Notice ID: 395f22d86d144a6d87afadb723e83036SolicitationArchived
Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska
Archived on December 15, 2025. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 6:00 PM AKST
- Posted
- November 21, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION PACIFIC OCEAN.ENDIST ALASKA.W2SN ENDIST ALASKA
- Place of performance
- Skagway, AK, Skagway, Alaska, 99840
- PSC
- Y1KZ: CONSTRUCTION OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
- Last updated
- Nov 5, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911KB26RA002
- Notice ID
- 395f22d86d144a6d87afadb723e83036
Description
Repair the Skagway River Levee to restore its functionality to the pre-disaster conditions it has sustained as a result of significant flooding events. The levee is located along the southeast bank of the Skagway River starting at the Klondike Highway Bridge in Skagway and was constructed between 1939-1940 with its original length being 6,700 feet. All but a roughly 1,300-foot portion of the levee was modified by DOT and PF in 2001, encapsulating the original levee and adding Class III and IV armor stone along the riverward side slopes. The levee protects public infrastructure as well as residential, commercial, and historical properties. Damage to the levee includes loss of riverward armor stone and toe width reduction. The aim of this project is to rebuild the levee toe and damaged side slopes with a USACE POA designated riprap gradation and a 1.5 horizontal ((H) to 1 vertical (V) side slope. The construction length is approximately 6,000 linear feet (LF). Construction wage rates (formerly Davis-Bacon Act wage rates) shall apply. Amendment 0001 posted 5 Nov 2025. Amendment 0002 posted 13 Nov 2025. Amendment 0003 posted 21 Nov 2025.
Award Overview
Contacts
Contracting Officer
Primary Contact
Jennifer Gosh
Secondary Contact
George Nasif
Documents
Links (4)
- PIEE Solicitation Module Link for W911KB26RA002piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1SolicitationArchived
Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska
- 2Version 2SolicitationArchived
Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska
- 3Version 3SolicitationArchived
Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska
- 5Version 5SolicitationArchivedCurrent
Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska
- 8Version 8Award NoticeArchived
Type changed from Solicitation to Award Notice
Skagway River Levee Rehabilitation of Damaged Flood Control Works, Skagway, Alaska
Similar Opportunities
Additional Details
Solicitation Number
W911KB26RA002
Archive Date
Dec 15, 2025
Office Address
ANCHORAGE, AK, 99506-0898