MKS Valves, Capacitance Manometers, and Pressure Controllers
Archived on October 5, 2026. Combined Synopsis/Solicitation posted by ENERGY, DEPARTMENT OF on September 28, 2026. Solicitation 499813.
NAICS 334513 (Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables). Place of performance: Oak Ridge, Tennessee. Original response deadline: . Full description on SAM.gov.
Description
UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL). The Nonproliferation Program Office at Oak Ridge National Laboratory is in need of MKS Valves, Capacitance Manometers, and Pressure Controllers or a compatible equivalent. Please reference Attachment C- RFQ499813 Bill of Materials for additional details.
- RFQ499813
- Attachment A- Terms Conditions Purchase Order Commercial Products Services dated 01.13.2026
- Attachment B- Prime Flowdown Clauses dated 07.06.2026
- Attachment C- RFQ499813 Bill of Materials
- Attachment D- Reps and Certs Abbreviated dated 03.09.2026
Overview
Award Overview
Possible prior contracts
Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).
Contacts
Contracting Officer
Primary Contact
Documents
Showing 5 of 5 items
Document | Source | Agency | Posted Date | File Size | Actions | |
|---|---|---|---|---|---|---|
| Combined Synopsis/Solicitation | ENERGY, DEPARTMENT OF | Sep 28, 2026 | 397.02 KB | |||
| Combined Synopsis/Solicitation | ENERGY, DEPARTMENT OF | Sep 28, 2026 | 976.26 KB | |||
| Combined Synopsis/Solicitation | ENERGY, DEPARTMENT OF | Sep 28, 2026 | 256.17 KB | |||
| Combined Synopsis/Solicitation | ENERGY, DEPARTMENT OF | Sep 28, 2026 | 298.26 KB | |||
| Combined Synopsis/Solicitation | ENERGY, DEPARTMENT OF | Sep 28, 2026 | 381.62 KB |
Lifecycle
499813- Combined Synopsis
- Combined SynopsisCurrentSep 28, 2026
MKS Valves, Capacitance Manometers, and Pressure Controllers
Similar Opportunities
Title | Phase | Agency | NAICS | Set Aside | Posted | Deadline | Location |
|---|---|---|---|---|---|---|---|
INTRODUCTION Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under a prime contract with the U.S. Department of Energy (DOE), is seeking to subcontract for work aligned with its mission objectives. The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab’s accelerator complex that will support the world’s most intense high-energy neutrino beam for the international Deep Underground Neutrino Experiment at LBNF, as well as a broad physics program for decades to come. In support of PIP-II, FNAL requires the procurement, assembly, testing, documentation, and delivery of SSRs and LB650 Vacuum Gauge and Readout and associated components in accordance with the requirements specified in Exhibit C – PIP-II SSRs and LB650 Vacuum Gauge and Readout Procurement Specification. | Solicitation | 334513 | No Set-Aside | 09/29/2026 | 10/23/2026 | - | |
Oak Ridge National Laboratory (ORNL) is a US Department of Energy (DOE) science and energy laboratory, conducting basic and applied research to deliver transformative solutions to compelling problems in energy and security. The Company is pleased to invite your firm, herein referred to as “Offeror,” to submit a proposal in support of the subject effort, as outlined in the attached Statement of Work or Specification and/or Technical Direction attached, Morphologi 4 ID - Rapid, Automated Particle Characterization. FAR 52.211-6, Brand Name or Equal applies. | Combined Synopsis | 334516 | No Set-Aside | 10/14/2026 | 10/21/2026 | Oak Ridge, TN | |
The Physics Division at Oak Ridge National Laboratory is in need of NOVO DR Inc., Discovery III System 22WNH - Bright XL, and accessories. Brand Name or Equal shall apply. Please see Attachment C_ Bill of Materials for RFQSSPR50891 for specifications and details. Attachments: Attachment A_Terms-Conditions-Purchase-Order-Commercial-Products-Services-BSD-CS-2154-09.30.2026 Attachment B_Prime-Flowdown-Clauses-BSD-CS-2258-09.30.2026 Attachment C_Bill of Materials for RFQSSPR508961 Attachment D_Reps-and-Certs-Abbreviated-2026.03.09 Attachment E_ Commercial Computer Software Request for Quotation-RFQSSPR508961 | Combined Synopsis | 334517 | No Set-Aside | 10/14/2026 | 10/23/2026 | Oak Ridge, TN | |
The Chemical Sciences Division at Oak Ridge National Laboratory is in need of GEMINI.HP.L.ASY: interferometer, Gemini-Felix, and PDM module. Brand Name or Equal shall apply. Please see Attachment C_ Bill of Materials for RFQSSPR507952 for specifications and details. Attachments: Attachment A_ Terms & Conditions- Purchase Order Commercial Product & Services Under the SAT (BSD-CS-2154, dated 09/30/2026) Attachment B_ Prime Flowdown Clauses- (BSD-CS-2258, dated 09/30/2026) Attachment C_Bill of Materials for RFQSSPR507952 Attachment D_Reps-and-Certs-Abbreviated-2026.03.09 Attachment E_ Commercial Computer Software Request for Quotation- RFQSSPR507952 | Combined Synopsis | 334516 | No Set-Aside | 10/14/2026 | 10/22/2026 | Oak Ridge, TN | |
UT-Battelle, LLC is the management and operating contractor of Oak Ridge National Laboratory (ORNL). The Manufacturing Science Division at ORNL is in need of a Piezo-Multicomponent Dynamometer or equivalent. Please reference Attachment C- RFQ487805 Bill of Materials for product specifications. Attachments: - RFQ487805 - Attachment A- Terms and Conditions Purchase Order Commercial Products and Services - Attachment B- Prime Flowdown Clauses - Attachment C- RFQ487805 Bill of Materials - Attachment D- Reps and Certs Abbreviated | Combined Synopsis | 334519 | No Set-Aside | 10/09/2026 | 10/16/2026 | Oak Ridge, TN |
Additional Details
Solicitation Number
499813
Archive Date
Oct 5, 2026
Office Address
Oak Ridge, TN, 37831