GovChime
Notice ID: e885df0b987449dfba3f1bc6c0c2e624Presolicitation

Hilfiker Wall Repairs Project, Sault Ste. Marie, MI

Archived on June 2, 2024. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:30 PM UTC−04:00
Posted
May 3, 2024
Notice type
Presolicitation
Set-aside
Small Business Set Aside - Total
NAICS
236220: Commercial and Institutional Building Construction
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R5 ACQUISITION MANAGEMENT DIVISION
Place of performance
Sault Sainte Marie, 49783
Last updated
Sep 25, 2026

Identifiers

Solicitation number
47PF0024R0042
Notice ID
e885df0b987449dfba3f1bc6c0c2e624

Description

The Hilfiker mechanically stabilized earth retaining wall at the Land Port of Entry in Sault Sainte Marie, MI, has distress in the form of bulging welded wire baskets, vertical and horizontal displacement of the concrete on top of the wall, and an outward lean of the walls has been noted in the Hilfiker wall system for several years. This project will address the bulging wire baskets and outward lean of the wall as well as correct poor drainage that has contributed to the wall’s movement. The project will construct a new earth retention soil nail wall and re-slope the concrete parking area above the Hilfiker wall, fortifying the wall and protecting it from continued corrosion. The construction contractor will be required to provide an Environmental Product Declaration (EPD) for its proposed low embodied carbon concrete (including cement) & steel (rebar) that meets the Global Warming Potential (GWP) limits. See following link to Inflation Reduction Act Pilot Program: Interim IRA Low Embodied Carbon Materials Requirements and Interim IRA LEC Material Requirements Fact Sheet. https://www.gsa.gov/system/files/Interim%20IRA%20LEC%20Material%20Requirements%20-%20used%20in%20Pilot%20May%202023%2005162023.pdf The Inflation Reduction Act of 2022 (IRA) In addition to the construction opportunity reflected herein, GSA is seeking suppliers and manufacturers that are interested in supplying low embodied carbon asphalt, concrete (and cement), glass and steel materials for the project. Suppliers and manufacturers of materials meeting GSA’s Inflation Reduction Act Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements may submit an Expression of Interest to the contact below no later than <>. Expressions of Interest should indicate materials available and global warming potential values reflected in materials’ environmental product declarations. Submission of an expression of interest grants GSA your permission to publish your firm’s contact information and offerings for use by potential offerors on GSA construction requirements. Supplier and manufacturer contact information will be published in an informational amendment issued by GSA and, potentially, in other fora. By participating in the competition, offerors consent to unrestricted GSA use of supplier names and the GWP values associated with supplier materials. Such information may be disclosed publicly or used to inform other low embodied carbon procurement activities. Technical solutions, supplier pricing, and supplier-offeror terms and conditions will not be shared. Any objection shall be transmitted to the Contracting Officer by the due date for offers and shall adhere to 41 C.F.R. § 105-60.601. Market research resources for identifying qualifying materials may include, but are not limited to, ASTM International’s EPD Page, Building Transparency’s Embodied Carbon in Construction Calculator (EC3), ICC Evaluation Service’s EPD Directory, EPD International AB’s EPD Library, the National Asphalt Paving Association’s Emerald Eco-Label EPD Tool, the National Ready Mixed Concrete Association’s Concrete EPDs page, National Science Foundation's Search for EPDs tool, and Underwriters’ Laboratories SPOT product catalog. Note: The information provided herein is for informational purposes only and does not indicate or imply Federal endorsement of any organization, business, material or product. The Federal Government makes no representation or warranty concerning the quality, performance, availability or suitability of any organization, business, material or product.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

No documents available.

Lifecycle

Solicitation:47PF0024R0042
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 2×
    Pre-SolicitationCurrentMay 3, 2024

    Hilfiker Wall Repairs Project, Sault Ste. Marie, MI

    Notice e885df0b987449dfba3f1bc6c0c2e624 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

47PF0024R0042

Archive Date

Jun 2, 2024

Office Address

CHICAGO, IL, 60604