Design-Build Services – STM Security Fencing - North Boundary
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM MST
- Posted
- November 10, 2026
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- NAICS
- 238990: All Other Specialty Trade Contractors
- Agency
- Department of Energy
Notice details
- Office
- ALLIANCE FOR ENERGY INNOVATION, LLC - DOE CONTRACTOR
- Place of performance
- Golden, Colorado, 80401
- PSC
- 5660: FENCING, FENCES, GATES AND COMPONENTS
- Last updated
- Nov 10, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- RFP-2027-27107
- Notice ID
- 501720d78c2a4aafb455b996db0cf2dd
Description
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement.
Project Overview
The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations.
Design‑Build Requirements
The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals.
Construction Requirements
All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits.
Management, Coordination, and Quality Assurance
The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
Award Overview
No prior contract identified
No matching prior contract was found within an 18-month window using the same agency, NAICS, place-of-performance state, and PSC. This may be a new requirement, or the prior award uses a different classification.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (5)
- Download
RFP - Amendment 3 - Drone Video and Safety Requirements.pdf
188 KBAdded in Solicitation version 5Posted - Download
RFP - Amendment 2 - Drone Video Extension.pdf
191 KBAdded in Solicitation version 4Posted - Download
AMENDMENT NO. 1 - RFP-2027-27107.pdf
187 KBAdded in Solicitation version 3Posted - Download
0 - RFP-2027-27107 - STM Security Fencing- North Boundary - LPTA.pdf
304 KBAdded in Solicitation version 2Posted - Download
SAM Post Narrative - STM North Boundary Fencing.pdf
158 KBAdded in Solicitation version 2Posted
Links (2)
- RFP Documentsapp.box.comPosted
- NOI Submission Portalapp.smartsheetgov.comPosted
Lifecycle
- 1Version 1Solicitation
Design-Build Services – STM Security Fencing - North Boundary
- 2Version 2Solicitation
Design-Build Services – STM Security Fencing - North Boundary
- 3Version 3Solicitation
Design-Build Services – STM Security Fencing - North Boundary
- 4Version 4Solicitation
Design-Build Services – STM Security Fencing - North Boundary
- 5Version 5SolicitationCurrent
Design-Build Services – STM Security Fencing - North Boundary
Similar Opportunities
Title | Phase | Deadline |
|---|---|---|
Additional Details
Solicitation Number
RFP-2027-27107
Archive Date
Nov 26, 2026
Office Address
Golden, CO, 80402