Leavenworth VA Decommissioning
Archived on October 8, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM CDT
- Posted
- September 18, 2026
- Notice type
- Solicitation
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236210: Industrial Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Office
- NATIONAL CMOP OFFICE (36C770)
- Place of performance
- Kansas, 66048
- PSC
- P400: SALVAGE- DEMOLITION OF BUILDINGS
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 36C77026R0015
- Notice ID
- e757bc187d6c45f4b079da3ecabedd5d
Description
The department of Veterans Affairs', CMOP division of NCO-15, intends to award a Construction Contract for Leavenworth VA CMOP facility, 5000 S 13th St, Leavenworth, KS 66048. See Statement of Work for deliverables.
The NAICS Code for this project is 236220- Commercial and Institutional Building Construction, size standard $45M. Estimated construction magnitude for this project is between $500K to $1M. This project is being solicited as a Service-Disabled Veteran Owned Business (SDVOSB) set aside.
See attached documentation for all necessary details.
The response due date has been extended to 23 Sep 26 @ 1700 Central
A site visit is scheduled for 17 Sep 26 @ 1200 Central. If you wish to attend, please contact Tony Crisp, Tony.Crisp@va.gov, and CC Robert Gochenour, robert.gochenour@va.gov, by 1500 Central, 16 Sep 26.
Revised documents have been uploaded into this post.
Award Overview
Possible prior contract
Inferred, not confirmedInferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.
Vendor
BKM CONSTRUCTION LLCContract end date
Sep 29, 2027
NAICS
236210
Agency
Department of Veterans Affairs
Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.
Contacts
Contracting Officer
Primary Contact
Documents
Files (8)
- Download
Leavenworth Decommissioning Walkthrough Sign In Roster 9_15_2026.pdf
15 KBAdded in Solicitation version 5Posted - Download
SOW Leavenworth Decommissioning 09112026.docx
7.1 MBAdded in Solicitation version 2Posted - Download
VA Power System Studies - Leavenworth KS CMOP One Line.pdf
1006 KBAdded in Solicitation version 2Posted - Download
Leavenworth_CMOP-Arch_Drwg-March_2013.pdf
2.0 MBAdded in Solicitation version 2Posted - Download
36C77026R0015 Questions.docx
19 KBAdded in Solicitation version 2Posted - Download
Leavenworth CMOP Decommissioning Source Selection.docx
23 KBAdded in Solicitation version 2Posted - Download
36C77026R0015 0001.docx
113 KBAdded in Solicitation version 2Posted - Download
36C77026R0015.docx
5.6 MBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationArchived
Leavenworth VA Decommissioning
- 2Version 2SolicitationArchived
Leavenworth VA Decommissioning
- 5Version 5SolicitationArchivedCurrent
Leavenworth VA Decommissioning
- 7Version 7Award NoticeArchived
Type changed from Solicitation to Award Notice
Leavenworth VA Decommissioning
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 DESCRIPTION TITLE OF PROJECT: 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC Solicitation 36C25527R0012 Scope of work: The General Description: VA Saint Louis Health Care System, John Cochran Division, requires a Construction Contractor to to replace various roofs identified through FCA report. Project will replace existing roofing beyond its useful life at JC. Roofs: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36,and R37; totaling approximately 44,000 SF. The following roof areas are modified bitumen roofs that have exceeded their useful life and should be replaced soon: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36, and R37.All work shall be performed in accordance with solicitation/contract terms and conditions,specifications and drawings, and all applicable VA TIL and local and National codes. Contractorshall furnish all supervision, tools, labor, materials, equipment, transportation and testingnecessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work.T his project has a set of drawings and specifications. These drawings and specifications indicate the work to be performed. Work includes, but is not limited to, general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures, associated appurtenances and certain other items necessary completion. All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA TIL and local and National codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work. All project work shall be installed in accordance with all applicable standards available at time of installation to include published commercial specifications as well as standards and preferences expressed in this document. All installation details shall be fully coordinated with VA CO and on-site Contracting Officer s Representative (COR). Period of Performance for all work is 180 calendar days. The facility location is the John Cochran VA Medical Center 915 N Grand Blvd, St. Louis, MO 63106. Pursuant to 38 USC 8127(d) and in accordance with Public Law 109-461, the Veterans Benefits, Healthcare and Information Technology Act of 2006, this procurement is set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The estimated cost magnitude is between $1,000,000-$2,000,000 (VARR 836.204). The North American Industry Classification Code (NAICS) for this procurement is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45.0 million. The duration of the project is estimated to be 180 calendar days after receipt of notice to proceed. This completion period includes final inspection and clean-up. Award will be made utilizing the Best Value Lowest Price Technically Acceptable Source Selection Process in accordance with Federal Acquisition Regulation (FAR) 15.101-2. Proposal submission instructions and project specific instructions will be included in the solicitation package. The government plans to award without discussions but reserves the right to hold discussions if necessary. The offeror is responsible to monitor and download any amendments from the System of Award Management (SAM) Business Opportunities (https://sam.gov/) website, which may be issued to this pre-solicitation. The successful prime contractor must perform no less than 85 percent of the General Construction labor for NAICS Code 236220. Proposal submission instructions will be included in the solicitation package. The government plans to award without discussions but reserves the right to hold discussions if necessary. The offeror is responsible to monitor and download any amendments from the System of Award Management (SAM) Business Opportunities (https://sam.gov/) website, which may be issued to this pre-solicitation. In accordance with FAR 52.204-7, registration in SAM is required and in accordance with FAR 2.101, prospective contractors must be registered in SAM under the applicable NAICS code. Additionally, in accordance with the Veterans Affairs Acquisition Regulation (VAAR) 819.7003, only businesses verified under the applicable NAICS and listed in the small business administration (SBA) registry https://veterans.certify.sba.gov, shall be considered. Firms may obtain SAM information at https://www.sam.gov and VIP information at Veteran Small Business Certification at https://veterans.certify.sba.gov. The solicitation package and drawings should be available for download on or before November 16, 2026, and the proposal due date will be on or about December2 , 2026. An organized site visit will be scheduled, and the information will be made available at time of solicitation issuance. Only one site visit will be scheduled and interested offerors are highly encouraged to attend. No hard copies of the solicitation or drawings will be provided; and telephone requests or questions will NOT be accepted. Please make sure that the subject line reads, Project: 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC END OF NOTICE | Pre-Solicitation | 11/13/2026 |
657-24-111JC Renovate Ambassador Suite & Main Lobby Bldg 1 Responses to questions 46 53, see attached See attached 657-CSI-332_1-SS5 & 657-CSI-332_1-SS7 Due date remains 11/12/2026 at 2:00pm CST. | Solicitation | 11/12/2026 |
Sources Sought Notice Sources Sought Notice Page 5 of 5 Sources Sought Notice *= Required Field Sources Sought Notice Page 1 of 5 The VA Saint Louis Health Care System, John Cochran Division, requires a Construction Contractor to Construction Contractor to prepare existing space for a new PET/CT., at the John Cochran VAMC, 915 N Grand Blvd, St. Louis, MO 63106. This project has a set of drawings and specifications. These drawings and specifications indicate the work to be performed at the John Cochran VAMC and will be issued at time of solicitation. Solicitation will be issued on before December 2, 2026. Title: 657-24-102JC - Prepare Site for New PET/CT, Room A011D Solicitation Number: 36C25527R0016 Contracting Office: Network Contracting Office 15 Contracting Office Location: 3450 S 4th Street Traffic way, Leavenworth, Kansas Posted Date: 11/03/2026 Response Date: 11/10/2026 at 2:00 PM Central Time Set Aside: Service-Disabled Veteran Owned Small Business Classification Code: Z2DA - Repair or Alteration of Hospitals and Infirmaries NAICS Code: 236220 Commercial and Institutional Building Construction Synopsis: Please note that this is NOT a request for quotes or proposals, the Government is seeking information for market research purposes only. The Government may or may not issue solicitation documents. The Department of Veterans Affairs Network Contracting Office (NCO) 15, is conducting a market survey for qualified: Service-Disabled Veteran Owned Small Businesses (SDVOSB), capable of providing the required services outlined below for the John Cochran VA Medical Center, Saint Louis, Missouri. The applicable NAICS code is 236220 Commercial and Institutional Building Construction and the size standard is $45.0 Million. Responses to this notice must be submitted via e-mail and received no later than November 10, 2026, at 2:00 PM Central Time. No telephone inquiries will be accepted or returned. Additional information about this project will be issued on the Federal Contract Opportunities website https://www.sam.gov once available. Period of Performance for base bid is 365 calendar days. In accordance with VARR 836.204, the estimated cost magnitude is between $1,000,000.00 and $2,000,000.00 Prospective SDVOSB firms are reminded that in accordance with Federal Acquisition Regulation (FAR) 52.219-14(e)(3), the Contractor agrees it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. GENERAL SCOPE OF WORK: Work includes, but is not limited to, general construction, alterations, mechanical, electrical & plumbing work, utility systems, fire protection systems, abatement work, necessary demolition and removal of existing structures, associated appurtenances, and certain other items necessary completion. All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA TIL and local and National codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work. The drawings and specifications include guidance on: Working hours allowed on this project. ICRA (Infection Control Risk Assessments) requirements and containment barriers. ILSM (Interim Life Safety Measures). Division of responsibilities between contractor and equipment vendor. This Statement of Work (SOW) is intended as an outline and is not a detailed summary of the work the contractor will be required to perform. In the event of conflict between this SOW and the project drawings and specifications, the drawings and specifications will take precedence over this SOW. END OF SCOPE OF WORK Interested firms must be registered in https://sam.gov with NAICS code 236220 and qualified as a Service Disabled Veteran Owned small business under 236220 Commercial and Institutional Building Construction. Qualified service-disabled veteran owned small businesses are encouraged to respond and required to be registered in with the Small Business Administration (SBA) registry https://veterans.certify.sba.gov on or before the response date. If interested in this opportunity, please provide Capability Statement via email. The Capability Statement is designed to inform the Department of Veteran Affairs of any prospective construction contractors' project execution capabilities. The submission is limited to 10 pages which shall include the following information: 1) Offeror's name, address, point of contact, phone number, e-mail address, and Unique Entity ID. 2) Offeror's interest in bidding on the solicitation when it is issued. 3) Offeror's capability to perform a contract of this magnitude and complexity and comparable work performed within the past 5 years - brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project - provide at least 1, but no more than 3 completed construction examples. 4) Offeror's CVE certification as a Veteran owned business. 5) Please provide Socio-economic status for NAICS code 236220 Commercial and Institutional Building Construction and provide percentage of self-performed labor your company can perform for this type of project. 6) Offeror's Joint Venture information if applicable - existing and potential. 7) Offeror's Bonding Capability in the form of a letter from Surety providing bonding level per contract and aggregate. No basis for claim against the Government shall arise as a result of a response to this sources sought or Government use of any information provided. The Government will not pay for information or comments provided and will not recognize any costs associated with submission of comments. There is no guarantee, expressed or implicit, that market research for this acquisition will result in a particular set-aside, or any other guarantee of award or acquisition strategy. Responses must be received by 2:00 PM Central on November 10, 2026, via e-mail to the Contracting Officer at Matthew.Finley@va.gov and Contract Specialist Abby.Monroe2@va.gov PLEASE REFERENCE "SOURCES SOUGHT: : 657-24-102JC - Prepare Site for New PET/CT, Room A011D , IN THE SUBJECT LINE and cover sheet. Respondents will not be contacted regarding their submission or information gathered as a result of this Sources Sought notice. Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https://sam.gov. The Contract Opportunities website is the only official site to obtain these documents. Contracting Office Address: Department of Veterans Affairs; Network 15 Contracting Office; 3450 S. 4th Street, Leavenworth, KS 66048 Point of Contact(s): Abby Monroe, Contract Specialist, e-mail address: Abby.Monroe2@va.gov | Market Research | 11/10/2026 |
657-27-103JB, FCA Replace Building 51 Roof This is a Sources Sought Notice to determine the availability of service disabled veteran owned small business (SDVOSB) firms for a possible small business category type set-aside for Construction Services project: This is a Sources Sought Notice that is issued for information and planning purposes only and is not to be construed as a commitment by the government, implied or otherwise to issue a solicitation or ultimately award a contract. An award will not be made on information received in response to this notice. This notice is not a Request for Proposal (RFP); it is a market research tool being utilized to determine the availability of sources prior to issuing a Best Value type RFP. PROJECT DESCRIPTION AND SCOPE 1. This contract is for CONSTRUCTION services for the work required to replace the existing roof and associated components on Building 51 at the St. Louis Medical Center Jefferson Barracks. 2. Description: Construction services: Furnish complete construction services to replace all designated Building 51 roofs, including projections, entrance roofs, and connecting portions. The preliminary net roof area is approximately 56,000 square feet, subject to field verification. Provide a watertight thermoplastic polyolefin (TPO) roofing system in accordance with the VA-prepared drawings and specifications. Contractor shall submit shop drawings, product data, and installation details for all proposed materials, equipment, and systems to be installed or replaced under this contract for VA review prior to commencing the associated work. Submittals shall include applicable manufacturer's specifications and required engineering certifications. Schedule, phasing, and occupied operations: Complete construction and closeout within 222 calendar days after the Notice to Proceed issue date. Building 51 remains occupied and operational 24 hours per day, seven days per week. Work hours are from 7:00 a.m. to 4:30 p.m., local time. Submit a contractor-developed phasing plan for the Contracting Officer's Representative (COR) to review before roofing. Complete both highest penthouse roof platforms first on the original building and the highest roof section first on the addition; either building portion may be started first. Maintain safe access, utilities, and required infection-control and HVAC-intake protection. Provide construction fall protection and keep the building watertight; coordinate service interruptions with the VA. Investigation and Roofing Requirements: a. Hazardous Materials: While neither Asbestos Containing Material nor Lead is expected to be encountered within the scope of this project, it will be the responsibility of the contractor to hire an independent 3rd party VPIH to complete the related work if they are to encounter a material that they deem suspicious. b. Demolition limit: At the original building (Zones 1-7, 13, and 14), remove the existing roofing assembly through the base sheet to the top of the Zonolite lightweight-concrete topping; retain the topping and underlying structural concrete deck. At the addition (Zones 8-12 and 15), remove the existing roofing assembly, including insulation and intervening layers, to the top of the metal roof deck; retain the deck and supporting structure. Clean and inspect retained surfaces, and repair deterioration within specified repair limits. Report differing construction or deterioration beyond those limits to the COR before proceeding with affected work. c. New roof and mechanical securement: Install mechanically fastened rigid insulation, adhered cover board, and fully adhered 70-mil TPO roofing membrane with continuous hot-airwelded seams. Contractor shall verify that the proposed fastening system is compatible with Building 51's existing roof construction. d. Parapets, penetrations, and retained metal: Extend new roofing up parapets to the existing flashing. Flash and seal, with the correct system specific boots, all roof penetrations with compatible membrane extending at least 8 inches above the finished roof, or higher where required by applicable VA criteria and manufacturer/warranty requirements. Retain metal flashings, flanges, and coping unless scheduled for replacement, and replace roofing beneath retained metal. Specific Replacement and Repairs: e. Associated roof work: Retain rooftop HVAC units in place and replace roofing beneath elevated units and frames and around curbs. Replace old or deteriorated wooden rooftop support blocks with load-rated black rubber blocks compatible with the roofing; retain serviceable recently replaced blocks. Replace roof-drain covers/strainers and recondition retained drains with watertight connections. Reflash existing scuppers and provide new scuppers only where detailed; retain gutters and downspouts unless otherwise indicated. Correct approximately 250 square feet of depressed roof on the original building's middle section north of the penthouse to provide positive drainage. Replace expansion-joint weatherproofing/cover material at two original-building sections, approximately 40 linear feet each. Temporarily remove and reinstall the existing lightning-protection system in its original locations and configuration with new clips securing it; complete specified testing and certification. Repair approximately 150 linear feet of the existing movable stanchion-andrope warning-line barrier. Replace the penthouse roof-access ladder to meet applicable VA safety requirements and OSHA criteria. Install 3-foot by 3-foot walking pads with 8-inch clear gaps along approximately 600 linear feet of total walkway route, including gaps. Provide positive drainage to roof drains and scuppers throughout all reroofed areas. Standing water shall not remain more than 48 hours after rainfall ends under conditions conducive to drying. Correct low spots and other drainage deficiencies that prevent compliance before final acceptance. f. Skylights: Replace four skylights: two approximately 85 square feet each and two approximately 40 square feet each. Field-verify openings and provide complete watertight installations. Before fabrication, submit contractor shop drawings and supporting structural calculations signed and sealed by a licensed structural engineer responsible for their design/review. g. Submittals, record drawings, and closeout: Provide required construction submittals and complete specified testing, inspections, and closeout. Submit a clean, coordinated as-built record drawing set in searchable PDF and editable CAD showing actual installed conditions and accepted changes; redline markups alone are not acceptable. Provide a 20-year nodollar-limit (NDL) warranty and maintenance information, complete cleanup and restoration, and comply with contract records-management, privacy, and security requirements. In accordance with VAAR 836.204, the estimated magnitude of the resulting construction price range is estimated to be between $2,000,000.00 and $5,000,000.00. The North American Industrial Classification System (NAICS) code is 236220, General Construction, small business size standard of $45 Million in average annual receipts for the preceding three years. Interested firms must be registered in https:www.SAM.gov with this NAICS code and qualified as a service disabled veteran owned small business under this NAICS code. Qualified service-disabled veteran owned small businesses are encouraged to respond and required to be registered with the SBA at https://search.certifications.sba.gov/ on or before the response date. The intent of this notice is to identify potential Small Business firms capable of performing these services. The Government will use the information obtained from this sources sought announcement to make a set-aside determination including further restriction under a socio-economic status, firms must identify their socio-economic status for NAICS code 236220, General Construction. The appropriate North American Industry Classification System (NAICS) code for this acquisition is 236220 with the applicable business size of $45 million. If interested in this opportunity, please provide via email a Capability Statement: The Capability Statement is designed to inform the Department of Veteran Affairs, of any prospective construction contractors' project execution capabilities. The submission is limited to 10 single sided pages which shall include the following information: 1) Offeror's name, address, point of contact, phone number, e-mail address, and EIN number; 2) Offeror's interest in bidding on the solicitation when it is issued; 3) Offeror's capability to perform a contract of this magnitude and complexity and comparable work performed within the past 5 years - brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project) - provide at least 3 examples; 4) Offeror's CVE certification as a Veteran owned business; 5) Please provide Socio-economic status for NAICS code 236220, General Construction and provide percentage of self-performed labor your company can perform for this type of project; 6) Offeror's Joint Venture information if applicable - existing and potential; 7) Offeror's Bonding Capability in the form of a letter from Surety providing bonding level per contract and aggregate. The Response Due Date for this Sources Sought Notice is November 9. 2026 at 10:00 am Central Time. Respondents will not be notified of the results of analysis. Submit your responses to Jennifer.Hill@va.gov. PLEASE REFERENCE "SOURCES SOUGHT: 36C25527Q0044 Project 657-27-103JB, FCA Replace Building 51 Roof " IN THE SUBJECT LINE and first page of the response. The point of contact for submission of Capabilities Statement and questions is: Jennifer Hill Contracting Officer Email: jennifer.hill@va.gov NCO 15 Contracting Office Leavenworth, Kansas 66048 No basis for claim against the Government shall arise as a result of a response to this sources sought or Government use of any information provided. The Government will not pay for information or comments provided and will not recognize any costs associated with submission of comments. There is no guarantee, expressed or implicit, that market research for this acquisition will result in a particular set-aside, or any other guarantee of award or acquisition strategy. Respondents will not be contacted regarding their submission or information gathered as a result of this Sources Sought notice. Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https://sam.gov/. The Contract Opportunities website is the only official site to obtain these documents. | Market Research | 11/09/2026 |
The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product. The Contractor shall provide all necessary services to meet the program objectives and requirements and to provide the required outcome in terms of overall quality, timeliness, and documentation, per Construction Documents & Specifications titled “762-24-101 FCA Drawings” and “762-24-101 FCA Specifications”. The Contractor shall be responsible for obtaining and coordinating the services of all Sub-Contractors performing other services on site and other entities as part of the contract to ensure the expected quality, timely, and documented final product.. | Awarded | Open |
Additional Details
Solicitation Number
36C77026R0015
Archive Date
Oct 8, 2026
Office Address
LEAVENWORTH, KS, 66048