solicitation are not available. Specifications, plans, or drawings are not available. All responsible sources may submit a quote which, if timely received, shall be considered. Quotes must be submitted electronically. | - | Combined Synopsis | 11/02/2026 |
| - | Solicitation | 11/04/2016 | |
Modification 2 to Presolicitation Notice 36C25527R0013 This modification provides answers to RFIs received and revised the evaluation criteria to be used for this project. RFIs Received for Project # 657A5-24-108, Replace Medium Voltage Feeder 3 and Transformers 1. Factor 4 Past Performance / Section F Project Eligibility  The solicitation states that projects submitted for past performance consideration must have completed both design and construction, and that projects not constructed will not be considered. Would the VA consider accepting relevant electrical infrastructure studies or assessments in Section F, particularly those involving medium-voltage distribution systems and feeder evaluations, that demonstrate directly applicable technical expertise but did not result in construction? We prefer to keep it as projects that were designed AND constructed. Since this is a construction project and not a study, we want projects that have been finished to be used for past performance criteria.  2. Factor 2 Specialized Experience and Technical Competence / Laboratory Requirements  Factor 2 references the firm's technical capabilities in design quality management procedures, CADD/BIM, equipment resources, and laboratory requirements. Given that the project scope primarily involves medium-voltage electrical feeder and transformer replacements, could the VA clarify the applicability of laboratory requirements to this project? We respectfully request that this criterion be removed from the evaluation requirements, as it does not appear directly relevant to the stated scope of work. Laboratory requirements were deleted. Please see revised evaluation criteria below.  3. Request for Submission Deadline Extension Given the technical scope of the project and the level of detail required to address the evaluation criteria, we respectfully request a one-week extension of the SF330 submission deadline, from November 10, 2026, to November 17, 2026. This additional time would allow interested firms to prepare comprehensive qualifications packages that fully address the solicitation requirements. SF330 submission due date extended from 11/10/2026 to 11/172026. End of RFIs. | - | Pre-Solicitation | 11/17/2026 |
Modification 2 to Presolicitation Notice 36C25527R0007, P/N 657-27-209JB, Project Title: Renovate Building 1 and 53 Main Lobbies. This modification provides answers to RFIs received, revised evaluation criteria and revised supplement B per below RFIs. The SF330 submission due date is extended from November 10, 2026 to November 16, 2026. RFIs Received with VA Responses in blue text: Construction Budget questions: Is that the Estimated Cost of Construction or the maximum for the A/E Design Fee? Estimated Cost of Construction If the $949,026 is the construction budget, this appears low in today's environment given that over 6,000 SF needs to be renovated. Can the VA please re-evaluate this budget and provide an update? The construction budget that was originally used in the supplement B pre-solicitation notice is incorrect. A revised supplement B is attached, changing the construction cost estimate from $949,026 to $725,873. The Construction budget is set and cannot be changed until the design process is underway. Key Personnel questions: The Presolicitation Notice lists: Supervisory, Fire Protection Engineer, Certified Professional Industrial Hygienist, and Life Safety Engineer. The Statement of Work and Supplement B list: Communications (voice/data), Interior Design, VPIH, Plumbing (including fire protection), and a 3rd Party Fire Protection Review. Questions: Which positions require resumes in Section E? What is the intended role of "Supervisory"? Per the SOW & Supplement B the following positions require resumes: Project Manager, Architectural, Mechanical, Electrical, Communication (voice data) Plumbing (Including Fire Protection), Structural, Interior Design, VPIH, Cost Estimator and a 3rd Party Fire Protection Review. Project manager is Supervisory Industrial Hygienist/Asbeston Project Designer: Question: Is an ABIH Certified Industrial Hygienist (CIH) acceptable for this position, and does a CIH satisfy the requirement for the VPIH and the state-accredited Asbestos Project Designer? If these must be separate individuals, should both be identified in the SF330? A CIH satisfies the requirement for the VPIH and the state-accredited Asbestos Project Designer. They can be the same individual. Site Visit: Supplement B, page 6, Section III.6.g: the A/E "shall meet with the COR at the proposed project site" prior to submitting a response Presolicitation Notice, page 4: "Personal visits to discuss this announcement will not be allowed" and only "the most highly rated firm must physically come to the site" before pricing Question: Please confirm that no site visit is required before the SF330 submission. No site visit is required prior to SF330 submission. Laboratory and Special Room Rquirements: Presolicitation Notice, page 7, Evaluation Criteria 2, Specialized Experience and Technical Competence: "laboratory requirements for the firm" Supplement B, page 18, Section B6.II.1: "floor plans of special rooms such as the endoscopy suite, recovery room, etc." Questions: Neither a laboratory nor an endoscopy suite or recovery room appears in the project scope. Do any of these requirements apply to this project? These requirements do not apply to this project. Can the VA please release updated and corrected documents? The evaluation criteria 2 will be changed to remove laboratory requirements for the firm and the COR will revise Supplement B to remove the endoscopy suite and recovery room from the Supplement B. | - | Pre-Solicitation | 11/16/2026 |
Additional Details
Solicitation Number
36C77024Q0153
Archive Date
Oct 4, 2024
Office Address
LEAVENWORTH, KS, 66048