Notice ID: defe371abda64855ac82b0a1f5bd98c9Award NoticeAwarded
Z1DA--EHRM Infrastructure Upgrades - Phase 1 - Hines, IL (VA-21-00008670)
Awarded on August 23, 2021. Full description on SAM.gov.
Awarded tounder 36C77621C0073 (source: SAM.gov award notice)• $515.0K
Overview
- Posted
- August 31, 2021
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Hines, IL, 60141
- Last updated
- Sep 9, 2025
- Award date
- Aug 23, 2021
- Award amount (SAM.gov award notice)
- $515.0K
Identifiers
- Solicitation number
- 36C77621B0011
- Notice ID
- defe371abda64855ac82b0a1f5bd98c9
- Award number (PIID)
- 36C77621C0073
Description
In accordance with 38 U.S.C 8127 (Public Law 109-461), this project is a competitive Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside. The contractor shall furnish all labor and materials and perform the work as required by the drawings and specifications for the Hines EHRM Construction Project. The project location is as follows: Hines VA Medical Center 5000 Fifth Avenue Hines, IL 60141 In accordance with VAAR 836.204, the magnitude of construction is between $200,000 and $500,000.
Award Overview
Award Number
36C77621C0073
Award Amount (SAM.gov award notice)
$515.0K
Award Date
Aug 23, 2021
Awardee
Awardee UEI
ZMEMKF5XQ7S6
Original Solicitation
Notice ID: defe371abda64855ac82b0a1f5bd98c9
Posted Date: Aug 31, 2021
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $10.0MSigned May 12, 2026
- $9.0MSigned Dec 17, 2025
- $8.9MSigned Oct 30, 2025
- $8.2MSigned Jun 10, 2025
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C77621B0011- Solicitation
- Awarded
This opportunity has been awarded.
- 5×SolicitationJun 2, 2021
EHRM Infrastructure Demo - Phase I - Hines, IL
- AwardedCurrentAug 31, 2021
Z1DA--EHRM Infrastructure Upgrades - Phase 1 - Hines, IL (VA-21-00008670)
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
The EHRM Infrastructure Upgrades Construction project at the Cheyenne VAMC involves preparing the VA campus for EHRM Upgrades, main campus of Cheyenne VA Medical Campus requires the following infrastructure improvements: electrical (panel upgrades, power [normal/emergency]), bonding, UPS, building management system interfaces, new and upgraded HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes). Expand space in MFA (demo, finishes, cable management, relocate cabinets), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, upgrades to fiber infrastructure backbone campus wide within buildings and between buildings, install diversified path to new data center for wide area network (WAN), hazardous material abatement. Project building locations include: Building 1 (Arrowhead, Buffalo, Cowboy, Douglas Fir), Building 4, Building 5, Building 6, Building 7, Building 8, Building 11, Building 12, Building 13, Building 23, Building 45, RRTP Building, & Site. | 100% | Awarded | Open |
This project is for the construction of EHRM Infrastructure Upgrades at the Louis A Johnson VA Medical Center in Clarksburg, WV. | 97% | Market Research | 11/13/2026 |
646A4-22-700 | EHRM Infrastructure Upgrades Pittsburgh-Heinz, PA | 97% | Awarded | Open |
642-22-104, 36C24426R0088, Upgrade Substation Building 2, Phase 1, PHL CMCVAMC Proposal Due Date: 11/20/2026 at 4:00pm EST. Email proposals to Kevin Rodgers at kevin.rodgers2@va.gov. Corporal Michael J. Crescenz Medical Center (CMC VAMC) requires replacement of Electrical Substations 1 and 2 in order to increase electrical capacity to support future facility projects. The existing substations are approximately 29 years old and require replacement to support current and future electrical demands. This project will replace Electrical Substations 1 and 2 with new 480/277V substations each containing a 1500 kVA transformer. A temporary 480/277V substation with a 1500 kVA transformer shall be installed to maintain electrical service to the facility during demolition and construction activities. Upon completion of construction, the temporary substation shall remain installed as a spare substation for the facility. All work shall be phased to minimize service outages and maintain continuous operation of the medical center. Defined and issued bid documents (drawings and specifications) will serve as the basis of this construction project. | 93% | Solicitation | 11/20/2026 |
Bid Log - Northport Chiller - Public | 85% | Special Notice | Open |
Additional Details
Solicitation Number
36C77621B0011
Archive Date
Nov 29, 2021
Office Address
INDEPENDENCE, OH, 44131