GovChime
Notice ID: 00102879f0bcd93968195aba4a01eff5Award NoticeAwarded

S--Notice of Award - Janitorial Contract - National Memorial Cemetery of Arizona

Awarded on January 11, 2019. Full description on SAM.gov.

Awarded tounder 36C78619D0071 (source: SAM.gov award notice)• $360.9K

Overview

Posted
January 11, 2019
Notice type
Award Notice

Notice details

PSC
S: UTILITIES AND HOUSEKEEPING
Last updated
Sep 10, 2025
Award date
Jan 11, 2019
Award amount (SAM.gov award notice)
$360.9K

Identifiers

Solicitation number
36C78619Q0063
Notice ID
00102879f0bcd93968195aba4a01eff5
Award number (PIID)
36C78619D0071

Description

General Information Document Type: Combined Solicitation/Synopsis Solicitation Number: 36C78619Q0063 Posted Date: 11-28-2018 Original Response Date: 12-11-2018 Current Response Time: 5:00pm(PST) Product or Service Code: J045 Set Aside: Service Disabled Veteran Own Small Business NAICS Code: 561720 Contracting Office Address Department of Veterans Affairs National Cemetery Administration Pacific District 1301 Clay Street, Suite 1230 North Oakland CA 94612-5209 Description This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) subpart 12.6, Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation quotes are being requested, and a written solicitation document will not be issued. This solicitation is a request for quotation (RFQ). The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular The associated North American Industrial Classification System (NAICS) code for this procurement is 561720, with a small business size standard of 1.5 Million. The National Cemetery Administration Pacific District is seeking quotes from Service Disabled Veteran Own Small Business (SDVOSB) that are qualified to provide janitorial services. The awarded contract will be a Base year w/4 Option periods at the National Memorial Cemetery of Arizona. Statement of Wok Provide all necessary labor, materials, tools and equipment to perform Janitorial Services at the National Memorial Cemetery of Arizona. All work shall be performed in accordance with the Description/Specifications/Statement of Work, contained within this requirement. The National Memorial Cemetery of Arizona (NMCA) will provide all cleaning supplies, trash bags, paper towers, toilet tissue, hand-soap, air freshener, toilet-bowl sanitizer, and urinal cakes. PRICE SCHEDULE CLIN BASE PERIOD: October 1, 2018-September 30, 2019 QTY UNIT UNIT PRICE TOTAL COST 0001 Janitorial Services: (Administration Building, Public Information Center (PIC), Foremen (2) Offices, Visitor Restrooms ((include Federal Holidays and four (4) cleanings 3-hours apart on Memorial Day)), Field Employee Breakroom and Field Employee Restrooms, Training Room and Training Room Restroom, Monday through Friday except for Federal Holidays. See Holiday Schedule Below. Administration Building: Vacuum all carpeted areas. Mop all floor areas. Empty trash receptacles-change trash receptacle liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls, and mirrors in Restrooms (Male/Female). Dust all surface areas. Remove and replace Shredder bag as needed. Full Shredder bags will be placed in the Recycle Dumpster near the Maintenance Area. Public Information Center: Spot-clean fingerprints from the doors (4 total) and all windows interior and exterior. Wipe down furniture to remove dust. Dust (clean) glass-top coffee-table to remove fingerprints and smudges. Empty Trash from receptacle and replace trash liners when visibly soiled. Mop floor daily. Vacuum carpet daily. Wipe down (clean) KIOSK Computer screen and area. Broom (remove cob webs and debris) from ceiling light in the breezeway between the Visitor Restrooms. Wipe down (clean) the drinking fountain and metal backsplash between the Visitor Restrooms. Foremen (2) Offices: Sweep and mop all floor areas. Empty trash receptacles-change receptacle liner when soiled. Dust all surface areas. Visitor Restrooms (Male/Female): Remove debris and cobwebs from door jams, mop all floor areas to include under and behind the sinks, Urinal and toilets. Empty trash receptacles-change trash receptacle liner when soiled. Clean Restrooms (Male/Female) sinks. Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilets. Female-Toilets. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas in Restrooms (Male/Female). Clean the Urinal Stall walls and Urinal back splash-wall (Male Restroom), Stall walls and back splash walls and all Restroom walls to remove all excrement and urine and any other visible stains or debris in Restrooms (Male/Female). Broom (remove cobwebs and debris) from sky-lights in Restrooms (two each in Male/Female Restrooms.) Field Employee Breakroom and Field Employee Restrooms: Mop all floor areas. Empty trash receptacles-change receptacle liners when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas. Training Room and Training Room Restroom: Mop all floor areas. Empty trash receptacles-change trash can liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispenser when empty in Restroom. Replace Toilet-Protectors when empty in Restroom. Replace Toilet Paper to last until next janitorial service in Restroom. Replace toilet sanitizer in Restroom Toilet. Wipe down stall walls, tile walls and mirror in Restroom. Dust all surface areas. 260 days 0002 Scrub/Wax Visitor Center/Public Restrooms Tile (Semi-annually or on demand) 2 Each 0003 Scrub/Wax Foremen (2) Offices Tile (Semi-annually or on demand) 2 Each 0004 Scrub/Wax Field Employees Break Room/Field Employees Restrooms Tile (Semi-Annually or on demand) 2 Each 0005 Scrub/Wax Training Room and Training Room Restroom (Semi-Annually or on demand) 2 Each 0006 Shampoo carpeted Areas: Admin Building and PIC (Semi-Annually or on Demand) 2 Each 0007 Wash all Windows in Admin Building, PIC and Maintenance Building (Semi-Annually or on Demand) 2 Each TOTAL CLIN OPTION YEAR 1: October 1, 2019-September 30, 2020 QTY UNIT UNIT PRICE TOTAL COST 1001 Janitorial Services: (Administration Building, Public Information Center (PIC), Foremen (2) Offices, Visitor Restrooms ((include Federal Holidays and four (4) cleanings 3-hours apart on Memorial Day)), Field Employee Breakroom and Field Employee Restrooms, Training Room and Training Room Restroom, Monday through Friday except for Federal Holidays. See Holiday Schedule Below. Administration Building: Vacuum all carpeted areas. Mop all floor areas. Empty trash receptacles-change trash receptacle liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls, and mirrors in Restrooms (Male/Female). Dust all surface areas. Remove and replace Shredder bag as needed. Full Shredder bags will be placed in the Recycle Dumpster near the Maintenance Area. Public Information Center: Spot-clean fingerprints from the doors (4 total) and all windows interior and exterior. Wipe down furniture to remove dust. Dust (clean) glass-top coffee-table to remove fingerprints and smudges. Empty Trash from receptacle and replace trash liners when visibly soiled. Mop floor daily. Vacuum carpet daily. Wipe down (clean) KIOSK Computer screen and area. Broom (remove cob webs and debris) from ceiling light in the breezeway between the Visitor Restrooms. Wipe down (clean) the drinking fountain and metal backsplash between the Visitor Restrooms. Foremen (2) Offices: Sweep and mop all floor areas. Empty trash receptacles-change receptacle liner when soiled. Dust all surface areas. Visitor Restrooms (Male/Female): Remove debris and cobwebs from door jams, mop all floor areas to include under and behind the sinks, Urinal and toilets. Empty trash receptacles-change trash receptacle liner when soiled. Clean Restrooms (Male/Female) sinks. Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilets. Female-Toilets. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas in Restrooms (Male/Female). Clean the Urinal Stall walls and Urinal back splash-wall (Male Restroom), Stall walls and back splash walls and all Restroom walls to remove all excrement and urine and any other visible stains or debris in Restrooms (Male/Female). Broom (remove cobwebs and debris) from sky-lights in Restrooms (two each in Male/Female Restrooms.) Field Employee Breakroom and Field Employee Restrooms: Mop all floor areas. Empty trash receptacles-change receptacle liners when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas. Training Room and Training Room Restroom: Mop all floor areas. Empty trash receptacles-change trash can liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispenser when empty in Restroom. Replace Toilet-Protectors when empty in Restroom. Replace Toilet Paper to last until next janitorial service in Restroom. Replace toilet sanitizer in Restroom Toilet. Wipe down stall walls, tile walls and mirror in Restroom. Dust all surface areas. 260 DAY 1002 Scrub/Wax Visitor Center/Public Restrooms Tile (Semi-annually or on demand) 2 EACH 1003 Scrub/Wax Foremen (2) Offices Tile (Semi-annually or on demand) 2 EACH 1004 Scrub/Wax Field Employees Break Room/Field Employees Restrooms Tile (Semi-Annually or on demand) 2 EACH 1005 Scrub/Wax Training Room and Training Room Restroom (Semi-Annually or on demand) 2 EACH 1006 Wash all Windows in Admin Building, PIC and Maintenance Building (Semi-Annually or on Demand) 2 EACH 1007 Wash all Windows in Admin Building, PIC and Maintenance Building (Semi-Annually or on Demand) 2 EACH TOTAL CLIN OPTION YEAR 2: October 1, 2020-September 30, 2021 QTY UNIT UNIT PRICE TOTAL COST 2001 Janitorial Services: (Administration Building, Public Information Center (PIC), Foremen (2) Offices, Visitor Restrooms ((include Federal Holidays and four (4) cleanings 3-hours apart on Memorial Day)), Field Employee Breakroom and Field Employee Restrooms, Training Room and Training Room Restroom, Monday through Friday except for Federal Holidays. See Holiday Schedule Below. Administration Building: Vacuum all carpeted areas. Mop all floor areas. Empty trash receptacles-change trash receptacle liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls, and mirrors in Restrooms (Male/Female). Dust all surface areas. Remove and replace Shredder bag as needed. Full Shredder bags will be placed in the Recycle Dumpster near the Maintenance Area. Public Information Center: Spot-clean fingerprints from the doors (4 total) and all windows interior and exterior. Wipe down furniture to remove dust. Dust (clean) glass-top coffee-table to remove fingerprints and smudges. Empty Trash from receptacle and replace trash liners when visibly soiled. Mop floor daily. Vacuum carpet daily. Wipe down (clean) KIOSK Computer screen and area. Broom (remove cob webs and debris) from ceiling light in the breezeway between the Visitor Restrooms. Wipe down (clean) the drinking fountain and metal backsplash between the Visitor Restrooms. Foremen (2) Offices: Sweep and mop all floor areas. Empty trash receptacles-change receptacle liner when soiled. Dust all surface areas. Visitor Restrooms (Male/Female): Remove debris and cobwebs from door jams, mop all floor areas to include under and behind the sinks, Urinal and toilets. Empty trash receptacles-change trash receptacle liner when soiled. Clean Restrooms (Male/Female) sinks. Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilets. Female-Toilets. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas in Restrooms (Male/Female). Clean the Urinal Stall walls and Urinal back splash-wall (Male Restroom), Stall walls and back splash walls and all Restroom walls to remove all excrement and urine and any other visible stains or debris in Restrooms (Male/Female). Broom (remove cobwebs and debris) from sky-lights in Restrooms (two each in Male/Female Restrooms.) Field Employee Breakroom and Field Employee Restrooms: Mop all floor areas. Empty trash receptacles-change receptacle liners when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas. Training Room and Training Room Restroom: Mop all floor areas. Empty trash receptacles-change trash can liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispenser when empty in Restroom. Replace Toilet-Protectors when empty in Restroom. Replace Toilet Paper to last until next janitorial service in Restroom. Replace toilet sanitizer in Restroom Toilet. Wipe down stall walls, tile walls and mirror in Restroom. Dust all surface areas. 260 DAY 2002 Scrub/Wax Visitor Center/Public Restrooms Tile (Semi-annually or on demand) 2 EACH 2003 Scrub/Wax Foremen (2) Offices Tile (Semi-annually or on demand) 2 EACH 2004 Scrub/Wax Field Employees Break Room/Field Employees Restrooms Tile (Semi-Annually or on demand) 2 EACH 2005 Scrub/Wax Training Room and Training Room Restroom (Semi-Annually or on demand) 2 EACH 2006 Shampoo carpeted Areas: Admin Building and PIC (Semi-Annually or on Demand) 2 EACH 2007 Wash all Windows in Admin Building, PIC and Maintenance Building (Semi-Annually or on Demand) 2 EACH TOTAL CLIN OPTION YEAR 3: October 1, 2021-September 30, 2022 QTY UNIT UNIT PRICE TOTAL COST 3001 Janitorial Services: (Administration Building, Public Information Center (PIC), Foremen (2) Offices, Visitor Restrooms ((include Federal Holidays and four (4) cleanings 3-hours apart on Memorial Day)), Field Employee Breakroom and Field Employee Restrooms, Training Room and Training Room Restroom, Monday through Friday except for Federal Holidays. See Holiday Schedule Below. Administration Building: Vacuum all carpeted areas. Mop all floor areas. Empty trash receptacles-change trash receptacle liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls, and mirrors in Restrooms (Male/Female). Dust all surface areas. Remove and replace Shredder bag as needed. Full Shredder bags will be placed in the Recycle Dumpster near the Maintenance Area. Public Information Center: Spot-clean fingerprints from the doors (4 total) and all windows interior and exterior. Wipe down furniture to remove dust. Dust (clean) glass-top coffee-table to remove fingerprints and smudges. Empty Trash from receptacle and replace trash liners when visibly soiled. Mop floor daily. Vacuum carpet daily. Wipe down (clean) KIOSK Computer screen and area. Broom (remove cob webs and debris) from ceiling light in the breezeway between the Visitor Restrooms. Wipe down (clean) the drinking fountain and metal backsplash between the Visitor Restrooms. Foremen (2) Offices: Sweep and mop all floor areas. Empty trash receptacles-change receptacle liner when soiled. Dust all surface areas. Visitor Restrooms (Male/Female): Remove debris and cobwebs from door jams, mop all floor areas to include under and behind the sinks, Urinal and toilets. Empty trash receptacles-change trash receptacle liner when soiled. Clean Restrooms (Male/Female) sinks. Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilets. Female-Toilets. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas in Restrooms (Male/Female). Clean the Urinal Stall walls and Urinal back splash-wall (Male Restroom), Stall walls and back splash walls and all Restroom walls to remove all excrement and urine and any other visible stains or debris in Restrooms (Male/Female). Broom (remove cobwebs and debris) from sky-lights in Restrooms (two each in Male/Female Restrooms.) Field Employee Breakroom and Field Employee Restrooms: Mop all floor areas. Empty trash receptacles-change receptacle liners when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas. Training Room and Training Room Restroom: Mop all floor areas. Empty trash receptacles-change trash can liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispenser when empty in Restroom. Replace Toilet-Protectors when empty in Restroom. Replace Toilet Paper to last until next janitorial service in Restroom. Replace toilet sanitizer in Restroom Toilet. Wipe down stall walls, tile walls and mirror in Restroom. Dust all surface areas. 260 DAY 3002 Scrub/Wax Visitor Center/Public Restrooms Tile (Semi-annually or on demand) 2 EACH 3003 Scrub/Wax Foremen (2) Offices Tile (Semi-annually or on demand) 2 EACH 3004 Scrub/Wax Field Employees Break Room/Field Employees Restrooms Tile (Semi-Annually or on demand) 2 EACH 3005 Scrub/Wax Training Room and Training Room Restroom (Semi-Annually or on demand) 2 EACH 3006 Shampoo carpeted Areas: Admin Building and PIC (Semi-Annually or on Demand) 2 EACH 3007 Wash all Windows in Admin Building, PIC and Maintenance Building (Semi-Annually or on Demand) 2 EACH TOTAL CLIN OPTION YEAR 4: October 1, 2022-September 30, 2023 QTY UNIT UNIT PRICE TOTAL COST 4001 Janitorial Services: (Administration Building, Public Information Center (PIC), Foremen (2) Offices, Visitor Restrooms ((include Federal Holidays and four (4) cleanings 3-hours apart on Memorial Day)), Field Employee Breakroom and Field Employee Restrooms, Training Room and Training Room Restroom, Monday through Friday except for Federal Holidays. See Holiday Schedule Below. Administration Building: Vacuum all carpeted areas. Mop all floor areas. Empty trash receptacles-change trash receptacle liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls, and mirrors in Restrooms (Male/Female). Dust all surface areas. Remove and replace Shredder bag as needed. Full Shredder bags will be placed in the Recycle Dumpster near the Maintenance Area. Public Information Center: Spot-clean fingerprints from the doors (4 total) and all windows interior and exterior. Wipe down furniture to remove dust. Dust (clean) glass-top coffee-table to remove fingerprints and smudges. Empty Trash from receptacle and replace trash liners when visibly soiled. Mop floor daily. Vacuum carpet daily. Wipe down (clean) KIOSK Computer screen and area. Broom (remove cob webs and debris) from ceiling light in the breezeway between the Visitor Restrooms. Wipe down (clean) the drinking fountain and metal backsplash between the Visitor Restrooms. Foremen (2) Offices: Sweep and mop all floor areas. Empty trash receptacles-change receptacle liner when soiled. Dust all surface areas. Visitor Restrooms (Male/Female): Remove debris and cobwebs from door jams, mop all floor areas to include under and behind the sinks, Urinal and toilets. Empty trash receptacles-change trash receptacle liner when soiled. Clean Restrooms (Male/Female) sinks. Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilets. Female-Toilets. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas in Restrooms (Male/Female). Clean the Urinal Stall walls and Urinal back splash-wall (Male Restroom), Stall walls and back splash walls and all Restroom walls to remove all excrement and urine and any other visible stains or debris in Restrooms (Male/Female). Broom (remove cobwebs and debris) from sky-lights in Restrooms (two each in Male/Female Restrooms.) Field Employee Breakroom and Field Employee Restrooms: Mop all floor areas. Empty trash receptacles-change receptacle liners when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispensers when empty in Breakroom, and Restrooms (Male/Female). Replace Disposable Toilet Seat Covers when empty in Restrooms (Male/Female). Replace Toilet Paper to last until next janitorial service in Restrooms (Male/Female). Replace toilet sanitizers in Restrooms: Male-Urinal and toilet. Female-Toilet. Wipe down stall walls, tile walls and mirrors in Restrooms (Male/Female). Dust all surface areas. Training Room and Training Room Restroom: Mop all floor areas. Empty trash receptacles-change trash can liner when soiled. Clean Breakroom and Restrooms (Male/Female) sinks. Replace hand-towels in dispenser when empty in Restroom. Replace Toilet-Protectors when empty in Restroom. Replace Toilet Paper to last until next janitorial service in Restroom. Replace toilet sanitizer in Restroom Toilet. Wipe down stall walls, tile walls and mirror in Restroom. Dust all surface areas. 260 DAY 4002 Scrub/Wax Visitor Center/Public Restrooms Tile (Semi-annually or on demand) 2 EACH 4003 Scrub/Wax Foremen (2) Offices Tile (Semi-annually or on demand) 2 EACH 4004 Scrub/Wax Field Employees Break Room/Field Employees Restrooms Tile (Semi-Annually or on demand) 2 EACH 4005 Scrub/Wax Training Room and Training Room Restroom (Semi-Annually or on demand) 2 EACH 4006 Shampoo carpeted Areas: Admin Building and PIC (Semi-Annually or on Demand) 2 EACH 4007 Wash all Windows in Admin Building, PIC and Maintenance Building (Semi-Annually or on Demand) 2 EACH TOTAL TOTAL ALL OPTION YEARS $___________ Place of Performance National Memorial Cemetery of Arizona 23029 North Cave Creek Road Phoenix, AZ 85024 For site visits email: Valentin Saucedo @ valentin.saucedo@va.gov GENERAL SCOPE OF WORK: B.4.01 JANITORIAL SERVICES BACKGROUND INFORMATION: The Department of Veterans Affairs, National Cemetery Administration (NCA) requires janitorial services to be performed at the National Memorial Cemetery of Arizona. The National Memorial Cemetery of Arizona (NMCA) is a National Shrine. The standards of maintenance and appearance at this cemetery must reflect this nation s concern for those interred there. For this reason, the Contractor s strict adherence to the specifications is required and essential. NCA STANDARDS Restrooms are inspected daily and determined to be clean and supplied in accordance with a Restroom Checklist. Structures have a clean and well-maintained appearance. SCOPE This is a Non-Personal Janitorial Service in which the Contractor shall furnish personnel, equipment, tools, floor-wax, and supervision necessary to provide complete Janitorial Services. The NMCA will furnish all supplies, materials for the Janitorial Service. PERSONNEL Contractor personnel shall adhere to established training criteria (such as OSHA, JCAHO), and shall be able to demonstrate a documented employee initial and refresher training program that includes Universal Precautions, basic bacteriological concepts, infection control, safety, fire protection, Personal Protective Equipment (PPE), and laundry operating procedures and policies. PHYSICAL SECURITY The contractor shall, at all times, exercise care and caution in performing the duties described in the statement of work so as not to cause injury to themselves or other persons. The contractor shall perform the assigned tasks and duties in a safe manner in accordance with VA, NCA, and OSHA regulations and policies. The contractor shall indemnify to protect it, and render the United States Government, its employees, agents and representatives, harmless from any liability resulting from personal injury arising out of performance of the work contained herein. Contractor shall provide all safety warning devices at worksite to warn visitors and cemetery employees of potential hazards, (e.g., Caution Wet Floors). QUALITY CONTROL The Contractor shall establish and maintain a complete Quality Control Plan to ensure that the requirements of the contract are provided as specified. One copy of the contractor s Quality Control Plan shall be provided to the Contracting Officer not later than the Post Award Conference. An updated copy must be provided to the Contracting Officer and COR on the contract start date and as changes occur. The plan shall describe the methods for identifying and preventing defects before the level of performance becomes unacceptable. QUALITY ASSURANCE The Government will evaluate the contractor s performance under this contract in accordance with the work statement and the enclosed Janitorial and Restroom Checklist s. The checklists shall be initialed and dated each day by contractor personnel signifying that the work was completed. All surveillance observations will be recorded by the Government. When an observation indicates defective performance, the COR will complete a discrepancy report and send it to the contracting officer and the contractor by e-mail and or fax. The discrepancy reports will be used to establish documentation for Non-performance or tasks not satisfactorily completed in accordance with the Work Statement which will result in a reduction of the monthly amount in the Schedule. Performance Evaluation Meetings: The contract manager may be required to meet with the COR and Contracting Officer at the beginning of each month to evaluate contract performance. Quarterly meetings will be scheduled with the Director of National Memorial Cemetery of Arizona, COR and/or Contracting Officer. The contractor may request meetings whenever a Contract Discrepancy Report is issued. The written minutes of these meetings shall be signed by the contractor s manager, Contracting Officer and COR. If the contractor does not concur with the minutes he/she shall state any areas of non-concurrence within 5 business days of receipt of the signed minutes. ADMINISTRATIVE ISSUES Based upon satisfactory completion and final inspection and acceptance of all work performed in accordance with the Statement of Work., the Contractor shall be paid monthly in arrears by Government Purchase Order and after receipt of a properly prepared invoice. Notwithstanding the provisions of the contract covering inspection and acceptance, any items found to be unsatisfactorily cleaned shall be re-cleaned at no additional cost to the VA/NCA. Contracted services are to be accomplished subject to emergency situations-as defined by VA-which may require alteration of schedules. In the event that the VA declares a facility emergency or disaster, or participates in a federal and/or DOD drill, the contractor shall perform services as required by the facility COR per the Emergency Preparedness Plan. Contractor shall specify a point of contact (with phone number) as the designated contact for VA/NCA and the parties shall meet as needed. The point of contact can be reached during normal business hours and off-duty hours, and be able to respond within one hour of notification by the VA/NCA and take prompt action on matters pertaining to the contract. EQUIPMENT, MATERIALS and SUPPLIES Contractor Supplied Items: Unless otherwise stated all equipment, such as step ladders, water hose, mops, vacuum, and brushes will be furnished by the contractor. NMCA will provide the Contractor who will then provide his staff members a binder and training for all cleaning materials with a copy of all material safety data sheets (MSDS), and provide the COR with copies of the MSDS s for all chemicals stored at the cemetery. Proper and Safe use of Equipment and Chemicals: Contractor shall use all equipment, disinfectants, detergents, and other chemical agents in accordance with OSHA and manufactures instructions. Contractor shall take extreme care while performing cleaning services to insure that corrosive or abrasive chemicals do not mar, discolor, remove or harm the finish in any way on any facility or fixture. Contractor may be liable for damages to private or Government property caused by misuse. Reasonable Cleaning Effort. Contractor shall advise the COR of any stains or markings that cannot be removed by reasonable cleaning efforts. CUSTODIAL SERVICES, DAYS AND HOURS OF PERFORMANCE Areas to be serviced are located in the Administrative Building (Admin Bldg.), Public Information Center (PIC), Visitor Restrooms, Field Employee Breakroom, Field Employee Restrooms, Training Room. The Administration Building consist of 8 areas, they are: Visitor entrance. Reception. Front office. Director s office. Office area (all areas not already identified from front lobby to break room door. Break room. Men s restroom. Women s restroom. The Public Information Center consists of 2 areas, t...

Full description on SAM.gov

Award Overview

Award Number

36C78619D0071

Award Amount (SAM.gov award notice)

$360.9K

Award Date

Jan 11, 2019

Awardee

Awardee UEI

NGFXU6ZQJK59

Original Solicitation

Notice ID: 00102879f0bcd93968195aba4a01eff5

Posted Date: Jan 11, 2019

Original Response Deadline: Not specified

Task Orders Under This IDV

Top 10 by total obligated

10
  • 36C78623N0210
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $69.8KSigned Dec 29, 2022
  • 36C78623N0210
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $69.8KSigned Mar 16, 2023
  • 36C78623N0210
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $69.8KSigned Feb 14, 2023
  • 36C78623N0210
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $69.8KSigned Oct 21, 2022
  • 36C78621N0206
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $67.2KSigned Dec 23, 2021
  • 36C78621N0206
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $67.2KSigned Oct 26, 2020
  • 36C78619N0205
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $66.8KSigned Oct 8, 2020
  • 36C78619N0205
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $66.8KSigned Jan 13, 2019
  • 36C78619N0205
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $66.8KSigned Aug 29, 2019
  • 36C78620N0243
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $44.2KSigned Dec 18, 2019

More From This Vendor

Top 5 most recent

1
  • 36C78624N0079
    FOUR PEAKS GLOBAL, INC.
    Department of Veterans AffairsNAICS 561720
    $32.9KSigned Sep 17, 2025

Contacts

Documents

No documents available.

Lifecycle

Solicitation:36C78619Q0063
  1. Combined Synopsis
  2. Awarded

This opportunity has been awarded.

  1. Combined SynopsisNov 28, 2018

    S--FY19 New Contract - Janitorial Contract - National Mem Cemetery of Arizona - Base year + 4 Option years

    Notice dd20db50f35142c15c87ab120c5f0fd6 on SAM.gov

  2. AwardedCurrentJan 11, 2019

    S--Notice of Award - Janitorial Contract - National Memorial Cemetery of Arizona

    Notice 00102879f0bcd93968195aba4a01eff5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

36C78619Q0063

Archive Date

Jan 16, 2019

Office Address

QUANTICO, VA, 22134