Debris Boom Supply and Install at Harry S. Truman Lake Project
Active, responses due . Full description on SAM.gov.
Description
The solicitation is amended to provide revisions to the Purchase Description, CLIN Structure, provide a Projnet Plan Room key to access the Bathymetry survey information and extend the quote due date. Also, Contractor Questions Answered Part 2 are posted.
Contractor Questions/Government Answers are posted. The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at Harry S. Truman Dam. The approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. The debris boom shall be designed for an 800-foot-long by 3-foot-thick debris field, use a minimum safety factor of 2.0 for design loads, withstand a direct head-on impact from an 18-inch-diameter, 100-foot-long log traveling at the maximum design water velocity, and withstand design conditions including 50 mph wind speed and 5-foot wave height.
This acquisition is not set-aside for small business concerns and is competed as full and open competition, Unrestricted.
An organized site visit has been scheduled for: Friday, 9 October 2026 at 11am.
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (8)
- Download
Solicitation Amendment 0001.pdf
8.5 MBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Contractor Questions Answered Part 2.pdf
72 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Contractor Questions Answered.pdf
61 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
Combined Synopsis_Solicitation - W912DQ26QA080.pdf
3.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Purchase Description.pdf
2.5 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Site Visit Sign-In Sheet.pdf
92 KBAdded in Combined Synopsis/Solicitation version 2Posted - Download
Contractors Experience Form.pdf
111 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Past Performance Questionnaire.pdf
48 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/Solicitation
Debris Boom Supply and Install at Harry S. Truman Lake Project
- 2Version 2Combined Synopsis/Solicitation
Debris Boom Supply and Install at Harry S. Truman Lake Project
- 3Version 3Combined Synopsis/Solicitation
Debris Boom Supply and Install at Harry S. Truman Lake Project
- 4Version 4Combined Synopsis/SolicitationCurrent
Debris Boom Supply and Install at Harry S. Truman Lake Project
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
Additional Details
Solicitation Number
W912DQ26QA080
Archive Date
Nov 17, 2026
Office Address
KANSAS CITY, MO, 64106-2896