GovChime
Notice ID: c45f1d8f42981b23b078bf737fed2eabPresolicitation

FY19 Fire Protection Survey- California

Archived on May 31, 2019. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM UTC−08:00
Posted
May 15, 2019
Notice type
Presolicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R9 GOLDEN GATE FIELD OFFICE
Place of performance
Various Federal Buildings/ US Borders Stations in Southern California locations 11000 Wilshire Blvd Los Angeles,CA 1260 S. Sepulved, Los Angeles, CA 1699 Carr RD Calexico Imperial, CA 23 Hefferna, Calexico Imperial, CA , Los Angeles, CA, 90024
PSC
12: FIRE CONTROL EQPT.
Last updated
Jan 23, 2026

Identifiers

Solicitation number
47PK0219Q0002
Notice ID
c45f1d8f42981b23b078bf737fed2eab

Description

Obtain the services of a registered fire protection engineer to conduct a fire protection survey for each of the GSA Facilities listed in Attachment (2), Southern CA. All areas of the facility shall be surveyed, including all building services (mechanical, electrical and storage spaces), and all common spaces accessible to building tenants. The purpose of the survey is to verify compliance with the latest NFPA (including the NFPA requirements to maintain and test fire protection systems) and International Building Codes and document non-compliant items as well as exemplary fire protection systems maintenance and testing practices. The survey shall include a review of the Occupant Emergency Plan. The report shall address all findings during the survey including life safety code violations, testing results, review of the findings from the last fire protection survey, review of the recent (yearly, quarterly and monthly) fire maintenance and test reports generated by the building maintenance staff or their contractor.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

Select documents to download

Showing 8 of 8 items

Document
Source
Agency
Posted Date
File Size
Actions
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-
GSA_Fire_Protection_Checklist_Template_Attachment_4.xlsm
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-
PresolicitationPUBLIC BUILDINGS SERVICEMay 15, 2019-

Lifecycle

Solicitation:47PK0219Q0002
  1. Pre-Solicitation

Formal solicitation typically follows within 30–60 days. (estimate)

  1. 3×
    Pre-SolicitationCurrentMay 2, 2019

    FY19 Fire Protection Survey- California

    Notice c45f1d8f42981b23b078bf737fed2eab on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

47PK0219Q0002

Archive Date

May 31, 2019

Office Address

SAN FRANCISCO, CA, 94102