Bonneville PH2 Bridge Crane 3 Scissor Lift
Archived on September 9, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM PDT
- Posted
- August 13, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION NORTHWESTERN.ENDIST PORTLAND.W071 ENDIST PORTLAND
- Place of performance
- Cascade Locks, Oregon, 97014
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W9127N26QA140
- Notice ID
- 3e2747e66da147248988a5b13a8c74a0
Description
COMBINED SYNOPSIS/SOLICITATION
W9127N26QA140
Bonneville PH2 Bridge Crane 3 Scissor Lift Replacement
Bonneville Lock and Dam
U.S. ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT
* Added a new attachment titled "Questions from Industry_8.13.26 Govt Response - 7N26QA140". A list of questions proposed by the industry regarding this requirement, with the governments responses, can be found in the attachment section of this post.
** Added a photo of the site where the existing scissor lift is installed in the attachment section.
This solicitation is for commercial supplies prepared in accordance with the format in the Revolutionary RFO 12.201-1 - Simplified Acquisition Procedures, and additional information is included in this notice. This announcement constitutes the only solicitation; quotes are being requested.
Solicitation W9127N26QA140 is for purchase of two (2) Stationary Scissor Lifts to replace existing failing scissor lifts currently in use on the bridge crane located in Powerhouse II at Bonneville Lock and Dam.
Please see the attached Scope of Work / Purchase Description for additional information.
The following solicitation document, incorporated provisions, and clauses are in effect through Federal Acquisition Circular 2026-01, effective 13 MAR 2026.
This solicitation is advertised as a 100% small business set aside, under NAICS Code: 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing, with a size standard of 900 employees. All prospective offerors must be registered in the System for Award Management (SAM) at www.sam.gov to be eligible for award. Lack of SAM registration will make an offeror ineligible for award.
Quotes are to be submitted to john.r.scukanec@usace.army.mil,NLT 2:00 PM PST on 25 August 2026. Please submit any questions to John Scukanec through email. All questions related to this solicitation must be submitted in writing to John Scukanec, questions will not be responded to by phone.
Delivery Information:
Supplies shall be delivered to Bonneville Lock and Dam, Interstate 84 Exit 40, NE Bonneville Way, Cascade Locks, OR 97014. Delivery hours are 0700-1600 MON-THU and deliveries are required during these hours and days, excluding Federal Holidays. The Government shall not be responsible for the cost of shipping.
Submittal Instructions
Quotes shall be submitted to John Scukanec at john.r.scukanec@usace.army.mil and include the following:
1) Solicitation Number
2) Date of Submittal
3) Acknowledgement of any Amendments
4) Pricing for all CLINs. Refer to the "Purchase Description" in the attachment section which includes a table layout of all CLINs.
5) Contractor Name, UEI Number, Cage Code
6) Submittal of no more than three (3) examples of performance history regarding custom scissor lift procurement / manufacturing, or supplies/services of a similar nature.
7) Self-certification that the offeror qualifies as a small business concern under NAICS code 333924, if not already listed under the offerors 52.219-1 section on SAM.gov.
8) Offeror will submit acknowledgment and compliance with section 1.4 of the Statement of Work, titled “Supplier Requirements”.
** Additional mandatory instructions that the offeror must comply with can be found in FAR clauses 52.212-1 and 52.212-2, which are included in the solicitation as well as in the attachment section.
FOB destination must be included in the offered price. Firm Fixed Price.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (5)
- Download
Questions from Industry_8.13.26 Govt Response - 7N26QA140.pdf
137 KBAdded in Combined Synopsis/Solicitation version 4Posted - Download
Scissor Lift Location Photo.jpg
2.8 MBAdded in Combined Synopsis/Solicitation version 2Posted - Download
52.212-1 - Instruction to Offerors Addendum.pdf
108 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
B.08 Solicitation Issued - W9127N26QA140.pdf
3.2 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
A.02 SOW_PD_PH2 Bridge Crane 3 Scissor Lifts.pdf
120 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Bonneville PH2 Bridge Crane 3 Scissor Lift
- 2Version 2Combined Synopsis/SolicitationArchived
Bonneville PH2 Bridge Crane 3 Scissor Lift
- 4Version 4Combined Synopsis/SolicitationArchivedCurrent
Bonneville PH2 Bridge Crane 3 Scissor Lift
- 7Version 7Award NoticeArchived
Type changed from Combined Synopsis/Solicitation to Award Notice
Bonneville PH2 Bridge Crane 3 Scissor Lift
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Item: Electronic Scissor Lift Brand Name: JLG or Equal Part Number: ES1932 Salient Characteristics:1. General Requirements: Power Source: The unit must be a 24V DC electric-powered scissor lift featuring a highly efficient electric drive system. Application: The unit must be rated for both indoor and outdoor operational use. 2.Dimensional and Weight Requirements: Maximum Overall Width: 32 inches (81 cm) to ensure the unit can maneuver through standard commercial doorways and tight spaces. Maximum Stowed Height (Rails Lowered): 78.2 inches (1.99 m). Maximum Machine Weight: 3,450 lbs (1,565 kg). 3. Performance and Capacity Minimums: Platform Height: Must achieve a minimum platform height of 19 feet (5.8 m). Platform Capacity: Must have a minimum weight capacity of 507 lbs (230 kg). Platform Extension: The platform must include an extension deck that provides at least 36 inches (91 cm) of additional outreach. Occupancy Rating: Must be rated for a minimum of two (2) personnel indoors and one (1) person outdoors. ? Drive Capabilities: The unit must be capable of being driven while fully elevated. Gradeability: Must have a minimum gradeability rating of 25 percent. 4.Safety and Operational Features: Rail System: Must include quickly folding/collapsible rails (equivalent to QuikFold) for rapid stowing and transport. Safety Mechanisms: Must be equipped with an active pothole protection system. Must include a load sensing system to monitor platform weight and ensure safe operation parameters. Operator Convenience: The operator platform must include standard convenience features such as a built-in USB charger and device/phone holder. | 79% | Combined Synopsis | 07/31/2026 |
Scope of Work Project Overview: Provide and install Variable Frequency Drives (VFDs) for two bridge crane hoists (Yale Hoists), ensuring compliance with electrical classification requirements: Class 1, Div. 1, Group D and Class 2, Div. 1, Groups E, F, and G. Both hoists are located indoors and have a hook height of approximately 30 feet. Specific model and serial numbers are as follows: Model: FEW30-31TR10D6 (1 of 2) Serial: CK2334RM (1 of 2) Level of Service The contractor shall provide a complete turnkey solution for the project. This service level includes providing all necessary labor, materials, equipment, and project management required for the successful installation and commissioning of the VFDs on the two specified bridge cranes. 2 additional enclosures will be required to be mounted to the frame of the bridge crane. The required site visit will determine optimal location. The final deliverable must be a fully operational and integrated system that is compliant with all standards mentioned herein. The contractor is expected to manage all project phases, from the initial site assessment to final documentation and training, ensuring minimal disruption to ongoing operations. 1. Site Assessment: Conduct an initial site assessment to evaluate the existing crane setup and electrical infrastructure. Identify any structural modifications required for the safe and secure installation of the new VFDs, controls, and associated protective enclosures. The contractor will be responsible for executing all necessary and approved structural modifications as part of the turnkey installation. Verify the electrical classification requirements and ensure all necessary safety measures are in place. 2. Equipment Procurement: Procure VFDs suitable for the specified electrical classifications and crane specifications. Ensure all equipment is certified for use in hazardous locations. Include specific model and serial number (FEW30-31TR10D6, CK2334RM) for one of the hoists. 3. Installation: Install VFDs on each of the two bridge cranes, following manufacturer guidelines and safety protocols. Ensure proper wiring and connections are made to integrate the VFDs with the existing crane control systems. Install necessary protective enclosures and grounding to meet the specified electrical classifications. 4. Testing and Commissioning: Perform initial testing of the VFDs to ensure proper functionality and integration with the crane systems. Conduct load testing to verify the performance and safety of the VFDs under operational conditions. Make any necessary adjustments or calibrations to optimize performance. 5. Documentation: Provide detailed documentation of the installation process, including wiring diagrams, equipment specifications, and safety compliance records. Submit final reports and test results to the project stakeholders. 6. Training: Provide training to crane operators and maintenance personnel on the operation and maintenance of the new VFDs. Ensure all personnel are familiar with the safety protocols and emergency procedures related to the VFDs. 7. Warranty and Support: Provide a warranty for the installed VFDs and offer ongoing support for any issues or maintenance needs. 8. Project Timeline: The period of performance for this contract is six (6) months, beginning March 1, 2026. All work, including site assessment, procurement, installation, testing, commissioning, and training, must be completed within this timeframe. The offeror must provide a detailed project timeline with milestones for each phase of the project that fits within this required period of performance. 9. Safety Compliance: Ensure all work is performed in accordance with relevant safety standards and regulations, including NFPA 70 (National Electrical Code) and OSHA requirements. | 73% | Combined Synopsis | 01/05/2026 |
DIESEL FORKLIFT - FORT BRAGG | 67% | Combined Synopsis | 11/19/2026 |
SWIVEL SHACKLE ASSEMBLY | 67% | Combined Synopsis | 10/21/2026 |
LCRTF Light Capacity Rough Terrain Forklift Military Specification (Mil-Spec) - Telescopic (Quantity 1) | 67% | Combined Synopsis | 09/12/2026 |
Additional Details
Solicitation Number
W9127N26QA140
Archive Date
Sep 9, 2026
Office Address
PORTLAND, OR, 97204-3495