GovChime
Notice ID: fdd9e3b485b7463c863db6c1d0e2ba7fAward NoticeAwardedArchived

Roof Replacement - A/E Construction Support Services

Awarded on May 8, 2026. Full description on SAM.gov.

Awarded tounder 47PE5426P0002 (source: SAM.gov award notice)• $45.7K

Overview

Posted
May 12, 2026
Notice type
Award Notice
Set-aside
No Set aside used
NAICS
541310: Architectural Services
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS PROJECT DELIVERY CENTRAL - BRANCH D
Place of performance
Chicago, Illinois, 60604
PSC
C1AA: ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS
Last updated
Oct 31, 2026
First published
Last updated on SAM.gov
Award date
May 8, 2026
Award amount (SAM.gov award notice)
$45.7K

Identifiers

Solicitation number
47PE5426P0002
Notice ID
fdd9e3b485b7463c863db6c1d0e2ba7f
Award number (PIID)
47PE5426P0002

Description

The General Services Administration (GSA) requires the professional services of Wold Architects and Engineers to provide continuity for the construction phase of the roof replacement design previously developed by the firm. Although the construction solicitation has been publicized via SAM.gov and a site visit is imminent, the technical expertise of the original design firm is essential to address specialized inquiries regarding specifications and to perform requisite construction oversight. While this project was initially slated for award in 2025 during the firm's active contract period, potential property disposition necessitated the cancellation of the original solicitation and the subsequent expiration of the firm's task order in December 2026.

Alternative sources were considered; however, engaging a different Architect/Engineering (A/E) firm would result in substantial cost increases, significant schedule disruptions, and the following unacceptable risks:

  • Fiscal Impact: Increased costs stemming from the liability and risk premiums associated with assuming professional responsibility for a design package authored by another firm.
  • Liability Constraints: Anticipated contractual exclusions from a new firm refusing to validate or take ownership of the original design.
  • Operational Delays: Extended procurement timelines required for an unfamiliar team to perform the necessary research to interpret the existing design.
  • Information Attrition: Loss of institutional knowledge and critical engineering history established during the design phase.
  • Technical Risk: Potential procurement errors resulting from a new team's lack of familiarity with previous engineering decisions.

GSA cannot sustain further delays to the construction schedule. Expedited roof replacement is mandatory to remediate active water infiltration on the 6th floor, which has compromised the operational mission of the ATFE and forced them to move out of the space. Wold Architects and Engineers remains the sole entity possessing the comprehensive background data required for this phase, particularly as the original Government project personnel are no longer affiliated with the agency.

Full description on SAM.gov

Award Overview

Award Number

47PE5426P0002

Award Amount (SAM.gov award notice)

$45.7K

Award Date

May 8, 2026

Awardee

Awardee UEI

XAL4MN6TMAN3

Awardee CAGE Code

0YGR6

Awardee Address

Minneapolis, MN 55402, UNITED STATES

Line Item Number

0001

Original Solicitation

Notice ID: fdd9e3b485b7463c863db6c1d0e2ba7f

Posted Date: May 12, 2026

Original Response Deadline: Not specified

Contacts

Contracting Officer

Primary Contact

Documents

No documents available.

Lifecycle

  1. 3
    Version 3Award NoticeArchivedCurrent

    Roof Replacement - A/E Construction Support Services

    Notice fdd9e3b485b7463c863db6c1d0e2ba7f on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

47PE5426P0002

Archive Date

May 23, 2026

Office Address