Notice ID: 4b3530108b18409cbf0bee6892d779b0Award NoticeAwarded

Z1DA--544-20-107 EHRM Infrastructure Upgrades Construction Columbia, SC VAMC

Awarded on September 26, 2023. Full description on SAM.gov.

Awarded tounder 36C77623C0147 (source: SAM.gov award notice)• $46.1M

Overview

Posted
September 26, 2023
Notice type
Award Notice
Set-aside
Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Place of performance
Department of Veterans Affairs Columbia VA Health Care System 6439 Garners Ferry Rd, Columbia, SC 29209, Columbia, SC, 29209
Last updated
Sep 9, 2025
Award date
Sep 26, 2023
Award amount (SAM.gov award notice)
$46.1M

Identifiers

Solicitation number
36C77623R0096
Notice ID
4b3530108b18409cbf0bee6892d779b0
Award number (PIID)
36C77623C0147

Description

EHRM Infrastructure Upgrades Construction at the Columbia VA Health Care System

Full description on SAM.gov

Award Overview

Award Number

36C77623C0147

Award Amount (SAM.gov award notice)

$46.1M

Award Date

Sep 26, 2023

Awardee

Awardee UEI

LERTSV4EQKB3

Original Solicitation

Notice ID: 4b3530108b18409cbf0bee6892d779b0

Posted Date: Sep 26, 2023

Original Response Deadline: Not specified

More From This Vendor

Top 5 most recent

5
  • 36C24822C0110
    ESA SOUTH, INC.
    Department of Veterans AffairsNAICS 236220
    $58.9MSigned Oct 9, 2026
  • 36C77626C0075
    ESA SOUTH, INC.
    Department of Veterans AffairsNAICS 236220
    $45.9MSigned Oct 5, 2026
  • 36C10F25C50000
    ESA SOUTH, INC.
    Department of Veterans AffairsNAICS 236220
    $81.2MSigned Sep 30, 2026
  • 36C10F25C50000
    ESA SOUTH, INC.
    Department of Veterans AffairsNAICS 236220
    $81.1MSigned Sep 24, 2026
  • 36C77623C0162
    ESA SOUTH, INC.
    Department of Veterans AffairsNAICS 236220
    $29.4MSigned Sep 14, 2026

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C77623R0096
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. Pre-SolicitationMay 26, 2023

    Z1DA--EHRM Infrastructure Upgrades - Columbia, SC VAMC 544-20-107

    Notice bd849d94c9554010a1d5cbc1e3534f30 on SAM.gov

  2. 3×
    SolicitationJul 17, 2023

    EHRM Infrastructure Upgrades Construction - Columbia, SC VAMC

    Notice 012053f87b3945d9961d5702535e12d6 on SAM.gov

  3. AwardedCurrentSep 26, 2023

    Z1DA--544-20-107 EHRM Infrastructure Upgrades Construction Columbia, SC VAMC

    Notice 4b3530108b18409cbf0bee6892d779b0 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
539-23-101 Modernize Nurse Call Statement of Work The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Modernize Nurse Call Project (539-23-101) All work shall be completed in accordance with the project drawings and specifications. The scope of work involves renovation for nurse call system in the main hospital and CLC at the VA Cincinnati Site. Work includes, but is not limited to, general construction, alterations, electrical, and telecommunications necessary for demolition and removal of existing nurse call completion and installation of new work. A full list of requirements and further details are provided in the project drawings and specifications. The above construction Statement of Work (SOW) constitutes a basic outline of work and in no way outlines all details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifications be initiated to determine the needs and conditions for the construction of this project.
-Pre-Solicitation11/30/2026
CONSTRUCTION STATEMENT OF WORK Install Roof Equipment Railings Project No. 539-22-206 The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications. Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications. This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc. The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project. Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed.
-Pre-Solicitation11/30/2026
This project is for the construction of EHRM Infrastructure Upgrades at the Louis A Johnson VA Medical Center in Clarksburg, WV.
-Market Research11/13/2026
The project’s general scope of work is to furnish all tools, equipment, material, permits, labor, supervision, and all other necessary resources to accomplish the following work: This project replaces a portion of the existing campus water loop piping and existing campus water loop isolation valves. The project also includes installing a water booster pump that will be powered by a new equipment branch of emergency power in Building 22. For the new equipment branch of emergency power to be added, new wiring will feed from Building 19 (generator building) utilizing an existing underground conduit to Building 22 to feed a new emergency power distribution panel which will replace the existing emergency power distribution panel that does not meet code requirements. Installation of a new automatic transfer switch and panelboard along with wiring and conduits will be required to create the new equipment branch of emergency power. The project will also disturb many portions of the existing asphalt roadways and parking lots as well as concrete sidewalks and curbing due to excavation work. The contractor shall patch or replace asphalt and concrete as shown on the drawings and repair any areas of the landscaping and lawn that get disturbed during the project. The existing campus water loop piping is located below many of the existing campus roadways and sidewalks, and it is anticipated that most of the new piping will be as well. Therefore, this project shall be completed in phases to allow campus access for employees and Veterans and maintain water service until a tie-in to an existing building service pipe is to take place. If a shutdown of water service for any building is required during the duration of the project, it must be coordinated with the COR. Period of performance is 300 calendar days from receipt of the Notice to Proceed.