GovChime
Notice ID: b24877c5f1d65431813cfdfaf50f7042Combined Synopsis/Solicitation

Mine Academy Fence Relocation

Archived on September 18, 2013. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
6:00 PM UTC+02:00
Posted
August 29, 2013
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
238190: Other Foundation, Structure, and Building Exterior Contractors

Notice details

Place of performance
Mine Safety and Health Administration Mine Academy 1301 Airport Road, Beaver, 25813
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 5, 2025

Identifiers

Solicitation number
483-13MR-7239(A)
Notice ID
b24877c5f1d65431813cfdfaf50f7042

Description

PLEASE NOTE THE SITE VISIT FOR THIS REQUIREMENT HAS BEEN CHANGED TO: WEDNESDAY, AUGUST 28, 2013 @2:00PM. THE POC FOR THE SITE VISIT IS: GARY HUMPHREY 304.256.3481

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Tracey L. Cross
Contract Specialist

Documents

No documents available.

Lifecycle

Solicitation:483-13MR-7239(A)
  1. Combined Synopsis
  1. 6×
    Combined SynopsisCurrentAug 21, 2013

    Mine Academy Fence Relocation

    Notice b24877c5f1d65431813cfdfaf50f7042 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
This contract is for the removal of the existing Duro-Last roofing system. The Contractor shall supply and install a new, complete membrane roofing system, providing all necessary components and materials to ensure a watertight, warranted system. The new roofing system to be warranted (20-year minimum), installed with quality craftsmanship, and free of leaks at the time of acceptance by the Government.
-Solicitation08/03/2026
Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to completely remove and replace the roof systems on five (5) pier house structures and the Operations Building at the London Locks and Dam facility. This project requires the installation of new plywood sheathing, 30 lb felt underlayment, and new asphalt shingle system to restore watertight integrity, ensure long-term structural reliability, extend the service life of the facilities, and reduce future maintenance needs. The Operations Building and Pier House 1 roofs serve as the base requirement for this contract, with the remaining 4 pier houses being the Option 1 requirement.
-Solicitation04/28/2026
Contractor is required to furnish all labor, materials, equipment, supervision, and incidentals necessary to completely remove and replace the roof systems on five (5) pier house structures (identified as Pier Houses 2, 3, 4, 6, and 7) at the Winfield Locks and Dam facility. This project requires the installation of a new structural deck and a completely new roofing system to restore watertight integrity, ensure long-term structural reliability, extend the service life of the facilities, and reduce future maintenance needs.
-Solicitation04/20/2026
11/09/2026 UPDATE - ADDING RFI RESPONSES. SEE ATTACHED DOCUMENT ______________________________________________________________________________________________________ This posting is for Tinker AFB - MAC BOA Holders ONLY. After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor. After receipt of your RSVP by October 20, 2026 COB CST and EAL if required, an Initial Site Visit is set for October 22, 2026 @ 10am CST–– B1134. RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP. You must attend the Initial Site Visit for the project to be considered eligible to propose. This posting is for Tinker AFB - MAC BOA Holders ONLY.
-Solicitation11/16/2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12445127Q0004 is issued as a Request for Quotation (RFQ) for: There are three (3) garage bay doors at Peaks and four (4) garage bay doors at MLWC for full replacement. Some bay doors shall receive 24 in x 12in clear, insulated, shatter-resistant glass windows. Eight (8) garage bay doors at Peaks will receive a complete general service and lubrication, and three (3) garage bay doors at Peaks need parts replaced or adjusted prior to complete general service and lubrication. The 11 bay doors receiving general service and lubrication will also receive new flexible seal strips. This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238190 Other Foundation, Structure, and Building Exterior Contractors. The small business size standard is $19 This acquisition is a Total Small Business Set- Aside. All responsible sources may submit a quotation which will be considered by the agency.
-Combined Synopsis11/23/2026

Additional Details

Solicitation Number

483-13MR-7239(A)

Archive Date

Sep 18, 2013