Notice ID: 4b3530108b18409cbf0bee6892d779b0Award NoticeAwarded
Z1DA--544-20-107 EHRM Infrastructure Upgrades Construction Columbia, SC VAMC
Awarded on September 26, 2023. Full description on SAM.gov.
Awarded tounder 36C77623C0147 (source: SAM.gov award notice)• $46.1M
Overview
- Posted
- September 26, 2023
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Place of performance
- Department of Veterans Affairs Columbia VA Health Care System 6439 Garners Ferry Rd, Columbia, SC 29209, Columbia, SC, 29209
- Last updated
- Sep 9, 2025
- Award date
- Sep 26, 2023
- Award amount (SAM.gov award notice)
- $46.1M
Identifiers
- Solicitation number
- 36C77623R0096
- Notice ID
- 4b3530108b18409cbf0bee6892d779b0
- Award number (PIID)
- 36C77623C0147
Description
EHRM Infrastructure Upgrades Construction at the Columbia VA Health Care System
Award Overview
Award Number
36C77623C0147
Award Amount (SAM.gov award notice)
$46.1M
Award Date
Sep 26, 2023
Awardee
Awardee UEI
LERTSV4EQKB3
Original Solicitation
Notice ID: 4b3530108b18409cbf0bee6892d779b0
Posted Date: Sep 26, 2023
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $58.9MSigned Oct 9, 2026
- $45.9MSigned Oct 5, 2026
- $81.2MSigned Sep 30, 2026
- $81.1MSigned Sep 24, 2026
- $29.4MSigned Sep 14, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C77623R0096- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- Pre-SolicitationMay 26, 2023
Z1DA--EHRM Infrastructure Upgrades - Columbia, SC VAMC 544-20-107
- 3×SolicitationJul 17, 2023
EHRM Infrastructure Upgrades Construction - Columbia, SC VAMC
- AwardedCurrentSep 26, 2023
Z1DA--544-20-107 EHRM Infrastructure Upgrades Construction Columbia, SC VAMC
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
539-23-101 Modernize Nurse Call Statement of Work The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Modernize Nurse Call Project (539-23-101) All work shall be completed in accordance with the project drawings and specifications. The scope of work involves renovation for nurse call system in the main hospital and CLC at the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, and telecommunications necessary for demolition and removal of existing nurse call completion and installation of new work. A full list of requirements and further details are provided in the project drawings and specifications. The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project. | - | Pre-Solicitation | 11/30/2026 |
CONSTRUCTION STATEMENT OF WORK Install Roof Equipment Railings Project No. 539-22-206 The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications. Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed. | - | Pre-Solicitation | 11/30/2026 |
This project is for the construction of EHRM Infrastructure Upgrades at the Louis A Johnson VA Medical Center in Clarksburg, WV. | - | Market Research | 11/13/2026 |
The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed. | - | Pre-Solicitation | Open |
Bid Log - Northport Chiller - Public | - | Special Notice | Open |
Additional Details
Solicitation Number
36C77623R0096
Archive Date
Dec 25, 2023
Office Address
INDEPENDENCE, OH, 44131