GovChime
Notice ID: 46ee507e0f5a44e4a7c16f76c1d67fcaSolicitationArchived

Amendment 01 - Q & A USDB Steam Boiler Bldg. 1140 Ft Leavenworth

Archived on September 25, 2025. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
August 28, 2025
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of WarDepartment of the Army

Notice details

Office
W6QM MICC-FT LEAVENWORTH
Place of performance
Fort Leavenworth, 66027
Last updated
Nov 9, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W91QF4_25_B_A014
Notice ID
46ee507e0f5a44e4a7c16f76c1d67fca

Description

The work consists of furnishing all plant, labor, equipment, and materials to perform all work in strict accordance with the plans and specification to perform all work in strict accordance with the plans and specification to demolish and replace the existing steam boiler and associated equipment in The USDB Prisons E134 mechanical room. In addition to the steam boiler replacement, the work will also include the replacement of three corroded electrical panels (one 150A MCB and two 600A MLO) and one 45 kVA step-down transformer located in a boiler room. The existing equipment is deteriorating due to direct exposure to steam, chemicals and high humidity conditions. The replacement work will include furnishing and installing NEMA 4X-rated stainless steel equipment to mitigate environmental damage and comply with NEC 110.11 and 450.9. All work performed by the contractor shall result in a complete, functional system.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (8)

  • Solicitation Amendment W91QF425BA0140001 SF 30.pdf

    3.2 MBAdded in Solicitation version 4Posted
    Download
  • Construction Wage Determination_Building_20250620.pdf

    265 KBAdded in Solicitation version 4Posted
    Download
  • Drawings M3.5 Laundry.pdf

    3.9 MBAdded in Solicitation version 4Posted
    Download
  • Drawings M7.4 Schedule HVAC.pdf

    4.3 MBAdded in Solicitation version 4Posted
    Download
  • E1.9 - First Level Plan Area E Power.pdf

    8.1 MBAdded in Solicitation version 4Posted
    Download
  • Questions and Answers_W91QF4-25-B-A014 DPW Steam Boiler.pdf

    97 KBAdded in Solicitation version 4Posted
    Download
  • SOW_B1140_Steam Boiler Rpl_Rev_5.pdf

    619 KBAdded in Solicitation version 4Posted
    Download
  • SOW_B1140_Steam Boiler Rpl_Rev_4.pdf

    675 KBAdded in Presolicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3PresolicitationArchived

    Synopsis USDB Steam Boiler Bldg. 1140 Ft Leavenworth

    Notice 6d561dcac04b4d37bc9da321a7221da6 on SAM.gov

  2. 4
    Version 4SolicitationArchived

    Type changed from Presolicitation to Solicitation

    Synopsis USDB Steam Boiler Bldg. 1140 Ft Leavenworth

    Notice 05b4cd115f8c4600b12eb80944a9c8d7 on SAM.gov

  3. 7
    Version 7SolicitationArchivedCurrent

    Amendment 01 - Q & A USDB Steam Boiler Bldg. 1140 Ft Leavenworth

    Notice 46ee507e0f5a44e4a7c16f76c1d67fca on SAM.gov

  4. 9
    Version 9Special NoticeArchived

    Type changed from Solicitation to Special Notice

    Amendment 02 - Photos USDB Steam Boiler Bldg. 1140 Ft Leavenworth

    Notice fd559b2f0f6441efaa35f1fc2d1f3ec5 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

W91QF4_25_B_A014

Archive Date

Sep 25, 2025