Notice ID: 08cb36cb32a641c7b95f40432fefe9baAward NoticeAwarded
Y1DZ--437-21-205 EHRM Infrastructure Upgrades Construction Fargo, ND
Awarded on August 23, 2022. Full description on SAM.gov.
Awarded tounder 36C77622C0094 (source: SAM.gov award notice)• $20.5M
Overview
- Posted
- August 23, 2022
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Fargo VA Health Care System 2101 Elm Street, Fargo, 58102
- Last updated
- Sep 9, 2025
- Award date
- Aug 23, 2022
- Award amount (SAM.gov award notice)
- $20.5M
Identifiers
- Solicitation number
- 36C77622B0030
- Notice ID
- 08cb36cb32a641c7b95f40432fefe9ba
- Award number (PIID)
- 36C77622C0094
Description
Construction work shall include, but shall not be limited to providing all labor, materials, equipment, etc. necessary to complete Fargo VA Health Care System project 437-21-205, EHRM Infrastructure Upgrades – Fargo, ND in accordance with the specifications, drawings, NFPA, local building codes, and other applicable requirements. The project shall include, but shall not be limited to demolition, new construction, plumbing, mechanical (HVAC), sprinklers/fire protection, electrical (lighting, power, systems, etc.), asbestos abatement, masonry work, structural work, and other work as required by the contract documents. This project upgrades the entire Fargo campus IT infrastructure to the latest VA and industry standards. Phasing and coordination shall ensure downtimes are kept to a minimum.
Award Overview
Award Number
36C77622C0094
Award Amount (SAM.gov award notice)
$20.5M
Award Date
Aug 23, 2022
Awardee
Awardee UEI
N6CTZBFDV5J6
Original Solicitation
Notice ID: 08cb36cb32a641c7b95f40432fefe9ba
Posted Date: Aug 23, 2022
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $24.5MSigned Nov 2, 2026
- $26.9MSigned Sep 29, 2026
- $4.0MSigned Aug 7, 2026
- $32.3MSigned Aug 6, 2026
- $24.4MSigned Jul 15, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C77622B0030- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationApr 27, 2022
Y1DZ--437-21-205 EHRM Infrastructure Upgrades Construction Fargo, ND
- 9×SolicitationMay 25, 2022
Y1DZ--437-21-205 EHRM Infrastructure Upgrades Construction Fargo, ND
- AwardedCurrentAug 23, 2022
Y1DZ--437-21-205 EHRM Infrastructure Upgrades Construction Fargo, ND
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
EHRM Infrastructure Upgrades Construction – Dallas CMOP | - | Solicitation | 12/23/2026 |
Big Spring CLC Phase III Minor Construction | - | Solicitation | 10/22/2026 |
Amendment 0007 has been posted. Amendment 0007 extends the date for receipt of offers. The new date for receipt of offers is 10/14 at 3PM EDT. Amendment 0007 also provides an update to RFIS and a new basis of design for HVAC units. Amendment 0006 has been posted. Amendment 0006 extends the date for receipt of offers. The new date for receipt of offers is 10/9 at 3PM EDT. Amendment 0006 also excludes the draft schedule from the page limit for Technical Volume I and provides responses to technical questions. Amendment 0005 has been posted. Amendment 0005 extends the date for receipt of offers. The new date for receipt of offers is 10/2 at 3PM EDT. Amendment 0004 has been posted. Amendment 0004 extends the date for receipt of offers. The new date for receipt of offers is 9/18 at 3PM EDT. Amendment 0003 has been posted. Amendment 0003 provides the site visit sign-in sheet and agenda from the 8/20 site visit. Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map. Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope. | - | Solicitation | 10/14/2026 |
Solicitation - Expand Radiology & Oncology Minor Construction - Lake Nona | - | Solicitation | 04/30/2026 |
Project 619-21-106 - EHRM Infrastructure Upgrades - Construction - Montgomery VAMC located in Montgomery, AL | - | Solicitation | 01/05/2027 |
Additional Details
Solicitation Number
36C77622B0030
Archive Date
Nov 30, 2022
Office Address
INDEPENDENCE, OH, 44131