GovChime
Notice ID: 2252b10505a344308611329e43ce2666Solicitation

Rainwater Harvest Systems Technical Compliance Study

Archived on August 21, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
July 26, 2021
Notice type
Solicitation
NAICS
221310: Water Supply and Irrigation Systems
Agency
General Services AdministrationPUBLIC BUILDINGS SERVICE

Notice details

Office
PBS R11 BUILDING SERVICES DIVISION CENTER 2
Place of performance
Washington, DC
Last updated
Dec 4, 2025

Identifiers

Solicitation number
47PM1121Q0023
Notice ID
2252b10505a344308611329e43ce2666

Description

The General Services Administration (GSA) National Capital Region (NCR) Public Buildings Service (PBS) Office of Facilities Management (OFM), Facilities Management and Services Programs Division (FMSP), is pursuing environmental technical study work to: 1. assess the performance status of the regions various rainwater harvesting systems so facility managers may make needed repairs or perform needed maintenance, 2. document lessons learned and best practices to share with future project teams considering or planning on designing and installing a new system, 3. understand industry trends around the design and sale of off-the-shelf/stock systems to share with future project teams considering or planning on designing and installing a new system, and 4. learn if and where the best bang-for-the-buck retrofit opportunities exist that could yield additional potable water savings within a favorable payback period. NCRs portfolio includes 16 owned and operated rainwater harvesting systems located at ten different facilities or campuses. Five more systems were installed at facilities no longer owned by or not managed by GSA. There are only two rainwater harvest systems residing at two different campuses in MD. The rest are located in facilities in DC with six in SE, five in SW and eight in NW. The system at GSAs headquarters in NW DC is the most sophisticated and complicated in its design and operation and is the only system which harvests greywater in addition to rainwater. Of the remaining systems, two systems harvest groundwater while the rest of the systems exclusively harvest rainwater. Water is reused for a variety of purposes including cooling tower make-up water, toilet flushing and irrigation although NCR attempts to plant landscapes that are drought tolerant so they dont need a lot of watering. These systems were largely designed and installed over the last decade to meet stormwater regulations and/or earn LEED points but a few were installed as part of Energy Savings Performance Contracts or to take advantage of excessive amounts of groundwater. The ESPC systems are likely well understood and well maintained by the responsible operations and maintenance contractors since they need the systems to perform well to recoup their costs. How well other systems are understood and maintained will be a hit or miss. And this can be exacerbated if there has been turnover in the facility management staff or in the O&M contractor teams. In these cases, historical knowledge back to the date of operational launch may not be able to be as fully mined as would be helpful. The lack of standards and codes guiding this industry until more recently meant that these systems consisted of highly customized designs with components from a variety of suppliers. This has resulted in systems that were expensive to design, install and maintain and also posed challenges in identifying which component company to work with to troubleshoot and resolve issues. Some treatment systems have also included approaches that were much more expensive to install and maintain that other ones that would do the same job. Some systems have redundant pumps. And certain types of tanks have had leaks that were difficult to remedy likely due to installation issues. See Amendment 0001 See Amendment 0002 - REVISED evaluation factor sheet

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Documents

No documents available.

Lifecycle

Solicitation:47PM1121Q0023
  1. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 3×
    SolicitationCurrentJul 9, 2021

    Rainwater Harvest Systems Technical Compliance Study

    Notice 2252b10505a344308611329e43ce2666 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

47PM1121Q0023

Archive Date

Aug 21, 2021

Office Address

WASHINGTON, DC, 20405