GovChime
Notice ID: b11ea92f2a524c319d23e1311c12a931Combined Synopsis/Solicitation

Engine REM Install

Archived on April 7, 2026. Original response deadline: . Full description on SAM.gov.

Description

Combined Synopsis/Solicitation for Commercial Services

Solicitation Number: 52000PR260003600 (Request For Quote - RFQ)

This is a combined synopsis/solicitation for commercial services, prepared in accordance with the format in subpart 12.6 of the FAR and as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued. This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-87, effective, 7 March 2016. It is anticipated that a competitive price purchase order shall be awarded as a result of this synopsis/solicitation. All responsible sources may submit a quotation, which if timely received, shall be considered by this agency.

Agency:  U.S. Coast Guard, Surface Forces Logistics Center (SFLC)

Contract Type:  Firm Fixed Price Purchase Order

Set-Aside Information:  This solicitation is total small business

Evaluation Criteria: Quotes will be evaluated based on the following factors:

  • Technical Capability: The offeror’s ability to perform the services described in the Performance Work Statement.
  • Past Performance: The offeror’s record of relevant and recent past performance.
  • Price: Fair and reasonable pricing.

Submission of Quotes: Quotes must be submitted via email to Joshua.C.Richardson2@uscg.mil. The subject line of the email should include the solicitation number: 52000PR260023600.

Point of contact for questions

Contracting

  • Contracting Officer: Joshua Richardson
  • Email: Joshua.C.Richardson2@uscg.mil

Technical

  • Technical expert: Montrese Clay
  • Email: Montrese.J.Clay@uscg.mil

Performance Work Statement (PWS) / Statement of Work (SOW)

This Statement of Work is for the U.S. Coast Guard Station Noyo River, 19325 South Harbor Drive, Fort Bragg, CA 95437. (707) 964-6612.

SCOPE

Contractor shall provide general labor, equipment, and facilities to haul out US Coast Guard 47 FT Motor Life Boat 47271 to stable blocking or cradle, remove the port engine and reinstall a repaired or new port engine.

COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

Upon acceptance, the contractor shall commence work within 5 days and work diligently to complete the entire project and have vessel ready for use by 5 working days from scheduled haul out after contract award.

INFORMATION AND REQUIREMENTS

Physical Characteristics of Vessel

  • Hull Length 47’ 11”
  • Length Overall 48’ 11” (w/ rub rails)
  • Hull Beam 14’ 0” Beam Overall 15’ 0”
  • Highest Points: Fixed 18’ 6”, Unfixed 28’ 4”
  • Hoisting condition 40,000 LBS (boat, full fuel, outfit; no crew or cargo)

Drydocking

  • Haul vessel with 2 straps
  • Securely block vessel in accordance with military specifications
  • With 2 straps lower vessel in water (Coast Guard representative shall ensure watertight integrity of vessel and test all propulsion machinery before launch).
  • Launch vessel with 2 straps.

Engine Remove/Install

  • Completed IAW MPC’s and Manufacturer’s Instructions.

CONDITIONS AFFECTING THE WORK

If additional work items are found after hauling the 47’ MLB, Contractor shall report findings immediately before work continues via CFR along with commercial estimate of necessary work to be completed outside the original SOW.

AFTER AWARD OF THE CONTRACT

The contractor must immediately notify the contracting officer’s representative of his intended start date. The work shall be done in accordance with the specification.

ORAL MODIFICATION

No oral statement of any person other than the Contracting Officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

WORKMANSHIP

All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer Representative (COR).

PERMITS

The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state, and local laws.

CLEAN UP

All HAZWASTE, trash and debris shall be removed from the site and or recycled as applicable. The job site shall be left in a clean and neat manner.

UPON COMPLETION OF WORK

Contact the COR to arrange for inspection/acceptance of work.

Place of Performance

Services shall be performed at:

U.S. Coast Guard Station Noyo River

19325 South Harbor Drive

Fort Bragg, CA 95437

Period of Performance

Upon acceptance, the contractor shall commence work within 5 days and work diligently to complete the entire project and have vessel ready for use by 5 working days from scheduled haul out after contract award. Work shall be performed Monday through Friday between the hours of 7:00 AM to 1:00 PM, unless otherwise coordinated with the Point of Contact.

Invoicing

Invoicing in IPP:** It is now a requirement that all invoicing for Purchase Orders will now be entered and processed through https://www.ipp.gov.

FAR Clauses

This order is subject to but is not limited to the following Federal Acquisition Regulations:

  • 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.
  • 52.204-26 Covered Telecommunications Equipment or Services-Representation.
  • 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services.
  • 52.212-3 Offeror Representations and Certifications—Commercial Products and Commercial Services.
  • 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services.
  • 52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services.
  • 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities.
  • 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

Service-Specific Clauses (Added for Services):**

  • 52.222-41 Service Contract Labor Standards (formerly Service Contract Act). (Required for service contracts over $2,500).
  • 52.222-42 Statement of Equivalent Rates for Federal Hires.
  • 52.222-43 Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (Multiple Year and Option Contracts).
  • 52.237-2 Protection of Government Buildings, Equipment, and Vegetation.

Full description on SAM.gov

Overview

Agency:
Department of Homeland SecurityUS COAST GUARD
Office:SFLC PROCUREMENT BRANCH 3(00040)
Posted:March 19, 2026
NAICS:336611: Ship Building and Repairing
Last Updated:Aug 21, 2026
PSC:J020: MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT
Set-Aside:Total Small Business Set-Aside (FAR 19.5)
Type:Combined Synopsis/Solicitation
Place of Performance:Fort Bragg, California, 95437

Award Overview

Possible prior contracts

Sign in to see possible prior contracts for this requirement (matched by agency, NAICS and place of performance; not confirmed).

Contacts

Contracting Officer

Primary Contact

Documents

Showing 1 of 1 items

Document
Source
Agency
Posted Date
File Size
Actions
Combined Synopsis/SolicitationUS COAST GUARDMar 19, 202631.04 KB

Lifecycle

Solicitation:52000PR260023600
  1. Combined Synopsis
  1. 2×
    Combined SynopsisCurrentMar 12, 2026

    Engine REM Install

    Notice b11ea92f2a524c319d23e1311c12a931 on SAM.gov

Similar Opportunities

Title
Phase
Agency
NAICS
Set Aside
Posted
Deadline
Location

Additional Details

Solicitation Number

52000PR260023600

Archive Date

Apr 7, 2026

Office Address

BALTIMORE, MD, 21226