Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM PST
- Posted
- November 3, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238910: Site Preparation Contractors
- Agency
- Department of TransportationFEDERAL HIGHWAY ADMINISTRATION
Notice details
- Office
- 690567 WESTERN FEDERAL LANDS DIV
- Place of performance
- Oregon
- PSC
- F015: NATURAL RESOURCES/CONSERVATION- WELL DRILLING/EXPLORATORY
- Last updated
- Nov 3, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 69056727Q000006
- Notice ID
- 4bc23f7c872e46928b96c4c9e17eed14
Description
The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA) is preparing a geotechnical subsurface exploration program for the Winchester Creek Bridge in Douglas County, Oregon. The primary goal is to assess the subsurface conditions for designing a replacement bridge structure. Agency partners include the U.S. Forest Service.
The project is located at latitude N 43.6751° and longitude W 124.1788° in the northeast ¼ of the southwest ¼ of Section 7, Township 22 South, Range 12 West of the Bureau of Land Management (BLM) Public Land Survey System (PLSS).
See attachments for full requirements.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (7)
- Download
Attachment 005 FLH Rock Identification Guidelines_2025.pdf
9.6 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 004 FLH Soil Identification Guidelines_2025.pdf
9.2 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 001 Boring Location Map.pdf
2.8 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
RFQ 69056727Q000006.pdf
1.1 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 006 Wage Determination.pdf
133 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 003 Geotechnical Activities Categorical Exclusions.pdf
89 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
Attachment 002 Table of Borings.pdf
46 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationCurrent
Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
Similar Opportunities
Additional Details
Solicitation Number
69056727Q000006
Archive Date
Dec 2, 2026
Office Address
VANCOUVER, WA, 98661