Notice ID: 689c3724046145fda9206d4b57e95613Award NoticeAwarded

Eastern Multiple Award Task Order Contract (MATOC) Replacement

Awarded on September 26, 2022. Full description on SAM.gov.

Awarded tounder 47PL0122D0056-0062 (source: SAM.gov award notice)• $70.0M

Overview

Posted
September 23, 2022
Notice type
Award Notice
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
236220: Commercial and Institutional Building Construction
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R10 CONSTRUCTION ACQUISITIONS BRANCH
Last updated
Dec 4, 2025
Award date
Sep 26, 2022
Award amount (SAM.gov award notice)
$70.0M

Identifiers

Solicitation number
47PL0122R0035
Notice ID
689c3724046145fda9206d4b57e95613
Award number (PIID)
47PL0122D0056-0062

Description

Amendment 0007: Amend 0007 SF30 47PL0122R0035.pdf Provide the following documents in response to Contractor RFI's: Amend 0007 Contractor RFI's and Responses 6.pdf Amend 0007 Attachment F Seed Project Price and Services Schedule Rev2.xlxs NO OTHER AMENDMENTS WILL BE ISSUED. PROPOSALS REMAIN DUE 8/3/2022 1:00PM PST. Updating attachment: Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlxs Note regarding period or performance on "Evaluated Price Info Sheet" corrected for appropriate duration. (100-160). Amendment 0006: Amend 0006 SF30 47PL0122R0035.pdf Provide the following documents in response to Contractor RFI's: Amend 0006 Contractor RFI's and Responses 5.pdf Amend 0006 Attachment F Seed Project Price and Services Schedule Rev1.xlxs Amendment 0005: Amend 0005 SF30 47PL0122R0035.pdf Extending the due date for proposal to 3 August 2022 at 1:00PM PST, Provide the following documents in response to Contractor RFI's: Amend 0005 Contractor RFI's and Responses 4.pdf Amendment 0004: Amend 0004 SF30 47PL0122R0035.pdf Provide the following documents in response to Contractor RFI's: Amend 0004 Contractor RFI's and Responses 3.pdf Amend 0004 Site Visit Sign In Sheet 2 Redacted.pdf Please sign and return ALL AMENDMENTS with proposal submission. Amendment 0003: Amend 0003 SF30 47PL0122R0035.pdf Extending the due date for proposal to 1 August 2022 at 1:00PM PST, Schedule a second site visit for the Seed Project for 20 July 2022 at 10:30AM PST Provide the following documents in response to Contractor RFI's: Amend 0003 Contractor RFI's and Responses.pdf 2019 Asbestos Reinspection Survey Report Thomas S. Foley USCH.pdf Please sign and return ALL AMENDMENTS with proposal submission. Amendment 0002: Amend 0002 SF30 47PL0122R0035.pdf Providing the following documents: Amend 0002 Contractor RFI's & Responses.pdf, Amend 0002 Exhibit 6 Past Performance Questionnaire Rev1.doc; Amend 0002 R10 EMATOC SOW 04222022.pdf. Amend 0002 Site Visit Sign in Sheet.pdf Please sign and return ALL AMENDMENTS with proposal submission. Amendment 0001: Amend 0001 SF30 47PL0122R0035.pdf Updating inconsistencies between documents regarding Site Visit, add directions for site visit attendees regarding Spokane County's Covid-19 Level HIGH rating, and providing a correct EMATOC SF1442 document. See revised Attachments: Amend 0001 RFP EMATOC 47PL0122R0035.pdf, Amend 0001 Attachment D - TORFP Seed Project.pdf; Amend 0001 SF 1442 47PL0122R0035.pdf. **In accordance with CDC requirements for a County Level that has been categorized as HIGH, which Spokane County was as of 30 June 2022 all site visit attendees must bring and properly wear a mask while indoors.** Description of Services The GSA Northwest/Arctic Region (R10) has a recurring requirement for construction services. In order to support these projects R10 will award (1) Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction projects in federally owned and leased facilities in the area of responsibility (AOR) covering a geographic range of Eastern Washington, Eastern Oregon, and Idaho. This IDIQ supports the following project delivery methods; 1) non-complex construction efforts to be constructed based on Government furnished scope of work. 2) design-bid-build, using Government furnished design documents. 3) design/build, based on the Government furnishing a statement of objectives to be used as the basis of design and which the selected contractor designs and constructs the effort. 4) bridging design/build, using Government furnished design documents developed to no more than 30% design documents. The construction scope Work includes, but is not limited to, tenant improvement, minor repair and alteration of building envelope, conveyance systems, roofing, mechanical and electrical systems, plumbing, and exterior improvements. Construction projects will be completed in a safe, efficient, cost effective manner that is based upon prudent use of taxpayer funds. Contractor firms awarded a Task Order Contract shall deliver the completed construction project, for its intended purpose and within the established project delivery schedule. Prime contractors are responsible for project management, site superintendence, labor, subcontractor management, quality control of installation and end use functionality for all work awarded. GSA anticipates awarding 6 separate contracts as a result of the solicitation. Total contract length, and ordering period, will be for five (5) years. Awarded contractors are expected to compete by participation in task order solicitations. Task Order solicitations will be issued by GSA offices assigned to the Acquisition Division within Region 10. Contract Value The Contract Maximum Value (CMV) for this contract vehicle is $70,000,000.00. Meaning the cumulative total for all task orders awarded to all contractors over the life of the contract (5 Years) shall not exceed $70 Million. The anticipated ordering limits are between $25,000.00 and $5,000,000.00. The typical task order is expected to be between $50,000.00 and $250,000.00. Task Order solicitations will adhere to the competitive procedures outlined in FAR 16.5. Access to Controlled Unclassified Information (CUI): Please see Exhibit 2 and 3 for instructions to obtain access to Seed Project attachments that contain CUI. Provide signed acknowledgement and the GACA email address and created for your firm to mackenzie.dunn@gsa.gov, Cc: heather.bowden@gsa.gov. NAICS Code and Small Business Standard The applicable NAICS code is 236220, Commercial and Institutional Building Construction, and the small business size standard is $39.5 million. Pre-Proposal Conference for Prime Contractors A pre-proposal site walk for the Seed Project will be held onsite on Wednesday, July 6, 2022. See attached files for solicitation details.

Full description on SAM.gov

Award Overview

Award Number

47PL0122D0056-0062

Award Amount (SAM.gov award notice)

$70.0M

Award Date

Sep 26, 2022

Awardee

Original Solicitation

Notice ID: 689c3724046145fda9206d4b57e95613

Posted Date: Sep 23, 2022

Original Response Deadline: Not specified

Contract Details

Contract data not yet available

Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:47PL0122R0035
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 3×
    Pre-SolicitationMay 2, 2022

    Eastern Multiple Award Task Order Contract (MATOC) Replacement

    Notice bea228ce57424a1896b94f74a97703c2 on SAM.gov

  2. 9×
    SolicitationJun 24, 2022

    Eastern Multiple Award Task Order Contract (MATOC) Replacement

    Notice b88f6c278ee84ef9886759fb1f0953ba on SAM.gov

  3. AwardedCurrentSep 23, 2022

    Eastern Multiple Award Task Order Contract (MATOC) Replacement

    Notice 689c3724046145fda9206d4b57e95613 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

47PL0122R0035

Archive Date

Oct 11, 2022

Office Address