Notice ID: 0c3e68c4a4bb4bb9a8fd96c8c9446c5dAward NoticeAwarded
Y1DZ--663-24-715 EHRM WAN Path Upgrades Construction - Seattle, WA
Awarded on September 18, 2024. Full description on SAM.gov.
Awarded tounder 36C77624C0199 (source: SAM.gov award notice)• $3.1M
Overview
- Posted
- September 19, 2024
- Notice type
- Award Notice
- Set-aside
- Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- NAICS
- 236220: Commercial and Institutional Building Construction
- Agency
- Department of Veterans Affairs
Notice details
- Last updated
- Dec 4, 2025
- Award date
- Sep 18, 2024
- Award amount (SAM.gov award notice)
- $3.1M
Identifiers
- Solicitation number
- 36C77624R0108
- Notice ID
- 0c3e68c4a4bb4bb9a8fd96c8c9446c5d
- Award number (PIID)
- 36C77624C0199
Description
The Justification and Approval (J&A) document is to be posted within 14 days after award in accordance with FAR Subpart 6.305. Please see the J&A attached to satisfy that requirement.
Award Overview
Award Number
36C77624C0199
Award Amount (SAM.gov award notice)
$3.1M
Award Date
Sep 18, 2024
Awardee
Awardee UEI
J39ZNELNYAU8
Awardee CAGE Code
433P8
Original Solicitation
Notice ID: 0c3e68c4a4bb4bb9a8fd96c8c9446c5d
Posted Date: Sep 19, 2024
Original Response Deadline: Not specified
More From This Vendor
Top 5 most recent
- $2.1MSigned Oct 14, 2026
- $6.3MSigned Oct 13, 2026
- $2.1MSigned Oct 13, 2026
- $12.1MSigned Oct 5, 2026
- $3.0MSigned Sep 8, 2026
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
36C77624R0108- Awarded
This opportunity has been awarded.
- 3×Special NoticeJun 6, 2024
Y1DZ--663-24-715 EHRM WAN Path Upgrades Construction - Seattle, WA
- AwardedCurrentSep 19, 2024
Y1DZ--663-24-715 EHRM WAN Path Upgrades Construction - Seattle, WA
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
EHRM Infrastructure Upgrades Construction – Dallas CMOP | - | Solicitation | 12/23/2026 |
Big Spring CLC Phase III Minor Construction | - | Solicitation | 10/22/2026 |
Amendment 0007 has been posted. Amendment 0007 extends the date for receipt of offers. The new date for receipt of offers is 10/14 at 3PM EDT. Amendment 0007 also provides an update to RFIS and a new basis of design for HVAC units. Amendment 0006 has been posted. Amendment 0006 extends the date for receipt of offers. The new date for receipt of offers is 10/9 at 3PM EDT. Amendment 0006 also excludes the draft schedule from the page limit for Technical Volume I and provides responses to technical questions. Amendment 0005 has been posted. Amendment 0005 extends the date for receipt of offers. The new date for receipt of offers is 10/2 at 3PM EDT. Amendment 0004 has been posted. Amendment 0004 extends the date for receipt of offers. The new date for receipt of offers is 9/18 at 3PM EDT. Amendment 0003 has been posted. Amendment 0003 provides the site visit sign-in sheet and agenda from the 8/20 site visit. Amendment 0002 has been posted. Amendment 0002 provides an updated Attachment 11 - Site Visit Details which includes a campus map. Amendment 0001 has been posted. Amendment 0001 Provides updated Volume 2 drawings and renumbers attachments. The scope of this project includes, but is not limited to the following infrastructure improvements: Electrical (electrical panel upgrade, power (normal, emergency)), Bonding, UPS, Building Management System interfaces, assess for new and upgrades to existing HVAC, reconfiguration, expansion and renovation of existing space (demo, new construction, finishes) cabling and rack/cabinet work for Data Center (relocation of racks/cabinets, cable management), communication infrastructure (new data outlets, patch panels, upgrade to Cat 6A cable) in buildings as necessary, physical security upgrades, assess and upgrade fiber infrastructure backbone campus wide within buildings and between buildings, provide diversified path for wide area network connection, hazardous material abatement. Project building locations include: Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 13, 14, 15, 16, 45, 46, 49, 136, 142, 147, 171, Jennings M.H. CBOC, and the Fort Polk CBOC. The Jennings CBOC, Lafayette CBOC, Lafayette Campus B CBOC, and the Natchitoches CBOC are also included in the scope. | - | Solicitation | 10/14/2026 |
Solicitation - Expand Radiology & Oncology Minor Construction - Lake Nona | - | Solicitation | 04/30/2026 |
Project 619-21-106 - EHRM Infrastructure Upgrades - Construction - Montgomery VAMC located in Montgomery, AL | - | Solicitation | 01/05/2027 |
Additional Details
Solicitation Number
36C77624R0108
Archive Date
Dec 27, 2024
Office Address
INDEPENDENCE, OH, 44131