GovChime
Notice ID: 87e537462e824a2cab83a9c2d948132aSolicitation

Amendment 0001, Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL

Archived on December 24, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
5:00 PM UTC−05:00
Posted
November 18, 2022
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
236220: Commercial and Institutional Building Construction
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R4 (AMD) ACQUISITION MGMT DIVISION
Place of performance
West Palm Beach, FL, 33401
Last updated
Dec 4, 2025

Identifiers

Solicitation number
47PE0722R0021
Notice ID
87e537462e824a2cab83a9c2d948132a

Description

11/18/22 Amendment 0001-RFI responses. This project requires the Design Build Contractor to perform a Pre-Alterations Assessment for Hazardous Materials prior to executing the work. Further the DB Contractor shall design, plan and perform the abatement for ACM containing cladding materials and mastics for 68 columns and properly dispose of the hazardous and non-hazardous materials properly. The DB Contractor shall also provide four (4) conceptual design options, one full design option, and estimated pricing for each reconstruction/refinish options for the 68 columns for GSA SMEs and Historical Preservation review. Additionally, the DB Contractor shall conduct a structural analysis of the existing columns and concrete walkway to determine if any additional work will be required to strengthen the columns or if the proposed finish materials are within the weight capacity of the design. This project includes concrete repairs of the concrete walkway, and new traffic coating and waterproofing of the concrete walkway. This Design Build Contract includes performing Construction and Design services for a Base Contract and Options. See attachments for complete solicitation and project requirements including, but not limited to, the following: Statement of Work, The Solicitation, The Agreement, SF1442, Wage Determination. The RFP Instructions, 1 pg, is included as a general guide and reference tool. It is not an official contract document.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:47PE0722R0021
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJul 21, 2022

    Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL

    Notice c1165be06138400c99f028eed581df57 on SAM.gov

  2. 2×
    SolicitationCurrentOct 24, 2022

    Amendment 0001, Column Abatement and Reconstruction Design, Paul G. Rogers Fed Bldg, W Palm Beach, FL

    Notice 87e537462e824a2cab83a9c2d948132a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

47PE0722R0021

Archive Date

Dec 24, 2022

Office Address

ATLANTA, GA, 30303